NIT / document publication
NIT issued and tender accessible on AP e-Procurement Portal from 14/05/2026.
- Tender No. APBIL/ABP/2026/001, Dated 14/05/2026.
- Portal: www.apeprocurement.gov.in.
Loading…
Development (Creation, Upgradation and Operations & Maintenance) of Middle mile Network of BharatNet on DBOM Model and Operations and Maintenance of APSFL Phase-I NetworkF
Andhra Pradesh Bharatnet Infrastructure Limited · Andhra Pradesh933440
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
14 May 2026
24 Sept 2026
₹10 Cr
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
NIT issued and tender accessible on AP e-Procurement Portal from 14/05/2026.
Pre-bid meeting held at 11:00 hrs on 26.05.2026 at APBIL office, Tadepalle.
Latest documented online bid submission deadline is 10.08.2026 by 15:00 hrs (Corrigendum 8).
Latest documented technical bid opening is 10.08.2026 at 16:00 hrs (same day as closing).
Bid validity is 180 days from the Tender opening date.
Development/completion is scheduled for 365 days from Appointed Date; O&M is for 10 years.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
No lump-sum estimated contract/project cost is stated; quantities and rates are bidder-quoted against SoR/price schedules.
Non-refundable tender fee Rs 29,500/- (Rs 25,000 + GST @ 18%), payable online; upload payment proof with technical bid.
EMD/Bid Security is INR 10 Cr.; preferably online; alternatively DD/Banker's cheque, Bank Guarantee or Insurance Surety Bond.
Successful bidder must furnish Performance Security equal to 10% of Advance Work Order value within 14 working days of APO; separate PBGs for Package A and Package B.
CAPEX paid against ring/GP commissioning milestones; O&M paid quarterly against SLAs; invoices certified by Independent Engineer with staged disbursement.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Single entity or Consortium (max 3 members incl. Lead); each member registered under Companies Act 1956/2013 or LLP Act 2008 with ≥3 years operations in India as on Bid Date.
Minimum Net Worth INR 140 Cr and Average Annual Turnover INR 470 Cr (Table B).
Corrigendum 4 relaxes look-back to last 5 years and lowers OFC/active-node thresholds versus original 7-year criteria.
Lead/sole bidder must submit MAF from 1–4 OEMs per passive and active component family, with TSEC/QF-103/Form-B as specified.
Bidder and consortium members must not be blacklisted/debarred by State Govt, MoC, APBIL or DoE pan-Ministry debarment as on bid date; DBN non-performers ineligible.
Max 3 members; Lead Member nominated by PoA; binding Joint Bidding Agreement (Annexure-XII); joint and several liability.
PPP-MII (DPIIT 19.07.2024 & DoT 21.10.2024) applies; Class-I preference; notified items from Class-I; Form-1 local content declaration required.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
DBOM for BharatNet middle-mile (Package A) plus O&M of APSFL Phase-I network (Package B), on behalf of Digital Bharat Nidhi / DoT via APBIL.
Build IP-MPLS ring topology for unconnected GPs/Blocks; upgrade Phase-I linear to ring; O&M existing + new BharatNet for 10 years; upgrade/integrate S-NOC DC/DR with APSFL NOC.
Operations & Maintenance of APSFL Phase-I infrastructure (PoPs and OFC) for the contract period under Package B SCC.
Primarily underground/overhead OFC as per existing local method; ADSS on electricity infrastructure if UG not feasible; alternate tech only with IE/APBIL approval.
Development Period milestones from Appointed Date: 10% GPs @120d, 30%@180d, 50%@240d, 75%@300d, 90%@330d; full scheduled completion 365th day.
PIA responsible for end-to-end unified network O&M/SLA; associated BoM gaps at no extra cost; battery replacement and change requests under controlled paid mechanisms (C4).
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Single-stage e-tender on AP e-Procurement Portal (www.apeprocurement.gov.in) with two electronic envelopes; techno-commercial and financial submitted simultaneously.
Technical e-envelope first; financial e-envelope opened only for techno-commercially responsive bidders.
Original bank instruments for EMD (BG/ISB) if not e-paid must reach The CEO, APBIL, Vijayawada within 5 days after bid submission end date (Corrigendum 5).
Documents under authorized signatory/digital signature; PoA notarized with banker attestation of specimen signatures; Integrity Pact applicable.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
Fixed pre-bid venue/time, extended query deadline to 26/05/2026 18:00, and published APBIL bank account for tender fee.
Last date for seeking clarifications moved from 26/05/2026 to 30/05/2026, 18:00 hrs.
Online bid submission/opening extended multiple times from original 12/06/2026 to final documented 10.08.2026 15:00 / 16:00.
Large amendment set: relaxed technical eligibility, corrected SoR quantities, allowed ISB for mobilization BG, NOC coordinates, deleted UBR and some O&M cost-shift clauses, updated O&M payment formula, batteries & change-request regime.
Aligned offline EMD submission to within 5 days after bid end; tender-fee checklist to online receipt; added OLTs to MAF actives; deleted Package B free-enhancement O&M clauses; deleted solar panel requirement; added battery SoR lines.
Extended bid to 29.07.2026 and issued revised Technical Specifications of UPS at Block (solar items deleted; Li-ion battery/digital interlock specs).
C7 to 05.08.2026; C8 to 10.08.2026 (submission 15:00 / opening 16:00).
After all available corrigenda PDFs: bid end 10.08.2026 15:00; open 10.08.2026 16:00; fee Rs 29,500 online to C1 bank; EMD INR 10 Cr; validity 180 days; PS 10%; technical eligibility per C4/C5; solar UPS panels deleted; Package B free-enhancement O&M clauses deleted.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
Original Section IV-A required original Bid Security offline within 5 days before bid end, while Section I-A allowed before or within 5 days after; Corrigendum 5 amends both toward within 5 days after.
Annexure-III offline/tech items still printed DD/Bankers cheque for tender fee, while DNIT/C1 require online NEFT/RTGS and C5 replaces checklist item with transaction receipt.
RFP Note-8 allowed last 10 years for experience conditions, while Corrigendum 4 rewrites Note-8 to last 5 years consistent with amended S.No.4 criteria.
Original SoR stated 4,344 IP-MPLS routers at GP; Corrigendum 4 amends to 2,172 (aligned with GP racks 2,172).
RFP Package B O&M clauses o/p required free O&M of APBIL/APSFL enhancements under existing O&M cost; Corrigendum 5 deletes n/o/p.
RFP body still shows 22/05/2026 in cl.17 while schedule table shows 26/05; C1 then C2 extended queries to 30/05/2026 18:00.
Latest PDF corrigendum sets bid end 10.08.2026, but the tender pack index lists a later Date corrigendum (no.10, published 10.08.2026) with no attached file.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask APBIL/portal admin to publish Corrigendum 10 text confirming whether 10.08.2026 still applies or was further extended.
Seek written confirmation that post-C5, O&M of new APSFL/APBIL enhancements during contract will be via paid change order / separate WO, not deemed included in quoted O&M.
Request sample acceptable certificate wording for Year-Kms and Year-Node-numbers under C4 (sums X1..X5) to avoid evaluation rejection.
Clarify whether affiliates/subsidiaries of an AP LSA ISP/TSP (not themselves licence holders) are barred, and treatment if licence is surrendered before bid date.
Confirm whether any OEM support proof is still required at bid stage for legacy BharatNet/APSFL kit O&M, after C4/C5 deleted the separate existing-infrastructure MAF note.
Seek risk allocation for RoW and discom pole permissions delays: time extensions, LD relief, or employer-risk events beyond force majeure list.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
Scheduled completion in 365 days from Appointed Date with weekly LD 0.5% then 0.7% of incomplete GP value, capped at 12% CAPEX; double LD if delay from subcontracted works.
GP network availability target ≥98% quarterly; below that proportionate then double penalties, with steep extra penalties under 90%; S-NOC target ≥99.9%.
INR 10 Cr EMD plus 10% PBG on AWO (separate A & B), long Package B PBG (10.5 years), optional mobilization advance with 110% security and MCLR penal interest on delayed adjustment.
BoM gaps to complete work at no extra cost; 10-year OEM support/spares; replace desupported kit free; field-trial router path with penalties if OEM-1 fails.
CEO may accept/reject any bid without assigning reason; conflict-of-interest and consortium role-change can forfeit securities; Integrity Pact with IEMs.
PIA must resolve public-utility damage disputes and compensation; take over existing networks/shelters/HDD crossings and continue OEM AMCs; RoW/ADSS on electricity assets uncertain.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
The CEO, Andhra Pradesh BharatNet Infrastructure Limited (APBIL), Vijayawada, as agent of DBN, DoT.
2nd Floor, INFOSIGHT building, NH-16 Service Road, Tadepalle – 522501, Andhra Pradesh, India.
[email protected] (clarification window closed 30/05/2026 18:00 after C2).
www.apeprocurement.gov.in (also written https://www.apeprocurement.gov.in in checklist).
Independent External Monitors (IEMs) appointed by APBIL oversee Integrity Pact implementation; format in Section XIV.