Publication of e-tender
e-tender published on 13/08/2026, 6.30 PM.
- Downloading of tender documents starts from publication and continues until the online submission deadline.
Loading…
Digitization and Implementation of DMR Tier II system in Northern Cluster
Kerala Police · Kasaragod, Kerala2026_KP_865360_1
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
13 Aug 2026
25 Sept 2026
₹23.4 L
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
e-tender published on 13/08/2026, 6.30 PM.
Queries due by 17/08/2026, 11 AM; pre-bid meeting on 18/08/2026, 2 PM at Cyber Police Headquarters, Pattom, Thiruvananthapuram.
Online submission opens 13/08/2026, 6.30 PM and closes 01/09/2026, 11 AM on www.etenders.kerala.gov.in.
Technical bids open online on 02/09/2026, 2 PM at Cyber Police Headquarters, Pattom, Thiruvananthapuram.
Technical evaluation is scheduled within 10 days of tender opening at Cyber Police Headquarters; equipment presentation may be required within 6 days of opening, and field-trial setup within 10 days of bid opening.
Rates are to remain firm for 180 days.
NIT requires full supply/installation/integration/testing/commissioning/training within 80 days of work order; towers and housing within two months of work order (or 15 days after statutory permission).
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
Estimated amount is ₹ 23,41,00,000/-.
Non-refundable tender fee ₹ 25,000/- + GST extra; 18% GST on the tender fee is to be paid by the bidder directly to the GST Department.
EMD is ₹23,41,000/-, payable online only through the e-GP portal at bid submission.
Successful tenderer must deposit security equal to 5% of contract value (less EMD already deposited) before signing the agreement, within the period in the letter of acceptance.
Spec payment schedule: 30% non-interest-bearing advance against BG; part payments up to 80% on delivery/verification/stock entry; final 20% after full installation, verification, coverage/functionality tests, commissioning and handover.
Minimum 5-year onsite warranty from commissioning plus quoted 3-year AMC thereafter; delay LD under GC is 0.5% or 1% of delayed value per week up to 10%.
Bidder bears SACFA fees, KSEB/FTTH installation bills until handover, stamp duty/lawyer charges for agreement, and field-trial costs; Department pays WPC royalty/licence fees where it is the licence holder.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Open to OEMs, OEM-authorised dealers/system integrators and qualified vendors; Spec also allows consortiums and State/Central PSUs with OEM authorisation to participate, execute and maintain.
Documents impose overlapping but inconsistent experience bars: NIT requires 3 years continuous professional wireless SI/maintenance experience and at least one similar completed DMR project in the preceding 3 years for Central/State/PSU/statutory bodies; Spec requires 5 years market presence, digital wireless/telecom track record in last 3 years, DMR Tier II install in last 3 years, and 3 years LEA DMR equipment experience.
NIT sets average annual turnover ₹11 crore (FY 2023–24, 2024–25 and 25-26), certified net worth ≥ ₹25 Cr as on 31/03/2026, and liquid assets/credit ≥ ₹2.71 crore; Spec separately states minimum average annual turnover of 25 crores for the past three years.
Mandatory GST and PAN; dealer/SI/consortium members need valid WPC DPL at technical bid opening; system must meet ETSI TS 102 361; OEM ISO 9001 and ISO 14001; ISO/IEC 27001 where NMS/dispatch/server apps supplied; DMR Association IOP certificates; MTCTE certificate at technical verification before stock entry.
Bidder/OEM/consortium must not be blacklisted by any State or Central LEA, department or other government body at bid submission.
Technical qualification requires document scrutiny, RF survey submission, equipment evaluation and successful field trial/PoC; prior Kerala Police DMR Tier II completers using the same equipment may be exempted from field trial with TEC permission.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Design, supply, installation, testing, commissioning, training and maintenance of a DMR Tier II digital wireless system (136–174 MHz) for Northern Cluster law-and-order networks across five police districts: Kozhikode Rural, Wayanad, Kannur City, Kannur Rural and Kasaragod.
ETSI DMR Tier II network with microwave primary/secondary plus standby links in ring/mesh topology, district dispatcher consoles with GPS tracking, reserved slots for L&O and GPS, and multi-vendor interoperability obligations.
Indicative main quantities include 69 two-slot repeaters & duplexers, 50 antenna arrays/LMR-400 runs, 35 GBT towers, 49 Li-ion battery banks, 1,330 GPS handhelds, 730 GPS mobiles, 360 static/non-GPS mobiles, 5 dispatcher systems and related control-room gear, plus backhaul/CCTV/services and 3-year post-warranty AMC by district.
Scope includes towers/fixtures/lightning protection, AC RCC rooms or IP55 canopy racks where needed, KSEB metering and connections, CCTV at each repeater site, endpoint installation with poles, and storage/transport at bidder risk.
At least two weeks’ operation/repeater installation/maintenance/programming training in three sections; full English technical/user/network documentation; 5-year onsite warranty with optional 3-year AMC and 10-year OEM spare/software support.
NIT completion: 80 days from work order for SITC+training; tower/housing within 2 months of WO (or 15 days after permissions). Spec completion: 60 days from LoI or 5 months from SLA, whichever later.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Bids only online via Kerala e-GP www.etenders.kerala.gov.in in two covers — Technical Bid and Financial Bid; any other mode is rejected.
Class III Digital Signature Certificate required; all uploaded documents must bear signature and office seal of bidder/authorised persons and be digitally signed while uploading.
All bidders must produce originals/hard copies of all relevant e-tender documents at technical evaluation for verification.
Online tender-fee and EMD remittances (or valid EMD exemption certificate) are mandatory with the bid.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
The tender document set contains no corrigendum or addendum; original NIT/GC/Spec/BOQ values currently apply.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
NIT requires minimum average annual turnover of ₹11 crore over FY 2023–24, 2024–25 and 25-26; Spec Pre-Qualification requires minimum average annual turnover of 25 crores for the past three years.
NIT requires 3 years continuous engagement in professional wireless systems as on bid submission; Spec requires the vending outfit to have functioned in the market for at least 5 years, plus other 3-year DMR/LEA experience tests.
NIT Schedule requires SITC+training within 80 days from work order; Spec requires completion within 60 days from LoI or 5 months from SLA, whichever is later; NIT also sets a separate 2-month tower/housing milestone from work order.
NIT Schedule places technical evaluation within 10 days of opening; NIT XIV requires equipment presentation within 6 days of opening if required; Spec field trial is within 10 days after bid opening.
NIT fixes pre-bid on 18/08/2026, 2 PM with queries by 17/08/2026, 11 AM; Spec cl. 3 says bidders should contact the department to fix date and time.
Financial BOQ item 1.08 is described as 'Self-Supported Towers GBT (45 Nos Minimum)' but the quantity cell is 35; Spec architecture and consolidated BOM require minimum/quantity 35 towers.
NIT XI expressly exempts SPD Kerala registrants and NSIC-certified MSMEs for tendered items; GC cl. 4 lists additional State MSME/cottage/Khadi/PSU/NSIC security-deposit exemptions and conditions.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask which average annual turnover threshold and financial-year window is binding, and whether NIT net-worth ₹25 Cr and liquid-asset ₹2.71 Cr tests still apply alongside Spec financials.
Ask which completion clock governs (80 days from WO vs 60 days from LoI vs 5 months from SLA), how tower 2-month milestone interacts, and whether statutory permission delays extend only tower works or the whole SITC schedule.
Seek confirmation of payable quantity, whether additional towers beyond 35/45 are variation at quoted rates, and how shared towers across adjacent districts are measured/paid.
Ask which existing Kerala Police DMR makes/models must interoperate, whether third-vendor radios will be provided by Department for trial, exact mandatory feature set beyond Spec 2.4.1, and scoring/pass-fail methodology.
Request the exact notice period, identified Thiruvananthapuram sites, who provides power/space/permissions, whether microwave failover must be live-demonstrated, and documented criteria for TEC exemption of prior Kerala Police DMR implementers.
Clarify whether advance BG is additional to 5% SD/PBG, when each is released, whether SD remains locked for full 5-year warranty, and if monthly performance-report penalties are recoverable from SD/running bills.
Request the draft SLA (said to be available only at IGP Cyber Operations office) before bid submission, including uptime commitments, manpower deployment, spares stocking and linkage to Spec cl. 24 penalties.
Confirm Department will hold licences and pay royalty, bidder pays SACFA only; ask current frequency assignment status for Northern cluster and whether delayed WPC/SACFA stops LD clocks.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
Full SITC in ~80 days from WO (or 60 days from LoI) across five districts, with towers/housing in two months, is high execution risk especially with statutory permissions, private land and simultaneous multi-district rollout.
Spec treats police communication as 24×7 emergency service: 1-hour response, high-priority restore within 6 hours, then escalating hourly/daily penalties up to cost recovery plus ₹2,00,000 (high) / ₹50,000 (medium/low).
Paper-compliant bids still fail without successful multi-site PoC (unless TEC exemption); all field-trial costs are on the bidder, including 48-hour live network with ≥3 repeaters and AES-256/interop demos.
Although 30% advance is available against BG, another 5% performance security is locked through warranty, final 20% waits full commissioning/handover, and KSEB/FTTH bills till handover are bidder-funded.
Government may accept part quantities, reject lowest bid, recover dues as land revenue, determine contract on insolvency, and confine disputes to Thiruvananthapuram courts; bidder special conditions do not apply unless expressly accepted.
Bidder bears radio survey accuracy, private-land procurement, SACFA fees, tower certification, KSEB connections and storage risk; coverage and interop obligations are absolute acceptance criteria.
Inconsistent turnover/experience clauses between NIT and Spec create avoidable technical-rejection risk if the evaluation committee applies the stricter unread/uncorroborated threshold.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Inspector General of Police, Cyber Operations, Cyber Police Headquarters, Pattom, Thiruvananthapuram (Kerala Police / Government of Kerala).
Cyber Police Headquarters, Thiruvananthapuram, Pattom, PIN 695004; email [email protected]; phone 04712726522.
Pre-bid queries to [email protected] before 17/08/2026, 11 AM.
Online opening and technical evaluation/physical document verification at Cyber Police Headquarters, Pattom, Thiruvananthapuram; equipment presentation at the same office.
Portal www.etenders.kerala.gov.in; DSC/e-tender help via Saankethika near EPF Office, Vrindavan Gardens, Pattom, and 24×7 numbers 0120-4001002, 0120-4001005, 0120-4493395.