Publication / bid document date
Bid document GEM/2026/B/7853820 is dated 30-07-2026.
- No separate publication timestamp beyond the bid document date is printed in the pack.
- No corrigendum has amended this date.
Loading…
Civil Work
Indian Institute Of Technology (IIT) · Patna, Bihar9683219
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
30 Jul 2026
20 Aug 2026
₹38 L
₹1.2 L
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
Bid document GEM/2026/B/7853820 is dated 30-07-2026.
Bid End Date/Time is 20-08-2026 18:00:00.
Bid Opening Date/Time is 20-08-2026 18:30:00.
Bid Offer Validity is 180 days from the bid end date.
Delivery period is 56 days for every item category; ATC states delivery and installation within 8 weeks of Purchase Order.
Time allowed for Technical Clarifications during technical evaluation is 2 Days.
No pre-bid meeting date or bidder clarification submission deadline is specified in the tender documents.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
Estimated Bid Value is 3800000 (INR 38 lakh).
EMD Amount is 120000; beneficiary is General Manager, Incubation Centre, IIT Patna (Joseph Paul Arackalan).
No tender document fee amount is prescribed; ATC refers to 'EMD & Tender Fee (if any)' and the technical-bid checklist mentions EMD/Tender fee printout or exemption.
ePBG Percentage is 5.00% for Duration of ePBG required 14 Months; Advisory Bank State Bank of India.
Payment within 30 days from successful installation, generally by RTGS/fund transfer.
MII purchase preference Yes (Class-1 within L1+20% up to 50% of bid quantity); MSE purchase preference Yes (within L1+15% for 25% of bid quantity).
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Minimum Average Annual Turnover of the bidder (For 3 Years) is 18 Lakh(s).
OEM Average Turnover (Last 3 Years) is 100 Lakh(s).
3 Year(s) past experience required for same/similar service; Past Performance 80% of bid quantity in at least one of the last three Financial years to any Central/State Govt Organization/PSU.
Only Class-I and Class-II local suppliers may bid; non-local suppliers are not eligible (eligible MSEs still allowed to participate per concurrent MSE-MII OM).
Any bidder from a country sharing a land border with India is eligible only if registered with the Competent Authority; false declaration is ground for immediate termination and legal action.
Bidder must declare the firm has not been blacklisted/debarred by any Govt. Department/PSU; false information can lead to summary rejection/termination and full EMD forfeiture.
Only non-obsolete products with at least 3 years residual market life may be quoted; bidder must supply spares for 10 years from installation on the same payment terms.
No separate consortium size, equity floor or lead-member rules are set for this bid; land-border ATC defines 'bidder' to include consortium/JV members for GFR 144(xi) purposes only.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
BOQ bid for Extension Centre Infrastructure Set-up at Bhagalpur College of Engineering (carpet area 2368 SQFT / total area 1st+2nd floor 2367.54 SQFT), covering civil, modular furniture, electrical with AC, branding, CCTV, IT networking/telephone and video conferencing.
Civil package (category qty 5700): GI-framed partitions with/without glass, wall painting, curtain rods, and kitchen countertop/sink works.
Modular furniture (category qty 89 pcs): workstations, lab/conference tables, pedestals, almirahs, chairs, sofa, centre table and dining set.
Electrical package (category qty 270): modular switch/socket wiring, DBs/MCBs, LED lights, wall fans, cable trays, chemical earthing and 2 Ton split ACs.
Branding 750 units (frosted film, nameplates, acrylic LED sign, vinyl on sunboard); Camera 8 (CCTV combo kit); IT Networking 42; Video Conferencing 1 (65-inch Android Smart LED TV + 10 m HDMI).
Works are for Bhagalpur College of Engineering, Bhagalpur (ATC delivery location), while GeM consignee fields list Joseph Paul Arackalan at IIT Patna, Kanpa Road, Bihta 801103.
Minimum 1-year onsite warranty after delivery, installation and acceptance; steel almirah paint/locks carry 10-year guarantee; spares support 10 years; regional service facility required.
Purchaser may increase or decrease quantity up to 25% of bid quantity at contract placement and may increase ordered quantity up to 25% during contract currency at contracted rates.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Online two-packet bid on GeM; technical and financial bids uploaded electronically — no physical document submission is mandated as a pre-qualification step.
Tender Acceptance Letter must be on company letter head with signature of the bidder and official seal, plus contact person, email and mobile.
Upload scanned proof of EMD payment/instrument (or valid exemption certificate) with the bid; indicate bid number and bidding entity for online transfers.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
No corrigendum or addendum files are present among the tender documents; all dates, amounts and conditions stand as originally printed in the bid, BOQ/ATC and GeM GTC.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
GeM consignee address is IIT Patna, Kanpa Road, Bihta 801103, while BOQ title and ATC require door delivery/installation at Bhagalpur College of Engineering, Bhagalpur.
Bid EMD Detail lists Advisory Bank as State Bank of India, while buyer-added online EMD and ATC direct payment to Canara Bank Incubation Centre IIT Patna account; ATC also says EMD as BG or DD, while bid highlights surety bond and RTGS.
GeM experience/past-performance clauses accept supplies to any Central/State Govt/PSU, but Special Terms require at least three satisfactory performance certificates from government-funded organizations in the Eastern and North-Eastern zone.
Bid Details set Arbitration Clause to No and Mediation Clause to No, but ATC Applicable Law provides reference of disputes to President IC & Director IIT Patna and then to an Arbitrator appointed by the Director, with decision final and binding.
Buyer-added bid specific warranty clause requires service/rectification within 7 days of notice, while Special Terms require response in 48 hours and resolution of minor problems within 2 weeks.
Scope is civil/furniture/electrical infrastructure works at an extension centre, yet the GeM bid is structured as a Goods BOQ; GeM disclaimer says publishing bids on GeM for procurement of works can make the bid & contract null & void.
ATC and document checklist refer to Tender Fee (if any) / EMD-Tender fee printout, while GeM disclaimer prohibits asking for tender/bid participation fee.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask buyer to confirm whether all works, door delivery and installation are at Bhagalpur College of Engineering, Bhagalpur, despite GeM consignee fields showing IIT Patna Bihta.
Seek written confirmation whether the Special Term requiring three satisfactory performance certificates from Eastern and North-Eastern zone government-funded organizations is mandatory pass/fail, given GeM experience accepts any Central/State Govt/PSU and GeM disclaimer disfavours organisation-specific experience.
Clarify how OEM Average Turnover of 100 Lakh and OEM Authorization Certificate apply across civil works, furniture, electrical, AC, CCTV, networking and TV brands in a single bunch bid.
Confirm acceptable EMD instruments for this bid (RTGS to Canara account vs BG/DD/surety bond) and whether Advisory Bank SBI has any separate role.
Ask which warranty response/rectification timeline prevails (7 days with 0.5%/week penalty vs 48 hrs/2 weeks special terms) and whether LD 0.5%/week to 10% of order value for late delivery stacks with warranty penalties.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
Full civil, furniture, electrical, AC, branding, CCTV, networking and VC fit-out must be delivered and installed within 56 days/8 weeks of PO at a remote college site.
Late/partial execution attracts LD at 0.5% of order value per week, capped at 10%, with alternate risk procurement at defaulter's cost and blacklisting exposure.
Warranty failures can trigger weekly penalties up to 10% of contract value, PBG forfeiture/retention and risk rectification; 5% performance security remains for ~14 months.
Payment is due within 30 days after successful installation (not against dispatch), creating working-capital risk on a multi-trade project.
President, Incubation Centre & Director IIT Patna may reject any/all bids, is not bound to accept lowest, and may change quantity/upgrade criteria/drop any item any time before PO.
No MSE or Startup relaxation for years of experience and turnover, plus OEM turnover 100 lakh, 80% past performance, zonal performance certificates and regional service centre requirements narrow the bidder pool and raise disqualification risk.
GeM GTC forfeits bid security for withdrawal/modification during validity, false documents, or failure to furnish performance security; GeM may also debar the seller (minimum 3 months on first offence).
Buyer-added ATC disclaimer lists multiple clauses that can render the GeM bid null & void (works on GeM, physical docs, tender fee, organisation-specific experience, etc.), creating award/enforceability uncertainty.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Incubation Centre, Indian Institute of Technology Patna under Department of Higher Education, Ministry of Education.
HOD grievance email [email protected]; Buyer email [email protected].
General Manager, Incubation Centre, IIT Patna Campus, Amhara Road, Bihta, Patna, Bihar- 801106; Phone: 06115-233546.