Publication / bid date
Bid document dated 29-08-2026 (GEM/2026/B/7975254).
Loading…
Nagarpalika Gumla · Gumla, Jharkhand9822497
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
29 Aug 2026
9 Sept 2026
₹16.5 L
₹16,526
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
Bid document dated 29-08-2026 (GEM/2026/B/7975254).
No pre-bid meeting date or pre-bid query deadline is stated in the bid documents.
Bid End Date/Time: 09-09-2026 11:00:00.
Bid Opening Date/Time: 09-09-2026 11:30:00.
Bid Offer Validity: 30 (Days) from Bid End Date.
Contract Period: 1 Month(s).
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
Estimated Bid Value in INR (Inclusive of all taxes): 1652600.
EMD Amount: 16526; Advisory Bank: State Bank of India; Beneficiary: Executive Officer Nagar parishad Gumla (Manish Kumar).
No tender document fee or bid participation fee is prescribed in the bid; GeM disclaimer treats asking for tender/bid participation fee as impermissible ATC.
ePBG Required: No (no performance bank guarantee required under this bid).
Payments shall be made to the Seller within 45 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (superseding 10 days under GeM GTC clause 12).
MSE Purchase Preference: Yes; preference margin L1+15%; if L-1 is not MSE and an MSE quotes within L-1+15%, 100% order quantity may be awarded to such MSE subject to matching L1 price.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Minimum Average Annual Turnover of the bidder (For 3 Years): 7 Lakh(s); Turnover eligibility criteria: GeM verified turnover.
Years of Past Experience Required for same/similar service: 3 Year(s); Past Experience of Similar Services required: Yes.
Over the last three years (current FY + last three FYs ending March prior to bid opening), bidder must have completed similar services as: 3 works ≥40% of estimated cost; OR 2 works ≥50%; OR 1 work ≥80%.
MSE Relaxation for Years Of Experience and Turnover: Yes | Complete; Startup Relaxation for Years Of Experience and Turnover: Yes | Complete.
MII Compliance: Yes. Bid splitting not applied.
Per GeM GTC clause 26, any bidder from a country sharing a land border with India is eligible only if registered with the Competent Authority; false declaration/non-compliance is ground for immediate termination and legal action.
Sellers/Service Providers must fully comply with applicable labour laws including the four Labour Codes (as notified/enforced) and operative pre-existing labour enactments until substituted; non-compliance is breach of contract.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Facility Management Services - LumpSum Based for NAGARPALIKA GUMLA; Type of services required: STREET LIGHT; Service component: ISTALLATION OF STREET LIGHT; consumables by service provider inclusive in contract cost.
Buyer ATC text directs bidders to participate as per ATC document quantity of 250 NOS. Matching scope/spec sheets list: LED Street Light 100W - 250 Nos; GI Pipe 1.5" x 3 ft - 250 Nos; Fitting Clamp with M10 nuts/bolts - 500 Nos; 1.5 sq mm aluminium cable - 2400 mtr.
Supply items shall be high quality from approved branded manufacturer; minimum 2 years warranty from date of supply.
Consignee/Reporting Officer: Manish Kumar; Address: 835207, Palkot Road Near BSNL Exchange Nagar Parishad Gumla; Quantity mode: Project / Lumpsum Based; Contract Period: 1 Month(s).
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Online bid submission on GeM as a Two Packet Bid; documents uploaded by bidders are visible to other participants; Bid to RA not enabled.
Upload scanned EMD with online bid; submit hard copy of EMD directly to the Buyer within 5 working days of bid opening (GeM GTC), failing which bid may be treated incomplete and rejected. GeM disclaimer also notes EMD (and signed Integrity Pact, if any) may be submitted within 5 days of bid opening.
Bid lists 'Certificate (Requested in ATC)', 'Additional Doc 1 (Requested in ATC)' and 'Additional Doc 2 (Requested in ATC)', but the uploaded ATC/spec sheets only contain street-light BOQ/specs and do not name or attach prescribed certificate formats.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
No corrigendum or addendum documents are present in the tender pack; original bid values dated 29-08-2026 continue to apply.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
Buyer ATC text and Scope-of-work sheet specify 250 LED street lights (with matching accessories), while Details-of-premise file lists 400 LED street lights (and scaled pipes/clamps). Cable remains 2400 mtr in both.
Bid is created under Facility Management Services (lump-sum service) with service component 'ISTALLATION OF STREET LIGHT', while ATC/scope is essentially supply of LED lights and accessories with warranty — i.e. goods supply packaged as a service bid.
Spec sheets list preferred makes (Havells, Philips, Sturlite, Surya, Crompton or equivalent) while GeM disclaimer treats mandating specific Brand/Make/Model (except PAC/Single Bid) as a nullifying ATC practice.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask buyer to confirm in writing whether the contractual quantity is 250 sets (ATC text + scope sheet) or 400 sets (premise file), and whether cable length remains 2400 mtr.
Request exact list of documents expected under Certificate, Additional Doc 1 and Additional Doc 2 fields, since ATC PDFs only contain specifications.
Confirm whether scope is supply-only or full installation on existing poles at Nagar Parishad Gumla, who provides poles/power tapping/civil works, and what constitutes SDAC completion within the 1-month contract period.
With ePBG Required = No but minimum 2-year product warranty, ask how warranty obligations will be enforced (retention, undertaking, post-contract claims) and whether any other security will be sought at award.
Seek buyer confirmation that creating this street-light supply/installation under Facility Management Services is intentional and will not be cancelled under GeM disclaimer against goods-via-service bids.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
Conflicting BOQs can cause under/over-pricing of a lumpsum bid; ATC text points to 250 but premise file still shows 400.
Contract Period is only 1 Month for supply + installation of 250 street lights at Gumla, creating high delivery/LD exposure.
Delay LD @ 0.5% of contract value of delayed quantity per week or part week, until actual delivery/performance; pre-estimated damages not exceeding 5% of total contract value; for inordinate delay, maximum deduction 10%.
Payment only within 45 days after SDAC + online bill submission (slower than default GeM 10-day GTC timeline).
All consumables/materials are inclusive in contract cost; minimum 2-year warranty from supply date while ePBG is not required — warranty claims may be hard to backstop and material cost risk sits fully with bidder.
Buyer can increase or decrease quantity/duration up to 25% at contract issue (increase only after issue); lumpsum scope/value may increase up to 25% with service provider consent — capacity and price contingency needed.
Possible GeM nullification risk if treated as goods procured via service bid; preferred-brand language; missing named ATC certificates; uploaded bidder documents visible to competitors.
Arbitration Clause: No; Mediation Clause: No — limited contractual ADR avenues beyond GeM/GTC mechanisms.
EMD can be forfeited for withdrawal/modification within validity, false documents, or failure to furnish performance security if later required; late physical EMD may cause rejection.
Full labour-code / legacy labour-law compliance is on the service provider; non-compliance is contractual breach.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Ministry/State: Jharkhand; Department: Revenue Registration And Land Reforms Department Jharkhand; Organisation: Registration Department; Office: Gumla.
HOD grievance redressal Email: [email protected]; Buyer Email: [email protected].
Consignee/Reporting Officer: Manish Kumar; Address: 835207, Palkot Road Near BSNL Exchange Nagar Parishad Gumla.
Beneficiary for EMD/performance security: Executive Officer Nagar parishad Gumla (Manish Kumar), Gumla, Revenue Registration and Land Reforms Department Jharkhand, Registration Department. Advisory Bank: State Bank of India.