Bid publication date
Bid document dated 11-08-2026 (GEM/2026/B/7900678).
- No separate pre-bid meeting date is stated in the tender documents.
Loading…
Hiring of Special Purpose Mining or Earth Moving Machines (Monthly Basis) - As Per Buyer's Requirement; Material Handling Equipment; Fork Lift
Central Railway · Jalgaon, Maharashtra9736849
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
11 Aug 2026
24 Aug 2026
₹37.8 L
₹82,800
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
Bid document dated 11-08-2026 (GEM/2026/B/7900678).
Bid End Date/Time finally applicable after Date corrigendum: 24-08-2026 09:00:00 (portal extension; original bid PDF still prints 21-08-2026 09:00:00).
Bid Opening Date/Time finally applicable after Date corrigendum: 24-08-2026 09:30:00 (original bid PDF prints 21-08-2026 09:30:00).
Bid Offer Validity is 60 days from the bid end date.
Contract Period is 3 Year(s) / 36 months of service; 2 days allowed for technical clarifications during technical evaluation.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
No numeric Estimated Bid Value / tender value is printed in the available documents.
EMD Amount is Rs 82,800; Advisory Bank State Bank of India; beneficiary WAAO/ELW/BHUSAWAL; surety bond also accepted; GeM exemption categories apply.
ePBG Percentage 5.00% for 38 months; Advisory Bank SBI; submit within 15 days of award; payments due only after receipt/verification.
Monthly billing/hiring charges against certified invoices and logbook; firm rates inclusive of taxes/duties; GeM service payments generally within 10 days of SDA/CRAC.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Bid lists MSE/Startup experience-and-turnover relaxations as No, and refers to Experience/Turnover Criteria, but does not state numeric turnover, net-worth or past-performance quantities.
Bidder must not be under liquidation, court receivership or similar proceedings, or bankrupt; upload undertaking with bid.
An office of the Service Provider must be located in the state of Consignee (Maharashtra); documentary evidence to be submitted.
One diesel forklift Cap. 03 MT, make VOLTAS/GODREJ/ACE or equivalent, not older than 3 years, with driver (valid heavy motor driving licence), two helpers, diesel and all charges.
MII Compliance: Yes. MSE Purchase Preference: Yes — MSEs within L1+15% can match L1 for 100% quantity; traders/resellers excluded from MSE preference.
Any bidder from a country sharing a land border with India is eligible only if registered with the Competent Authority; false declaration/non-compliance can cause immediate termination and legal action.
No consortium or JV eligibility rules are stated in the bid or ATC documents.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Monthly hiring of 1 x diesel Forklift (Cap. 03 MTs / 03 Ton minimum) with driver, two helpers, diesel and all operating expenses for material handling at ACL BSL depot, for 36 months.
Depot duty Mon–Fri 08:30–12:30 & 13:30–17:30 and Sat 08:30–13:30 (8 hrs/shift); daily allotted material-handling work to be completed same day with logbook control.
Buyer not liable for third-party/public property damage from machine deployment; contractor's staff are not buyer employees; contract may be closed if Artisan posts are filled.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Online Single Packet Bid on GeM; no multi-cover structure; Bid to RA disabled.
Upload scanned Bid Security/EMD with online bid; submit hard copy directly to Buyer within 5 working days of bid opening (GTC), failing which bid may be rejected.
Para-wise compliance and mandated self-declaration must be on company letter head with stamp/seal/sign of proprietor; general signed bid copies are not accepted as compliance.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
Only amendment on record is a Date-type corrigendum with no attached file; portal bid end/opening moved from the bid-PDF values of 21-08-2026 09:00/09:30 to 24-08-2026 09:00/09:30.
All non-date bid/ATC/GTC conditions remain as in the original pack; only submission/opening deadlines change to 24-08-2026 09:00 and 09:30.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
bid_9736849.pdf still shows 21-08-2026 09:00/09:30, while Date corrigendum 4512902 (no file) leaves final portal deadlines at 24-08-2026 09:00/09:30 — the amended portal dates prevail.
GeM item category reads 'Hiring of Special Purpose Mining or Earth Moving Machines... Fork Lift', while ATC/scope narrow the procurement to depot forklift material-handling hire — ATC/scope govern the actual work.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask buyer/GeM to confirm on record that bid end/opening are 24-08-2026 09:00/09:30, because the downloaded bid PDF still shows 21-08-2026 and the corrigendum has no file.
Request the exact turnover and past-experience criteria (if any), since the bid refers to Experience/Turnover Criteria and Estimated Bid Value guidance but prints neither the value nor thresholds.
Seek clarity on notice period, demobilisation costs and payment up to termination month under scope para 12 allowing closure from the next month if sufficient Artisan (Technical Multiskilled) and ADS vacancies are filled.
Clarify whether a physical standby forklift must be pre-positioned at Bhusawal or a written immediate-arrangement commitment suffices, and maximum replacement time expected beyond the 2-hour penalty trigger.
Ask whether 'other consignee of this Railway' deployments include extra shift, outstation stay, transport of machine, or only within normal weekly hours at same monthly rate.
Request the formula for daily contract value used in 8–20% penalties (monthly hire/30, working-day basis, or other), as this controls downside on non-deployment/breakdown events.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
Non-deployment/breakdown without timely replacement attracts third-party hire recovery plus 8–20% of that day's contract value, escalating to possible termination after 3rd instance.
Contract may be closed from the next month if sufficient Artisan (Technical Multiskilled) and ADS vacancies are filled — significant volume/tenure risk on a 36-month firm-price hire.
Buyer may vary quantity/duration up to 25% (increase after award up to 25%) while rates stay firm with no PVC — fuel, wage and spare-price inflation sit with the bidder for up to ~45 months including option.
Service provider must pay crew wages first and only then bill Railways with PF/ESIC/bank proof; ePBG 5% for 38 months must be in place before any payment becomes due.
Full compliance with labour codes/legacy labour laws, Contract Labour, PF, ESI, Motor Vehicle/Transport Workers Acts and depot safety rules is on the service provider; non-compliance is contractual breach.
If services are not delivered within the original/re-fixed period, buyer may recover LD @ 0.5% (GTC LD clause) in addition to ATC operational penalties where applicable.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Ministry of Railways — Indian Railways — Central Railway — Central Railway Stores Deptt; execution at Dy.CMM (ACL), Electric Loco Workshop, Bhusawal.
Consignee/Reporting Officer: Pravinkumar Suryakant Kore, Central Railway Electric Loco Workshop, Bhusawal.
HOD grievance email [email protected]; Buyer email [email protected].