Publication / bid document date
Bid document dated 03-08-2026 (Bid No. GEM/2026/B/7860072).
- No corrigendum in the tender pack; this remains the publication/issue date.
Loading…
Hiring of Consultancy Services - Percentage based - Technology Consultants; Engineering Design; Yes; Hybrid(As specified in scope of work)
Indian Army · Darjeeling, West Bengal9690160
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
3 Aug 2026
13 Aug 2026
₹35,400
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
Bid document dated 03-08-2026 (Bid No. GEM/2026/B/7860072).
Bid End Date/Time is 13-08-2026 13:00:00.
Bid Opening Date/Time is 13-08-2026 13:30:00.
Bid offer validity is 60 days from the bid end date.
No pre-bid meeting date or pre-bid query deadline is stated in the tender documents.
GeM bid states Contract Period of 1 Month(s); buyer-specific method/SLA requires completion and report submission within 90 days from agreement/placement of job work.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
Estimated Bid Value is INR 35,400 (inclusive of all taxes); consignee quantity shows Estimated Value of Project to be Managed (inclusive of GST): 35400.
GeM Bid Details state EMD Required: No; buyer ATC BidDocs still prescribe EMD @2% of value of work (BG/DD of SBI, valid 3 months, in favour of GE Bengdubi) or an exemption declaration.
GeM Bid Details state ePBG Required: No; buyer ATC still refers to performance security / performance bank guarantee without stating amount or form in the BidDocs pack.
Quote is lump sum percentage on estimated value for the entire Appx A scope; inclusive of all taxes and all expenses (transport, boarding, lodging, meetings); TDS deducted at source as applicable.
All payment only after successful completion of entire job work, after Inspection Authority certification; paid by e-payment through AO GE Bengdubi.
MSE Purchase Preference is Yes: eligible MSE service provider within L1+15% can match L1 for 100% of quantity/amount.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
3 years past experience of similar services is required; bidder must have provided similar services to any Central/State Govt Organisation/PSU (ending month of March prior to bid opening).
Buyer ATC requires average annual turnover for three consecutive years ending up to 31 Mar 24 of not less than 10 Lakhs; GeM enables complete MSE/Startup relaxation from bidder turnover.
Buyer ATC requires either MES enlistment in appropriate category for supply/job works/consultancy, or un-enlisted bidders meeting specified State/Central/PSU registration rules.
Bidder must not be under liquidation/court receivership/bankruptcy; must not be blacklisted/debarred; relatives of Client employees cannot participate; land-border registration rule applies.
No consortium or joint-venture participation rules are specified in the tender documents.
MII Compliance is Yes on the GeM bid.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Percentage-based hiring of Technology Consultants (Engineering Design profile) for soil investigation related to 'PROVN OF DEFI JCOs LIVING ACCN FOR 5 FOD AT BENGDUBI MIL STN'.
One borehole soil investigation with SPT up to 6.0 m or refusal (N=50), sampling, specified field/lab tests, settlement analysis for bearing capacity, and recommended results.
Submit soil investigation report (with borehole layout drawing), personally inside consignee premises at GE Bengdubi / Darjeeling; hybrid deployment as specified.
Method/SLA requires completion and handover/report submission within 90 days from agreement/placement of job work including client check/approval.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Online two-packet e-bid (Technical and Financial) only through Government e-Marketplace (GeM) using valid GeM ID.
Buyer ATC requires original EMD/exemption letter and hard-copy notarized affidavits (Annexure-7/8) to GE Bengdubi within bid timelines; GeM Disclaimer treats mandating physical documents as a pre-requisite to qualify as making the bid null & void.
Upload authorization letter/Power of Attorney for signatory; sign and stamp bid forms; Annexure-7/8 require notarized affidavits on Rs.10/- non-judicial stamp paper.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
No corrigendum or addendum files are present among the tender documents; original GeM bid and buyer attachments remain unamended.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
GeM Bid Details set EMD Required: No, while buyer BidDocs ATC mandates EMD @2% (or exemption declaration) with original physical submission before bid close.
GeM ePBG Required: No, but BidDocs Annexure-1/7 and GCC refer to performance security/PBG without stating amount.
GeM Bid Details state Contract Period 1 Month(s), while Method/SLA requires completion and report submission within 90 days from agreement/job-work placement.
SOW Appx A requires 05 x set copies of results/recommendations, while Method para 9 requires one four set of report.
Buyer ATC makes original EMD and hard-copy affidavits part of qualification/opening, while GeM Disclaimer says mandating physical-form documents as a pre-requisite to qualify bidders makes the bid & resultant contract null & void.
BidDocs repeatedly uses manpower-outsourcing / supply-of-stores language and Annexure-6 similar-work table header says manpower outsourcing, while the actual SOW is soil investigation consultancy.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask Buyer to confirm whether GeM flags (EMD No / ePBG No) prevail over BidDocs ATC demanding 2% EMD and performance security.
Seek confirmation whether completion is 1 month (GeM) or 90 days (Method/SLA), and from which start event LD at 0.5%/week applies.
Ask Buyer to define acceptable 'similar services' for this soil-investigation consultancy and what Proof of Concept is required before/at award.
Confirm final deliverable set count (4 vs 5), acceptable vetting bodies (IIT included or not), and whether personal-only delivery (no courier/email) is mandatory for acceptance.
Seek confirmation whether ₹10 lakh average turnover still applies to this ₹35,400 job, and whether MSE/Startup complete turnover relaxation will be accepted without MES-enlistment path issues.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
Delay compensation is 0.5% of quoted rate per week, capped at 10%; Department may also take disciplinary action for blacklisting with enlisting authorities.
No stage payments: entire payment only after successful completion, inspection certification and bill formalities; no advance.
GE Bengdubi decision is final in disputes under Method; BidDocs allows rejection without reasons, award to next higher bidder with recovery of price difference, and termination/forfeiture for breach without payment.
Multiple conflicting eligibility, security and physical-submission conditions create high risk of arbitrary rejection or later dispute over which clause applies.
Military station site peculiarities, mandatory third-party vetting, and personal hand-delivery only (no courier/email) create schedule and access risk within a short bid-to-completion window.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Client / Accepting Officer is the Office of the Garrison Engineer (GE) Bengdubi under Indian Army / Department of Military Affairs, Ministry of Defence.
GE Bengdubi, Post: Bengdubi, Dist: Darjeeling (W.B), Pin-734424.
HOD grievance redressal email: [email protected]; Buyer email: [email protected].
Payment by e-payment through AO GE Bengdubi.