Publication / upload date
Tender uploaded on IREPS on 13/08/2026 at 15:54 hrs.
- NIT Run Date/Time shown as 13/08/2026 15:55:15.
- No corrigendum amends this date.
Loading…
DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF INTEGRATED COMMUNICATIONSYSTEM FOR TUNNELS (T8-T20) CONSISTING OF VHF COMMUNICATION, CCTV, PA SYSTEM,EMERGENCY CALL AND SERVICE TELEPHONE IN CONNECTION WITH NEW SINGLE BROAD-GAUGERAIL LINE BETWEEN THE BHANUPALI-BILASPUR-BERI SECTION IN THE STATE OF PUNJAB ANDHIMACHAL PRADESH, INDIA.
RVNL · Punjab, Himachal PradeshRVNL-CDG-TEL-PKG-2~RVNL
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
13 Aug 2026
6 Oct 2026
₹118.5 Cr
₹2.4 Cr
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
Tender uploaded on IREPS on 13/08/2026 at 15:54 hrs.
Online bidding start date is 29/08/2026.
Pre-bid conference is scheduled on 20/08/2026 at 11:00 hrs (NIT).
Written clarification requests must reach the Employer no later than 21 days before the bid submission deadline.
Completed e-bids must be submitted on www.ireps.gov.in by 04/09/2026 at 11:00 hrs.
Technical bids open online on the same day at 11:30 hrs on www.ireps.gov.in.
Bids remain valid for 120 days after the bid submission deadline.
Time for Completion of the Entire Works is 24 months; works commence within 42 days of LOA receipt.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
Advertised value is ₹1,185,162,288.66 (approx. ₹118.51 Cr).
Bid security is ₹2,37,03,300.00 (₹2.37 Cr approx.), valid 42 days beyond bid validity.
Tender document cost is ₹0.00; bidding documents download free from www.ireps.gov.in.
Performance Security is 5% of Accepted Contract Amount excluding GST, valid 28 days beyond issue of Performance Certificate.
Retention is deducted at 6% of each payment, capped at 5% of the Contract Price.
Interest-bearing mobilization advance up to 5% of Accepted Contract Amount in two equal installments; plant & machinery advance is deleted.
Volume-II sets staged payments for supply, supply+install, design, erection and spares.
Quote entirely in INR; single rate (percentage above/below/at par) for each schedule.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Only Class-I Local suppliers are eligible; foreign-bidder ITB 4.1(c)/(d) provisions are not applicable (domestic bidding).
JV is allowed; consortium is not. Lead partner minimum share 40%; combined partners 100%.
Need sound finances: positive PBT in 2 of last 5 years; average annual construction turnover ≥ ₹118.51 Cr (last 3 FYs); average net worth ≥ ₹23.70 Cr (last 3 FYs); available bid capacity > estimated price.
Within last 7 years before bid deadline: either 1 similar contract with ≥10.62 km tunnel integrated communication, OR 2 similar contracts each with ≥6.07 km.
Must demonstrate last-7-years key activity: ≥6.07 km integrated tunnel communication (CCTV, PA, emergency call, VHF simplex with OFC/leaky) in railway.
If bidder lacks specified specialist experience, may deploy specialist subcontractor(s) (not exceeding three per activity) with required experience.
Bidder must have no conflict of interest (ITB 4.3) and must not be disqualified under ITB 4.4; affidavit Form PS 3 is mandatory.
Bidder must undertake to provide key personnel and key equipment as specified in Section 5 if awarded.
Each bidder must submit EQC Form No.1 showing how every eligibility/qualification item is met, with document folio references.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Design, Supply, Installation, Testing & Commissioning of Integrated Communication System for Tunnels (T8–T20): VHF, CCTV, PA, Emergency Call and Service Telephone on the new single BG line Bhanupali–Bilaspur–Beri (Punjab & Himachal Pradesh).
Package covers ~40 km of the 63.10 km Bhanupali–Bilaspur–Beri project with tunnels T8–T20 (total tunnel length 30.353 km) and 4 stations.
Scope covers general telecom (incl. IP-MPLS/control communication) plus tunnel communication: IT networking, emergency telephones, PA, IP CCTV, VHF simplex with OFC/leaky cable, integration at control centres, survey, cabling, testing, training and CRS coordination.
Financial bid is percentage above/below/at par on estimated BOQ schedules in Volume-II (Groups B, C, D and Site Facilities).
Works to latest RDSO/TEC specifications and Railway Board/RDSO directives as applicable on date of supply/installation; telecom manual parameters for cable testing.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Bids only through e-tendering on www.ireps.gov.in; two-packet (Technical + Financial); no manual offers.
Technical Bid holds LTB, bid security, POA, qualification evidence and BDS checklist; Price Bid holds LPB and online Financial Rate Page/BOQ.
Bid must be signed by authorized person; POA rules differ for companies, proprietors and JV.
If bid security is e-Bank Guarantee or Insurance Surety Bond, original must be delivered in person within 5 working days after bid closing.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
The workspace contains only nit.pdf, Volume-I.pdf and Volume-II.pdf; no corrigendum, addendum or pre-bid reply document is present.
Final governing snapshot unchanged from originals: close 04/09/2026 11:00; open 11:30 same day; pre-bid 20/08/2026 11:00; validity 120 days; EMD ₹2,37,03,300; advertised value ₹1,185,162,288.66; completion 24 months; Class-I only; tender fee nil.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
NIT allows maximum 2 JV members; Bid Data Sheet states 3 partners — unresolved conflict in the issued documents.
NIT sets pre-bid 20/08/2026 11:00; Volume-I IFB blanks the date and says 11:30 at New Delhi WTC or VC; BDS blanks date (shows 2019) and places meeting at Chandigarh CPM office at 11:30.
BDS and IFB leave bid submission/opening dates as blanks or ‘2019’ placeholders, while NIT states 04/09/2026 11:00 closing.
Works Requirements cl. 2.2 table is headed “Anuppur – Salka Road” / “Provision of double line”, conflicting with the tender’s Bhanupali–Bilaspur–Beri single BG line scope.
BDS ties a “not applicable for MSEs” note to bid-security validity, but Special Provisions for MSEs (ITB 44) are DELETED.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask Employer to confirm whether JV may have maximum 2 members (NIT) or 3 partners (BDS), and which document prevails.
Request confirmed date/time, physical address (Delhi WTC vs Chandigarh CPM) and video-conference link/credentials.
With closing 04/09/2026, ITB 7.1’s 21-day clarification cutoff is 14/08/2026 (one day after upload). Ask whether queries up to pre-bid / a later cutoff will still be answered and issued as addenda.
Seek explicit ruling whether MSEs are exempt from EMD after deletion of ITB 44, given the residual “not applicable for MSEs” phrase in BDS ITB 19.3.
Ask BDS to name the exact official, room and receiving hours for original bid-security instruments within 5 working days after closing.
Request confirmation that tunnel lengths T8–T20, 40 km package length, station chainages and “single line BBB” description override the Anuppur–Salka Road double-line table heading.
Seek current civil/tunnel handover status, sectional access dates within the 90-day progressive access window, power availability at stations/tunnel niches, and interface responsibilities with civil/OHE/other S&T packages (e.g. Telecom Pkg-1).
Ask whether metro/highway/tunnel road projects or railway contracts missing one subsystem (e.g. VHF without PA/CCTV) count toward the 10.62 km / 6.07 km integrated tunnel communication criteria, and required certificate wording.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
Fully contractor-attributable delay damages are 1/25000 of Contract Price per day (section-proportionate for sectional delay), capped at 5% of Contract Price; retention 6% up to 5%.
Only ~3 weeks from upload (13/08/2026) to close (04/09/2026), with bidding start only on 29/08/2026 and multiple unfilled BDS/IFB fields.
EMD ~₹2.37 Cr plus post-award 5% PG (~₹5.9 Cr on estimated value) and interest-bearing mobilization advance create large bank-line demand.
Pass/fail experience demands railway tunnel integrated communication with VHF leaky/OFC plus CCTV/PA/emergency systems at multi-km scale — limited eligible bidders; specialist SC route has timing covenants.
Contractor gives unqualified guarantee to achieve the end objective/spec; any extra equipment/work needed to meet performance is at contractor’s cost.
Final 5–10% of supply/install payments wait until station/IBH/gate-wise portion is commissioned and opened for traffic — cash lock-up if civil/other interfaces delay opening.
Works adjacent to running tracks/public utilities; safety non-compliance and absence of key personnel attract daily penalties and operational stoppages.
Multiple automatic rejection/forfeiture triggers: missing affidavit, LTB, LPB/BOQ, bid security; false local-content declaration; eligibility change non-disclosure; withdrawal during validity.
Only Class-I local bidders eligible; award still subject to Make-in-India matching rules with 20% MPP when applicable — pricing strategy must consider possible L1 matching obligations/opportunities.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
E-tender invited by Additional General Manager acting for and on behalf of The President of India; NIT signed by Jiwan Ram, AGM/SnT/CDG (PIU-Chandigarh-2-S&T/RVNL).
Rail Vikas Nigam Limited, World Trade Center, Tower A, 7th–9th Floor, Nauroji Nagar, New Delhi-110029.
Chief Project Manager / CPM-I, RVNL, First Floor, Railway Recruitment Board Building, Railway Colony, Near Chandigarh Railway Station, Chandigarh 160002.
E-tendering help via IREPS Learning Centre and Helpdesk 011-23761525; portal www.ireps.gov.in.