Bid document dated 23-07-2026 (GEM/2026/B/7771995).
- NIT reference in buyer documents: FAGMIL/CGWA NOC-1/2026 (STC uses FAGMIL/CGWA-01/2026).
Loading…
Hiring of Consultants - Milestone/Deliverable Based - MINING CONSULTANCY; Mines
Fci Aravali Gypsum And Minerals · Jodhpur, Rajasthan9589661
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
23 Jul 2026
10 Aug 2026
₹1.8 L
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
Bid document dated 23-07-2026 (GEM/2026/B/7771995).
Bid End Date/Time finally 10-08-2026 13:00:00 after Date Corrigendum 4454533 (published 2026-08-03; no corrigendum file).
Bid Opening Date/Time finally 10-08-2026 13:30:00 after the same Date Corrigendum 4454533.
Bid Offer Validity is 90 days from the bid end date.
Contract period is 2 Month(s); scope requires applying, studying, preparation and getting CGWA NOC within two months from work-order date, extendable under GeM GTC.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
Estimated Bid Value on GeM is INR 1,84,080 inclusive of all taxes; buyer ATC invitation states the same figure as Estimated Cost excluding GST.
EMD is not required under the GeM bid details.
No tender / bid participation fee is stated; GeM advisory also treats asking for tender fee as an invalid ATC practice.
ePBG / performance bank guarantee is not required under the GeM bid details.
Buyer scope: 100% payment on completion of the job; GeM bid payment timeline: within 45 days of SDAC and online bill submission.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Online GeM two-bid invitation to interested, bonafide, experienced, resourceful, reputed consultancy firm/company/agency for mining/environmental-clearance consultancy to obtain CGWA NOC for ground-water use.
Minimum Average Annual Turnover of the bidder (for 3 years) is 1 Lakh(s); turnover is verified by the buyer at technical evaluation.
GeM bid requires 1 year past experience of same/similar service and quantitative similar-service completion over the recent years on a 40%/50%/80% basis.
ATC restricts consideration to tenderers who have executed and completed at least two similar jobs in their own name in any of the immediately preceding 7 years (Annexure-2).
GeM bid marks MSE and Startup relaxation for years of experience as Yes | Partial | Experience - 1 year(s), and evaluation notes say MSEs and DPIIT Startups are relaxed from the Experience Criteria if quality/technical specifications are met.
PAN, GST registration and firm registration are required; bidder must not be blacklisted/debarred; several form defects make the bid non-responsive.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Milestone/deliverable-based hiring of mining consultancy to apply for and obtain CGWA NOC for ground-water use at FAGMIL’s Birmania Rock Phosphate Project.
Project site is Village Birmania Rock Phosphate Project, Tehsil Fatehgarh, District Jaisalmer, Rajasthan; buyer/consignee office is at Jodhpur.
End-to-end CGWA NOC consultancy: site visit, hydrogeological study, application preparation/submission/follow-up, and delivery of the granted CGWA NOC report to FAGMIL.
Two months from work order to apply, study, prepare and get the CGWA NOC; consultant bears tour/boarding/survey costs; statutory fees reimbursable on original receipts after completion.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Bids are to be submitted online only on the GeM portal in a two-packet (Technical + Financial) system.
Upload legible self-certified / self-attested scanned copies with the technical bid; keep financial information out of the technical packet.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
One Date corrigendum (no. 4454533) was published on 2026-08-03 with no attached files; it extends bid timelines from the original 03-08-2026 dates in the bid PDF.
After Corrigendum 4454533, key process values that finally apply are: publish 23-07-2026; bid end 10-08-2026 13:00; bid opening 10-08-2026 13:30; validity 90 days from end date; estimated value INR 1,84,080; EMD/ePBG not required; contract 2 months.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
GeM bid-detail experience (1 year + 40/50/80% similar services over recent FYs to Govt/PSU) conflicts with ATC’s separate rule of at least two similar completed jobs in the preceding 7 years.
GeM evaluation notes grant MSE/DPIIT Startup relaxation from Experience Criteria, while ATC limits exemption to 50% and still demands one CGWA clearance credential.
Same numeric estimate INR 1,84,080 is described as inclusive of all taxes on GeM and excluding GST in the buyer invitation table.
GeM sets EMD Required = No, but Proforma-1 still threatens EMD forfeiture if the non-blacklisting declaration is incorrect.
Scope says 100% payment on completion of the job, while GeM payment timeline pays within 45 days of SDAC and online bills.
Buyer documents use N.I.T. No. FAGMIL/CGWA NOC-1/2026, while the STC file header uses FAGMIL/CGWA-01/2026.
STC says Special Directions supersede GeM GTC on conflict, while the GeM bid says Service Level Agreement conditions override GTC for the service.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Please confirm whether evaluation will apply the GeM 1-year + 40/50/80% similar-service tests, the ATC ‘two similar jobs in 7 years’ test, or both.
Please confirm whether eligible MSE/Startup bidders get full Experience Criteria relaxation under GeM notes or only 50% relief with one mandatory CGWA clearance as per ATC.
Please confirm whether ‘completion of the job’ / deliverable acceptance requires the NOC to be granted, or whether submission of a complete application plus hydrogeological study can trigger payment if CGWA delay is outside consultant control.
Please confirm that FAGMIL will timely furnish land ownership/lease, approved mining plan, MoEF&CC ToR compliance papers and support for State Water Resources Department consent, and whether delays in buyer inputs extend the two-month period without LD.
Please clarify whether the GeM financial quote must be GST-inclusive, and whether the published estimate of INR 1,84,080 is inclusive of all taxes (GeM) or excluding GST (ATC).
Please define acceptable credentials/accreditation for the hydrogeological study provider and whether the study may be subcontracted.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
Payment and deliverable acceptance are tied to completion/getting the CGWA NOC, not merely filing the application.
Contract/scope period is only two months to study, apply and obtain NOC; GeM LD is 0.5% of contract value of delayed quantity per week (part week counted), capped at 5% generally and 10% for inordinate delay.
All travel/boarding/survey costs are non-reimbursable; GST reimbursement is conditional on GSTR-2B visibility and can be denied if not visible by September of the following year.
Missing any checklist/eligibility document is liable for rejection; conditional tenders are refused; buyer may cancel without liability; uploaded bid documents are visible to other bidders.
No assignment/sub-contract without consent; seller remains jointly and severally liable; full labour-code compliance is mandated; land-border false declaration enables immediate termination.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
FCI Aravali Gypsum and Minerals India Limited (FAGMIL), Department of Fertilizers, Ministry of Chemicals and Fertilizers; office at Jodhpur.
Buyer email [email protected]; HOD grievance redressal email [email protected].
Consignee/Reporting Officer: Jasraj Gehlot, Plot No. 02 West Patel Nagar, Circuit House Road, Ratanada, Jodhpur - 342011.