EOI publication / download start
EOI is downloadable from 14.08.2026; bid submission also starts on that date.
- Tender Data Sheet S.No 1 and 5 both state Dt.14.08.2026.
Loading…
EOI Municipal Solid Waste Management
Khammam Municipality · Khammam, Telangana725339
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
12 Aug 2026
18 Sept 2026
₹15,000
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
EOI is downloadable from 14.08.2026; bid submission also starts on that date.
Pre-bid meeting and last date for receipt of queries are both 19.08.2026; original response-to-queries date was 20.08.2026.
EOI states last date for bid submission and technical bid opening as 02.09.2026; bids due before 15:00 hours IST. Date corrigenda exist but no amended calendar date is printed in the available tender files.
Presentation by technically qualified bidders, financial bid opening and LOA dates are to be informed later; Contract Agreement to be signed within 30 days of LOA.
Bids remain valid for not less than 120 days from the Bid Due Date, extendable by mutual consent.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
Indicative Project Cost is left blank (“-”) in the Tender Data Sheet; no estimated project cost/value is stated.
Non-refundable Cost of EOI is Rs. 15,000/- payable in favour of The Commissioner, Khammam Municipal Corporation at Khammam via the online e-procurement portal (also described as Demand Draft).
Original EOI required Rs.20,00,000 Bid Security/partial EMD; Corrigendum 3 revised pre-bid reply states “Bid Security is waived off.”
Successful bidder must submit Performance Guarantee of 2.5% of quoted Price Bid Value (capital cost + O&M cost for 5 years) before agreement; 7.5% FSD is retained from each bill.
EOI contains two capital-payment schedules and a later “modified” payment clause; O&M is quarterly/performance-linked with escalation, and contractor may retain by-product sale revenue.
LCS on Assessed Bid Price = Capital Cost + NPV of O&M Cost for 5 years (10% discount; O&M escalated at 1.10^n for evaluation).
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Bidder must be an Indian legal entity (company/LLP/partnership/proprietorship) with SWM experience and existence of not less than three years as on 31 March 2026 (text also says “(2) years” in the same cell).
Successfully completed O&M of MSW processing facility (MRF/RDF/Bioremediation/Compost/CBG/WtE/Landfill/C&D etc.) in last 7 FYs ending 31.03.2026, meeting 1/2/3 similar-contract value thresholds vs project value.
Minimum average annual turnover Rs.1.00 crore over FY 2023-24, 2024-25 and 2025-26; positive net worth for FY 2024-25; ITRs for last three FYs.
Valid PAN, GST, EPFO and ESIC (or self-declaration with later registration before agreement); no blacklisting/debarment; no material adverse litigation; not NPA; tender fee paid; EMD as specified (later waived).
JV permitted up to 3 members; bid only in Lead Member name on e-procurement; Lead equity ≥51%, each other member ≥20%; joint and several liability; project-specific MoU mandatory.
Financial bids open only after pre-qualification and a minimum technical score — stated both as 70 marks and as 60 marks in different places; no detailed marking table is printed.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Setting up of 198 TPD Municipal Solid Waste Processing, Treatment and Management Facility on EPC & O&M basis at the Dumping yard Site, Khammam Municipal Corporation, for 6 months EPC + 5 years O&M.
Design, build, operate and maintain MSW processing including MRF, compost, RDF or other suitable technology except MSW incineration; closed environment; max 20% rejects dumping.
ULB/KMC provides listed plant machinery and some mobile equipment; contractor installs, commissions, fuels and O&Ms within its scope.
Contractor runs facility for 5-year O&M with manpower, housekeeping, fire safety, PPE, training of KMC manpower, supervisor deployment, and statutory compliance.
Project site is the existing dumping yard / SWM site in Khammam Municipal Corporation; works must meet SWM Rules 2016, SPCB CTE/CTO, FCO compost standards and EOI Appendices VII–IX specifications.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Bids are to be processed on the e-procurement platform; a later EOI modification says physical submission of technical proposals, bid security and bid processing fee can be dispensed and offline references stand modified for online tenders.
EOI still describes four inner envelopes (Eligibility, Technical, Financial, Copy of Documents) placed in a sealed outer envelope, each marked with project identification, envelope number, bidder name/address and Bid Due Date.
Authorised signatory must sign the Bid and initial each page in blue ink; supporting certificates to be attested by the bidder; self-declarations on letterhead duly signed and stamped where specified.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
Date corrigendum published 01.09.2026 with no attached document in this pack; original EOI bid due date was 02.09.2026, so any extension text is not available to quote from files.
Issued first pre-bid reply set covering scope, land, 20% inerts, DRCC, vehicles, manpower, EMD (then not waived), NPV, BG/insurance, lock-in, measurement and ULB machinery list.
Supersedes Corrigendum 2 replies on key commercial/process points: Bid Security waived; process reframed as proposals now with online tender later; eligibility/formats still largely “as previous bid document”.
Further Date corrigendum published 09.09.2026 with no attached file; final submission/opening calendar after this corrigendum is not printed in available documents.
Bid Security waived; Cost of EOI Rs.15,000 remains; capacity 198 TPD; PG 2.5% of quoted price bid value; eligibility largely as EOI; process ambiguous between current proposal submission and a later online tender.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
EOI mandates Rs.20,00,000 Bid Security/EMD; Corrigendum 3 revised pre-bid states Bid Security is waived off (prevailing for EOI-stage security).
Letter of Invitation and evaluation clauses require 70 marks; eligibility notes require 60 marks; no marking matrix is printed to resolve either threshold.
Tender Data Sheet/Appendix-V note use 6 months validity; Clauses 2.1.5 and 2.19 use 120 days with 60-day claim period.
Original schedule pays capital in 50%+20%+15%+15% tranches through 2-year DLP; modified clause pays 75% on commissioning and holds balance through year 5, with internal 20% vs 10%+15% mismatch.
Execution O&M escalation is 5% per year (non-compounding in modified clause); financial evaluation NPV uses 1.10^n uplift on quoted 1st-year O&M with 10% discount rate.
Title/data sheet/scope use 198 TPD at Khammam dumping yard; envelope marking and some BG proforma text still say 185 TPD at Balemla Site for Khammam Municipal Council.
Project duration is 5 years O&M almost everywhere, but a clause states the Trommel-equipped facility shall be operated and maintained for one (1) year from Effective Date.
Eligibility Sr.No 1 writes “three (2) years”; Sr.No 2 third limb writes “forty percent (3o%)” — internal drafting errors.
EOI instructs Appendix IV financial format only on e-procurement and not uploaded; Corrigendum 3 says Appendix IV shall be submitted as a sealed document.
EOI is written as LCS award with LOA and contract signing; Corrigendum 3 says online tender will be published based on submitted proposals and frames EOI as shortlisting/market sounding with no right to award.
One clause selects higher technical marks on identical assessed Bid Price; another selects highest turnover in any three consecutive years of last ten FYs.
Detailed physical ORIGINAL+2 copies and four-envelope filing remain; modification F says physical submission can be dispensed and offline references modified for e-procurement.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Corrigendum 3 says an online tender will be published based on proposals and EOI creates no right to award, while the base EOI runs full LCS/LOA mechanics — confirm before pricing capital+O&M.
Revised reply waives Bid Security, but portal metadata/original EOI still show EMD/Bid Security amounts — get written portal/compliance confirmation to avoid non-responsive upload.
Eligibility similar-work thresholds are % of “project value specified in the EOI”, but Indicative Project Cost is blank — request notified project cost or absolute experience values.
Request a single consolidated payment clause replacing original 50/20/15/15 schedule and modified 75%+retention wording (including the 20% vs 10%+15% error).
No scoring table is printed yet financial opening depends on minimum marks — request full marking system and controlling threshold.
Base EOI focuses on MSWPF at dump yard with ULB machinery; Corrigendum 3 broad scope table adds secondary collection, GPS transport, sanitary waste, IEC — confirm inclusions/exclusions and measurement.
EOI itself notes draft concession agreement with penalty clauses must still be incorporated; Corrigendum 3 says final penalties/security/termination will be in subsequent procurement document — material unpriced risk.
Date corrigenda have no files in the pack; only original 02.09.2026 15:00 IST is printed — request the controlling portal timetable.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
Bidders may be asked for priced financials now while Corrigendum 3 indicates a later online tender and no right to award, creating free optionality for the Authority and pricing risk for bidders.
Even with Bid Security waived, contractor funds Performance Guarantee on full quoted capital+5yr O&M, bill-wise FSD, long capital retentions through year 5, and 10% O&M performance retention.
No quantified liquidated damages schedule is printed; EOI admits draft agreement with penalty clauses still needs incorporation; final penalties deferred to later procurement text.
Throughput revenue/O&M metrics depend on KMC supplying minimum assured MSW, site, utilities, clearances and listed machinery; contractor still bears install/O&M/fuel and cannot assume DRCC closure or extra quantity treatment without directions.
6-month design-build-commission window from agreement signing is aggressive for a 198 TPD closed MSWPF; technical scoring matrix absent and 60/70 mark conflict increases award-challenge risk.
Authority may cancel/modify process without liability; bidder bears all bid costs; broad release of Authority from claims; conflict-of-interest and adviser rules can forfeit security/disqualify.
Blank project cost plus “three (2) years” and “forty percent (3o%)” drafting errors create rejection/dispute risk if evaluators apply inconsistent readings.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Commissioner, Khammam Municipal Corporation (Authority), Municipal Administration & Urban Development Department, Government of Telangana.
O/o. Commissioner, Khammam Municipal Corporation, Telangana; detailed envelope address to Deputy Commissioner K.Srinivasa Rao, Khammam Municipal Corporation, Khammam-507001.
Clarification queries to be notified in writing and by e-mail to [email protected].