Key dates
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
6
Publication / NIT issue
NIT issued/dated 17.08.2026; tender download opens the same day on the MHRD e-Wizard portal.
Cover page of Technical Bid: Date of Issue of NIT 17.08.2026; downloading 17.08.2026 to 07.09.2026.
NIT notice also dated Aug 17, 2026 with e-Tender No. IIMK/CIVIL/e-12/2026-27 dt. 17.08.2026.
Pre-bid / clarification deadline
Queries/clarifications due by 31.08.2026 up to 5:00 p.m.; answers to be uploaded as corrigendum on 01.09.2026.
Queries only via email to [email protected]; late queries not entertained.
Q&A form part of the tender document and contract agreement.
Bid submission deadline
Online bid submission closes 07.09.2026 up to 03:00 p.m. (IST server time on portal).
Offline/physical bids are not accepted.
Portal availability window ends the same date/time.
Bid opening
Technical Bid (Part I / NIT) opens 07.09.2026 at 04:00 p.m.; Price-Bid of technically qualified bidders opens on a later date announced by IIMK.
If opening day is a holiday, opening shifts to next working day at the same time.
Bidders can log into the portal for opening updates.
Bid validity
Bids remain valid for a minimum of 90 days beyond/after tender opening; IIMK may seek further extension (additional 30 days stated under acceptance period).
Shorter validity is non-responsive.
Withdrawal/modification within validity attracts 50% EMD forfeiture (see risks/financials).
Contract start / duration milestones
Mobilisation within 15 days of Work Order; initial AMC period 2 years (stated effective from 14.10.2026 in GCC/special conditions), extendable by about one further year on mutual consent/satisfactory performance.
Appendix-I: Period of Contract 2 Years (extendable up to One Year on Satisfactory Performance and mutual consent).
GCC states duration Two year/three years as the case may be, effective from 14.10.2026.
Contract papers to be signed within seven days of intimation after acceptance.
Financials
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
6
Estimated / probable contract value
Probable Amount of Contract / Approx. Value of Work is Rs. 68,60,000/- (Rs 68.60 Lakhs).
Covers two-year AMC (Schedule A) plus Schedule B equipment SITC/buy-back items in the price bid.
EMD / bid security
EMD Rs. 2,06,000/- (Rupees Two Lakh and Six Thousand Only) via E-Payment on the e-procurement portal; MSEs registered on Udyam for the relevant category are exempt.
No interest on EMD.
EMD returned on furnishing Performance Guarantee.
Forfeiture rules: 50% if bid withdrawn/modified within 90-day validity before award; full forfeiture after award if agreement not executed/work not taken up or award terms not complied with; also forfeitable if selected contractor fails to accept/sign agreement or start on stipulated date.
Tender document fee
No tender document fee is stated; documents are available for download on https://mhrd.ewizard.in during the tender window.
Performance security / security deposit
Performance Guarantee (Security Deposit) = 7% of contract value, as e-bank guarantee / DD / Deposit at call receipt / Fixed Deposit, valid for contract period plus two months.
Furnish within ten days of award (NIT clause 1.21); Tender Form separately says within 7 days — see contradictions.
e-BG must be backed by SFMS IFIN 760 message to ICICI Bank, IFSC ICIC0000444, Kunnamangalam Branch.
Special conditions require BG/FDR from a Nationalized Bank in favour of IIM Kozhikode before signing agreement.
No interest. Return after successful contract period (1.22); special condition 25 also says after six months of satisfactory completion/termination after adjusting dues — see contradictions.
Payment terms & taxes
Monthly RA bills; GST @ 18% on quoted rates as separate line item; TDS applicable; minimum-wage/statutory component revisions claimable every six months.
Bill for previous month on first working day of current month (1.23); special conditions also say submit by 5th and settlement in 30 working days / within thirty days of bill receipt (GCC).
Payment by cheque on SBI in contractor's favour (special conditions).
Actual payment adjusted to actual manpower deployment.
Quote not less than Central Government minimum wages (Supervisor Basic+VDA guidance Rs.1008/day with 10% extra allowance; Operator Rs.918/day per SoW annexure).
Major repairs initially borne by contractor and reimbursed on actuals after verification.
Offers firm; only minimum wage revision and government levy/tax changes payable at actuals.
Pricing structure (what is bid)
Item-rate e-tender: Schedule A (2-year O&M manpower, AMC consumables/chemicals, overheads, service charge, insurance, annual filter media) + Schedule B (specified STP equipment SITC with buy-back).
Schedule A builds annual total then multiplies by 2 years, with GST 18%.
Schedule B: 1 sewage transfer pump, 2 filter feed pumps, 1 blower motor, 1 blower, and buy-back of 2 nos 3 HP filter feed pumps and 1 nos 12.5 HP blower (without motor).
Eligibility
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
7
Similar-work experience (financial thresholds)
In last 7 years, satisfactorily completed: one similar work of Rs. 54.880 Lakhs (two-year contract), OR two of Rs. 41.16 Lakhs each, OR three of Rs. 27.44 Lakhs each.
Cost of works = gross value of completed work including client-supplied materials, excluding free-issue materials.
Completion to be certified by officer not below Executive Engineer/Project Manager or equivalent.
For private-body works, TDS Form 16A/26AS required to establish completion cost.
NIT defines similar work as O&M of Sewage & Water Treatment plants under MBBR/SBR technology; Technical Bid clause 1.2 text says 'Similar works means Civil/Building construction works' — material conflict (see contradictions).
STP/WTP maintenance experience (additional)
Special conditions require certificates/work orders showing minimum three years’ experience in Maintenance of STP/WTP works for Govt/PSUs/Nationalized Banks/large industrial units/companies — bid rejected without listed proofs.
Also need proof of sufficient Supervisor & workmen for a single client on need basis.
NIT invites experienced contractors from CPWD, KPWD, MES, PSUs, etc.
Registrations, local presence and statutory setup
Mandatory GST, PAN + last 3 years ITRs, EPF & ESI registrations; documentary proof of local office at Kozhikode/Kunnamangalam; constitution documents; Quality/Process certifications evidence.
GCC Legal Compliances: bid liable to rejection without ESI/EPF/Contract Labour registration proofs.
Labour licence from competent authority within 45 days of award if applicable.
No separate turnover/net-worth threshold is stated.
GFR 144(xi) / land-border bidder restrictions
Bidders from countries sharing a land border with India are eligible only with valid registration from the Competent Authority of GoI under Rule 144(xi) GFR 2017; successful bidder cannot subcontract to unregistered contractors from such countries.
Bidder definition includes consortium/JV members; restriction applies if any member falls under the land-border criteria.
Consortium / JV and subcontracting
Consortium/JV is contemplated only in the GFR bidder definition; no equity floors/size caps are specified. Sub-letting the services contract to another agency/individual is prohibited.
Debarment / blacklisting disclosure
Response Format requires disclosure whether firm was ever debarred by any Court of law OR penalized by any Government/PSU/Private organization, with self-attested certificate.
Supervisor: minimum Diploma in Civil/Mechanical Engineering + 5 years relevant experience; Operators/workmen: minimum 2 years relevant experience; age not above 60 at contract signing; police-verified antecedents.
Institute may accept/reject proposed personnel on qualification/experience.
Round-the-clock 365-day operation with minimum 1 Supervisor + 5 Operators on 3-shift basis.
Scope of work
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
6
What is procured
Two-year AMC for Operation & Maintenance of Sewage Treatment Plant (STP) and Water Treatment Plant (WTP) — Plant-1 near Main Security Gate, IIM Kozhikode Campus — plus specified equipment supply/installation/buy-back under Schedule B.
Scope also covers pond pumps/machinery pumping water to WTP, clarifiers, panel boards, internal lines and other plant services as required by the Institute.
Contract reviewable after six months; extendable ~1 further year on mutual terms.
Plant process, capacity and performance standards
STP is SBR-based (~350 cum/day design when institute fully operational) with tertiary chlorine disinfection, sand/carbon filtration and screw-press sludge dewatering; treated effluent for gardening/flushing reuse.
Expected STP treated quality includes BOD <10 mg/l, COD <50 mg/l, pH 6.5-8.5 (design section) / discharge liability standards under IS:2490/CPCB also list TSS 20 mg/l max, O&G 10 mg/l, faecal coliform 100, pH 5.5–8.5.
WTP drinking water to IS:10500-2012 essential characteristics.
Contractor liable for costs if discharged water/wastewater exceeds permissible limits.
Monthly lab testing of treated water and sewage from approved labs; samples by 10th of every month.
Manpower, shifts and service window
Minimum 1 Supervisor (day duty) + 5 Operators on 3-shift round-the-clock duty, 365 days including holidays/Sundays; weekly roster totals 1 supervisor and 5 operators.
Personnel familiarisation deployment at least 30 days before commencement at contractor cost (no separate payment).
Extra manpower if required on same terms.
Monthly expert visit to review plant operations.
No residential accommodation, subsidized food or transport from Institute.
Contractor-borne O&M inclusions
Quoted rates must cover chemicals, minor spares/consumables, lab charges, annual fine-bubble diffuser replacement, tools/PPE/uniforms, basic plant mobile phone & recharge, quarterly authorised-agency equipment servicing, and at least annual sand/carbon/membrane filter media replacement for STP & WTP.
Chemicals explicitly include Alum/coagulant, Chlorine (WTP & STP), DAP, Urea, polymer for screw press (Zetag 8127 cited in SoW), residual chlorine kit, gear oil/grease, bearings, gaskets, belts, fuses, membranes, sludge sacks, etc.
Sand filter and carbon filter medium at STP to be changed yearly (special conditions).
Dewatered bio-sludge collected/stored by contractor; disposal/use for gardening by Institute.
Major repairs (motor rewinding, cables, impeller/lobe replacement, blower overhaul, panel overhaul due to voltage fluctuation, etc.) executed by contractor then reimbursed on actuals after approval.
Schedule B equipment works
SITC of specified Kirloskar sewage transfer pump (1), Kirloskar filter feed pumps (2), CG motor for Kay blower (1), Kay twin-lobe blower 250 m3/hr (1), with pipeline modifications; buy-back of existing 2×3 HP filter feed pumps and 1×12.5 HP blower without motor.
Rates to include modification of existing pipelines with new pipes/accessories/fittings.
Defects liability
Defect Liability Period of 60 days from actual date of completion; defects noted in this period to be rectified at contractor cost, else Institute gets them done at contractor risk and cost.
Required documents & submission
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
33
Submission mode and portal
Online-only two-bid e-tender on https://mhrd.ewizard.in (MHRD e-Wizard); freeze bid after upload; offline bids not accepted.
Part I Technical Bid and Part II Schedule of Quantities (Price-Bid).
Financial bid only in prescribed portal/format; SoQ template must not be modified.
Print and retain bid summary acknowledgement after successful submission.
Server clock IST (GMT+5:30) governs deadlines.
Digital signature
Valid Class III DSC with signing and encryption key from a CCA-recognised Certifying Authority required; uploaded documents digitally signed with bidder e-token.
Only one valid DSC per bidder account; do not lend DSC.
Registration on portal with email/mobile required before bidding.
Signing / attestation rules
Sign tender forms with official seal; company tenders by MD/Director authorised on that behalf; partnership tenders by partner with PoA and certified registered partnership deed; serially number and initial all loose papers.
No alterations to tender documents; special conditions attached by bidder can cause rejection.
Annexures I–IV to be filled in specified Excel formats on portal.
Relative employed at IIMK must be disclosed in writing with tender.
Physical originals
No physical bid/EMD submission channel is provided; offline tenders are not accepted. EMD is portal e-payment only.
Post-award physical instruments may arise for PBG/DD/FDR and agreement on non-judicial stamp paper, but pre-bid physical originals package is not prescribed.
Corrigendum analysis
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
1
No corrigendum in the tender pack
The available tender documents (NIT.pdf, Technicalbid.pdf, SoW.pdf) contain no issued corrigendum/addendum file; only a planned query-reply corrigendum date of 01.09.2026 is stated.
Bidders must still check https://mhrd.ewizard.in and IIMK tender webpage before bid freeze for any later corrigendum.
Final applicable dates/values are therefore those in the original NIT/Technical Bid/SoW as summarised in other sections.
Contradictions
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
9
Definition of 'similar work'
NIT defines similar work as O&M of Sewage & Water Treatment plants under MBBR/SBR technology, while Technical Bid clause 1.2 states 'Similar works means Civil/Building construction works'.
Special condition 53.d further requires minimum three years’ Maintenance of STP/WTP experience.
For bid strategy, treat STP/WTP O&M (MBBR/SBR) as the work-type intended by NIT/SoW title and seek written clarification before relying on civil-building credentials alone.
No corrigendum resolves this in the pack.
Performance Guarantee submission timeline
Clause 1.21 requires PBG within Ten days of award; Tender Form requires deposit of 7% PBG within 7 days of award; special condition 24 requires Security Deposit before signing agreement (agreement itself within 7 days of intimation).
Practical reading: be ready to furnish 7% security within 7 days and in any case before agreement signing, while clause 1.21 outer mark is 10 days — confirm with IIMK if needed.
Security Deposit refund timing
Clause 1.22 returns security deposit after successful contract period; special condition 25 returns it after six months of satisfactory completion/termination after dues adjustment.
Bidder should price working-capital assuming up to 6 months post-completion retention unless clarified.
Contract extension / effective start wording
Appendix-I and special condition 83: 2 years extendable by one more year; clause 1.15 says 'extendable up to three years'; GCC says Two year/three years effective from 14.10.2026; clause 53 says agreement initially Two Years from 14.10.2026.
Prevailing commercial structure in price bid is clearly a 2-year priced AMC (SoW total for two years) with optional further extension on mutual consent.
Termination notice period
Clause 53 allows either party to terminate on three months’ notice; clause 84 ending text allows termination by either party on mutual consent by 90 days’ notice.
Three months ≈ 90 days, but one text is unilateral notice and the other is mutual consent — clarify before relying on exit rights.
Mobilisation / deployment start timelines
Work commencement/deployment within 15 days of Work Order (1.15/Appendix-I); Tender Form undertakes labour deployment within 7 days of acceptance intimation; GCC requires skilled personnel at site at least 30 days before commencement for familiarisation (unpaid).
30-day unpaid familiarisation before 14.10.2026 effective start is a material cost/risk if enforced with the stated effective date.
Monthly bill submission day
Clause 1.23: bill on first working day of current month; special condition 10: submit bills every month by 5th; GCC Institute responsibility: pay within 30 days of bill receipt.
Bonus obligation wording
GCC Legal Compliances require contractor to extend Annual Bonus among other benefits; special condition 30(g) states Payment of Bonus Act does not apply to employees of universities/educational institutions and IIMK would not be required to pay bonus to contract workers.
Clarify whether bonus is contractor’s statutory burden outside Institute reimbursement, or not payable at all for this deployment.
Insurance clause cross-reference in SoW
SoW Schedule A item 13 cites insurance 'as specified under Clause 1.24 of the Tender Document', but in Technical Bid clause 1.24 is E.S.I. & Provident Fund Obligations and Insurance is clause 1.25.
Substance of required EC/Mediclaim/GPA covers is still set out under Insurance clause 1.25 / SoW item 13 text.
Pre-bid queries
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
6
Confirm controlling definition of similar work
Ask IIMK to confirm whether eligibility similar works are STP/WTP O&M under MBBR/SBR (NIT footnote) or Civil/Building construction (clause 1.2), and how the separate 3-year STP/WTP maintenance proof interacts.
Material bid/no-bid and partnering decision; request corrigendum language.
Local office at Kozhikode/Kunnamangalam — must it pre-exist at bid?
Clarify whether documentary proof of local office must exist before bid submission or may be established within a stated time after LOA, and what documents constitute acceptable proof.
Clause 53 makes absence a hard rejection ground.
Unpaid 30-day pre-commencement familiarisation vs 14.10.2026 start
Seek confirmation whether the mandatory unpaid 30-day familiarisation deployment applies before the stated 14.10.2026 effective date, and whether any mobilisation payment is admissible.
Affects manpower cash flow and bid loading.
Major repair reimbursement scope and turnaround
Request a worked list of what is contractor-inclusive vs reimbursable major repair, approval workflow, and typical reimbursement timeline, especially given contractor must initially fund major repairs.
Also clarify risk allocation for failures attributed to poor maintenance (full cost recovery from bills/SD).
Quality/Process certification expectation
Ask which Quality or Process certifications are acceptable under clause 53.k (ISO 9001/14001, OEM process certs, PCB consents, etc.), since non-attachment is stated as rejection ground.
Security deposit release and termination notice mechanics
Confirm whether SD is released at contract end or only after +6 months, and whether exit is on unilateral 3-month notice or only mutual 90-day consent.
Risks
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
7
Delay compensation / LD
Compensation for delay @1% per week of delay, capped at 10% of tendered value (or of the segregated item group’s tendered value).
Milestone shortfalls may lead to withholding amounts adjusted against EOT compensation.
Institute decision in writing is final.
Performance fines, risk-and-cost and termination
Unsatisfactory service attracts fine not less than ₹1,000 per occasion or equal to Institute loss; repeated failure after 7-day show-cause allows termination, SD forfeiture, risk-and-cost retendering and recovery beyond SD from pending bills — no contractor compensation.
Director is sole judge of unsatisfactory service.
Loss/damage from negligence must be made good within 7 days or SD/dues recovery and/or termination can follow.
EMD / award compliance forfeiture
50% EMD forfeiture for withdrawal/unaccepted modification within 90-day validity; full EMD forfeiture after award for failure to execute agreement, take up work, or comply with award/agreement terms.
High inclusive cost & treatment-quality liability
Contractor rates must absorb chemicals, spares, lab testing, annual media/diffuser replacement, PPE, phone, expert visits and authorised servicing; still liable for costs if effluent/water exceeds PCB/IS limits.
Poor-maintenance-caused equipment damage recovered from bills/SD.
7% PBG locked for contract + 2 months (and possibly +6 months return under special conditions) is significant working capital (~₹4.8 Lakh on PAC, more on actual contract value).
Labour-law, insurance and manpower rigidity
Full statutory compliance (CLRA, min wages Kozhikode B-region, EPF/ESI, etc.) on contractor; Institute may withhold ESI/EPF claim amounts; insurance minima are high; staff changes need Institute concurrence; age cap 60; police verification mandatory.
Wages payable by 3rd of every month in presence of Institute representative.
Payment only for actual deployment — absenteeism directly cuts revenue while 365×24 coverage obligation remains.
Arbitration sole arbitrator is Director, IIMK or nominee — concentrated dispute forum risk.
Jurisdiction only Kunnamangalam/Kozhikode courts.
Price-bid evaluation anomaly
If words and figures differ in price bid, the higher amount is taken as bid price — unusual vs typical lower/words-prevail rules and can inflate evaluated price against the bidder.
One-sided acceptance and scope flexibility
Institute may accept whole/part of tender at quoted rates, not bound to accept lowest; may modify shift timings with 7 days’ notice; Engineer-in-Charge may alter chemical/equipment makes/grades; Institute may reject personnel without assigning reason.
Defect liability 60 days after completion still binds contractor for latent complaints from contract period.
Contacts
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
4
Tender inviting authority / Institute address
Indian Institute of Management Kozhikode, IIM Kozhikode Campus P.O, Kozhikode / Calicut – 673 570 (Kunnamangalam).
NIT signed Sd/- SM (EO).
Website: www.iimk.ac.in; tender page also referenced as http://www.iimk.ac.in/tender/tender.php (spelling as printed).
No separate physical bid-submission address applies — online only.
Technical queries to [email protected] not later than 31.08.2026 up to 5:00 p.m.
e-Wizard portal & helpdesk
Bid portal https://mhrd.ewizard.in; helpdesk contacts include Gagan 8448288987 / [email protected], Vijay 8448288989 / [email protected], Suriya 8448288994 / [email protected], plus numbers 8448288992, 8448288984, 8448288986, 8448288982, 8448288988.
PBG SFMS verification bank: ICICI Bank, IFSC ICIC0000444, Kunnamangalam Branch (not a bidder contact, but Institute bank channel for BG confirmations).