Bid publication date
Bid document is dated 27-07-2026 (GeM Bid GEM/2026/B/7834155).
- No corrigendum in the document set amends this date.
Loading…
POLYTHENE SHEET
National Aluminium Company Limited · Anugul, Odisha9660632
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
27 Jul 2026
17 Aug 2026
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
Bid document is dated 27-07-2026 (GeM Bid GEM/2026/B/7834155).
Bid End Date/Time is 17-08-2026 10:00:00.
Bid Opening Date/Time is 17-08-2026 10:30:00.
Bid Offer Validity is 90 days from the bid end date.
No separate pre-bid meeting date is fixed; pre-opening clarifications must be raised only online on GeM before bid opening.
Delivery is 45 days to the NALCO Smelter Plant consignee.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
No tender value, estimated cost or BOQ amount is stated in the bid documents.
EMD is not required for this bid.
ePBG / performance security is not required for this bid.
100% payment by e-mode within 10 days of CRAC and online bill submission; GST paid only after invoice reflects in NALCO's GSTR-2A/ANX-2.
PO quantity tolerance is +/- 5%; weighment items are accepted on Smelter weighbridge weight with +/- 0.5% tolerance.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Only Class-I and Class-II local suppliers under the Make in India order may bid; non-local suppliers are ineligible.
Bidders on NALCO holiday/negative list as on bid due date or during evaluation will not be considered.
A bidder from a country sharing a land border with India is eligible only if registered with the Competent Authority; false declaration can lead to immediate termination and legal action.
No specific experience, turnover, net-worth, or consortium/JV qualification criteria are printed in the bid/ATC.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Supply only of POLYTHENE SHEET (NATURAL), 36", total 6500 kg, to NALCO Smelter Plant, NALCO Nagar / Angul-759145, Odisha.
Virgin LDPE natural film, nominal 80 micron to IS 2508-2024, width 36 inch +/-1%, mechanical properties and packing/labelling as specified.
No GeM empanelled inspection agency is mandated; each lot needs a government/authorised lab test certificate, and site sample-roll performance decides lot acceptance.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Two-packet online bid on GeM; all bid documents and clarifications/representations must be submitted on the GeM portal only.
CA/CMA-certified documents must carry valid UDIN; annexure formats require authorised signatory signature and firm seal where indicated.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
The tender document set contains no corrigendum or addendum; original bid values apply as published.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
Technical sheet states single-wall thickness 80 micron (-10/+20%) and also 'total thickness should be 160 mm in tubular form', while mandatory labels require 'Thickness-160 Micron'.
This bid sets ePBG Required: No, while GeM GTC clause 7 provides for Performance Security up to 5% on e-bid contracts.
GeM bid header says EMD Required: No, but ATC mandatory-document list still includes EMD 'wherever applicable'.
Land-border guidelines page is headed both Annexure-XI and '(Annexure- VIII)'.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask buyer to confirm whether supply is 80 micron single film in tubular form with 160 micron total wall, and that '160 mm' is a typo for 160 micron.
Seek written definition of 'successful performance' of the 5 sample rolls, the test period, who decides, and whether the balance lot is held unpaid/unaccepted pending site trial.
Ask what guarantee/warranty period and liability apply, because ATC headings mention Guarantee/Warranty but only prescribe test certificates.
Ask buyer to identify the exact 'Confirmation to commercial terms, ATC & GTC' file and confirm that no experience/turnover PQC applies despite the PQC document bullet.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
Whole lot is accepted only after successful site performance of 5 sample rolls drawn from that lot, creating acceptance and cash-flow risk.
Under GeM GTC, delayed delivery attracts LD @ 0.5% of delayed quantity contract value per week (or part), capped at 5% normally and 10% for inordinate delay (>25% of completion period).
Missing bid certificates can reject the offer; missing supply documents can cause rejection of all supplied material.
Payable/accepted weight is Smelter weighbridge weight (+/-0.5%); net weight deducts core and packing; PO qty may vary +/-5%.
GST is paid only after invoice reflects in NALCO GSTR-2A/ANX-2; TDS u/s 194Q and anti-profiteering obligations apply.
Documents uploaded by bidders, including clarification/representation documents, are shown to other participated bidders after login.
45-day delivery is relatively tight for custom-labelled virgin LDPE rolls with government lab test certificates per lot.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
National Aluminium Company Limited (NALCO), Materials Department — Smelter Plant, Angul-759145, Odisha (organisation also shown as NALCO Bhubaneswar).
Ms. Naneeta Priyadarshini, Sr. Manager (Materials), Purchase — email [email protected], phone 9437477873.
HOD grievance email: [email protected].
Technical compliance sheet letterhead contact: [email protected]; Tel 06764-220459; Mobile 9439054597.
Spares/equipment CRAC: Mr. Subhendu Mishra, Manager (Mat.), Central Store — [email protected]. Raw materials: Mr. Bibhuti Bhusan Das, SM (Mat), Central Store — [email protected].
Finance contacts by seller name initial: A–L Ms. Sandeep Sah, Mgr (Fin.) [email protected]; M–Z Mr. J.K. Jena, AM (Fin.) [email protected].
If original DD/Cheque for CPBG/EMD/SD were required, send to GM (Finance), NALCO Smelter Plant, Angul-759145, Odisha, with GeM bid/contract number and subject on the envelope.