Tender publication / tender date
Tender dated and published on 31-07-2026; online bid submission opens the same day at 11:40.
- Tender No. SDSC SHAR/RO PURCHASE/SH202600098501.
- No corrigendum amends this date in the available documents.
Loading…
SUPPLY, INSTALLATION AND COMMISSIONING OF PROCESS VIDEO SURVEILLANCE SYSTEM
Satish Dhawan Space Centre Sriharikota · Nellore, Andhra PradeshSH202600098501
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
31 Jul 2026
21 Aug 2026
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
Tender dated and published on 31-07-2026; online bid submission opens the same day at 11:40.
Bid clarification due date is 07-08-2026 at 14:00.
Online bid submission due date is 21-08-2026 at 14:00.
Bid opening (Part-I) is scheduled on 21-08-2026 at 14:03.
Price bid opening is scheduled on 25-09-2026 at 14:00.
Offer validity required is 120 days for this two-part tender; the start point differs between documents.
Supply within 16 weeks of PO; installation/commissioning within 12 weeks of site clearance; overall completion within 28 weeks of PO. POC within two weeks after technical bid opening or a date communicated by the Department.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
No tender value or estimated project cost is stated in the tender documents.
Tender fee is not applicable.
Earnest Money Deposit is not applicable unless mentioned in the RFP; the RFP does not prescribe any EMD amount.
3% of order/contract value is required as interest-free Security Deposit for due performance until completion/acceptance.
3% of total order/contract value is required as Performance Bank Guarantee covering the warranty period.
80% of supply cost after CLIP clearance at SHAR; remaining 20% of supply cost plus 100% of installation cost after installation, commissioning and CLIP clearance.
Applicable GST/IGST is 5% for supply and erection/installation under the cited scientific-equipment notification; End Use Certificate will be issued.
LD at 0.5% per week or part thereof on the undelivered portion, capped at 10% of order/PO value.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Bidder must have prior process video surveillance experience and meet both camera-count and value thresholds over the last five years.
Average annual turnover not less than Rs. 275 Lakhs over last three FYs, with continuous profit in each of those years; current-year solvency of Rs. 100 lakhs required.
Bidder must exist for at least three years before tender issue, bid for the full scope only, and show backend OEM support for warranty and post-warranty.
Camera OEM must have 7 years in IP process video surveillance manufacturing; products need STQC and must satisfy ONVIF, MAC/IPR and land-border/blacklisting rules.
Only Class-I and Class-II local suppliers are admissible; local-content percentage must be declared or the offer is summarily rejected.
MSE purchase preference and turnover/experience exemptions are available to eligible manufacturers/service providers and Startups, subject to valid registration evidence.
Self-declaration of no blacklisting/vigilance inquiry is mandatory; failure to demonstrate the required POC leads to rejection.
No express consortium size, equity floor or lead-member rules are prescribed; organisation type may be Proprietary/Pvt. Ltd/Public Ltd/Joint Venture/Consortium in the vendor format.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Supply, installation, testing and commissioning of a Process Video Surveillance System at SDSC SHAR, Sriharikota, with 3-year comprehensive warranty support.
BOQ covers 50 Ex-proof PTZ cameras, 50 Ex-proof junction boxes, 64 weather-proof PTZ cameras (with JBs/mounts), 14 km armoured CAT6 cable, plus installation of all 114 cameras.
End-to-end dismantling of old analog CCTV, supply/install of new IP PTZ cameras and junction boxes, armoured CAT6 laying/termination, NVR and Genetec Omnicast integration, testing, training and handover.
Department provides inter-facility network connectivity and central CCTV control, VMS/servers/storage, and power for cameras and network switches.
Works are at SDSC SHAR, Sriharikota (32 facilities). Overall supply and installation must finish within 28 weeks from PO release.
Ex-proof and weather-proof 4MP IP PTZ cameras with ≥30x optical zoom, ONVIF, STQC and related certifications; armoured CAT6 copper cable to TIA/EIA and ISO standards.
Three-year comprehensive warranty from acceptance of the fully commissioned system, with max 48-hour device downtime and free repair/replace at site.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Two-part bids are to be submitted online only on the ISRO e-procurement portal; physical bids are not considered.
Proposal/RFP set to be signed and stamped as acceptance; vendor evaluation questionnaire signed by authorised person; commercial deviations and taxes must be stated clearly.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
The workspace contains only the base tender document and RFP; no corrigendum or addendum files are present, so original schedule and conditions stand as published.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
Both documents require 120-day validity, but RFP measures it from bid submission due date while the tender document measures it from Part-1 opening.
RFP requires SD within 10 days of PO with BG valid 90 days beyond completion; tender commercial terms require SD within 14 days, valid till delivery period plus 60 days claim period.
RFP awards matched MSE contract for 100% of quantity, while the tender document awards 25% of quantity; both cannot operate together with the no-split-order rule.
Annexure-II requires a 100% uptime guarantee, while Section A warranty allows up to 48 hours device downtime.
Minimum qualification uses last five years for similar works, while Part-I project list asks for last three financial years ending 31.03.2026.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask SDSC SHAR to confirm whether an eligible MSE matching L1 gets 25% or 100% quantity, and how that coexists with the repeated no-split / overall-L1-only condition.
Request confirmation that EMD is not required, and which Security Deposit clock and validity apply (10 days + 90 days beyond completion vs 14 days + delivery + 60 days claim).
Facilities are listed only as Facility 1–32 with no names/drawings; seek site survey access, actual camera mounting conditions, Ex-proof zone classifications, and basis for 14 km CAT6.
Clarify whether existing Genetec Omnicast licences/channels are sufficient for 114 cameras, who provides any extra licences, and what offline/online POC environment and pass criteria will be used.
Seek written reconciliation between Annexure-II 100% uptime guarantee and Section A 48-hour maximum downtime, including penalties if exceeded.
Ask how far clause 2.2.10 open-ended free supply of missing hardware/software extends, and whether the 7+7 spare cameras are installable extras or delivered spares only.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
28-week overall completion from PO, with supply in 16 weeks and installation in 12 weeks after site clearance, across 32 secure facilities.
Delay attracts 0.5%/week LD up to 10% of order value; unjustified delay may cancel the contract; warranty failures can be rectified at supplier risk and cost.
No advance: only 80% of supply after CLIP at site; remaining 20% supply plus all installation paid only after full installation/commissioning and CLIP.
Any missing hardware/software needed for operational completeness at installation must be supplied free; quoted rates already include minor civil and power cabling works.
3-year comprehensive on-site warranty with 48-hour max downtime (and Annexure-II 100% uptime wording), plus mandatory Genetec/third-party VMS-NVR integration.
Multiple hard gates: STQC, 7-year OEM manufacturing, land-border certificate, MII local-content declaration, no price in technical bid, and full-scope-only offers.
Work is inside SDSC SHAR with Ex-proof installations, dismantling of live analog systems, and full contractor responsibility for workmen safety and patent/accident risks.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Satish Dhawan Space Centre SHAR (SDSC SHAR), Department of Space / ISRO, Sriharikota – 524 124, Andhra Pradesh; purchase entity RO PURCHASE.
Phone 08623-225127 / 6366; Fax 08623-225170 / 22-5028; emails [email protected], [email protected], [email protected].
Bids online at https://eproc.vssc.gov.in. Security Deposit is to be deposited with the Accounts Officer, Satish Dhawan Space Centre SHAR, Sriharikota (DD/FDR/TDR on SBI payable at Sriharikota).