RFP issue / publication
RFP issued on 30/07/2026 (Tender No. TMTU/TM/WS/138/2026).
- Cover also carries RFP Number & date: TMTU/TM/WS/138/2026, Date: 30/07/2026.
- No corrigendum in the workspace; these remain the applicable dates.
Loading…
RFP for Procurement, Operation and Maintenance of Part 1 100 Nos. Midi (09mtrs) AC Electric Buses and Part 2 70 Nos. SD (12mtrs) AC Electric Buses and 10 Nos. Double Decker (09-10mtrs) AC Electric Buses on GROSS COST CONTRACT.
Thane Municipal Corporation Thane · Thane, Maharashtra2026_TMC_1324871_1
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
4 Aug 2026
25 Aug 2026
₹65.9 L
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
RFP issued on 30/07/2026 (Tender No. TMTU/TM/WS/138/2026).
Pre-bid meeting on 07/08/2026 at 11:30 Hrs at TMT Office, Wagle Estate; pre-bid queries after 06/08/2026 will not be entertained.
Online RFP download and bid upload from 30/07/2026 to 21/08/2026 up to 15:00 Hrs on mahatender.gov.in.
Technical bids open on 24/08/2026 at 15:00 Hrs (if possible).
Bids remain valid for not less than 120 days from the Bid Due Date.
LOA acknowledgement within 7 days; stamped Bus Operator Agreement within 15 days of LOA dispatch; Performance Security before agreement signing; 12-year contract from COD with mandatory refurbishment after 7th year.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
No overall tender estimated cost/project value is stated; commercial evaluation is on quoted per-km GCC rates against Assured Kilometers.
RFP fee Rs. 29,500/- (incl. GST @ 18%), payable online only; non-payment makes the bid non-responsive.
EMD Rs. 65,88,000/- payable only via e-tender portal payment gateway (Net banking/NEFT/RTGS); BG/DD not accepted for bid submission.
Rs. 1,00,000/- per bus as irrevocable BG from Nationalized/Scheduled Bank in favour of “Parivahan Seva, Thane Mahanagarpalika Thane”, before signing the Bus Operator Agreement.
Monthly per-km payment: invoice on 1st working day next month; 70% of estimated dues by 7th of that month; balance 30% on 7th working day of the following month after verification/deductions.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Single entity or Consortium (max 3 members: OEM / Bus Operator / Aggregator); only OEM or Bus Operator may be Lead Member; legally competent Indian company, partnership or registered proprietary firm.
Registered electric bus manufacturer in India with ≥50 Electric OR ≥200 HSD/CNG buses manufactured/delivered in last five FYs (incl. current) to STUs/PTAs/Govt bodies; CMVR type-approval of any one Midi/Standard electric AC bus model; MAAT > Rs. 75 Cr last 3 FYs; positive net worth in 3 of last 5 FYs; bank solvency ≥ Rs. 60 Cr.
Govt/STU O&M project reference (≥1 year in last 7 years); Part-1: ≥50 cyber-secured 9m e-buses for ≥6 months; Part-2: ≥100 e-buses or ≥200 Diesel/CNG/alt-fuel/hybrid for ≥6 months, plus ≥6 months ops of ≥10 Double Decker EV buses; MAAT Rs. 75 Cr last 3 FYs; positive NW in 3/5 FYs; solvency ≥ Rs. 60 Cr; OEM MAF + type approval; OEM AMC consent for entire contract if single bidder.
Minimum net worth Rs. 15 Cr as on 31 March 2026; MAAT Rs. 75 Cr last 3 FYs; bank solvency ≥ Rs. 60 Cr.
Lead Member ≥51% SPV equity for first 3 years from COD; other member(s) ≥10% during lock-in; all members jointly and severally liable; no composition change during bidding or lock-in.
Bidder, Associates used for qualification, and Consortium Members must not be blacklisted by any Indian Government Agency in the last 12 months before Bid Due Date for performance default/fraudulent conduct; self-attested Anti-blacklisting certificate (Annexure 6, notarized) required.
Minimum single-charge range with 80% SOC: 160 km for 9m, 160 km for 12m, 140 km for Double Decker; undertaking for single range and opportunity charging with ≥75 minutes plug-in/out slot required.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Selection of bus operator for procurement, operation and maintenance of AC electric stage-carriage buses on Gross Cost Contract (own-and-operate / opex) in Thane & neighbouring suburban cities and Mumbai.
Supply buses meeting Schedule-S/UBS-II/CMVR specs; drivers; O&M; depot/charging civil & electrical infrastructure (22 kVA HT); electricity charges; ITMS integration with TMTU; RTO/insurance; assured fleet availability; fleet deployment plan compliance.
9m & 12m: prototype structure ≤60 days LOA, fully built prototype ≤100 days LOA, then 25% lots at 30/60/90/120 days from final prototype approval; FCOD 120/220 days from LOA. Double Decker: structure ≤90, fully built ≤145, lots at 60/90/120/150 days from prototype approval; FCOD 300 days from LOA.
Bus technical specs in Schedule-S; ITMS per UBS-II and compatible with Authority CCC; Authority provides depot land/right of way and finalizes routes/schedules; operator cannot claim relief for bad roads/weather/traffic.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Single-stage two-part online bid (Technical + Price) only on https://www.mahatender.gov.in/nicgep/app; no separate physical bid submission process is prescribed in the RFP.
Bid must be signed by proprietor / PoA holder (company, corporation, partnership) / Lead Member authorized signatory; company PoA supported by Board Resolution uploaded in technical bid.
Upload scanned proof of online RFP fee and EMD in Part 1A; no BG/DD for EMD at bid stage.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
The downloaded tender set contains only Tendernotice_1.pdf, 180TD.pdf (RFP) and BOQ_2269177.xls; no corrigendum or addendum file is present, so original RFP/NIT/BOQ values apply as published.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
Clause 1.8 table allows pre-bid queries until 21/08/2026 before 15:00, but the Note on the same page says queries after 06/08/2026 will not be entertained.
NIT shows one EMD of Rs. 65,88,000/- for the RFP package, while Clause 2.5(a) states EMD of Rs. 65,88,000/- for each part.
Clause 2.3 gives exclusive jurisdiction to Courts at Mumbai, while Clause 10(a) Miscellaneous gives exclusive jurisdiction to Courts at Thane for the Bidding Process.
Bidders must quote only one Part, but Clause 5.3 says allocation to the tenderer who quoted the lowest rate for all three models.
Article 21.1.1 states Financial Close within 160 (one hundred and eighty) days—number and words disagree.
Supply schedule lists Final COD as '120/220 days from LOA' without explaining which figure applies.
Article 13.6.1 requires prototype chassis induction within 90 days of LOA, while Article 13.9(a) requires prototype structure inspection within 60 days of LOA for 9m/12m.
Clause 1.2(c) says non-lead members maintain ≥10% during the Contract Period, while Clause 7.4(b) ties the 10% holding to the first three years from COD (Lock-in Period).
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Is portal EMD Rs. 65.88 lakh once for the chosen Part, or Rs. 65.88 lakh × each Part as Clause 2.5 'for each part' suggests?
How is L1 decided for Part 2 (12m + DD)—sum of (rate × annual assured km × qty), lowest of both rates mandatory, or another formula—and what does 'lowest rate all three models' mean if only one Part may be quoted?
Is Rs. 35,84,444/- per bus subsidy guaranteed for all 180 buses, what if NCAP disbursement is delayed/reduced, and is the 0.25 paise per lakh reduction the sole adjustment mechanism?
Which FCOD binds for 9m/12m (120 or 220 days from LOA), and which prototype timeline prevails (structure inspection 60 days vs chassis induction 90 days)?
Who bears delays if DISCOM HT 22 kVA / permissions slip, and is there any Authority contribution or timeline relief for Kolshet bare-land civil works and charging infrastructure?
What evidence proves 'cyber secured' 9m e-bus operations for Part-1, and can DD EV experience be via Associate/OEM while Lead is operator, or must the bidding operator itself have operated ≥10 DD EVs?
Confirm binding Financial Close deadline and whether failure (even with partial financing) terminates the Agreement and allows encashment of Bid Security/PS equal to Bid Security.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
Rs. 2,000 per bus per day LD for late delivery with RTO registration; multi-lot delivery ending ~120–150 days after prototype approval plus FCOD pressure.
Heavy operational penalties (infraction slabs Rs. 100 to Rs. 50,000+; lost-km deductions up to 100% of trip; KPI damages; 5% of monthly invoice overall cap for penalties/damages/fines/performance deductions).
Must maintain 95→90% fleet availability; under-utilized assured km (when payable) only paid at 0.75× rate; shortfalls from bidder default/maintenance/accidents not compensated.
Bidder funds buses, 22 kVA HT supply, chargers, transformers, civil depot works (including bare land at Kolshet), electricity bills, RTO and insurance for 12 years with mandatory 7th-year refurbishment—no separate capex reimbursement beyond per-km and NCAP subsidy milestones.
Only 70% of estimated monthly dues paid on 7th; 30% delayed another month after audit—working-capital strain; PS Rs. 1 lakh/bus held full term + 3 months; EMD at risk until PS/Agreement.
Authority may accept/reject any bid without liability; successful bidder cannot seek deviation in Bus Operator Agreement; LOA non-acknowledgement forfeits EMD; unbalanced low/high price bids may be rejected after market-rate review.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Thane Municipal Transport Undertaking (Transport Wing of Thane Municipal Corporation), tender floated by Thane Municipal Corporation for TMTU.
Transport Manager, Thane Municipal Transport Office, Rd Number 27/34, Wagle Estate, Hanuman Nagar, Wagle Industrial Estate, Thane West, Maharashtra 400604; Email: [email protected] (also [email protected] on cover).
Documents are signed/stamped with Vidya Sawant, In-charge Chief Environment Officer, Thane Municipal Corporation, Thane (Marathi designation on page footers), alongside Transport Manager signature block.