Tender issue / sale start
Issue and sale of tender starts on 24.08.2026 from 11:00 Hours.
- Header Data of the e-tender notice / detailed tender.
- No corrigendum alters this date.
Loading…
Municipal Corporation of Greater Mumbai · Andheri East, Maharashtra2026_MCGM_1330681_1
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
24 Aug 2026
15 Sept 2026
₹2.1 Cr
₹2.5 L
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
Issue and sale of tender starts on 24.08.2026 from 11:00 Hours.
Last date and time for sale of tender is 03.09.2026 up to 16:00 Hours.
Online submission of Packet A, B & C and receipt of Bid Security Deposit must be completed by 03.09.2026 up to 16:00 Hours.
Packet A and Packet B open on 04.09.2026 after 16:00 Hours online in Ch. Engg. (BM)’s office. Header Data does not state a separate Packet C opening date.
Bids must remain valid for not less than 180 days after the bid submission deadline; shorter validity is non-responsive / ground for rejection.
Contract period / time for completion is 12 months including monsoon.
No pre-bid meeting date or clarification cut-off is fixed in Header Data; queries are to be emailed and GCC refers to a Header Data date that is not printed.
Contract documents and Contract Deposit within 30 days of LOA; Performance Guarantee within 15 days of LOA; ASD (if applicable) within 15 working days of LOA.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
Estimated cost excluding GST is Rs. 2,07,77,445/- (Civil Rs. 1,75,31,456/- + Electrical Rs. 32,45,989/-); including 18% GST Rs. 2,45,17,386/-.
Tender / scrutiny fee is Rs. 23,559/- (Rs.19,965/- + 9% SGST + 9% CGST), payable online while downloading from https://mahatenders.gov.in.
EMD is Rs. 2,46,000/- (Rupees Two Lakhs Forty Six Thousand Only), paid online through GOM payment gateways on https://mahatenders.gov.in; bid without EMD is summarily rejected.
Successful contractor pays Contract Deposit equal to 2% of the contract sum by Demand Draft only in favour of ‘Brihanmumbai Municipal Corporation’ within 30 days of LOA.
Retention Money is 5% of the Contract Sum, recovered from every interim / running / final bill; not applicable to M. & E. Department.
ASD applies only if rebate is more than 12% (circular CA(F)/Project/04 dtd. 08.07.2026), paid by DD at CFC within 15 working days of LOA.
PG is over and above Security Deposit; for premium/at-par/rebate 0–12% PG = 0.92% × contract sum applicable for 12% rebate; for rebate >12% additional X% of contract sum where X is rebate above 12%; payable within 15 days of LOA and valid till DLP or final bill finalisation, whichever is later.
Monthly running bills for works estimated above Rs.1,000; Employer pays certified amounts within 15 days of each Engineer’s certificate, subject to deductions (advance, retention, SD, statutory taxes).
Valid Bank Solvency Certificate of minimum Rs. 30,00,000/- (Rs. Thirty Lakhs only) as per Registration Rules for the contractor’s class is required in Packet A.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Open to reputed contractors — Proprietary/Partnership/Private Ltd/Public Ltd/companies under Companies Act 2013 — registered with BMC in Class III & above (new registration), or equivalent/superior class with Central/State Govt, Semi-Govt, or Central/State PSUs.
In own name, satisfactorily executed similar work in BMC / Semi Govt. / Govt. & Public Sector Organizations during last seven (7) years ending last day of month previous to bid invitation month, as Prime Contractor (or nominated Sub-Contractor meeting conditions).
Average annual financial turnover in all classes of civil engineering construction works only, certified by Chartered Accountant, equal to 30% of estimated cost of work in last three (3) financial years immediately preceding the Financial Year in which bids are invited.
Assessed Available Bid Capacity = (A × N × 2 − B) must be demonstrated; wrong bid-capacity calculation is a non-curable defect.
Even if qualifying criteria are met, bidders are disqualified for misleading/false qualification submissions and/or poor performance (abandoning works, not properly completing, inordinate delays, financial failures, etc.).
For cost Rs. 1.5 to 5 crore: Principal Technical Representative — 1 Graduate Engineer with 5 years; plus Project/Site Engineer — 1 Graduate Engineer with 2 years or Billing Engineer — 1 Diploma Engineer with 5 years.
Civil contractors must get Electrical/Mechanical work done through BMC-registered Class ‘A’ Electrical Category contractors; upload attested electrical registration and willingness undertaking with the tender.
Packet B must disclose litigation history for last 5 years covering blacklisting, debarring, banning, suspension, deregistration and cheating with BMC/State/Central Govt or authorities; if none, specifically state no litigation history.
Successful bidder must produce ESIC registration if establishment exceeds employee thresholds (10 with energy / 20 without), else Rs.500 stamp-paper undertaking; EPF if more than 20 employees, else similar undertaking — as and when demanded.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Repairs & beautification of Sagbaug Hindu Cemetery at Marol, Andheri (E) in K/East ward, Mumbai.
Civil scope covers roof replacements, toilet slab/roof and waterproofing, burial earth filling, pathways, SWD, plumbing/sanitation, doors/windows, masonry, flooring, anti-termite, plastering/pointing/painting.
Electrical estimate based on approximate site measurements: LED street lights and poles for compound and burial area; SFUs, DBs, MCBs, ELCBs, cables; and point wirings.
Commercial bid is on percentage over/under two BOQ components: Civil Works Rs. 1,75,31,456 and Electric Works Rs. 32,45,989 (total Rs. 2,07,77,445 excl. GST).
Complete the whole contract in 12 months including monsoon; Defect Liability Period is 3 years for general works and 5 years for structural and waterproofing works.
Special directions impose free barricading, own-cost debris disposal under C&D Waste Rules/DMP, licensed plumber, licensed structural engineer for structural repairs, night work if directed, noise limits, and approved materials list.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
E-tender only on https://mahatenders.gov.in under three-packet system (Packet A, B & C); freeze bid online; no fax/telex/telegram applications.
Missing Packet A/B documents are emailed; bidder has three working days to comply or is non-responsive. Maximum 5 shortfalls of curable defects allowed.
Bid documents are uploaded as scanned certified copies; specified undertakings on Rs.500/- stamp paper; Form of Tender & Appendix-I to be filled, signed, scanned and uploaded. No separate physical bid-submission address/deadline beyond online Header Data is prescribed for the bid packets.
Equal lowest percentage: preference order BMC-registered over others, then higher class, then earlier higher-class registration date, then earlier registration, else draw by Ch.E.(B.M.). If rebate/premium ≥15%, L1 must submit rate analysis of major items on demand (Annexure D) or 10% EMD forfeited.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
The downloaded tender set contains only Tendernotice_1.pdf, DTSagbaug.pdf and BOQ_2277939.xls; no corrigendum or addendum document is present, so original Header Data and conditions presently apply.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
Dedicated Bid Validity / rejection clauses require ≥180 days, but Form of Tender clause 5 still says keep tender open 120 days from opening. Prefer 180 days as the operative bid-validity rule and rejection standard; treat Form of Tender 120 days as unamended boilerplate conflict.
Section 2 Technical Capacity requires similar works in last seven (7) years, while Packet B document list repeatedly says last Five years / Proforma for five years. Eligibility criteria should drive qualification; Packet B five-year wording is inconsistent and creates evaluation risk.
Packet B requires ‘Annexure A (Irrevocable Undertaking) for compliance of provisions of GST Act’ on Rs.500 stamp paper, but printed ANNEXURE – A is only Contract Data (engineers, costs, EMD, time, DLP). No GST irrevocable-undertaking proforma is printed under that name.
Tender-specific EMD rules require online gateway payment only (not at CFC), yet the generic e-procurement instructions still say the original EMD should be posted/couriered/given in person and offline payment scanned copies must match physical. For this tender the specific online-EMD clauses govern; physical EMD is not the prescribed mode.
Notice says Packet A, B & C open on dates in Header Data, but Header Data only prints Opening of Packet A and B (04.09.2026 after 16:00). Packet C timing is left to later communication after A/B responsiveness.
GCC tells bidders to send queries before the date specified in Header Data, but Header Data has no pre-bid/clarification deadline.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Please confirm whether bid validity is 180 days (Bid Validity / Clause 59) or 120 days (Form of Tender cl.5), and whether Form of Tender should be amended before signing/uploading.
Confirm whether technical eligibility is last seven years (Section 2) or last five years (Packet B / Proforma), and which certificates will be evaluated.
Packet B requires Annexure A GST Irrevocable Undertaking on Rs.500 stamp paper, but Annexure A in the book is Contract Data only — please issue the correct GST undertaking format or clarify the document to upload.
For Assessed Bid Capacity, what N applies when contract period is ‘12 months including monsoon’ — 1.0 year, or months excluding monsoon plus 0.33 monsoon factor?
Please clarify site access restrictions, permitted working hours, coordination with burial/rites activities, and any stoppages around prayer hall / pyre shed / burial areas that affect programme and cost.
Confirm whether eligibility percentages apply on estimated cost excluding GST (Rs.2,07,77,445) or including GST (Rs.2,45,17,386).
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
For this 12-month job (between 6 months and 2 years), delay compensation is up to ½ percent of contract value per week, capped at 7½ percent; may be set off against sums due.
DLP is 3 years general / 5 years structural & waterproofing; Contract Deposit, balance RM and PG stay locked through DLP regimes, with BG to remain valid 6 months beyond DLP.
Rebates above 12% trigger ASD (escalating formula) and higher PG; missing ASD deadlines forfeits 10% then 100% EMD and can debar the company (and related director/partner companies) for two years.
Several mandatory costs are deemed included in the percentage quote with no separate payment: debris disposal, barricading, dewatering, site porta-cabin/chowky, temporary power, structural engineer, night work, etc.
Works at an active Hindu cemetery (burials fill, prayer hall, pyre shed, burial-area lighting) with silence-zone noise limits and possible night work create programme, stakeholder and stoppage risks not fully specified.
Engineer may rescind for default and forfeit Security Deposit; or complete departmentally/through another contractor at contractor’s risk and cost with limited recovery rights for work done.
About 10 calendar days from sale start (24.08.2026) to submission (03.09.2026); only 3 working days to cure document shortfalls; max 5 curable shortfalls; repeated non-responsiveness can lead to banning/de-registration.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Chief Engineer (Building Maintenance), 3rd floor, Engineering Hub Building, Dr. E. Moses Road, Worli Naka, Worli, Mumbai – 400018.
Engineer for this work: Chief Engineer (B.M.); Dy. Chief Engineer (B.M.) Subs; Ex.Eng. (BM) WS–I.
Tender queries / additional information only by e-mail to [email protected] with subject title of the work; any mail-ID change will be intimated on the portal.
NIC / MahaTenders portal https://mahatenders.gov.in for sale, submission, corrigenda and bidder help kit.