Publication / NIT date
NIT advertisement dated 10.08.2026; covering letter also dated 10/8/2026 (digitally signed 11.08.2026).
- No corrigendum changes this date.
- Portal metadata is not used as source; documents control.
Loading…
Work of separate earthing for lightning arresters installed on power transformers operational under 33/11 kV electrical substations under Electricity Distribution Circle, Sant Kabir Nagar.
Purvanchal Vidyut Vitran Nigam Limited · Sant Kabir Nagar, Uttar Pradesh2026_PVVNV_1176225_1
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
11 Aug 2026
1 Sept 2026
₹8,000
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
NIT advertisement dated 10.08.2026; covering letter also dated 10/8/2026 (digitally signed 11.08.2026).
No pre-bid meeting date or clarification deadline is stated in the tender documents.
Online submission last date: 01.09.2026 at 14:00 Hrs.
Tender opening: 02.09.2026 at 14:00 Hrs; if that day is a holiday/office closed, opens on the next working day.
Tender/rate validity shall not be less than 90 days from tender opening.
Work must be completed within a maximum of 3 months from the date of LOI/work order.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
No absolute estimated cost or tender value is stated in the NIT, tender document or BOQ (BOQ is bidder-rate based).
Tender document cost Rs. 1180.00 (Rs. 1000.00 + Rs. 180.00 GST @18%), non-refundable.
Earnest money Rs. 8000.00, via RTGS/NEFT only to the circle Axis Bank account; scanned UTR with Part-I.
Accepted bidder's earnest money is converted into security deposit (jamaanat) and returned only after satisfactory full completion as per rules.
Quoted prices must be firm; BOQ description is Excl. GST; payment after successful satisfactory completion via TBTS portal; income tax deducted at current rates from bills.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
RTGS/NEFT of tender fee and EMD into the departmental account in time is mandatory; deposits before the tender invitation date are not accepted.
Copy of valid solvency certificate issued by the District Magistrate, or bank solvency of 25% of tender amount.
Copy of valid character certificate issued by the District Magistrate.
Copy of registration with the Labour Department.
Class 'क' licence issued by the Electrical Safety Directorate, Lucknow, renewed for year 2026-27.
Copies of contracts of similar/same-nature works in last 5 years; plus minimum turnkey/semi-turnkey order value thresholds vs tender cost.
GST registration under Work and Contract; last 3 years' income-tax returns; and balance sheet of last 3 years showing turnover of 100% of tender value.
Notarised affidavit that all submitted documents are valid, no fact is concealed, and the firm is not blacklisted.
Owner's Aadhaar and PAN copies required; any Part-1 certificate whose validity has expired (current or up to previous year) causes Financial Bid Part-2 not to be opened.
If two or more firms quote the same rate, the firm with more experience gets first preference for allotment; no consortium/JV rules are stated.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Separate earthing for lightning arresters on power transformers at operational 33/11 kV substations under Electricity Distribution Circle, Sant Kabir Nagar (PuVVNL).
One priced item: Separate Delta Earthing of LA, 20 feet long, with all accessories complete as per site requirement — quantity 28 Nos (Excl. GST).
Work under direction/supervision of Executive Engineer, Electrical Testing Division, Sant Kabir Nagar; shutdown by concerned Junior Engineer; skilled labour only; contractor supplies all T&P and safety equipment.
Complete within maximum 3 months from LOI/work order; estimated quantities may vary ±10%; Engineer of Contract may vary item quantities within total contract amount.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
E-bid only on https://etender.up.nic.in; complete in all respects; no hard copy of Tender Bid Part-I required.
Part-1 technical/pre-qualifying; Part-2 financial opened only if Part-1 qualifies.
Tender proforma, E-Tender forms and schedules to be signed by the tenderer with seal; affidavit to be notarised; performance copies certified.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
The downloaded tender pack contains only Tendernotice_1.pdf, TD_16.docx and BOQ_2210408.xls — no corrigendum or addendum file is present.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
BOQ says all material is provided by the contractor; Works Terms say materials to be given by the department will be issued at store and the contractor must transport them to site.
E-Tender Form subject line cites E-Tender No. (16/EDC(SKN)/2025-26) while the tender specification throughout is 16/EDC(SKN)/2026-27.
Other Terms fix completion at maximum 3 months from LOI/work order, while the offer form asks the bidder to agree to a blank number of days for finalization and further 365 days for execution.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask the authority to publish the estimated cost used for 60%/40%/30% experience, 100% turnover and 25% bank solvency calculations.
Clarify whether any earthing materials are free-issue from PuVVNL stores or whether the contractor must supply 100% as the BOQ note states.
Request copies of General Conditions Form A/B and schedules I/II/III referenced for contract execution and deviation mapping.
Confirm whether any additional performance security percentage is recoverable on award, or only the Rs. 8000 EMD converted to jamaanat applies.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
If contractor fails to supply/execute within the stipulated period, deduction at 0.5% per week on the delayed portion, maximum 10%.
If contractor fails to finish in the time fixed by the authorised representative/Engineer of Contract, department may complete the work itself or via another agency and recover cost plus 25% overhead from bill/security/account.
Contract may be terminated anytime in special circumstances without assigning reason; undersigned may reject/accept any or all tenders without reason; lowest tender not guaranteed acceptance.
Payment after successful satisfactory completion (TBTS portal); contractor bears utility damage, material custody/theft replacement, and one-week free defect rectification.
Disputes: Chief Engineer (Distribution), Basti Zone, Basti is sole arbitrator and decision is final; court jurisdiction limited to District Santkabirnagar.
Any Part-1 certificate past validity blocks financial opening; electrical Class 'क' licence must specifically be renewed for 2026-27.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Superintending Engineer, Electricity Distribution Circle (EDC), Sant Kabir Nagar — Purvanchal Vidyut Vitaran Nigam Limited.
Chief Engineer (Distribution), Basti Zone, Basti — sole arbitrator for contractor–department disputes; also on NIT copy list.
All bidding and further notices via https://etender.up.nic.in.