Publication date
Bid dated 11-08-2026 (GeM Bid Number GEM/2026/B/7892040).
- No corrigendum amends the publication/bid date.
Loading…
SLEEPER
Steel Authority Of India Limited · Durg, Chhattisgarh9726642
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
11 Aug 2026
21 Aug 2026
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
Bid dated 11-08-2026 (GeM Bid Number GEM/2026/B/7892040).
No pre-bid meeting date or bidder clarification/query deadline is stated in the tender documents.
Bid End Date/Time: 21-08-2026 14:00:00.
Bid Opening Date/Time: 21-08-2026 14:30:00.
Bid Offer Validity: 90 Days from Bid End Date.
Consignee delivery days: 180 days for full quantity 3000 set at Bhilai Steel Plant.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
No explicit tender value or estimated cost is stated in the bid document or ATC.
EMD is not applicable / not required.
No tender fee is charged; GeM bid disclaimer treats seeking tender/bid participation fee as invalid.
ATC requires successful bidder to furnish Security Deposit of 3% of PO contract value (excluding taxes & duties) within 30 days of PO (45 days for overseas supplier).
Bid: payment within 45 days of CRAC and online bill submission; ATC: 100% after GRN, subject to GST return verification (GSTR-2A) and SD submission.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Successfully completed similar PSC sleeper supply orders in any one of the last five years ending last day of month previous to tender invitation month, meeting one of three value thresholds.
Financial turnover in any one of FY 23-24, FY 24-25 & FY 25-26 must be at least Rs.75,55,989/-.
Vendor must submit self-attested manufacturing licence for Railway Track Materials from DTIC or NSIC or MSME.
Only Class-I and Class-II local suppliers may bid; non-local suppliers are not eligible (eligible MSEs still allowed to participate under concurrent MSE-MII rules).
MSE purchase preference is available (Udyam-validated manufacturer/OEM), but experience/turnover relaxation is not granted.
BSP prefers direct manufacturer offers; authorised dealer/channel partner offers must include valid manufacturer authorisation and guarantee/price confirmation.
Bidders from countries sharing a land border with India need Competent Authority registration; fake documents attract punitive action; adverse capability reports can cause rejection before price bid opening.
No consortium or joint-venture eligibility rules are stated in the tender documents.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Supply of SLEEPER, PSC, BG to Drawing RDSO-T 2496 (item code 70910209000147) — PSC sleepers for 60KG (BG).
Each set of PSC sleeper 60KG includes specified track fittings.
Delivery to Bhilai Steel Plant, Bhilai-490001; consignee table sets 180 delivery days for 3000 quantity.
Specification requires third-party pre-dispatch inspection by RITES/RDSO/Zonal Railway plus visual check and monogram marking; GeM bid flag says Inspection Required = No.
After GeM PO, BSP issues corresponding backup SAP PO; post-order activities (receipts, GRN, billing) run against the SAP PO.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Online two-packet bid on GeM (Bid GEM/2026/B/7892040); offer submission construes full acceptance of GeM tender + ATC without deviation.
Eligibility proofs are to be self-attested photocopies; Annexure-A on bidder letterhead; GeM uses Aadhaar-based e-sign treated at par with digital signatures.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
The workspace documents contain no corrigendum or addendum; original bid dates and conditions stand as published.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
GeM bid ePBG Required = No, while ATC mandates 3% Security Deposit after PO; GeM disclaimer also flags ATC clauses that contravene ePBG bid fields.
Bid details mark Inspection Required = No, but buyer specification mandates TPI PDI by RITES/RDSO/Zonal Railway and ATC contemplates inspection including third-party PDI at supplier cost.
Consignee quantity table fixes Delivery Days = 180, while specification sheet shows Delivery Period '30 To 180'.
Bid Evaluation Method is Total value wise evaluation; ATC says price evaluation on Item Wise LCNITC L1 basis only.
Bid states bid splitting not applied, yet ATC says order may be distributed on more than one vendor; MSE/MII preferences also contemplate quantity sharing.
Bid payment timeline is 45 days from CRAC; ATC states 100% after GRN and adds GSTR-2A verification and SD submission as payment preconditions.
ATC incorporates SAIL-P1 (Oct 2023) from sailtenders.co.in, while the GeM bid disclaimer lists reference to external site/documents as a ground treating bid/resultant contract null & void.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask buyer to confirm if successful bidder must still furnish 3% SD/PG under ATC when GeM bid ePBG Required is No, and which instrument/timeline prevails (30 days ATC vs 15 days GTC).
Seek clarity that TPI by RITES/RDSO/Zonal Railway is mandatory despite GeM Inspection Required = No, which agency is acceptable, booking lead time, and confirmation that all TPI charges are seller-borne.
Ask whether full quantity must be delivered by day 180 only, or staggered deliveries from day 30 are required/accepted, and exact unload locations within BSP stores/user departments.
Request confirmation whether award can be split across vendors under ATC/MSE/MII despite bid statement that bid splitting is not applied, and what maximum share a single L1 can expect.
Ask buyer to identify enforceable SAIL-P1 clauses (especially LD, extension with price matching, risk purchase) given GeM disclaimer against external document references.
Confirm complete per-set BOM (sleeper + rubber pads + GFN liners + ERC Mk-III) is mandatory, whether any other fittings/fastenings are excluded, and how bidders obtain RDSO-T 2496 / related component drawings T-3711, T-3706, T-3701 if not attached.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
GeM GTC LD @ 0.5% of contract value of delayed quantity per week or part week, capped at 5% normally and 10% for inordinate delay (>25% of completion period).
If delivery extension is needed and a later PO/price discovery is lower, vendor must match the lower rate for the extended quantity/period (ATC), in addition to SAIL-P1 extension/LD regime.
On delivery failure, purchaser may procure alternate supplies at supplier's risk and cost for undelivered portion, recover price differential, and supplier has no claim over failed quantity.
3% SD (if enforced), delayed SD penalty, no payment until SD + GSTR-2A verification, and 45-day CRAC payment cycle create working-capital strain.
Offer acceptance is without deviation; BSP may accept/reject or seek clarification based on credentials; adverse reports can reject before price bid opening; fake documents attract punitive action even after PO.
18 months from supply or 12 months from commissioning (earlier) warranty requires free replacement on FOR Bhilai if item does not perform as required.
From 11-08-2026 publication to 21-08-2026 bid end is a short ~10-day window; auto-extension occurs only if <3 bids and only once by 7 days.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Ministry of Steel — Steel Authority of India Limited — Bhilai Steel Plant — Materials Management.
Pavan Prakash Athawale, AGM (Pur-Consumables); and Rahul Arora, GM (Pur-Consumables), SAIL Bhilai Steel Plant.
HOD email [email protected]; Buyer email [email protected].
Consignee Reporting Officer: Ravi Kumar, Room No. 302, 3rd Floor, Ispat Bhavan, Bhilai Steel Plant, Bhilai-490001.