Publication / bid date
GeM Bid GEM/2026/B/7974428 is dated 29-08-2026; ATC IFB Ref BCPL/C&P/LA26W065MC/03794 is also dated 29.08.2026.
- No corrigendum is present in the tender pack that amends the publication date.
Loading…
Custom Bid for Services - HIRING OF SPECIFIC SOR HOUSEKEEPING AND MAINTENANCE SERVICES AT BCPL LAKWA PLANT FOR A PERIOD OF TWO YEARS Similar Category Facility Management Service- Manpower based (Version 2)
Brahmaputra Cracker And Polymer Limited · Dibrugarh, Assam9821562
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
29 Aug 2026
12 Sept 2026
₹1.6 Cr
₹2.7 L
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
GeM Bid GEM/2026/B/7974428 is dated 29-08-2026; ATC IFB Ref BCPL/C&P/LA26W065MC/03794 is also dated 29.08.2026.
Pre-bid is scheduled on 02-09-2026 at 16:00:00 through Video Conference; prior intimation to be sent to the dealing officer email.
Bid End Date/Time is 12-09-2026 17:00:00 on GeM (no corrigendum extension found).
Bid Opening Date/Time is 12-09-2026 17:30:00 (Two Packet Bid; public opening not applicable on GeM).
Bid Offer Validity is 90 Days from Bid End Date on GeM; BDS restates validity as 3 months from final Bid Due Date.
Contract period is 2 years / 24 months from LOI/LOA; mobilisation within 15 days of LOI/LOA.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
Estimated Bid Value is INR 1,58,79,425 (inclusive of all taxes).
EMD Amount is INR 2,69,000; Advisory Bank ICICI; beneficiary BCPL, Lepetkata.
No tender document fee or bid participation fee is charged (GeM prohibits asking tender fee).
GeM requires ePBG 2.50% for 27 months (Advisory Bank ICICI). ATC/BDS separately require Contract Performance Security/SD @ 5% of Annualized Order/Contract value (ex-GST) for this >1-year contract, valid 3 months beyond contract/warranty.
GeM Payment Timelines: payment within 30 days of SDAC and online bill submission (supersedes GeM GTC 10-day clause). SCC also states monthly bills certified by EIC, payment within 15 days via e-banking/NEFT/RTGS.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
In previous 7 years from unpriced bid opening/due date: 3 similar completed contracts each ≥ Rs 31.55 Lakh OR 2 each ≥ Rs 39.44 Lakh OR 1 ≥ Rs 63.11 Lakh.
Average annual turnover of last 3 FYs (2023-24, 2024-25 & 2025-26) ≥ Rs 39.44 Lacs; Net worth positive as per last audited FY 2025-26; Working capital ≥ Rs 7.88 Lacs as per last audited FY 2025-26.
Startup relaxation for experience & turnover: Yes | Complete on GeM; MSE relaxation for experience & turnover: No. Startups still must meet net worth & working capital, quality/technical specs, and domain Industry/Sector.
Consortium/JV bids are NOT APPLICABLE; sole-bidder responsibility; only one bid per bidder.
Land-border bidders eligible only if registered with Competent Authority (GeM GTC 26 / Annexure-B). Bid Security Declaration / F-5 address holiday/banning consequences; corrupt practices attract action under Annexure-I.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Hiring of specific SOR housekeeping and maintenance services at BCPL Lakwa Plant (C2+ recovery unit and Administrative Building, Lakwa), Assam, for 24 months.
SOR deploys 3 Semi-Skilled and 14 Un-Skilled manpower (plus associated EPF, gratuity, holidays, increment, WC insurance, 2 PPE sets, annual health check-up) over 24 months; bidder quotes only contractor profit margin.
Daily housekeeping of Admin Building and listed plant buildings/units; plant roads fortnightly; roadside pavements and drains weekly; specified outside areas weekly; any other area as directed by EIC.
24 months from LOI/LOA; services/materials/workmanship to satisfy relevant Indian Standards, job specs and codes; plant machinery excluded from cleaning scope where noted.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Two-packet bid only on GeM portal (https://gem.gov.in); price on GeM SOR/price schedule plus uploaded price-breakup Excel; no reverse auction.
In addition to GeM upload, submit original EMD/Bid Security (if applicable)/Declaration for Bid Security and Line of Credit (if applicable) in physical form to C&P Lepetkata within 7 days (IFB: from Bid Due Date; ITB also references 7 days from unpriced bid opening for EMD/PoA/IP).
BEC experience docs: Chartered Engineer certified + Notary attested; financial statements: Notary attested; Startup certificates: CA-certified and notarised; bid/tender copy signed by PoA holder.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
The downloaded tender pack contains no corrigendum or addendum PDF; GeM bid and ATC both carry original dates of 29-08-2026 with bid end 12-09-2026 17:00.
Publication 29-08-2026; pre-bid 02-09-2026 16:00 VC; bid end 12-09-2026 17:00; opening 12-09-2026 17:30; validity 90 days/3 months; estimated value INR 1,58,79,425; EMD INR 2,69,000; contract 24 months.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
GeM ePBG Detail fixes 2.50% for 27 months, while BCPL BEC/BDS require CPS/SD 5% of annualized contract value (or 2.5% ISD + 2.5% from bills) valid 3 months beyond contract. GeM also says ATC cannot contravene ePBG Detail unless GTC allows.
GeM Payment Timelines promise payment within 30 days of SDAC + online bills, while SCC 10.2 states payment within 15 days of EIC-certified bill submission.
IFB 4.0 requires physical EMD/Declaration and LOC within 7 days from Bid Due Date; ITB requires original EMD within 7 days from Due Date of Bid Opening / unpriced bid opening (and also mentions PoA & Integrity Pact originals).
GeM shows MII Compliance Yes and ITB 11 requires Annexure-C local-content forms, but BEC 2.4 states Purchase preference under PP (Local Content-Make in India) is not applicable.
Working capital threshold is Rs 7.88 Lacs, but BEC Note once states bank LOC confirmation for Rs 7.9 Lacs while the documents table states Rs 7.88 lakhs.
GeM states 90 Days from Bid End Date; BDS states 3 months from final Bid Due Date — practically aligned but not identical calendar math.
IFB D1 and ITB 16A require F-2A for MSE/Startup/CPSE (exemption cases); BEC note (viii) says Bid Security Declaration is to be submitted by all participating bidders.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask whether successful bidder must furnish GeM ePBG 2.5% for 27 months, BCPL CPS 5% annualized (or ISD+recoveries), or both, and the exact BG formats/portals to use.
Clarify whether contractor payment is 15 days (SCC) or 30 days (GeM), and how wage disbursement by 7th (irrespective of RA bill release) is to be funded if bills are delayed.
Request the PAP/local unskilled candidate list, when it will be issued, skill/medical filters, and consequences if list is incomplete or candidates refuse deployment.
Confirm that fixed non-quotable SOR wage/PF/gratuity/material rates will be paid/reimbursed as printed even if actual statutory outgo exceeds them, and that bidder risk is limited to the quoted profit margin (+ any under-provisioned compliance).
Confirm exact list of hard-copy originals (EMD/F-2A, LOC, PoA, Integrity Pact) and whether the 7-day clock runs from Bid Due Date or Bid Opening.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
Almost entire cost is buyer-fixed; bidder prices only contractor profit margin while remaining fully liable for labour law compliance, uniforms, tools, supervision and shortfalls.
Mobilise within 15 days or face Rs 1000/day penalty up to 30 days then cancellation and EMD forfeiture; performance can be terminated on 30 days’ notice with risk-and-cost re-procurement.
Wages must be paid by 7th (elsewhere also by 10th) via e-banking irrespective of BCPL RA bill release; heavy PF/ESI/bonus/leave/PMSBY-PMJJBY/WC insurance documentation gates monthly bills.
EMD forfeiture triggers are broad; CPS/ePBG conflict creates security sizing risk; GeM bid sets Arbitration Clause No and Mediation Clause No; contract jurisdiction courts at Dibrugarh only.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Brahmaputra Cracker and Polymer Limited (Ministry of Petroleum and Natural Gas), Office Lepetkata; tender via GeM Custom Bid.
Mausoom Choudhury, SM (C&P); Mobile 7086045737; Email [email protected].
HOD grievance email [email protected]; Buyer email [email protected].
Physical EMD/LOC/other specified originals to: Attention Mausoom Choudhury, C&P Department, Administrative Building, BCPL, PO Lepetkata, Dibrugarh, Assam 786006, India.