Bid publication date
Bid document dated 25-08-2026 under Bid Number GEM/2026/B/7961569.
Loading…
Curtains (V2) (Q3)
Regional Institute Of Medical Sciences Imphal · Imphal West, Manipur9806631
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
25 Aug 2026
16 Sept 2026
₹52 L
₹1.6 L
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
Bid document dated 25-08-2026 under Bid Number GEM/2026/B/7961569.
Bid End Date/Time is 15-09-2026 19:00:00.
Bid Opening Date/Time is 15-09-2026 19:30:00.
Bid Offer Validity is 180 days from Bid End Date.
No pre-bid meeting date is stated; only post-submission technical clarification time and GeM representation channel are specified.
ATC requires curtain fabric samples before the last date of bid submission.
GeM consignee schedule states 90 delivery days; ATC requires supply and install within 21 days of supply order (conflict recorded under contradictions).
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
Estimated Bid Value is Rs. 52,00,000.
EMD Amount is Rs. 1,56,000; Advisory Bank Bank Of Baroda; beneficiary Director, RIMS, Imphal.
ePBG Detail shows Required: No for this bid.
ATC: payment only on complete commissioning; GeM GTC default for goods is 100% within 10 days of CRAC and online bills.
Total value wise evaluation; Bid to RA enabled among first 50% lowest-priced technically qualified bidders.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Minimum average annual turnover of the bidder (for 3 years) is 26 Lakh(s).
OEM Average Turnover (Last 3 Years) is 200 Lakh(s).
1 Year(s) past experience required for same/similar service/products.
Past Performance filter is 20% of bid quantity in at least one of the last three Financial years before bid opening, to any Central/State Govt/PSU.
Only Class-I and Class-II local suppliers may bid; non-local suppliers not eligible (eligible MSEs still allowed to participate).
MSE Purchase Preference Yes: MSEs (manufacturer/OEM of offered product; traders excluded) within L1+15% may match L-1 for 25% of total quantity.
Bidder should not be under liquidation, court receivership or similar proceedings, and should not be bankrupt; upload undertaking with bid.
Bidder must have a local office/service support facility; KVIC registration required only if supplying hand-spun/handwoven khadi goods.
Any bidder from a country sharing a land border with India is eligible only if registered with the Competent Authority (GeM GTC clause 26); false declaration is ground for immediate termination and legal action.
Integrity Pact breach can lead to debarment from RIMS Imphal bidding for minimum five years (extendable) and other sanctions including contract termination and forfeiture.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Supply, installation, testing and commissioning of Curtains (V2) — Door Curtains (2000) and Window Curtains (4000); total quantity 6000.
Buyer-added ATC detail specs supersede GeM category specifications and must be included in the compliance statement.
Consignee Khangembam Surjit Singh, 795004 Lamphelpat (RIMS Imphal); GeM delivery days 90 for both line items; ATC install within 21 days of supply order.
Inspection by Empanelled Inspection Authority/GeM pre-registered agencies: No; demonstration at RIMS Imphal at bidder/OEM cost if required.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Online two-packet bid on GeM; Type of Bid is Two Packet Bid.
Upload scanned EMD with online bid; deliver hard copy DD/BG to Buyer/RIMS Imphal (deadlines conflict: 5 days vs 7 days — see contradictions).
Upload scanned copy of signed buyer-organization Integrity Pact with bid; GeM allows physical signed Integrity Pact within 5 days of bid opening.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
The tender document set contains no corrigendum/addendum files; published bid dates and conditions stand as in the Bid Document dated 25-08-2026 and buyer ATC/Integrity/GTC attachments.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
Consignee delivery days are 90 for both line items, while ATC requires supply and installation within 21 days of supply order — bidders face inconsistent completion risk.
ATC demands fabric samples before bid end; buyer Sample Clause demands 2 advance samples within 5 days after award; GeM disclaimer generally disallows seeking sample with bid except where permitted by buyer policy.
Buyer Forms of EMD require hardcopy within 5 days of Bid End/Opening; ATC requires within 7 days from closing; GTC requires within 5 working days of bid opening.
GeM category allows Door 6.5–7 ft × 3.5–4 ft and Window 4.5–5 ft × 3.5–4 ft, while ATC states Door 4×7 ft and Window 4×5 ft (or as per Institute).
Category allowed GSM values start at 175; ATC allows polyester GSM 172–220.
Bid ePBG Detail is Required No, while GTC says Performance Security is obtained for contracts after e-Bidding/RA at buyer-selected percentage.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Confirm whether LD will run against ATC 21-day install-from-SO or GeM consignee 90-day delivery schedule.
Ask buyer to reconcile ATC pre-bid sample requirement with post-award Sample Clause and GeM disclaimer on samples with bid.
Confirm whether doors/windows will be measured site-wise ('as per requirement of Institute') and when colour will be frozen relative to sample approval and bulk production.
Clarify whether 'payment only on complete commissioning' means no part-CRAC payments until all 6000 curtains are installed, overriding default GeM goods payment terms.
ATC cancels order without notice if bidders/OEM cannot produce price reasonability proof/certificate before Contract Order — ask for acceptable document format and timing.
Confirm whether 'local office/service support facility' must be in Imphal/Manipur or any India location is acceptable.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
GeM GTC LD @ 0.5% of contract value of delayed quantity per week (or part), capped at 5% of total contract value (10% for inordinate delay >25% of completion period).
Any deviation from approved sample leads to rejection of entire supply at supplier's cost; user dissatisfaction can trigger return of goods.
Cash-flow risk: ATC withholds payment until complete commissioning of items, despite GeM default 10-day CRAC payment for goods.
Contract Order can be cancelled without further notice if price reasonability proof/certificate is not produced before CO — post-L1 cancellation risk.
Purchaser may vary order up to 50% at placement and increase contracted quantity up to 50% during currency at contracted rates — capacity and working-capital exposure.
Fall clause can force price reduction/refund if lower prices were offered to other Govt/PSU buyers; pact breach can mean termination, forfeiture and 5+ year debarment from RIMS bids.
Failure to upload EMD DD/BG with tender leads to cancellation without notice; late hard copy can make bid incomplete under GTC.
RA among lowest 50% technically qualified bidders can compress margins after technical qualification.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Regional Institute of Medical Sciences (RIMS), Imphal, Manipur — Office: Lamphelpat, Imphal; under Department/Ministry of Health and Family Welfare.
HOD grievance email [email protected]; Buyer email [email protected].
Consignee/Reporting Officer: Khangembam Surjit Singh; Address PIN 795004, Lamphelpat.
IEM (1) Shri Nageshwar Rao Koripalli — [email protected], Mobile 9788918555 / 8985970045; (2) Shri Bharat Prasad Singh — [email protected], Mobile 9619145000.