Publication date
Bid document dated 11-08-2026 (GeM bid GEM/2026/B/7885018).
- NIT critical date sheet marks Publishing Date as 'As Per GeM'; the GeM bid header supplies the concrete date.
Loading…
Custom Bid for Services - Thematic Decoration and Passenger engagement activities atLBSI Airport
Airports Authority Of India · Varanasi, Uttar Pradesh9718717
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
11 Aug 2026
1 Sept 2026
₹34.2 L
₹1.0 L
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
Bid document dated 11-08-2026 (GeM bid GEM/2026/B/7885018).
No fixed pre-bid meeting date is printed; Clarification Start/End are 'As Per GeM'. Tender clarifications may be sought by email on working days 09:30–18:00 hrs.
Bid End Date/Time: 01-09-2026 15:00:00.
Bid Opening Date/Time: 01-09-2026 15:30:00 (Two Packet Bid: Envelope-I technical first, then Envelope-II financial of eligible bidders).
Bid Offer Validity is 90 (Days) from Bid End Date on GeM; SCC also requires quoted rates valid 90 days from tender opening.
Contract Period is 1 Year / 12 months from taking over; Security Deposit BG validity note is schedule completion + 6 months; BCAS security clearance application within 5 days of award.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
Estimated Bid Value / estimated cost is Rs. 34,22,531 (inclusive of 18% GST).
EMD Amount is Rs. 1,02,676; Advisory Bank State Bank of India; NIT requires NEFT/RTGS to AAI Varanasi revenue account; GeM also accepts surety bond and standard GTC instruments.
No tender document fee / bid document purchase fee is stated in the GeM bid or AAI NIT.
GeM ePBG Required = No; AAI NIT still requires Security Deposit @ 10% of Bid amount after award via RTGS/NEFT or Bank Guarantee (Annexure-V), no interest, released within three months after expiry subject to dues.
No advance. Bills after each event within 10 days with work completion certificate; payment within 15 days of bill/SDAC via RTGS; paid only for executed items at quoted rates.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Minimum average annual turnover Rs. 10.27 Lakh / Rs. 10,26,759 over last three years ending 31.03.2026; continuous losses in last three years lead to summary rejection.
5 years similar experience required. NIT: three works of Rs 13,69,012 each OR two of Rs 17,11,265 OR one of Rs 27,38,025 of Decorations/Event Management at five-star hotels, malls, Airports, Govt/Corporate buildings/offices, MNCs during last five years ending 30.06.2026.
PAN, GST registration, UDIN-backed financials, digitally signed tender, and non-blacklisting affidavit are mandatory; MSE certificate only if claiming exemption; land-border and MII rules apply.
Notarised Rs.100 affidavit required that firm and its proprietors/partners/directors are not debarred/blacklisted by AAI/MoCA/DoE as on bid due date; debarment before opening or contract can reject the bid.
No consortium, joint venture, or multi-entity bidding rules are stated in the bid or NIT.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Custom Bid for Services: Thematic Decorations and Passenger Engagement Activities at Lal Bahadur Shastri International Airport (LBSI), Varanasi, for 12 months.
Works at LBSI International Airport, Babatpur, Varanasi-221006; Project/Lumpsum Based quantity on GeM consignee Jyoti Singh.
MAJOR events use SOQ items 1–12; MINOR events use items 1–6. BOQ prices 5 MAJOR + 7 MINOR events. Install ≥2 days before; dismantle ≤2 days after each event.
Per-event Schedule-A minimum quantities: 3D replica×3; selfie zone×3; selfie backdrop×1; standees×4; rangoli×2; photo/video×1; entry/exit installs×5; hanging 2D×200; hanging 3D×50; counter décor×31; live demo×1; passenger engagement×1.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Online two-packet bid on GeM (www.gem.gov.in) only; Envelope-I EMD/PQ/Technical, Envelope-II financial rates in GeM format/BoQ; DSC mandatory.
Digitally sign complete tender document; checklist and annexures signed/stamped; blacklist affidavit notarised on Rs.100 non-judicial stamp; financials CA-certified with UDIN.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
The tender pack contains no corrigendum or addendum; original GeM bid dated 11-08-2026 and AAI tender document values apply as issued.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
GeM bid sets ePBG Required = No, while AAI GCC Clause 23 requires Security Deposit @ 10% of Bid amount after award.
NIT Clause 7.1 uses last five years ending 30.06.2026; Annexure-IV checklist says last seven years ending 30.03.2026; GeM past-experience formula uses current FY + last three FYs.
GeM years-of-experience clause limits similar services to Central/State Govt/PSU, while NIT 7.1 expressly allows five-star hotels, malls, Airports, Government and Corporate buildings/offices, MNCs.
NIT requires EMD via NEFT/RTGS to specified AAI account; GeM bid also accepts surety bond and GTC lists DD/FDR/BG/online forms.
GeM Bid Offer Validity is 90 days from Bid End Date; SCC Clause 2 states rates valid 90 days from date of opening of the tender.
BoQ prices 5 MAJOR and 7 MINOR events (12 total), while Annexure-IX lists only 9 tentative festivals (5 Major + 4 Minor).
GeM ties payment to SDAC + online bills within 15 days; AAI SCC ties payment to event-wise bill within 15 days of submission after completion certificate, and also says 'per month'.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask buyer to confirm in writing that GCC Clause 23 (10% SD/BG) will be enforced after award, and that this does not violate GeM ePBG Detail = No / Disclaimer item 12.
Seek clarification whether evaluation will apply NIT 7.1 (5 years to 30.06.2026; hotels/malls/corporate/MNCs allowed) or GeM Govt/PSU-only / last-three-years 40-50-80% test, and whether checklist 'seven years ending 30.03.2026' is a typo.
Ask whether the contract guarantees 5 Major + 7 Minor events, how unlisted/rescheduled events are ordered, and whether Major events with fewer than items 1–12 (or Minor with fewer than 1–6) are paid only for executed lines without minimum bill.
Request minimum notice period for event confirmation and design approval cycle, given need for 3 concept proposals, fabrication, and installation at least 2 days before the event.
Confirm if only NEFT/RTGS is accepted (NIT) or also surety bond/BG/DD (GeM), and whether any original EMD document must reach Airport Director physically and by when.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
Annexure-VII imposes steep deductions: 25% of event cost for delayed installation; 50% for delayed photo/video; 100% of item cost for missed live performance/engagement; daily dismantling fine Rs 5,000; plus property damage recovery.
AAI may terminate with 30 days' notice without compensation; PPP/O&M transfer allows assignment/novation releasing AAI; work can be closed at 2 hours' notice for VVIP with no compensation.
No advance; pay only for executed items; AAI can withhold payment for deficiencies; quantities ±30% and event list/item mix can change; rain/natural calamity damage not payable.
Must obtain BCAS security clearance within 5 days of award and AEPs for staff; criminal case found mid-contract terminates immediately and forfeits Security Deposit.
Three design options per event, install 2 days prior, same-day reels, next-day cinematic video, 4 live sessions/day, engage 60 pax and supply 100 gifts — operationally aggressive for an active airport terminal.
Documents uploaded by bidders (and clarification docs) are shown to other participating bidders after login — competitive leakage of experience/pricing strategy documents.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Airport Director, Airports Authority of India, Lal Bahadur Shastri International Airport, Varanasi – 221006, on behalf of Chairman, AAI (Ministry of Civil Aviation / AAI).
Tender clarifications: [email protected] (working days 09:30–18:00 hrs, except Sat/Sun/Gazetted Holiday). GeM grievance/HOD email [email protected]; Buyer email [email protected].
Physical communications, LOI acceptance, agreement and E-payment form are addressed to Airport Director, AAI, LBSI/Varanasi Airport, Varanasi-221006; courts at Varanasi have exclusive jurisdiction.
Undertaking of Competent Authority signed by Sunitha Varghese, JGM (Operations), LBSI Airport, Varanasi (07/08/26).