Bid publication date
Bid document dated 01-07-2026 (Bid Number GEM/2026/B/7671784).
- Publication/issue date shown on the GeM Bid Document cover is 01-07-2026.
Loading…
Custom Bid for Services - Turnkey Design
Indian Navy · Mumbai, Maharashtra9476650
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
1 Jul 2026
14 Aug 2026
₹1.8 Cr
₹5.6 L
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
Bid document dated 01-07-2026 (Bid Number GEM/2026/B/7671784).
Bid End Date/Time after Date Corrigendum 4455307: 14-08-2026 09:00 UTC (portal-updated). Original bid document stated 15-07-2026 15:00:00.
Bid Opening Date/Time after Date Corrigendum 4455307: 14-08-2026 09:30 UTC (portal-updated). Original bid document stated 15-07-2026 15:30:00.
Bid Offer Validity is 180 days from the Bid End Date.
Contract Period is 9 Month(s). Technical clarifications during technical evaluation allowed for 3 Days. PoC must be completed within 15 days of PoC start (or as specified in TEC).
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
Estimated Bid Value is INR 1,78,60,000 (inclusive of all taxes).
EMD Amount INR 5,64,000; Advisory Bank State Bank of India; beneficiary GE (ND), DGNP(MBI) / Vishal Bajaj. EMD also acceptable as surety bond. Validity per GeM GTC: 45 days beyond bid validity.
ePBG 5.00% of contract value; Advisory Bank State Bank of India; Duration of ePBG required 6 Months. Submit within 15 days of award; payments due only after receipt and verification.
100% payment after completion of work in all respects as per specifications and on certification of Engineer-in-Charge.
MII Compliance: Yes. MSE Purchase Preference: Yes, within L1+15%; if eligible MSE is within band, 100% order quantity to that MSE on matching L1.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Minimum Average Annual Turnover INR 50 Lakh (3 years). Past experience of similar services required: 3 Year(s). MSE and Startup get complete relaxation on years of experience and turnover (with supporting documents).
Failure to hold valid mandatory certifications for the complete project currency disqualifies the vendor.
Consortium not acceptable. Domain ERP experience with Defence/PSU/Govt; ERP OEM or certified partner; at least one process-integration/Common Data Framework project; service base at Mumbai within 15 days of order.
Self-certify not blacklisted by Govt of India/Central PSU in last 1 year preceding bid submission. Land-border bidders eligible only if registered with Competent Authority (GeM GTC clause 26).
Mandatory pre-bid conference attendance; mandatory site visit to assess SOW; product support minimum 5 years after warranty expiry; assignment/sub-contract only with prior written buyer consent.
Evaluation in three stages: Vendor Evaluation → Technical Evaluation (Phase-1 matrix + Phase-2 PoC on NCNC basis) → Commercial Evaluation. Only dual-phase technical qualifiers reach financial opening. L1 on overall lifecycle cost of serials 1–8 incl. taxes.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Turnkey design, development, integration, implementation and on-site support of Pan-Navy Common Data Framework based ERP applications (Nau-Prakalpa / DGNP Naval ERP) for DGNP (Mumbai).
ERP modules cover HR & Payroll, Finance, Civil, Admin & IT, Planning/Technical (pre- and post-contract), Fleet, Document/Knowledge, Fire Safety, RBAC, Workflow, Dashboard/MIS, alerts, audit trail; biometric attendance integration and IPBMS feasibility.
Eight priced deliverable groups: Project Charter; URS+SRS; ERP build; VAPT; legacy data migration (incl. 20,000-page scanning); Training & UAT; Go-Live; 6-month Warranty & Handholding with 1 Help Desk + 3 Fullstack developers onsite.
Primary delivery/support location DGNP WNC Mumbai / Mumbai-City consignee; Contract Period 9 months on GeM bid, with 6 months post-Go-Live warranty/handholding inside the commercial scope and 5 years post-warranty product support commitment.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Online two-packet bid on GeM portal; technical and financial packets; financial price-breakup document required; documents uploaded by bidders are visible to other participants.
Vendor Evaluation, Technical Bid and related compliance formats are to be duly filled, signed and stamped.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
Single Date corrigendum published 2026-08-03 with no attached files; portal-updated bid end/opening moved from 15-07-2026 to 14-08-2026.
Final schedule: publish 01-07-2026; bid end 14-08-2026 09:00 UTC; bid opening 14-08-2026 09:30 UTC; offer validity 180 days from end date; contract period 9 months. No non-date amendments were issued.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
GeM bid estimated value is INR 1,78,60,000 while GAR states Estimated Value Of Requirement ₹ 30,00,000.
Bid details fix EMD at INR 5,64,000, but Appendix A Ser 12 requires a 'Security declaration certificate in lieu of EMD'.
PQC narrative cites ISO 20000-1:2008; Appendix A matrix cites ISO 20000-1:2018.
Appendix A requires visit to ND(V) and ND(Mbi); Appendix B requires only ND(Mbi).
Bid ePBG duration is 6 months, while GTC requires performance security valid 2 months beyond all obligations including warranty, and the scope includes 9-month contract plus 6-month post-Go-Live warranty.
PQC requires Appendix C commercial format and SOW Para 3 project plan / Para 4(j) manpower, but Appendix C and those SOW paragraphs are not in the uploaded attachments.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask buyer to confirm if Appendix A Ser 12 declaration replaces the GeM EMD amount, or both are required, and share the declaration format if applicable.
Request the commercial bid Appendix C, complete numbered SOW with manpower Para 4(j)/project plan Para 3, and date/venue of the mandatory pre-bid conference and site visit procedure for ND(Mbi)/ND(V).
Seek milestone billing (charter/URS/build/UAT/Go-Live/warranty) instead of single 100% post-completion payment, or confirm working-capital expectations and certification timeline by Engineer-in-Charge.
Clarify required ePBG validity (6 months vs contract+warranty+2 months) and whether 5-year post-warranty product support is included in serials 1–8 price or a separate obligation/rate.
Confirm buyer-furnished infrastructure on isolated NCN, approved open-source stack constraints, whether IPBMS integration is in-scope or only feasibility study, and who engages/pays the CERT-IN VAPT agency.
Confirm acceptable ISO 20000-1 edition and whether CMMI Level 3 appraisal must be active for the bidding entity for the full project currency.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
Entire contract cashflow is back-ended until Engineer-in-Charge certification after completion in all respects — high working-capital and certification-delay risk.
LD @ 0.5% of contract value of delayed quantity per week (or part), cap 5% normally and up to 10% for inordinate delay (>25% of completion period).
Contract period 9 months must cover discovery, build, VAPT/security clearance, migration (20k pages), UAT, Go-Live and still leave room for 6-month onsite warranty staffing inside/around that window.
IPBMS integration is only 'feasibility to be explored' yet listed in scope features; 5-year post-warranty product support is mandatory with no separate commercial line visible.
No assignment/sub-contract without prior written consent, with continuing joint and several liability; EMD ₹5.64 lakh is significant and forfeitable under GTC for bid withdrawal/impairment.
Missing Appendix C, incomplete SOW cross-references, conflicting visit/EMD/ISO texts, and mandatory pre-bid with no scheduled date create high risk of technical rejection for documentary non-compliance.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Ministry of Defence / Department of Military Affairs / Indian Navy — DGNP (Mumbai) custom bid for Nau-Prakalpa ERP.
Buyer / HOD grievance email: [email protected]. EMD/Performance security beneficiary: GE (ND), DGNP(MBI) — Vishal Bajaj; UIN NCTGC2415P.