Publication / bid date
Bid dated 21-08-2026 (GEM/2026/B/7927477).
- No corrigendum alters this date in the document set.
Loading…
Upgradation of Upgraded 40MM L/70 Gun System for Counter UAS Interdiction Capb
Indian Army · Budgam, Jammu And Kashmir9767574
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
21 Aug 2026
30 Sept 2026
₹3.8 Cr
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
Bid dated 21-08-2026 (GEM/2026/B/7927477).
Pre-bid on 01-09-2026 at 11:00:00 through Video Conference.
Bid End Date/Time: 08-09-2026 10:00:00.
Bid Opening Date/Time: 08-09-2026 10:30:00, online on GeM.
Bid Offer Validity is 180 days from Bid End Date.
Consignee delivery: 12 units in 120 days and 12 units in 240 days at Budgam.
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
No estimated cost or tender value is stated in the bid documents.
EMD INR 3,84,00,000; Advisory Bank SBI; beneficiary GOC-in-C, Northern Command, HQ Northern Command, Udhampur (UIN NCTGC2415P).
No tender fee / bid participation fee is chargeable; GeM disclaimer treats seeking such fee as a voiding ATC practice.
ePBG 5.00% of contract value for 26 months; Advisory Bank SBI; in favour of GOC-in-C, Northern Command.
No advance; 100% payment after delivery, integration, commissioning, training, user acceptance and competent authority approval; paying authority PCDA Jammu via GeM/e-payment.
CMC required for 5 years post 2-year warranty; CMC charges quoted as % of equipment cost (GeM min 3%, max 25%) and included in total-value evaluation with 10% p.a. NPV discounting.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Minimum average annual turnover of the bidder (3 years): 4200 Lakh(s); GeM-verified turnover.
OEM average turnover (last 3 years): 35000 Lakh(s); OEM net worth must be positive as per last audited financial statement.
2 years past experience of same/similar category products to Central/State Govt/PSU; past performance 50% of bid quantity in at least one of last three FYs.
Only Class-I and Class-II local suppliers may participate (non-local ineligible); Class-I needs min 50% local content and Class-II min 20%; MII purchase preference Yes with L1+20% margin for up to 50% quantity.
MSE purchase preference Yes (L1+15% band); bid header quantity preference 25% while Buyer Added clause 27 states 50% of total value — conflict.
Defence Industrial Licence (DIL) is mandatory; ISO 9001 required for bidder or OEM; certificates/test reports as per technical specifications on bid opening date; OEM authorization where applicable.
Bidder must not be insolvent/bankrupt; not blacklisted/debarred by Procuring Organisation, MoD, DoE or GoI agencies; land-border bidders need Competent Authority registration.
No affirmative consortium/JV bidding structure or equity floors are prescribed; land-border definition treats a consortium/JV as covered if any member is from a restricted country.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Upgradation of 24 upgraded 40 mm L/70 gun systems with Counter-UAS (C-UAS) non-kinetic interdiction capability for 15 Corps Zone (OCPP capital procurement FY 2026-27).
24 complete upgradations, each with Passive RF Detector + RF Jammer & Spoofer, C2, Power Supply, mounting/integration kit & accessories; plus training, technical literature, installation/commissioning and 5-year CMC.
Passive DF 300 MHz–6 GHz+ with ≥8 km LOS detection; reactive jammer ≥5 simultaneous 100 MHz channels, ≥5 km directional / 2.5 km omni; GNSS spoofer ≥4 channels, ≥4 km LOS; system weight ≤100 kg +10%.
Delivery/installation at Budgam consignees: 12 units within 120 days and 12 within 240 days; acceptance via ATP/ATB/user trials against TEC-approved sample.
2-year onsite warranty from acceptance/installation (later of); 5-year comprehensive maintenance thereafter; BIS/NABL/Govt lab certifications as applicable; stores new (not manufactured before 2025).
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Two-packet online bid on GeM under bidder Digital Signature; no manual tender box.
Physical EMD (where applicable) to CDA/PCDA Jammu within 5 days of Bid End Date; Integrity Pact may be submitted within 5 days of bid opening per GeM disclaimer.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
The supplied tender pack contains no corrigendum or addendum; all dates, amounts and conditions stand as in the original GeM bid dated 21-08-2026 and its attached ATC/specs/SOR.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
Buyer clause caps CMC at not more than 8% of contract price per annum, while GeM CMC fields allow 3%–25% (and Additional CMC text even mentions up to 50%).
ATC and Buyer clause 24 say annual CMC payment; GeM Additional CMC clauses say quarterly.
Bid header MSE preference quantity is 25%, but Buyer Added para 27 awards 50% of total value to matching MSE.
GeM Option Clause and Repeat Order allow up to 50% quantity variation, while ATC Tolerance Clause limits increase/decrease to 25%.
GeM ePBG duration is 26 months, while ATC requires PBG valid up to 60 days beyond warranty (24-month warranty ⇒ ~26 months if warranty starts at acceptance).
Core bid restricts participation to Class-I/II local suppliers under DPIIT MII, but Buyer Added para 28 imports MoP&NG PP-LC policy language (oil & gas) and treats LC ≤20% as Non Local Supplier.
tech_specs_...pdf and 1786977530.pdf are byte-identical 14-page specification files; not a substantive conflict but creates dual citation sources.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Ask buyer to confirm whether the mandatory undertaking cap of 8% p.a. overrides the GeM CMC max field of 25% (and the 50% wording in Additional CMC text).
Seek written resolution of annual (ATC/para 24) versus quarterly (Additional CMC clauses) payment cadence and invoice/user-certificate process.
Request confirmation of MSE matched-quantity/value percentage if L1 is non-MSE.
Clarify maximum upward quantity exposure at award and post-award (option during currency + repeat within six months) and whether rates remain firm without renegotiation.
Confirm whether DIL is mandatory for pure system-integrator/authorized sellers as well as OEMs, and which licence category/product code is acceptable.
Ask where/when samples must be produced for TEC, who bears transport/security costs into J&K/formation locations, and return timeline for unsuccessful bidders.
Request gun interface control data, software/hardware ICD, site access protocol at Budgam/15 Corps locations, and responsibility matrix if gun readiness delays seller DP.
Request disclosure of estimated cost used for ALB scrutiny and confirm whether 26-month ePBG runs from contract date or acceptance, given warranty+60 days language.
Seek deletion/confirmation of para 28 MoP&NG PP-LC modification versus Class-I/II-only DPIIT MII participation rules.
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
LD 0.5% of delayed price per week (or part), capped at 5%; rises to 10% for inordinate delay (>25% of total DP); contract terminable after 7 weeks delay or >50% of scheduled DP, whichever earlier.
EMD of INR 3.84 crore plus 5% PBG and later 5% CMC security, with 100% payment only after full integration/acceptance and no advance.
12 systems in 120 days and balance 12 in 240 days including install/commission/train at Budgam, after TEC sample approval and ATP finalisation.
Fall clause, option/repeat quantity swings, no arbitration clause, Integrity Pact sanctions including PBG forfeiture without reasons, and agent-commission false-declaration penalties (5-year debarment, refund with interest).
Internal conflicts on CMC rate/payment, MSE split, MII regime and quantity options create award and post-award dispute risk if bid is submitted without pre-bid resolution.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Ministry of Defence — Department of Military Affairs — Indian Army; GeM bid GEM/2026/B/7927477 for Northern Command / 15 Corps Zone requirement.
HOD grievance email [email protected]; Buyer email [email protected].
EMD/performance beneficiary: GOC-in-C, Northern Command, HQ Northern Command, Udhampur (Goc-in-c); UIN NCTGC2415P.
PCDA Jammu is the paying authority for bills (electronically via GeM; fallback documentary set if GeM payment fails).
Pre-bid on 01-09-2026 11:00 through Video Conference (link/host details not printed in the PDFs).