Publication / bid dated
Bid document dated 21-08-2026 (GEM/2026/B/7927619).
- No corrigendum in the tender pack alters this date.
Loading…
Upgradation of Zu 23MM 2B Gun System for Counter UAS Detection Capb
Indian Army9767755
Written by TenderKart AI from the documents published when it was generated. Check the tender for later corrigenda before you bid.
21 Aug 2026
30 Sept 2026
₹3.8 Cr
All important dates as they stand after corrigenda: publication, pre-bid/clarification deadline, bid submission deadline, bid opening, and bid validity period.
Bid document dated 21-08-2026 (GEM/2026/B/7927619).
Pre-bid on 31-08-2026 at 10:00:00 through Video Conference.
Bid End Date/Time: 07-09-2026 10:00:00.
Bid Opening Date/Time: 07-09-2026 10:30:00, online on GeM.
Bid Offer Validity is 180 days from Bid End Date.
Staggered delivery to Anantnag: 12 units in 120 days and 12 units in 240 days from contract effective date; SoR requires complete delivery within 240 days (50% within 120 days).
Tender value or estimated cost, EMD/bid security (amount, acceptable forms, validity), tender document fees, performance security, and key payment terms.
No explicit estimated cost or tender value is stated in the bid pack.
EMD INR 3,84,00,000; Advisory Bank State Bank of India; beneficiary GOC-in-C Northern Command, HQ Northern Command, Udhampur.
ePBG 5.00% of contract value for 26 months; ATC requires Performance Guarantee of 5% within 30 days of confirmed order, valid 60 days beyond warranty.
Comprehensive Maintenance required for 5 years post 2-year warranty; quote CMC as % of equipment cost within 3%–25% band (bid header), evaluated on NPV with 10% discounting; Bid cl.23 also caps CMC at not more than 8% of contract price per annum.
No advance; 100% payment on delivery, integration, commissioning, training and user acceptance/competent authority approval; paying authority PCDA Jammu; RCM GST 18% applicable.
Every pass/fail eligibility and qualification requirement: experience and past performance, turnover/net worth, registrations and certifications, consortium/JV rules, and debarment or blacklisting conditions.
Minimum average annual bidder turnover 4200 Lakh (3 years, GeM-verified); OEM average turnover 35000 Lakh (last 3 years); OEM net worth must be positive as per last audited financial statement.
2 years past experience of manufacturing/supplying same or similar category products to Central/State Govt/PSU; past performance of 50% of bid quantity in at least one of last three FYs.
Only Class-I and Class-II local suppliers may participate; Non-Local suppliers not eligible (except concurrent MSE benefits as per OM). Minimum 50% LC for Class-1 and 20% for Class-2; MII purchase preference margin L1+20% for up to 50% quantity.
MSE purchase preference Yes: price band L1+15%; quantity/amount percentage stated as 25% in bid preference table (while another buyer-added clause says 50% of total value — see contradictions).
Bidders must not be insolvent/bankrupt; not blacklisted/debarred by Procuring Organisation/MoD/DoE; not convicted within 3 years for specified offences; no allied-firm evasion; cooling-off and near-relation bars; land-border registration if applicable; no conflict of interest.
ISO 9001 for bidder or OEM; certificates/test reports as in technical specifications on bid opening date; imported-product India office if applicable; TEC sample and physical verification of QR parameters.
No affirmative consortium/JV bidding structure is set out; land-border definition treats a consortium/JV as restricted if any member is from a restricted country.
What is being procured: the work, supplies or services, deliverables and quantities, locations, phases, completion or delivery timelines, applicable standards, and notable exclusions.
Upgradation of 24 × ZU-23MM 2B Gun Systems with Counter-UAS (C-UAS) detection capability for 15 Corps Zone (Air Defence of VA/VPs), OCPP FY 2026-27.
Tripod-mounted, 2-person deployable AESA/hybrid scan C-UAS radar with low-RCS detection ranges, 360° azimuth, elevation ≤0° to >60°, ≥50 simultaneous tracks, Akashteer ASTERIX CAT048/062 interface, and ZU-23 cueing.
Consignee location Anantnag (spelt Ananatnag in bid): 12 units / 120 days and 12 / 240 days; SITC + operator training (24 persons, 7 days at unit location); TEC sample, ATP/ATB acceptance.
Minimum 2-year comprehensive onsite warranty from acceptance/installation (whichever later), then 5-year CMC with 98% uptime, 48-hour response, max 5-day repair turnaround; 7-year product support/shelf life.
The complete checklist of documents to submit — mandatory vs conditional, with any prescribed formats, proformas or annexures — plus how to submit: portal and mode, envelope/cover structure, digital signature requirements, signing and attestation rules, and physical originals with their deadline.
Two-packet online bid on GeM under bidder Digital Signature; manual tender box not applicable; opening online on GeM.
Physical EMD (where applicable) to CDA/PCDA Jammu within 5 days of Bid End Date; GeM disclaimer also allows EMD and signed Integrity Pact in physical form within 5 days of bid opening; TEC sample to be produced during technical evaluation.
Online DSC signing; declarations on bidder letterhead as prescribed; Integrity Pact on behalf of CEO; LC undertaking by authorized signatory with Power of Attorney; post-award invoices need statutory auditor LC certificates.
Every corrigendum/addendum in order — what changed (original vs amended value), its impact, and the action for the bidder — ending with the values that finally apply.
The downloaded tender pack contains no corrigendum or addendum file; original GeM bid dated 21-08-2026 and attached ATC/SoR/tech specs apply as issued.
Genuine conflicts within and across the documents (original vs corrigenda, clause vs annexure, tender document vs BOQ): both sides with citations, and which value prevails.
Bid preference table awards MSE matched quantity/amount of 25%, but Buyer Added cl.26 awards 50% of total value within the same L1+15% band.
Bid cl.23 undertakes CMC at not more than 8% of contract price per annum, while bid CMC fields set min 3% / max 25%, and Additional CMC cl.8.5 allows 3% up to 50% of equipment cost.
ATC payment terms and Bid cl.23 provide annual CMC payment, while GeM Additional CMC clauses repeatedly require quarterly payment after user certification.
Bid cl.23 requires AMC Performance Security of 5% of total CMC value valid CMC period + 2 months; Additional CMC cl.10 states CMC PBG between 2.5% and 10% as specified and validity CMC period + one year.
GeM Option Clause and Repeat Order allow up to 50% quantity variation/repeat, while ATC Tolerance Clause limits increase/decrease to 25% from BID issue to contract placement.
Bid states “Bid splitting not applied”, yet Additional CMC cl.11 contemplates splitting order quantity and L1 price matching by higher bidders.
Core bid MII clauses invoke DPIIT Public Procurement (Preference to Make in India) Order with Class-I/II gates, while Buyer Added cl.27 says the MII preference clause is modified and governed by MoP&NG PP-LC Policy FP-20013/2/2017-FP-PNG dated 17.11.2020.
SoR starts 2-year warranty from signing of acceptance certificate; Bid cl.30/ATC para 70 start from final acceptance or installation/commissioning/testing (whichever later).
Bid cl.23 inserts an unexplained standalone ‘20 Crores’ under the CMC undertaking paragraph, with no definition whether this is a CMC scope value, estimated cost, or form-field error.
Only critical, tender-specific pre-bid queries that could materially change bid/no-bid, pricing, eligibility or contractual risk. Skip generic or obvious questions the documents already answer clearly.
Which MSE matched-quantity/value percentage will be used at award — 25% (preference table) or 50% (Buyer Added cl.26)?
Is the Bid cl.23 ‘not more than 8% per annum’ a hard ceiling overriding the portal min/max CMC percentages, and what happens if GeM forces a higher entry?
Will CMC be paid annually (ATC/Bid cl.23) or quarterly (GeM Additional CMC clauses), and what is the exact offline CMC agreement template/start trigger?
What exact hardware/software constitutes the mandatory TEC sample, where/when must it be presented, who bears transport/security costs into 15 Corps Zone/Anantnag, and how long is the L1 sample retained?
Who supplies Akashteer gateway ICD/credentials, on-gun mechanical/electrical interfaces, and live integration windows? Is demonstration of live Akashteer CAT048/062 exchange mandatory before acceptance?
Must the GeM bidder itself hold the DIL, or may an Indian OEM-authorized integrator bid while OEM holds licences? How are foreign-origin AESA components treated under DIL and land-border/ToT rules?
Can buyer stack Option (+50%), Repeat (+50% within 6 months of completion) and pre-award Tolerance (±25%)? Confirm resulting maximum quantity and delivery-period formula application for high-altitude Anantnag sites.
Does DPIIT MII Order (Class-I/II) or MoP&NG PP-LC policy in cl.27 control eligibility, preference and per-invoice LC certificates?
Commercial, legal and execution risks a bidder should weigh: liquidated damages and penalties, unusual or one-sided clauses, tight timelines, and payment or security risks.
LD 0.5%/week (part thereof) up to 5% of delayed price (10% if inordinate delay >25% of DP); denial clause shifts tax/FX/PVC upside to seller during seller-caused extensions; risk & expense after 45-day cure.
EMD INR 3.84 Cr locks significant capital; 5% ePBG for 26 months plus separate CMC PBG; failure to accept CMC forfeits performance security.
50% supply in 120 days and balance in 240 days into Anantnag/15 Corps Zone with ops to 4500 m, harsh environment and TEC sample-to-lot identity, plus training within 15 days of ICT.
Warranty downtime ≤5% (replace all if >10%); CMC 98% uptime (max 8 days down/year; ≤5 days any one time), 48 h response, 5-day max repair; LD on excess downtime; buyer can terminate CMC on 3 months’ notice without compensation.
Integrity Pact sanctions include forfeiture of securities without assigning reasons and debarment; agency-commission breach triggers 5-year debarment and refund with interest 2% above LIBOR; fall clause can force price reduction; confidentiality/cyber breaches are material defaults.
DIL mandatory; extensive NABL/OEM certifications; TEC physical checks; no extra document time; non-upload is rejection; public visibility of uploaded docs to other bidders.
The inviting authority and relevant contacts: office, person, designation, address, phone and email — and which address receives physical submissions, if any.
Ministry of Defence — Department of Military Affairs — Indian Army; GeM bid GEM/2026/B/7927619 for HQ Northern Command / 15 Corps Zone requirement.
HOD e-mail: [email protected]; Buyer e-mail: [email protected].
Physical EMD deposit: CDA/PCDA Jammu; instrument favouring GOC-in-C Northern Command; postal block GOC-in-C Northern Command, C/o 56 APO.