Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Clarification
Additional Technical ConsiderationsThis consultancy should support the operationalisation of Syria's national Multi-Hazard Early Warning System (MHEWS), rather than producing standalone technical documents.Accordingly, the bidder's proposal should explicitly link the technical outputs to:Impact-based forecasting and warning thresholds.CAP-compatible warning generation and dissemination through the existing ClimWeb platform.Clearly defined institutional responsibilities, escalation procedures and activation triggers.Anticipatory action and preparedness measures corresponding to warning levels.Practical simulations and sustainable national training capacity.These elements are essential to ensuring that the consultancy contributes directly to strengthening Syria's national early warning capabilities and the implementation of the Early Warnings for All (EW4All) initiative.
Clarification
Training and ParticipantsQuestion:Which reports, thresholds, manuals, SOPs and training materials must be submitted in Arabic, English or both?UNOPS Answer:Final operational documents, including warning thresholds, activation manuals, SOPs and training materials, should be available in Arabic. English versions of the main technical reports and methodologies should also be provided to facilitate technical review and international coordination. Both languages are preferred for key deliverables, with Arabic required for materials intended for national operational use.QuestionAre the community volunteers mentioned on page 1 included in the maximum of 20 trainees stated on page 4, or additional to them?UNOPS Answer:The maximum of 20 trainees should be considered the total number of participants for the formal ToT, including any selected community volunteers. Any additional participants or community-level training activities should be agreed separately.Further Implementation ClarificationsQuestionCan MoEDM provide a deliverables matrix specifying content, format, deadlines and acceptance criteria, and mapping the seven expected outputs in Section II to the five deliverables in Form B-1?UNOPS Answer:A consolidated deliverables matrix should be incorporated into the revised ToR, mapping the seven expected outputs under Section II to the five contractual deliverables in Form B-1. Each deliverable should specify its scope, required content, format, expected completion stage and acceptance criteria.1QuestionFor each hazard, what threshold quantity and level of detail are required (locations, time horizons, alert levels and validation method)? Who is responsible for final validation and formal adoption?UNOPS Answer:Thresholds should follow a consistent multi-hazard framework reflecting four impact-based warning levels, supported by documented technical indicators, trigger values, geographic applicability, forecasting or monitoring time horizons, anticipated impacts and corresponding actions.The proposed warning levels are:Blue: No significant adverse impacts are anticipated.1Yellow: Potential impacts, with a relatively low likelihood of material damage or casualties.Orange: Significant impacts are likely, requiring enhanced preparedness and possible anticipatory measures.Red: Severe impacts are occurring, expected or escalating, requiring immediate protective action.These levels should be associated with hazard-specific quantitative or qualitative indicators, exposure and vulnerability information, and clearly defined activation procedures. Final technical validation and formal adoption will be coordinated by MoEDM with the responsible national sectoral authorities.QuestionShould consultancy work be delivered on-site, remotely or in hybrid form? Are field visits, minimum expert-days or particular specialist disciplines mandatory?UNOPS Answer:A hybrid consultancy approach is acceptable, combining remote analytical work with essential in-country meetings, technical consultations, validation activities and the five-day ToT. Bidders should specify the proposed specialist expertise and estimated level of effort. Relevant expertise should include multi-hazard risk assessment, hydrometeorology, impact-based forecasting, early warning operations, CAP and SOP development, and training design.QuestionWill MoEDM supply computers, connectivity, platform credentials, equipment and data for practical training? Are pre/post assessments or competency evaluations required beyond completion certificates?UNOPS Answer:MoEDM will facilitate access to available institutional datasets, technical experts, existing platforms and training facilities, subject to security and technical requirements. Consultants should specify any additional equipment or software requirements in their proposals. Training should include pre- and post-training assessments, practical exercises and a competency evaluation to measure the effectiveness of the ToT.QuestionFor any on-site work, what access to Ministry sites, experts and systems will be arranged? What security, in-country travel and stakeholder coordination arrangements apply?UNOPS Answer:MoEDM will facilitate official coordination with relevant national institutions and arrange access to authorized Ministry facilities, experts and systems as appropriate. Consultants should account for necessary travel, logistical and security arrangements in coordination with MoEDM and UNOPS. Any field visits should be justified by specific technical objectives and agreed in advance.
Clarification
Scope and TimelineQuestion:What is the expected total assignment duration? Are technical consultancy activities separate from the five-day Training of Trainers (ToT) programme?UNOPS Answer:The assignment should include both technical consultancy services and a five-day Training of Trainers (ToT) programme. The five training days should be treated as a separate activity within the overall consultancy period. The final duration should allow sufficient time for technical assessments, stakeholder consultations, development of deliverables, validation and training.Question:Must technical deliverables be completed and approved before the ToT, or may their development and training run concurrently?UNOPS Answer:Technical development and capacity-building activities may partially overlap. However, the principal technical outputs, particularly the proposed thresholds and operational SOPs, should reach an agreed draft stage before the ToT to ensure meaningful practical exercises.Question:For the six priority hazards, are fully validated thresholds ready for operational adoption required, or technical proposals for subsequent validation and adoption? What validation standard is expected?UNOPS Answer:For the six priority hazards, the consultants are expected to develop scientifically justified, impact-based warning thresholds, supported by historical data, exposure and vulnerability analysis, and applicable international best practices. Where sufficient data are available, thresholds should undergo technical validation. Where gaps remain, the consultants should provide clearly documented provisional thresholds and a practical roadmap for further validation and formal adoption. Final operational approval will remain with the relevant national authorities.Existing Systems and Technical Inputs:Question:Will UNOPS/MoEDM provide existing thresholds, historical hazard and meteorological data, SOPs, event records and other technical documentation? When would these become available?UNOPS Answer:MoEDM will facilitate access to available historical hazard records, meteorological observations, existing thresholds, SOPs and relevant technical documents, subject to availability and applicable data-sharing arrangements. An initial inventory of available datasets should be undertaken at the beginning of the assignment.Question:What monitoring equipment, software, dashboards and MHEWS platform are available? Is actual platform configuration/integration required, or only aligned documentation and recommendations?UNOPS Answer:MoEDM operates a national early warning platform based on WMO ClimWeb, including CAP alert generation and dissemination capabilities, mapping tools and relevant meteorological and hazard information.The consultancy should ensure that all developed thresholds, warning levels, activation procedures and SOPs are compatible with the existing platform and Common Alerting Protocol (CAP). Practical configuration or demonstration of agreed warning workflows within the existing system is preferred where technically feasible and authorized. Development of a new platform is not required.Question:Should thresholds cover all of Syria or specified governorates/priority areas?UNOPS Answer:The methodology should be nationally applicable, covering all Syrian governorates. Detailed threshold development and validation may initially focus on priority locations where sufficient data and risk information are available. The consultants should identify geographic data gaps and recommend an approach for progressive national expansion.Question:Which national communication and coordination protocols must the Activation Manual and SOPs follow, and will copies be provided?UNOPS Answer:The Activation Manual and SOPs must align with the national institutional framework for emergency management, MoEDM's coordination responsibilities, sectoral technical authorities and the national warning dissemination arrangements. Available coordination protocols and institutional documentation will be shared as appropriate.Outputs, Stakeholders and ApprovalQuestion:Who will review, validate and approve technical deliverables, and what review/approval periods should bidders allow?UNOPS Answer:MoEDM will lead the technical review and coordinate validation with relevant national institutions and hazard-specific authorities. Deliverables should be submitted in draft form for review, followed by revisions and final acceptance. Bidders should propose realistic review and revision periods in their workplans, subject to agreement with MoEDM and UNOPS.Question:Are workshops, validation meetings or stakeholder consultations required beyond the five-day ToT? If so, how many, where and for how long?UNOPS Answer:In addition to the five-day ToT, the assignment should include an inception meeting, technical consultations with relevant stakeholders and at least one structured validation workshop. These activities may be conducted in person or through a hybrid approach, depending on requirements and available resources.Question:Does community engagement require direct consultations, fieldwork or implementation activities, or development of a plan, methodology and recommendations only?UNOPS Answer:Community engagement should primarily focus on developing practical methodologies and recommendations for communicating warnings, improving public understanding of warning levels and linking warnings to anticipatory action. Limited stakeholder or community consultations may be proposed where necessary to validate the approach. Large-scale community implementation activities are not expected under this consultancy.Training and ParticipantsQuestion:What are the expected training dates, city and venue?UNOPS Answer:The ToT is expected to take place in Damascus, subject to confirmation of the venue and dates through coordination between MoEDM and UNOPS. The training should preferably take place after the main technical deliverables have been developed and reviewed.Question:What are participants' technical roles and experience? Will equipment, system access and datasets be available for hands-on exercises?UNOPS Answer:Participants will primarily include technical staff from MoEDM and relevant national institutions involved in hazard monitoring, forecasting, risk assessment, warning issuance, preparedness and emergency response. The programme should combine technical presentations, hands-on exercises, case studies and simulations using Syrian hazard scenarios. MoEDM will facilitate available data and platform access where appropriate.
Amendment #2
Please note that Amendment 2 consists of one clause, as mentioned below. This document is considered an integral part of this RFQ.Clause 1: The tender deadline is extended to 26 November 2026 instead of 11 Nov 2026All other terms and conditions unchanged
Amendment #1
Please note that Amendment 1 consists of one clause, as mentioned below. This document is considered an integral part of this RFQ.Clause 1: The tender deadline is extended to 11 November 2026 instead of 04 Nov 2026All other terms and conditions unchanged
Tender Value
Refer Docs
Bid Security (EMD)
Refer Docs
Closing Date
26 Nov 2026, 09:00 (UTC)4d left26 Nov 2026, 2:30 pm IST
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender description: Training of Trainers (ToT) and Technical Support for Developing Operational Thresholds for the Multi-Hazard Early Warning System (MHEWS) in Syria ----- IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
319051
RFQ/2026/65148
Request for quotation
Syria
RFQ
UTC
21 Nov 2026
21 Oct 2026
Table 1. Cost breakdown per deliverable/output
Milestone Deliverables Percentage of Total Price (Weight for payment) Price $ (Lump Sum, All Inclusive)
1 Deliverable 1: Inception & Baseline Assessment Delivery & approval of the Inception Report & Baseline Assessment of existing thresholds 15% [Bidder to insert price]
2 Deliverable 2: Delivery & approval of Priority Hazards Thresholds Framework and Threshold–Impact–Action Matrix 25% [Bidder to insert price]
3 Deliverable 3: Activation Manual & SOPs Delivery & approval of Early Warning Activation Manual & Standard Operating Procedures integrated with MHEWS platform & bilingual requirements. 20% [Bidder to insert price]
4 Deliverable 4: Community Engagement Plan & Recommendations Delivery & approval of Community Engagement & Communication Strategy and Final Recommendations/Roadmap. 15% [Bidder to insert price]
5 Deliverable 5: Capacity Building & Training Delivery Completion of 5-day ToT program for up to 20 participants, submission of Training Package, Training Report & Evaluation, Personnel Submissions, Stationery Kits, and Catering Logistics. 25% [Bidder to insert price]
Table 2: Cost breakdown per component
Note: The total price offered in Table 1 must be identical to the total cost breakdown provided in Table 2, as Table 2 constitutes the detailed breakdown of costs for Table 1.
Offerors are requested to provide the cost breakdown for the above given prices based on the following format. UNOPS shall use the cost breakdown for price reasonableness assessment purposes as well as the calculation of price if both parties agree to a contract amendment in the future.
Table 2-1: Deliverable One
Cost component Qty/No of days No. of Personnel Remuneration per Unit/Daily rate Total Rate for the Period
Personnel Costs
(Please specify other personnel, if applicable)
Sub-total personnel costs
Other costs (provide details)
Travel, Local Transportation
Communication and printing, documentation
Equipment,PPE and other costs (provide costing details)
rents, reservations, food and refreshers (provide costing details)
Translation, Visual Aids, ICT
(Please specify other expenses, if applicable)
Sub-total other expenses
Total financial proposal (personnel + other costs)
Taxes (if applicable)
Grand Total of proposal (Financial Proposal)
Table 2-2: Deliverable Two
Cost component Qty/No of days No. of Personnel Remuneration per Unit/Daily rate Total Rate for the Period
Personnel Costs
(Please specify other personnel, if applicable)
Sub-total personnel costs
Other costs (provide details)
Travel, Local Transportation
Communication and printing, documentation
Equipment,PPE and other costs (provide costing details)
rents, reservations, food and refreshers (provide costing details)
Translation, Visual Aids, ICT
(Please specify other expenses, if applicable)
Sub-total other expenses
Total financial proposal (personnel + other costs)
Taxes (if applicable)
Grand Total of proposal (Financial Proposal)
Table 2-3: Deliverable Three
Cost component Qty/No of days No. of Personnel Remuneration per Unit/Daily rate Total Rate for the Period
Personnel Costs
(Please specify other personnel, if applicable)
Sub-total personnel costs
Other costs (provide details)
Travel, Local Transportation
Communication and printing, documentation
Equipment,PPE and other costs (provide costing details)
rents, reservations, food and refreshers (provide costing details)
Translation, Visual Aids, ICT
(Please specify other expenses, if applicable)
Sub-total other expenses
Total financial proposal (personnel + other costs)
Taxes (if applicable)
Grand Total of proposal (Financial Proposal)
Table 2-4: Deliverable Four
Cost component Qty/No of days No. of Personnel Remuneration per Unit/Daily rate Total Rate for the Period
Personnel Costs
(Please specify other personnel, if applicable)
Sub-total personnel costs
Other costs (provide details)
Travel, Local Transportation
Communication and printing, documentation
Equipment,PPE and other costs (provide costing details)
rents, reservations, food and refreshers (provide costing details)
Translation, Visual Aids, ICT
(Please specify other expenses, if applicable)
Sub-total other expenses
Total financial proposal (personnel + other costs)
Taxes (if applicable)
Grand Total of proposal (Financial Proposal)
Table 2-5: Deliverable Five
Cost component Qty/No of days No. of Personnel Remuneration per Unit/Daily rate Total Rate for the Period
Personnel Costs
(Please specify other personnel, if applicable)
Sub-total personnel costs
Other costs (provide details)
Travel, Local Transportation
Communication and printing, documentation
Equipment,PPE and other costs (provide costing details)
rents, reservations, food and refreshers (provide costing details)
Translation, Visual Aids, ICT
(Please specify other expenses, if applicable)
Sub-total other expenses
Total financial proposal (personnel + other costs)
Taxes (if applicable)
Grand Total of proposal (Financial Proposal)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Contract_for_small_services RFQ-2026-65148.docx
Bidding document • 0.03 MB
Form B-1_ Price Schedule Form in excel format.xlsx
Bidding document • 0.01 MB
RFQ_Section_I_InstructionstoBidders.pdf
Bidding document • 0.12 MB
RFQ_Section_II_ScheduleofRequirements.docx
Bidding document • 0.32 MB
RFQ_Section_III_Returnable Bidding Forms.docx
Bidding document • 1.07 MB
Notice on UNGM.html
Notice page • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .