Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Revision
PLEASE ALSO NOTE THAT THE SUBMISSION DEADLINE FOR THIS RFP HAS BEEN EXTENDED TO 3rd December 2026 – 17:00 hrs BST.
Tender Value
Refer Docs
Bid Security (EMD)
Refer Docs
Closing Date
3 Dec 2026, 04:59 (+06:00)3 Dec 2026, 4:29 am IST
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
The Office of the United Nations High Commissioner for Refugees (UNHCR), Sub-Office Cox’s Bazar, Bangladesh, invites qualified solar PV contractors to make a firm offer for the design, BoQ, supply, installation, testing and commissioning, on a turnkey basis, of a Solar PV Hybrid Power System (solar PV with LiFePO₄ battery storage) at each of two Refugee Higher Education Centres (RHECs) in the Rohingya refugee camps, Cox’s Bazar.
320031
BGD-UNHCR RFP 3830
Request for proposal
Bangladesh
RFP
+06:00
21 Nov 2026
28 Oct 2026
BGD-UNHCR RFP 3830 Technical Bill of Quantities (no prices) – Lot 1 – RHEC Camp 4 Design, BoQ, Supply, Installation, Testing and Commissioning of Solar PV Hybrid Power Systems – Two RHECs, Cox’s Bazar
Annex B1 – Technical BoQ
SL Item Specification offered (make, model, key ratings) Unit Qty Country of origin Stock availability / lead time
1 Solar PV modules – Monocrystalline N-Type or better/advanced technology, minimum 550 Wp per module, with total installed capacity meeting the design requirements (minimum 25 kWp). The stated specification shall be considered the minimum acceptable standard. Pcs
2 Mounting structure incl. roof fixing and any structural strengthening Lot
3 DC combiner / PV junction boxes with isolators, gPV fuses and SPDs Set
4 PV (DC) cables and MC4 connectors Meter
5 Three-phase hybrid inverter configuration with minimum combined inverter capacity of 20 kW. Bidders may propose one or multiple inverter units to achieve the required capacity and redundancy requirements. Set
6 LiFePO₄ battery energy storage system incl. BMS, racks/cabinet (≥ 150 kWh gross / ≥ 105 kWh usable) Set
7 Battery area works: enclosure/ventilation, smoke & heat detection with alarm Lot
8 Fire extinguishers, Class C (CO₂ / clean agent) Pcs
9 AC distribution board, automatic changeover/ATS, breakers and integration with existing MDB Set
10 AC cables incl. trenching / conduit Meter
11 Earthing system (array, inverter, BESS, boards) - Complete earthing system for solar array, inverter, battery energy storage system (BESS), distribution boards and all associated metallic structures. Design, installation and testing shall comply with the latest edition of BNBC and applicable IEC standards. Earthing bore depth shall be not less than 40 ft (12 m), subject to achieving the required earth resistance value. Lot
12 Lightning protection system - Complete lightning protection system designed and installed in accordance with BNBC and IEC 62305, including air terminals, down conductors, bonding, surge protection devices (SPDs), dedicated earthing network, and testing. The design shall be supported by calculations and drawings submitted during the detailed design stage. Lot
13 Monitoring system (data logger, communication, web portal and app) Lot
14 Energy meter(s) Pcs
15 Installation works, civil/structural works, labelling and signage Lot
16 Testing, commissioning and Final Acceptance Test (IEC 62446-1) Job
17 Training, O&M manual, SoP, as-built drawings and handover documents Job
18 Critical spare parts held in Bangladesh for the DLP (Annex D, Section 7) Lot
19 Defect Liability Period services – 12 months incl. quarterly preventive maintenance Lot
# [[[[Add additional Items if required]]]]
# [[[[Add additional Items if required]]]]
# [[[[Add additional Items if required]]]]
Add any further items required by your design in the additional rows; leave blank rows that do not apply, but do not change the structure. All equipment and labour needed to complete the works are deemed included.
Quantities and specifications must match your single line diagram, energy simulation and Technical Specification Format (Annex D).
NOTE: SUBMIT THIS BoQ WITH YOUR TECHNICAL OFFER. IT MUST NOT CONTAIN ANY PRICE INFORMATION. Prices go only in the Financial Offer Form (Annex E).
NAME OF AUTHORISED COMPANY REPRESENTATIVE: ______________________________
SIGNATURE / STAMP OF THE COMPANY: ______________________________
BGD-UNHCR RFP 3830 Technical Bill of Quantities (no prices) – Lot 2 – RHEC Camp 13 Design, BoQ, Supply, Installation, Testing and Commissioning of Solar PV Hybrid Power Systems – Two RHECs, Cox’s Bazar
Annex B2 – Technical BoQ
SL Item Specification offered (make, model, key ratings) Unit Qty Country of origin Stock availability / lead time
1 Solar PV modules – Monocrystalline N-Type or better/advanced technology, minimum 550 Wp per module, with total installed capacity meeting the design requirements (minimum 25 kWp). The stated specification shall be considered the minimum acceptable standard. Pcs
2 Mounting structure incl. roof fixing and any structural strengthening Lot
3 DC combiner / PV junction boxes with isolators, gPV fuses and SPDs Set
4 PV (DC) cables and MC4 connectors Meter
5 Three-phase hybrid inverter configuration with minimum combined inverter capacity of 20 kW. Bidders may propose one or multiple inverter units to achieve the required capacity and redundancy requirements. Set
6 LiFePO₄ battery energy storage system incl. BMS, racks/cabinet (≥ 150 kWh gross / ≥ 105 kWh usable) Set
7 Battery area works: enclosure/ventilation, smoke & heat detection with alarm Lot
8 Fire extinguishers, Class C (CO₂ / clean agent) Pcs
9 AC distribution board, automatic changeover/ATS, breakers and integration with existing MDB Set
10 AC cables incl. trenching / conduit Meter
11 Earthing system (array, inverter, BESS, boards) - Complete earthing system for solar array, inverter, battery energy storage system (BESS), distribution boards and all associated metallic structures. Design, installation and testing shall comply with the latest edition of BNBC and applicable IEC standards. Earthing bore depth shall be not less than 40 ft (12 m), subject to achieving the required earth resistance value. Lot
12 Lightning protection system - Complete lightning protection system designed and installed in accordance with BNBC and IEC 62305, including air terminals, down conductors, bonding, surge protection devices (SPDs), dedicated earthing network, and testing. The design shall be supported by calculations and drawings submitted during the detailed design stage. Lot
13 Monitoring system (data logger, communication, web portal and app) Lot
14 Energy meter(s) Pcs
15 Installation works, civil/structural works, labelling and signage Lot
16 Testing, commissioning and Final Acceptance Test (IEC 62446-1) Job
17 Training, O&M manual, SoP, as-built drawings and handover documents Job
18 Critical spare parts held in Bangladesh for the DLP (Annex D, Section 7) Lot
19 Defect Liability Period services – 12 months incl. quarterly preventive maintenance Lot
# [[[[Add additional Items if required]]]]
# [[[[Add additional Items if required]]]]
# [[[[Add additional Items if required]]]]
Add any further items required by your design in the additional rows; leave blank rows that do not apply, but do not change the structure. All equipment and labour needed to complete the works are deemed included.
Quantities and specifications must match your single line diagram, energy simulation and Technical Specification Format (Annex D).
NOTE: SUBMIT THIS BoQ WITH YOUR TECHNICAL OFFER. IT MUST NOT CONTAIN ANY PRICE INFORMATION. Prices go only in the Financial Offer Form (Annex E).
NAME OF AUTHORISED COMPANY REPRESENTATIVE: ______________________________
SIGNATURE / STAMP OF THE COMPANY: ______________________________
BGD-UNHCR RFP 3830 – Annex E – Financial Offer Summary
Lot Total excl. VAT (BDT) VAT (BDT) Total incl. VAT (BDT) Bid submitted (Yes/No)
Lot 1 – RHEC Camp 4 0.00 0.00 0.00
Lot 2 – RHEC Camp 13 0.00 0.00 0.00
Each lot is evaluated and awarded separately; conditional discounts across lots will not be considered.
BGD-UNHCR RFP 3830 Financial Offer Form / Priced BoQ – Lot 1 – RHEC Camp 4 Design, BoQ, Supply, Installation, Testing and Commissioning of Solar PV Hybrid Power Systems – Two RHECs, Cox’s Bazar
Annex E1 – Financial Offer Form Annex E (to be submitted separately)
SL Item Specification (as in Annex B) Unit Qty Unit Price in BDT (excluding VAT) Total Price in BDT (excluding VAT) VAT Amount in BDT Total Amount in BDT (including VAT)
1 Solar PV modules – Monocrystalline N-Type or better/advanced technology, minimum 550 Wp per module, with total installed capacity meeting the design requirements (minimum 25 kWp). The stated specification shall be considered the minimum acceptable standard. Pcs 0.00 0.00
2 Mounting structure incl. roof fixing and any structural strengthening Lot 0.00 0.00
3 DC combiner / PV junction boxes with isolators, gPV fuses and SPDs Set 0.00 0.00
4 PV (DC) cables and MC4 connectors Meter 0.00 0.00
5 Three-phase hybrid inverter configuration with minimum combined inverter capacity of 20 kW. Bidders may propose one or multiple inverter units to achieve the required capacity and redundancy requirements. Set 0.00 0.00
6 LiFePO₄ battery energy storage system incl. BMS, racks/cabinet (≥ 150 kWh gross / ≥ 105 kWh usable) Set 0.00 0.00
7 Battery area works: enclosure/ventilation, smoke & heat detection with alarm Lot 0.00 0.00
8 Fire extinguishers, Class C (CO₂ / clean agent) Pcs 0.00 0.00
9 AC distribution board, automatic changeover/ATS, breakers and integration with existing MDB Set 0.00 0.00
10 AC cables incl. trenching / conduit Meter 0.00 0.00
11 Earthing system (array, inverter, BESS, boards) - Complete earthing system for solar array, inverter, battery energy storage system (BESS), distribution boards and all associated metallic structures. Design, installation and testing shall comply with the latest edition of BNBC and applicable IEC standards. Earthing bore depth shall be not less than 40 ft (12 m), subject to achieving the required earth resistance value. Lot 0.00 0.00
12 Lightning protection system - Complete lightning protection system designed and installed in accordance with BNBC and IEC 62305, including air terminals, down conductors, bonding, surge protection devices (SPDs), dedicated earthing network, and testing. The design shall be supported by calculations and drawings submitted during the detailed design stage. Lot 0.00 0.00
13 Monitoring system (data logger, communication, web portal and app) Lot 0.00 0.00
14 Energy meter(s) Pcs 0.00 0.00
15 Installation works, civil/structural works, labelling and signage Lot 0.00 0.00
16 Testing, commissioning and Final Acceptance Test (IEC 62446-1) Job 0.00 0.00
17 Training, O&M manual, SoP, as-built drawings and handover documents Job 0.00 0.00
18 Critical spare parts held in Bangladesh for the DLP (Annex D, Section 7) Lot 0.00 0.00
19 Defect Liability Period services – 12 months incl. quarterly preventive maintenance Lot 0.00 0.00
# [[[[Add additional Items if required]]]] 0.00 0.00
# [[[[Add additional Items if required]]]] 0.00 0.00
# [[[[Add additional Items if required]]]] 0.00 0.00
Total – Lot 1 – RHEC Camp 4 (BDT) 0.00 0.00 0.00
Enter a price for every item of your Technical BoQ (Annex B), including any additional items. The total is a lump sum for the complete, fully functional system; all equipment, labour, transport, installation, testing, training, documentation, warranty and DLP obligations are deemed included.
Offer validity: 120 days from the submission deadline. Payment: per RFP Section 2.4.2 and ToR Section 14 (no advance payment).
NOTE: DO NOT SUBMIT THIS FORM WITH YOUR TECHNICAL OFFER. SUBMIT IT ONLY IN THE FINANCIAL SECTION OF THE CLOUD ERP NEGOTIATION.
NAME OF AUTHORISED COMPANY REPRESENTATIVE: ______________________________
SIGNATURE / STAMP OF THE COMPANY: ______________________________
BGD-UNHCR RFP 3830 Financial Offer Form / Priced BoQ – Lot 2 – RHEC Camp 13 Design, BoQ, Supply, Installation, Testing and Commissioning of Solar PV Hybrid Power Systems – Two RHECs, Cox’s Bazar
Annex E2 – Financial Offer Form Annex E (to be submitted separately)
SL Item Specification (as in Annex B) Unit Qty Unit Price in BDT (excluding VAT) Total Price in BDT (excluding VAT) VAT Amount in BDT Total Amount in BDT (including VAT)
1 Solar PV modules – Monocrystalline N-Type or better/advanced technology, minimum 550 Wp per module, with total installed capacity meeting the design requirements (minimum 25 kWp). The stated specification shall be considered the minimum acceptable standard. Pcs 0.00 0.00
2 Mounting structure incl. roof fixing and any structural strengthening Lot 0.00 0.00
3 DC combiner / PV junction boxes with isolators, gPV fuses and SPDs Set 0.00 0.00
4 PV (DC) cables and MC4 connectors Meter 0.00 0.00
5 Three-phase hybrid inverter configuration with minimum combined inverter capacity of 20 kW. Bidders may propose one or multiple inverter units to achieve the required capacity and redundancy requirements. Set 0.00 0.00
6 LiFePO₄ battery energy storage system incl. BMS, racks/cabinet (≥ 150 kWh gross / ≥ 105 kWh usable) Set 0.00 0.00
7 Battery area works: enclosure/ventilation, smoke & heat detection with alarm Lot 0.00 0.00
8 Fire extinguishers, Class C (CO₂ / clean agent) Pcs 0.00 0.00
9 AC distribution board, automatic changeover/ATS, breakers and integration with existing MDB Set 0.00 0.00
10 AC cables incl. trenching / conduit Meter 0.00 0.00
11 Earthing system (array, inverter, BESS, boards) - Complete earthing system for solar array, inverter, battery energy storage system (BESS), distribution boards and all associated metallic structures. Design, installation and testing shall comply with the latest edition of BNBC and applicable IEC standards. Earthing bore depth shall be not less than 40 ft (12 m), subject to achieving the required earth resistance value. Lot 0.00 0.00
12 Lightning protection system - Complete lightning protection system designed and installed in accordance with BNBC and IEC 62305, including air terminals, down conductors, bonding, surge protection devices (SPDs), dedicated earthing network, and testing. The design shall be supported by calculations and drawings submitted during the detailed design stage. Lot 0.00 0.00
13 Monitoring system (data logger, communication, web portal and app) Lot 0.00 0.00
14 Energy meter(s) Pcs 0.00 0.00
15 Installation works, civil/structural works, labelling and signage Lot 0.00 0.00
16 Testing, commissioning and Final Acceptance Test (IEC 62446-1) Job 0.00 0.00
17 Training, O&M manual, SoP, as-built drawings and handover documents Job 0.00 0.00
18 Critical spare parts held in Bangladesh for the DLP (Annex D, Section 7) Lot 0.00 0.00
19 Defect Liability Period services – 12 months incl. quarterly preventive maintenance Lot 0.00 0.00
# [[[[Add additional Items if required]]]] 0.00 0.00
# [[[[Add additional Items if required]]]] 0.00 0.00
# [[[[Add additional Items if required]]]] 0.00 0.00
Total – Lot 2 – RHEC Camp 13 (BDT) 0.00 0.00 0.00
Enter a price for every item of your Technical BoQ (Annex B), including any additional items. The total is a lump sum for the complete, fully functional system; all equipment, labour, transport, installation, testing, training, documentation, warranty and DLP obligations are deemed included.
Offer validity: 120 days from the submission deadline. Payment: per RFP Section 2.4.2 and ToR Section 14 (no advance payment).
NOTE: DO NOT SUBMIT THIS FORM WITH YOUR TECHNICAL OFFER. SUBMIT IT ONLY IN THE FINANCIAL SECTION OF THE CLOUD ERP NEGOTIATION.
NAME OF AUTHORISED COMPANY REPRESENTATIVE: ______________________________
SIGNATURE / STAMP OF THE COMPANY: ______________________________
BGD-UNHCR RFP 3830 TECHNICAL EVALUATION SCORING MATRIX (ANNEX F) – applied separately to each lot FOR THE DESIGN, BoQ, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF SOLAR PV HYBRID POWER SYSTEMS FOR TWO REFUGEE HIGHER EDUCATION CENTRES (RHECs), COX’S BAZAR – LOT 1: CAMP 4; LOT 2: CAMP 13
List of Bidders Score RESULT
Minimum 60% to pass: 42 points out of 70 (per lot)
BGD-UNHCR RFP 3830 TECHNICAL EVALUATION SCORING MATRIX (ANNEX F) – applied separately to each lot FOR THE DESIGN, BoQ, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF SOLAR PV HYBRID POWER SYSTEMS FOR TWO REFUGEE HIGHER EDUCATION CENTRES (RHECs), COX’S BAZAR – LOT 1: CAMP 4; LOT 2: CAMP 13
Prequalification Criteria Merit (Pass / Fail) In case Joint venture (Criteria To Be Met By Lead/Primary Vendor + Partner(s)
1 Valid commercial registration – trade licence for FY 2026–2027, with licences for FY 2024–2025 and FY 2025–2026 (minimum 3 years in business) PASS/FAIL Applicable to each joint venture member
2 VAT registration certificate (BIN) PASS/FAIL Applicable to each joint venture member
3 TIN certificate (Taxpayer Identification Number) PASS/FAIL Applicable to each joint venture member
4 Company profile (as per Technical Qualification Criteria), showing a minimum of three (3) years of experience in solar PV implementation PASS/FAIL Applicable to each joint venture member
5 Proof of site visit – Lot 1 (Camp 4) only, as recorded in UNHCR’s attendance sheet PASS/FAIL At least one of the joint venture members
6 Audit reports for the past 3 years (2023, 2024, 2025) OR Letter of Commitment for Bank’s Undertaking for Line of Credit (Annex M), issued not earlier than 28 days before the original closing date. (Minimum liquid assets or credit line: BDT 5,000,000 per lot bid; BDT 10,000,000 if bidding for both lots) PASS/FAIL Applicable to at least one of the joint venture members
7 Confirmation that the PV modules offered are listed on the BloombergNEF Tier-1 PV module list (latest quarter) PASS/FAIL Applicable to at least one of the joint venture members
8 At least three (3) completed solar PV projects of ≥ 20 kWp, supported by purchase orders/contracts and completion certificates PASS/FAIL The joint venture must meet the criterion collectively or through at least one member
9 Mandatory certifications submitted: PV modules IEC 61215, IEC 61730, IEC 61701; inverter IEC 62109; BESS IEC 62619 and UN 38.3 PASS/FAIL Applicable to at least one of the joint venture members
10 Signed acknowledgement of the GCC for Civil Works (Annex I) and the UN Supplier Code of Conduct (Annex K) PASS/FAIL Applicable to each joint venture member
11 Signed Bidder’s Undertaking Form submitted (Annex L) PASS/FAIL Applicable to Lead/Prime vendor only
12 Bid security submitted for each lot bid, in original, as per Annex G PASS/FAIL Applicable to Lead/Prime vendor only
Is the supplier eligible as per the UNGM Vendor Ineligibility List? (This criterion will be assessed internally by UNHCR; bidders are not required to respond.) ELIGIBLE/ INELIGIBLE Assessed internally by UNHCR for each joint venture member
Note: In the event that any administrative documents are missing at the time of submission, UNHCR will contact the concerned bidder(s) after the tender closing date during the technical evaluation phase. The bidder(s) will be required to provide the missing document(s) within a specified deadline. Failure to submit the requested documents within the stipulated timeframe will result in technical disqualification. UNHCR reserves the right to conduct due diligence at any stage of the procurement process. Any false or misleading information may result in disqualification from the tendering process at any stage. During the evaluation, the supplier(s) qualification will be determined by UNHCR, after analysis and validation of the Vendor Registration Form and self-registration in Cloud ERP supplier portal, and supporting documentation required. Such analysis and validation involve consideration of several factors supported by relevant documentation such as: financial standing, core business, track record, contract capacity, verification that the supplier is not part of UN ineligibility lists.
BGD-UNHCR RFP 3830 TECHNICAL EVALUATION SCORING MATRIX (ANNEX F) – applied separately to each lot FOR THE DESIGN, BoQ, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF SOLAR PV HYBRID POWER SYSTEMS FOR TWO REFUGEE HIGHER EDUCATION CENTRES (RHECs), COX’S BAZAR – LOT 1: CAMP 4; LOT 2: CAMP 13
Item Designation In case Joint venture (Criteria To Be Met By Lead/Primary Vendor + Partner(s)
Explanation of scoring Scoring range Max Score
COMPANY PROFILE & CAPACITY (18 points)
1 Company quality assurance certification Based on the bidder’s valid certifications (copies of certificates) 1 point – valid certificate for at least one of ISO 9001, ISO 14001 or ISO 45001 0 points – none 1.0 Applicable to Lead/Prime vendor
2 Company profile and years in solar PV business Number of years in solar PV installation, evidenced by trade licences and the date of the first completed solar PV contract. 2 points – 7 or more years in solar PV installation 1 point – 3 to less than 7 years (Less than 3 years fails pre-qualification) 2.0 The joint venture must meet the criterion collectively OR through at least one member independently.
3 Previous experience of delivering similar contracts Completed solar PV contracts of ≥ 20 kWp (2019–2026) with purchase orders/contracts and completion certificates. Projects that include lithium battery storage of ≥ 30 kWh count as “hybrid”. Number of completed contracts of any type: 8 points – 7 or more contracts 7 points – 6 contracts 6 points – 5 contracts 5 points – 4 contracts 4 points – 3 contracts (minimum; fewer than 3 fails pre-qualification) Plus hybrid experience: +2 points – at least one hybrid project with lithium battery storage of ≥ 30 kWh +0 points – no hybrid project (Maximum 10 points) 10.0 The joint venture must meet the criterion collectively OR through at least one member independently.
4 Experience and capacity of key personnel allocated to the project CVs (Annex J) with copies of degrees and licences, as per ToR Section 13 Minimum for key personnel: Project Manager (B.Sc. Engg., ≥ 8 years, ≥ 3 solar projects ≥ 20 kWp); two Electrical/Solar Design Engineers (B.Sc. EEE or RE, ≥ 5 years); Site Supervisor (Diploma, ≥ 3 years, valid electrical supervisor licence). Battery storage evidence: at least one member of the key team (Project Manager or either engineer) shows involvement in at least one completed solar project with battery storage (any size or chemistry), or holds a manufacturer training/installer certificate for the offered hybrid inverter or battery system. 5 points – all 4 meet the minimum, with battery storage evidence 4 points – all 4 meet the minimum, without battery storage evidence 3 points – 3 of the 4 meet the minimum (Project Manager must meet it) 1 point – 2 of the 4 meet the minimum (Project Manager must meet it) 0 points – Project Manager does not meet the minimum or fewer than 2 meet it 5.0 The joint venture must meet the criterion collectively OR through at least one member independently.
Sub-Total – Company Profile & Capacity 18.0
QUALITY OF TECHNICAL OFFER AND IMPLEMENTATION (44 points)
5 Overall quality and relevance of the technical offer and system design Design package submitted for each lot bid. The evaluators will verify each of the 13 requirements listed under “Scoring range” and award points only for requirements found in the offer. The Technical BoQ (Annex B) and the Technical Specification Format (Annex D) must be fully completed (ToR Sections 5, 6 and 9). Part A – Mandatory design requirements (2 points each): 1. Load analysis table (appliance, quantity, W, hours/day) with total daily energy ≥ 100 kWh/day 2. PVsyst/HOMER (or equivalent) simulation report naming the irradiation dataset and site coordinates 3. PV array sizing: kWp, number of modules, string configuration, string voltage within the inverter MPPT range 4. Hybrid inverter sizing calculation with rating at or above the ToR minimum 5. BESS sizing calculation: usable kWh, depth of discharge and autonomy ≥ 8 h 6. Single line diagram (SLD) showing all components and the ratings of breakers, fuses, SPDs and isolators If any Part A requirement is not provided or is incomplete, or the PV array or BESS is sized below the ToR minimum, the offer will be considered technically non-compliant and will not proceed to the financial evaluation. Part B – Safety and protection requirements (2 points each): 7. Cable sizing calculation with voltage drop for each circuit within the ToR limit 8. Earthing design with target earth resistance value and layout drawing 9. Lightning protection layout drawing 10. BESS fire-safety design: enclosure/room, detection and/or suppression, separation distances Part C – Compliance and consistency requirements (2 points each): 11. BSTI/SREDA compliance evidence for the PV modules and hybrid inverter, as required by the ToR 12. Mounting structure design with BNBC wind-load calculation for Cox’s Bazar and drawing 13. No discrepancy in make, model, quantity or rating between Annex B, Annex D, the SLD and the datasheets Scoring: 2 points for each requirement found in the offer with the content listed; 0 points if not provided or incomplete (13 requirements × 2 = 26 points). Minimum score: 18 of 26 points (all six Part A requirements plus at least three Part B or Part C requirements). An offer scoring below 18 points on this criterion will be considered technically non-compliant, regardless of its total technical score. Any Part B requirement not provided in a technically compliant offer must be submitted before contract signature, at no additional cost (included in the lump-sum price). 26.0 The joint venture must meet the criterion collectively OR through at least one member independently.
6 Work plan Gantt chart with resources, dependencies and the milestones in ToR Section 12 Days counted as in ToR Section 12. 3 points – Gantt chart covering all ToR Section 12 milestones, with resources assigned to each activity, completion within 75 days 2 points – Gantt chart covering all ToR Section 12 milestones, completion within 76–90 days (or within 75 days without resources assigned) 1 point – Gantt chart completing within 90 days but one or more ToR Section 12 milestones missing 0 points – completion beyond 90 days or no Gantt chart 3.0 Applicable to Lead/Prime vendor
7 Manufacturer authorisation and product certification (PV modules, hybrid inverter, BESS) Manufacturer authorisation letters (if the bidder is not the OEM), valid certificates and test reports as per Annex D, incl. a UL 9540A report or equivalent battery fire / thermal-propagation test evidence for the BESS (UL reports will be verified on UL Product iQ) Required documents for each of the three components: IEC certificates and test reports as per Annex D; manufacturer authorisation letter (if the bidder is not the OEM); for the BESS, a UL 9540A report or equivalent. 4 points – all required documents for all three components 3 points – one required document missing, other than an IEC certificate 1 point – two or more documents missing, but IEC certificates provided for all three components 0 points – any IEC certificate missing, or not provided 4.0 The joint venture must meet the criterion collectively OR through at least one member independently.
8 Milestones and performance monitoring Project progress tracking and reporting plan with four requirements: (a) milestones matching ToR Section 12; (b) a deliverable for each milestone; (c) a date for each milestone; (d) reporting frequency and report format. 2 points – all four requirements 1 point – two or three requirements 0 points – fewer than two requirements, or not provided 2.0 Applicable to Lead/Prime vendor
9 Equipment / tools for the project List of tools and test instruments, each owned, rented, or covered by a subcontract agreement with a specialist testing provider (all three count equally), with evidence of ownership, rental or subcontract. Five test instruments: insulation tester, earth resistance tester, I-V curve tracer/PV analyser, clamp meter, thermal camera – each with a calibration certificate issued within the last 12 months (the specialist testing provider’s certificate is accepted for subcontracted instruments). 3 points – all five instruments, plus PPE and mounting/electrical tools listed 2 points – four of the five instruments 1 point – two or three instruments 0 points – fewer than two instruments, or not provided 3.0 The joint venture must meet the criterion collectively OR through at least one member independently.
10 Health, safety, environment and compliance HSE approach, battery fire safety, RRRC/CiC camp access, waste/battery recycling, Code of Conduct and PSEA (ToR Section 11) Five requirements: (a) site risk assessment and method statements; (b) BESS fire safety procedure; (c) RRRC/CiC camp access procedure; (d) battery and waste recycling/disposal arrangement; (e) signed commitment to the UN Supplier Code of Conduct and PSEA covering all site personnel. 3 points – all five requirements 2 points – four requirements 1 point – two or three requirements 0 points – fewer than two requirements, or not provided 3.0 Applicable to all joint venture members.
11 Quality assurance plan and warranty QA/inspection plan, warranty terms per component, warranty claim procedure, local after-sales support in Bangladesh Four requirements: (a) QA/inspection plan with inspection points at delivery, installation and commissioning; (b) warranty for each component at or above ToR Section 10 minimums and matching Annex B/D; (c) written warranty claim procedure with response times; (d) local after-sales support in Bangladesh: office address and at least one named service engineer with contact number. 3 points – all four requirements 2 points – three requirements 1 point – two requirements 0 points – fewer than two requirements, not provided, or any warranty below the ToR minimum 3.0 Applicable to all joint venture members.
Sub-Total – Quality of Technical Offer and Implementation 44.0
AFTER-SALES, DEFECT LIABILITY AND TRAINING (8 points)
12 DLP maintenance, troubleshooting and spare parts plan 12-month DLP plan: quarterly preventive maintenance, response times (24 h / 3 days / 7 days), critical spares held in Bangladesh, 15-day warranty replacement Five requirements: (a) four quarterly preventive maintenance visits with checklist; (b) commitment to the 24 h / 3 days / 7 days response times; (c) critical spares list with quantities held in Bangladesh; (d) named service team with contact numbers; (e) 15-day warranty replacement commitment. 5 points – all five requirements 3 points – three or four requirements 0 points – fewer than three requirements, not provided, or response times longer than the ToR 5.0 Applicable to Lead/Prime vendor
13 Training plan and SoP Training curriculum, duration, materials, SoP in English/Bangla, refresher after 6 months (ToR Section 8) Six requirements: (a) curriculum topics; (b) duration in hours; (c) hands-on session on site; (d) sample training materials; (e) SoP in English and Bangla; (f) refresher training after 6 months. 3 points – all six requirements 1.5 points – three to five requirements 0 points – fewer than three requirements, or not provided 3.0 Applicable to Lead/Prime vendor
Sub-Total – After-sales, DLP and Training 8.0
Total Score – points (maximum 70; pass mark 42) 70.0
Evaluation note: (1) A requirement counts only if it is found in the offer. For each criterion, evaluators record in their comments which requirements were found, and points are awarded according to the number of requirements found. (2) To be technically compliant, an offer must score at least 42 of 70 points in total, provide all six mandatory design requirements under criterion 5 (Part A) and score at least 18 of 26 points under criterion 5.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Annex A - ToR.docx
Bidding document • 0.08 MB
Annex B - Technical BoQ.xlsx
Bidding document • 0.02 MB
Annex C - Structural design RHEC.pdf
Bidding document • 11.53 MB
Annex D - Tech Spec Format.docx
Bidding document • 0.07 MB
Annex E - Financial Offer.xlsx
Bidding document • 0.02 MB
Annex F - Scoring Matrix.xlsx
Bidding document • 0.03 MB
Annex G - Bid Security Form.docx
Bidding document • 0.05 MB
Annex H - Portal Manual.pdf
Bidding document • 3.84 MB
Annex I - GCC.pdf
Bidding document • 0.21 MB
Annex J - CV Template.docx
Bidding document • 0.05 MB
Annex K - Supplier CoC.pdf
Bidding document • 0.15 MB
Annex L - Bidder Undertaking.docx
Bidding document • 0.05 MB
Annex M - Bank Credit Line Letter.docx
Bidding document • 0.05 MB
Annex N - Construction Services Contract.doc
Bidding document • 0.15 MB
RFP 3830 Solar RHEC.pdf
Bidding document • 0.40 MB
Corrigendum No. 1.pdf
Bidding document • 0.18 MB
Notice on UNGM.html
Notice page • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .