Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Amendment #3
This Tender Amendment 3 is issued to upload the updated drawings for the Rabaraba LLG Accessible Toilet (Lot 1 Package). This update applies exclusively to the Rabaraba LLG Accessible Toilet and is provided under document Annex 1a - Drawings Rabaraba LLG Toilet_REV01 (superseding the initial version).There are no changes to any other sites under the Lot 1 Package (Rabaraba) or to the Lot 2 Package (Esa'ala)
Clarification
QUESTION 12:12. Lot 1 Bill 06 — the building measured in Bill No. 6-1The cover sheet of Bill 06 (Rabaraba Local Level Government Office) lists the works as including “Mainstream Dry Toilet blocks (1no.)”. The bill itself, sheet “Bill 6-1 Inclusive Dry Toilet”, is headed “BILL NO. 6.1, TYPICAL ACCESSIBLE DEHYDRATED TOILET (1NO.)”, and the Grand Summary at row 63 describes it the same way.A mainstream dry toilet block and an accessible dehydrated toilet are different structures, with different quantities and different prices. Please confirm that the quantities set out in sheet “Bill 6-1” are the quantities to be priced, and that the works required at the Local Level Government Office are one accessible dehydrated toilet block.ANSWER:Bill 6-1 is for One Accessible Toilet at the LLG Office and the items and quantities are correct.The updated documents only for Drawings Rabaraba LLG Toilet will be uploaded under the Tender Amendment 3 (Annex 1a - Drawing Rabaraba LLG Toilet_REV01). It also can be accessed in this link: https://drive.google.com/drive/folders/1mv5SjH9oRStv3EvbpZ_-WjaeCC9paqHABest Regards
Clarification
QUESTION 7:7. Sources of naturally occurring materialsTechnical criterion 2.4 requires bidders to state where they plan to source borrow pits, quarry sites, water sources and sand sources, and is assessed pass or fail. Please confirm (a) whether UNOPS holds records of approved or previously used borrow pits, quarries, sand and water sources at or near Rabaraba and Esa’ala that can be made available to bidders; and (b) whether extraction from customary land requires a landowner agreement or an authorisation under the Mining Act to be in place at bid stage, or only before extraction begins.ANSWER:a. UNOPS does not maintain records of approved or previously used borrow pits or quarries in the project areas. Bidders are responsible for identifying their own material sources, and UNOPS will conduct due diligence to verify the suitability and compliance of the Contractor's proposed sources prior to extraction.b. At the bid stage, it is sufficient for bidders to identify their proposed source(s) and confirm whether the required authorization under the Mining Act and/or landowner consent is currently available or will be obtained prior to extractionQUESTION 8:8. Workers Compensation insurance at bid stageSection IV, Schedule 3.12 [Insurance Requirements] requires Workers Compensation insurance at 100 per cent of the contract value in accordance with the Workers Compensation Act 1978. Technical criterion 2.1 allows the insurance requirement to be met by a confirmation letter undertaking to effect the required insurances if selected, although that criterion cites Schedule 3.11, which is Equipment and Machinery Requirements. Please confirm that a letter from our insurer undertaking to effect Workers Compensation cover at 100 per cent of the contract value for each Lot on award satisfies this requirement at bid stage.ANSWER:If a bidder does not currently hold the required insurance policies, a letter of undertaking from an insurance company confirming that it will issue the required policies upon contract award is sufficient at the bid stageQUESTION 9:9. Identity of the Bills of QuantitiesThe Bills of Quantities and the accompanying Pricing Notes issued with this tender are headed “East and Southern Africa Multi-Country Office”, while the tender is issued by B5524 – APR, EAPMCO, Papua New Guinea. Please confirm that the Bills issued are the correct Bills for ITB/2026/65113 and that no revised Bills are to be issued. ANSWER:The tender package is complete as issued. Should any part of the solicitation documents need to be amended, supplemented, or replaced, all bidders will be notified via a formal addendumQUESTION 10:In pricing both Lots we have since identified two further errors in the Grand Summary sheets of the Bills of Quantities, and one question on the scope of Bill 06 of Lot 1.10. Lot 1 Grand Summary — the Bill 03 sub-total omits Bill No. 3-7 (Cess Pool)In the Lot 1 Bill of Quantities, Grand Summary row 41 is labelled “BILL 03 - SUB TOTAL [C]” and contains the formula =SUM(E27:E38).Bill 03 (Rabaraba Primary School) is made up of seven bills, which the Grand Summary lists in rows 27 to 39:Bill No. 3-1, Typical Mainstream Dry Toilets (6 No.) — row 27Bill No. 3-2, Typical Accessible Dehydrated Toilet (1 No.) — row 29Bill No. 3-3, Assembly Hall — row 31Bill No. 3-4, Catchment Tank Plinth, Water Point and Splash Area — row 33Bill No. 3-5, Plumbing and Drainage — row 35Bill No. 3-6, Electrical Installations — row 37Bill No. 3-7, Cess Pool / Urine Absorption Pit — row 39The formula range ends at row 38. Bill No. 3-7, in row 39, falls outside it. The amount for the three cess pools at Rabaraba Primary School is therefore excluded from sub-total [C], and so from the Total Price, although that Bill is priced by the bidder and the work has to be built.Please confirm whether the formula in row 41 should read =SUM(E27,E29,E31,E33,E35,E37,E39), and please issue a corrected Bill of Quantities.ANSWER:Important Notice to All Bidders:Bidders are solely responsible for reviewing and verifying all embedded formulas in the Bill of Quantities (BoQ) template to ensure full arithmetic correctness across all item amounts, sub-totals, and the overall Contract Price. Any pre-set formulas in the spreadsheet are provided for convenience only and shall not be construed as formal instructions or guidelines from UNOPS; bidders must correct any formula discrepancies prior to submissionQUESTION 11:11. Lot 2 Grand Summary — Bill No. 4-5 (Cess Pool) draws its amount from the electrical billIn the Lot 2 Bill of Quantities, Grand Summary row 49 is labelled “Bill No. 4 - 5, CESS POOL/URINE ABSORPTION PIT” and contains the formula ='Bill 4-4 Electrical Installatio'!F38.That is the same cell that row 47, “Bill No. 4 - 4, ELECTRICAL INSTALLATIONS”, already draws from. Two consequences follow for sub-total [D] of Bill 04 (Esa’ala Market) in row 51:the amount of Bill No. 4-5, which totals at cell F41 of the sheet “Bill 4- 5Cesspool”, is not carried to the Grand Summary at all; andthe amount of Bill No. 4-4, Electrical Installations, is counted twice.The equivalent entries for the other sites in Lot 2 each draw from their own cess pool sheet — row 23 from 'Bill 2-6 Cesspool'!F41 and row 37 from 'Bill 3-6 Cesspool'!F41.Please confirm whether the formula in row 49 should read ='Bill 4- 5Cesspool'!F41, and please issue a corrected Bill of Quantities.ANSWER:Same as above Q11, Bidders are solely responsible for reviewing and verifying all embedded formulas in the Bill of Quantities (BoQ) template to ensure full arithmetic correctness across all item amounts, sub-totals, and the overall Contract Price. Any pre-set formulas in the spreadsheet are provided for convenience only and shall not be construed as formal instructions or guidelines from UNOPS; bidders must correct any formula discrepancies prior to submission
Clarification
QUESTION 1:1. Lot 1 Bill of Quantities – Grand Summary total price formulaIn the Lot 1 Bill of Quantities, the Grand Summary cell at row 75, described as “TOTAL PRICE [I = A+ B +C+D+F+G]”, contains the formula =SUM(E11,E25,E41,E55). That adds sub-totals [A], [B], [C] and [D] only. It does not include sub-total [F] at row 61, BILL 05 – Rabaraba District Development Authority (DDA) Office, or sub-total [G] at row 73, BILL 06 – Rabaraba Local Level Government (LLG) Assembly, although the printed description of that cell states that both are included. The Lot 2 Grand Summary is internally consistent. Noting the clarification published on 26 October 2026 that bidders are to price strictly against the Bill of Quantities provided, please confirm (a) whether the Lot 1 Grand Summary formula is to be corrected so that the total price includes sub-totals [F] and [G], and whether a corrected Bill of Quantities will be issued to all bidders; and (b) which figure bidders are to carry as the Contract Price into Schedule 1.2 [Contract Details] and the Bid Submission Declaration.ANSWER:Please note that the Total of Bills (Item I = A + B + C + D + F + G) comprises the prices from all six (6) preceding sections:A: Bill 01 – Preliminaries and GeneralB: Bill 02 – Rabaraba TVETC: Bill 03 – Rabaraba Primary SchoolD: Bill 04 – Rabaraba Health CentreF: Bill 05 – Rabaraba District Development AuthorityG: Bill 06 – Rabaraba Local Level GovernmentThe Final Total (Item K)—calculated as the summation of all six bills (Bills 01 to 06, i.e., Item I) less any offered discount—constitutes the Contract Price.Bidders are advised to disregard any typographical errors in the pre-set template formulas and ensure the full arithmetic correctness of their bid submissionQUESTION 2:2. Goods and Services Tax – where it is to be statedThe Tender Particulars state that all bids shall be submitted net of direct taxes including customs duties and of indirect taxes such as sales taxes or VAT, and that bidders shall separately mention the taxes in the BoQ. The Bills of Quantities issued contain no line, column or summary row for Papua New Guinea Goods and Services Tax. Please confirm where bidders are to state GST – for example as an added row beneath the Grand Summary – and confirm that any amount so stated sits outside the total price used for the financial evaluation.ANSWER:All quoted rates and prices must be exclusive of GST, and these GST-exclusive amounts will form the basis for financial evaluation. Following evaluation, applicable GST will be included as a separate line item in the final awarded Contract PriceQUESTION 3:3. Securities – validation of Papua New Guinea banksSection IV, Schedule 1 requires the Performance Security, and the guarantee for the 10 per cent advance payment, to be issued by a bank or financial institution holding a minimum long-term credit rating of BBB- with Standard and Poor’s or Fitch, or Baa3 with Moody’s, and provides that any instrument issued by an institution rated below that will require prior validation from UNOPS. Commercial banks in Papua New Guinea do not generally hold ratings at that level. Please confirm (a) whether UNOPS will validate guarantees issued by Papua New Guinea commercial banks, and what information is required for that validation; and (b) at what point validation may be sought – in particular whether it can be obtained between notification of award and contract signature, so that the advance payment is available for mobilisation.ANSWER:UNOPS will validate guarantees issued by Papua New Guinea (PNG) commercial banks, taking into account the local context and prevailing long-term credit ratings. Reference documents outlining the applicable credit rating definitions are available at the following links:https://www.fitchratings.com/products/rating-definitions#about-rating-definitionshttps://ratings.moodys.com/rmc-documents/53954To avoid delays in advance payment application and processing, this validation can be completed between the Notification of Award and Contract SignatureQUESTION 4:4. Provisional quantities and remeasurementBills 2 to 6 of each Lot are headed “(All provisional)”. Please confirm that all quantities in those Bills are provisional and subject to remeasurement, and identify which Bills, if any, are to be treated as fixed lump sums.ANSWER:Bills 02 to 06 comprise works items that are fully remeasurable based on actual quantities executed and measured on-site. None of the items under these bills are fixed lump-sum itemsQUESTION 5:5. Marine access for delivery of Plant and MaterialsThe clarification published on 30 October 2026 sets out travel routes and timings for bidders attending the site inspections. This question concerns the delivery of construction Plant and Materials rather than the movement of personnel. Bill 1 item (a) covers mobilisation, logistics and transportation services. Please advise, for Rabaraba and Esa’ala stations: (a) whether a wharf or jetty able to take a landing craft or barge is available at each station, and the maximum vessel length and draft each can accept; (b) any limit on individual lifted or rolled weights at each landing point, which governs how the water tanks and structural steel can be delivered; (c) any berthing, landing or handling fees payable to the Provincial Administration, the District Administration or any other party; and (d) whether those facilities are serviceable throughout the period from February to August 2027.ANSWER:It is the bidders' obligation to familiarize themselves with the marine transport requirements and logistical limitations along the project routes and to price their bids accordingly. Pre-bid site visits and independent market research by bidders are strongly encouraged to gather accurate, first-hand information for the preparation of responsive and competitive bids.Prior to mobilization, the Contractor will be required to submit a Risk Assessment and Method Statement (RAMS) for marine transit in accordance with the Health, Safety, Social and Environmental (HSSE) Requirements set out in the ITBQUESTION 6:6. Premises for the Contractor’s yardSection V, clause 2.1.5 makes the Contractor responsible for identifying, securing and leasing suitable land or buildings near the project sites, and Bill 1 item (c) prices the leasing of an existing building with adequate facilities. Please confirm whether UNOPS, the Milne Bay Provincial Administration or the respective District Administration is able to identify available premises at Rabaraba and Esa’ala, or whether bidders should instead price for temporary site offices and storage erected within the project sites.ANSWER:Recommended locations identified by UNOPS for the bidders' consideration are indicated on Page 19 of the ITB (Site Plan Section). Bidders are responsible for independently verifying the suitability of these locations and pricing their bids accordingly. Furthermore, the Contractor must obtain written consent from the respective institution heads prior to establishing any temporary site offices or storage areas within the project sites
Amendment #2
This amendment is to:1. Upload pre-bid meeting slides and minutes2. Extend submission deadline from 20 November to 25 November 20263. Extend clarification deadline from 18 November to 20 November 2026
Clarification
QUESTION:With reference to item 1.17- Dust, Insect and Vermin Proofing and Item 1.19- Specalist Manufacturers under Lot 1 and 2of the WaSH Project, we would like to seek clarification regarding opportunities for specialist subcontracting.Although this requiement appears to be relatively minor component within the overall technical specifications, its importance should not be underestimated. Inadequate protection against dust, insects and vermin van contribute to equipment damage, electrical faults, contamination risks, increased maintenance costs and premature deterioration of infrastucture.Considering the project's objectives of delivering sustaunable and climate- resilient WASH infrastructure, we believe that appropriate preventive measures are essential to safeguarding the project's long-term investment.We would therefore appreciate UNOPS'clarification on the following:Does this component have a seperately identifiable scope of works or BOQ allocation, or is it incorporated into the Main Contractor's general construction and installation responsibilities?Given the importance of preventive pest protection in maintaining infrastructure durability and operational safety, could UNOPS clarify why dust, insect and vermi- proofing is addressed only as a general requirement rather than as a more detailed specialist work component?Would UNOPS consider encouraging Main Contractors to engage qualified local pest control service providers to ensure that appropriate preventive protection measures are implemneted throughout the project?Thank you. We would appriciate UNOPS guidance on this matter.ANSWER:1. Execution of Scope and Subcontracting: The full scope of works will be awarded to the primary contractor. However, in accordance with the UNOPS Conditions of Contract, the contractor may engage specialized subcontractors, subject to UNOPS prior review and written approval.2. Preventive Treatment & Contractor Responsibility: Any preventive or protective measures required to ensure structural integrity, hygiene, and durability during construction remain the full responsibility of the main contractor, who may engage qualified sub-service providers as necessary to fulfill the technical specifications.3. Quality Assurance & Compliance: UNOPS maintains dedicated site supervision and quality assurance mechanisms to verify that all materials, treatments, and civil works strictly adhere to the project's technical specifications, environmental safeguards, and applicable standards.
Clarification
Dear Bidders,We would like to remind you of the pre-bid meeting for this tender, scheduled to take place today in accordance with the time specified in the Particulars section: Nov 9, 2026 12:00 PM, Papua New Guinea time.Participants are invited to attend either in person or via the online conference link provided below:In-Person: UNOPS Conference Room, Level 12, Kina Bank Haus, Douglas Street, Downtown Port Moresby, NCD, PNGOnline: https://meet.google.com/meet/fpm-nhzy-dpq?authuser=0Although attendance is optional, participation is highly encouraged to assist in the preparation of fully compliant submissions.Thank you!
Clarification
QUESTION:Could you please advise on the travel arrangements for the site visits to Esa'ala Primary School and Rabaraba Primary School?Specifically, we would appreciate clarification on the following:1. Transport Responsibilities: Will transport to and from the project sites be arranged by UNOPS, or are bidders expected to make their own arrangements? If bidders are responsible, please provide guidance on recommended travel routes, transport options, and site access requirements.2. UNOPS Support in Alotau: Will a UNOPS representative or designated personnel be based in Alotau to assist with coordinating site visits, facilitating transport, or acting as a local point of contact?3. Local Boat Operators: Could you provide contact details or recommendations for local boat charter operators in Alotau commonly used for travel to Esa'ala and Rabaraba?ANSWER:1. Bidders are expected to make their own travel and accommodation arrangements as indicated previously in the ITB Document.UNOPS Guidance on Travel RoutesRecommended travel routes out of Alotau are as follows:1. Chartered Boat from Alotau WharfCharter Boats- There are boat charter businesses in Alotau for both destinations2. Public Boat from East CapeTravel to Esa’ala Only (Return)Travel to East Cape by road (approx 2Hrs)East Cape to Esa’ala by Boat (approx 6Hrs)Vehicle back to AlotauTravel to Rabaraba Only (Return)Vehicle to Awaiama Jetty or Taupota Jetty (approx 2Hrs)Jetty to Rabaraba by boat (approx 5Hrs)Vehicle back to AlotauTravel to Esa’ala and Rabaraba (Return)Travel to East Cape by road (approx 2Hrs)East Cape to Esa’ala by Boat (approx 6Hrs)Esa’ala to Rabaraba by Boat (approx 10Hrs)- No Public transport AvailableRabaraba to Awaiama Jetty or Taupota Jetty (approx 5Hrs)Vehicle back to Alotau (approx 2Hrs)2. Please note that UNOPS personnel will be at the meeting locations on the following pre-bid walk dates:3 Nov 2026- Esa'ala Primary School @ Esa'ala Station, 10am5 Nov 2026- Rabaraba Primary School @ Rabaraba Station,10amInterested Bidders are advised to make their own arrangements to visit the sites. UNOPS will facilitate the pre-bid walk at the project sites.3. There are several public boats and dinghies that operate the routes, Alotau-Esa'ala and Alotau-Rabaraba which are available daily between 8am -1pm.Bidders are responsible for identifying the boat operators.
Clarification
QUESTION:Given that our company specializes in providing professional pest control services, while the overall project scope is primarily focused on building construction, we would like to seek clarification on how specialized service providers such as ourselves can participate in this tender process.Specifically, would it be more appropriate for our company to participate as a subcontractor under an appointed main construction contractor, or does the United Nations Office for Project Services (UNOPS) provide a mechanism through which specalized service providers can be identified, considered, or connected with main contractors bidding for the project?Addionally, we would appreciate guidance on whether there are opportunities for specialized service providers to submit independent bids for specific components of the project, particularly pest control, termite treatment and other related services that may be required during construction or upon project completion.We would appreciate your clarification on the appropriate procurement procedures and opportunities available to specialized service providers to ensure our participation aligns with the tender requirements.ANSWER:The scope of works included in this tender does not include Specialized Pest Control Services. As stipulated in the ITB document the scope is primarily construction of toilet blocks and rain water harvesting tanks.With regards to the services that you offer, we encourage you and similar companies to register and apply for applicable opportunities when they are advertised on the United Nations Global Market (UNGM).
Amendment #1
This amendment is to extend the notification deadline for the bidder to confirm joining the Site Visit, from 7 days to 2 days prior to the visits.
Clarification
QUESTION (For Lot 1 & 2):Given the groundwater salinity concerns identified in Section V, clause 2.1.1, and the risks of prolonged dry periods, could UNOPS confirm whether site-specific water-source feasibility assessments, groundwater testing and rainwater storage-sizing calculations were undertaken?In particular, how has the proposed system been assessed to ensure reliable year-round water availability for schools and health centres, and are alternative or backup water sources available?We would appreciate any supporting technical assessments used to determine the proposed water supply designs.ANSWER:Groundwater Extraction and Testing:The scope of works under this tender does not include groundwater extraction, borehole drilling, or aquifer abstraction. Consequently, site-specific hydrogeological assessments and groundwater salinity testing are not required for the execution of this contract.Rainwater Sizing and System Design:The technical scope is designed to augment and retrofit the institutions’ existing rainwater harvesting capacity to enhance water security during dry periods. Sizing and technical specifications were developed based on available roof catchment areas, local rainfall patterns, and institutional stakeholder consultations. The design has undergone formal technical review and certification by the UNOPS Infrastructure and Project Management Group (IPMG).Alternative / Backup Water Sources:The development of alternative water supply sources (e.g., desalination, deep-well drilling, or off-site reticulation) is outside the scope of this tender. Bidders are required to price strictly against the Bill of Quantities (BoQ) and Technical Specifications provided in the solicitation documents.Best Regards,
Tender Value
Refer Docs
Bid Security (EMD)
Refer Docs
Closing Date
25 Nov 2026, 02:00 (UTC)3d left25 Nov 2026, 7:30 am IST
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender description: ITB for Construction Works for WASH Interventions in Rabaraba and Esa'ala in Milne Bay Province of Papua New Guinea. ----- IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
319252
ITB/2026/65113
Invitation to bid
Papua New Guinea
INVITATION
UTC
21 Nov 2026
22 Oct 2026
United Nations Office for Project Services
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
THE GOVERNMENT OF PAPUA NEW GUINEA
CONSTRUCTION WORKS FOR WASH INTERVENTIONS IN RABARABA & ESA'ALA, MILNE BAY, PAPUA NEW GUINEA
LOT 1 - RABARABA (TVET, PRIMARY SCHOOL, HEALTH CENTRE, DISTRICT DEVELOPMENT AUTHORITY OFFICE & LOCAL LEVEL GOVERNMENT OFFICE )
BILL OF QUANTITIES (BOQ)
Consists of the following:
- Pricing notes
- Bill 01 - Preliminaries
- Bill 02 - Rabaraba TVET
- Bill 03 - Rabaraba Primary School
- Bill 04 - Rabaraba Health Centre
- Bill 05 - Rabaraba District Development Authority (DDA) Office
- Bill 06 - Rabaraba Local Level Government (LLG) Office
- Bill 07- Day works
- Bill 08 - Schedule of rates
NOTE: It is a MANDATORY requirement for bidders to complete and return all parts of this BOQ. Failure to complete all sections of the BOQ may result in automatic disqualification of your bid.
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
CONSTRUCTION WORKS FOR WASH INTERVENTIONS IN RABARABA & ESA'ALA, MILNE BAY, PAPUA NEW GUINEA
These price notes form part of the Bills of Quantities.
1 The Permanent Works shall be measured notwithstanding any general or local custom except where otherwise specifically described or prescribed in the Contract.
2 The rates and prices in the Bill of Quantities shall, except where otherwise provided in the Contract, cover all the Contractor's obligations under the Contract and all matters and things necessary for the proper execution and maintenance of the Works.
3 The items provided in the Bill of Quantities shall be the only items against which payment shall be made, except that where additional items are required in respect of authorized additional works, payments may be made against such additional items.
4 The Contractor shall be deemed to have included in his rates entered against the items in the Bill of Quantities for all activities necessary to complete the Contract Works, including any items of Work, which, in his opinion has been omitted from the Bill of Quantities.
5 Except where otherwise detailed in the Bill of Quantities or specified, labor, including the supervision thereof, materials, Constructional Plant, Temporary Works, transport to and from the Site and in and about the Works, laboratory testing and other things of every kind required for the execution and maintenance of the Works shall not be measured and the cost thereof shall be deemed to be included in the rates and prices in the Bill of Quantities.
6 The total quantity included in the final measurement of each item shall be measured to the nearest integer relative to that item, or to one decimal place if so indicated in the Bill of Quantities.
7 The following abbreviations are used in the Bill of Quantities:
a. m² Square meter
b. mm Millimeter
c. m³ Cubic meter
f. km Kilometer
j. dia Diameter
k. Prov. Sum Provisional Sum
m. USD US dollar
p. HP Horse power
q. M.s Measured Separately
8 Where in the Bill of Quantities there is a Schedule or subsidiary bill setting out the quantities of component materials and work which comprise a unit of work measured under a single item in a Part of the Bill of Quantities, the said quantities shall be subject to measurement and valued at the rates and prices entered therein and the total thereof shall be the rate for the item.
9 For items which the unit of work is given as “Sum” and the quantity of work is given as “Item”, otherwise than the items brought forward from a subsidiary schedule as explained under paragraph 8 above, the proportions of payments in interim payments shall be made, according to ratios based on the percentage of work or components of work completed and/or, in installments defined by the period covered by the interim certificate to the total period for which such works/facilities are provided. Such ratios and installments shall be determined by the Engineer. In his determination, the Engineer is at liberty to consider a breakdown of lump-sum items provided by the Contractor. At any stage during the duration of the Contract, the Engineer will be entitled to adjust such ratios and installments to correspond with any amendment to the duration of the works as related to completion of the Works.
10 Any item of work included in the Bill of Quantities for which no rate or price was specified shall be considered as included in other rates and prices in the Bill of Quantities and will not be paid for separately.
11 Definitive list of works is provided by the Bill of Quantities only and the quantities listed on the drawings and other tables are for information purposes only.
Provisional Quantities, Optional Works and Alternative Items
Provisional Quantities
12 Items in the Bill of Quantities for which the quantities are stated to be provisional shall only be executed if they are the subject of a written instruction from the Engineer. The rates set out for such items shall be used for the valuation of works so ordered by the Engineer in writing whether the quantities shown are used wholly or in part. If the amount of work ordered by the Engineer to be executed under a Provisional Quantity item exceeds the quantity shown in the Bill of Quantities, the rate for that item set out in the Contract shall be deemed applicable to the excess.
Schedule of Rates
13 The activities covered by the Schedule of Rates are general activities of a routine nature which are similar or the same as some of the activities which shall be paid for under other items in the Bill of Quantities.
14 The Contractor shall be deemed to have drawn on his technical expertise in entering the Prices and shall have made all due allowances for conforming to relevant codes, standard practice and the Specifications.
Anomalous Rates
15 The rates entered in the Schedule of Rates will be scrutinized as follows:
Where a rate is entered for an item in the Schedule of Rates and an equivalent item is provided under the Bill of Quantities, the rate in the Schedule of Rates should match the rate in the Bills of Quantities. Where such rates do not match; the lower rate for such similar items will govern.
Where a rate is entered for an item in the Schedule of Rates and there is no equivalent item provided under the Bills of Quantities, the bidder may be requested to provide a breakdown of the constituent costs of any rate together with the constituent costs of rates for specified items within the priced Bill of Quantities and demonstrate that the rate in the Schedule of Rates is priced in a manner consistent with the rates provided in the Bill of Quantities. In the event that the bidder cannot demonstrate such consistency, at UNOPS discretion the rate in the Schedule of Rates shall be adjusted.
16 Items in the Bill of Quantities for which the quantities are stated to be optional shall only be executed if they are the subject of a written instruction from the Engineer.
Alternative Items
17 Alternative Items will not be considered in the evaluation of the bids. However, UNOPS has the right to subsequently select the alternative item for implementation.
18 Provisional Sums for use when work is executed on a day work basis. Work shall not be executed as day work except by written instruction of the Engineer.
19 Payment in respect of labor employed on a day work basis shall be at the rate entered in the day work rates and no payment shall be made in respect of overtime. A work day is defined as an 8 hour working day including weekends and public holidays.
Construction Equipment
20 Payment in respect of Construction Equipment employed in the execution of the work on a day work basis, shall be at the rates entered in Day work Bill
The time for which Construction Equipment is broken down or during which it is being serviced shall not be measured, nor shall that of any labor or other Constructional Equipment which is unable to work by reason of such breakdown or servicing.
The rates for construction equipment working shall include for all operation and maintenance costs, fuel, oil, inclusive of drivers and attendants.
Plant and Materials
21 Payment in respect of plant and materials used in the execution of work on a day work basis shall be according to the rates of plant and materials entered in Bill 5, which shall include the cost of taking the plant and materials from the store or stockpile on the Site to the place where they are used.
22 No separate payment shall be made for complying with the provisions of the following Clauses of the Technical Specification except where explicitly provided in the Bill of Quantities.
23 Payment for diversion and/or modification of existing utility and road crossings of whatsoever kind shall be made under the items as set out in the Bill of Quantities for “temporary access roads” and for “temporary diversion works” as appropriate.
24 Where the unit of such work is defined as a “Sum” in the Bill of Quantities, the amount entered for that “Sum” shall be deemed to cover all components of work in order to complete the work. Components of such work, (e.g. removal of existing services, excavation, supply, laying and jointing of pipes, concrete, reinforcement, pile forming /driving, all temporary arrangements, etc.) shall not be separately measured.
25 No separate payment shall be made for the Contractor servicing any cranes and handling devices on completion of works that he has made use of during the works.
26 While determining unit rates, the Contractor shall take into consideration any site specific construction complexities and include their cost into the respective unit rates.
27 No separate payment shall be made for complying with any of the requirements of the Technical Specification with regard to the Contractor’s activities and requirements for the Site except as explicitly set out in the Bill of Quantities and where such items are provided these shall be deemed to cover all matters, costs and expenses.
The Contractor shall be deemed to have included in his rates for:
_ Organization of construction works when deriving his rates.
Temporary Works
28 Eighty percent (80%) of total lump sum price of temporary works will be paid to the Contractor upon completion of these temporary facilities, and the remaining twenty percent (20%) of the total price will be paid after handing over to the Employer of these temporary facilities.
29 Payment for temporary access roads shall be made in percentage of total required work in accordance with the progress of these works carried out by the Contractor. Payment for construction of temporary access roads shall be deemed to be included in the Contractor’s rates if not stated as an extra item in the Bill of Quantities.
30 Payment for photographs as per UNOPS requirements shall be deemed to be included in the Contractor’s rates if not stated as an extra item in the Bill of Quantities.
Control of Water
31 Payment for control of ground and surface water shall be deemed to be included in the Contractor’s rates if not stated as an extra item in the Bill of Quantities.
Materials and Workmanship
32 No separate payment will be made for complying with the provisions of Technical Specifications with respect to obtaining the specified standards and class of workmanship or complying with Standards ordered by the Engineer shall be paid at the net cost for supply of standards plus the percentage in the space provided for the relevant item.
33 No separate payment shall be made for complying with the provisions of earthworks except where explicitly provided, and no separate payment will be made for:
Fill / Backfill made by the Contractor for any purpose or reason, for over excavation or fill and for removal of material.
Payment for drainage pipes will be included in the Bill of Quantities. The payment will include all labor, equipment, tools and other incidentals for providing the slits and stops.
34 In case of separate Bill items for stripping, this will be measured for payment by the square meter and shall include a depth of 0.3 m below original ground surface. Quantities for payment will be computed by direct measurement of areas stripped, and will include only the locations directed by the Engineer. Payment will be made at the unit rates per square meter tendered therefore in the Bill of Quantities.
Clearing and Grubbing
35 Clearing and Grubbing shall be measured in square meters and payment will be made at the unit rates per square meter tendered therefore in the Bill of Quantities.
Site Investigations
36 Measurement and payment for site investigations where ordered by the Engineer shall be made on day-work report basis.
No separate payment shall be made for site investigations which are an integral part of the Contractor’s general activities under the Contract.
Clearance Works
37 Rates for removal of any type of existing structures and buildings (reinforced concrete, steelwork, etc.), their contents or general waste materials (including municipal waste) shall be included in the Contractor’s rates and prices except where it is expressly measured by a lump sum amount, or by volume as provided for in the Bill of Quantities.
The rate in the Bill of Quantities shall include all work necessary for the removal, transportation and safe disposal of materials in accordance with the Technical Specification.
38 Non-reinforced (plain) and reinforced concrete will each be measured for payment by cubic meter.
Precast concrete and reinforced concrete shall be measured in cubic meters except where the former is measured by number of units.
The unit rate for concrete works shall cover all costs that are necessary to obtain the concrete quality including, but not limited to the following items:
_ Delivery and storage of all materials
_ Preparation and submission of working drawings and calculations
_ all batching, mixing and transport equipment, including all required personnel and foremen
_ preparing, transporting and placing of concrete
_ finishing of surfaces
_ making and curing of test cubes, including laboratory tests;
_ curing of concrete, including materials and equipment;
_ drilling and cutting of concrete cores, including equipment and testing;
_ transportation, keeping on the site, including loading and unloading.
39 Shuttering shall be measured and paid for separately under the Bill of Quantities. No extra payment for cooling or soaking shuttering shall be made.
40 Unless otherwise stated in the Bills of Quantities no separate payment shall be made for reinforcement.
Where the item for concrete in the Bills of Quantities refers to a quantity or rate of reinforcement in the concrete, no separate measurement shall be made for reinforcement.
In such cases the concrete rates in the Bill of Quantities shall be deemed to include for reinforcement at the minimum of the density stated.
Where the Bills of Quantities provide for measurement of steel reinforcement bars, the weight shall be calculated on the basis of the relevant Technical Specification.
The rates for steel reinforcement, whether explicit or implicit, shall include all expenditures incurred in providing, cutting, bending, placing and fixing the reinforcement in its final position in the structure.
41 Finishes shall not be subject to additional payment and shall be deemed to be included in the rates for concrete.
42 No separate payment shall be made, for supply and testing of concrete ingredients; storage of materials; determination of mix proportions; making and testing of trial mixes; testing of concrete; control and mixing of concrete; transporting, placing and compacting concrete; finishes; construction joints (whether shown on the Drawings or not except that where a water stop is specified or ordered by the Engineer to be incorporated in construction joints it shall be measured by length for each type and size required); moulds for transporting and fixing pre-cast work; precautions for concreting in unfavourable weather; curing; ascertaining requirements for reinforcement, bending, cutting and fixing reinforcement or working space for erection and handling of shuttering.
If the Engineer so directs, samples of cement, water and fine and coarse aggregates shall be delivered by the Contractor to the Engineer for independent testing; such testing shall be charged directly to the contractor.
Removal of concrete structures
43 Demolition works to concrete structures shall be measured net as volume.
No separate payment shall be made for disposal of debris and waste in accordance with the Specification or for making good any damage arising from retained elements.
Precast Concrete Structures
44 Precast concrete and reinforced concrete will be measured in cubic meters or in case of pipes and manhole rings per unit or length as stated in the Bill items.
The unit rates for reinforced concrete elements must cover all costs, the following items inclusive:
_ Submission of working drawings;
_ Delivery and storage of all materials;
_ All equipment, including devices for dosing, mixing and transportation, and operating personnel;
_ Preparing, transporting and placing of the concrete;
_ Finishing of surfaces;
_ Making and curing of test cubes, including laboratory tests;
_ Curing of concrete, including material and equipment;
_ Transportation and storage of prefabricated elements at the site
The rates for precast reinforced concrete pipes and box units shall be deemed to include for supply and laying, including all joints and connections, except where the Bills of Quantities specifically provide for otherwise.
45 Placing of rubble concrete shall be measured by square meters stating the thickness.
46 Stone masonry shall be measured in square meters complete and shall include for all preparation, materials and finishing, including all pointing
47 Unless otherwise provided for in the Bill of Quantities no separate measurement shall be made for complying with the requirements of the Technical Specification, the cost of which shall be included in the rates and prices relative to the items concerned.
Where items are provided in the Bill of Quantities for painting, it shall be measured as the surface area covered for the top coat only.
Rules of measurement
48 Works are measured and classified in accordance to the rules of Standard Method of Measurement -SMM7 and therefore, any variation or disputed quantities SHALL be measured and classified accordingly for purposes of pricing. Where there is a deviation from the SMM measurement process on a BOQ item, any variation on that item will be measured and assessed in accordance to the unit and description presented in the BOQ.
United Nations Office for Project Services
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
THE GOVERNMENT OF PAPUA NEW GUINEA
CONSTRUCTION WORKS FOR WASH INTERVENTIONS IN RABARABA & ESA'ALA, MILNE BAY, PAPUA NEW GUINEA
LOT 1 - RABARABA (TVET, PRIMARY SCHOOL, HEALTH CENTRE, DISTRICT DEVELOPMENT AUTHORITY OFFICE & LOCAL LEVEL GOVERNMENT OFFICE )
BILL OF QUANTITIES (BOQ)
Consists of the following:
1-1 Preliminaries
NOTE: It is a MANDATORY requirement for bidders to complete and return all parts of this BOQ. Failure to complete all sections of the BOQ may result in automatic disqualification of your bid.
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
CONSTRUCTION WORKS FOR WASH INTERVENTIONS IN RABARABA & ESA'ALA, MILNE BAY, PAPUA NEW GUINEA
ITEM DESCRIPTION QTY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 1 PRELIMINARIES
For the purposes of this Bill of Quantities, items applicable to multiple project sites have been consolidated and included as a single lump sum item (Quantity: 1 Nr) while items that are site-specific have been separately quantified in accordance with standard measurement practice. Note
If no price has been stated against any item hereunder, the Contractor shall not be entitled to claim any money for such items even though he is obliged to execute the work or provide services described therein. Preliminary items priced by the Tenderer are deemed to include the cost of unpriced items. Note
The Tenderer shall read, understand and acquaint himself with the requirements in the Conditions of Contract, Instructions to Tenderers, Bidding Data, Bid Form, Appendix to Tender and Preamble notes. It is the Tenderer's responsibility to see that his price includes for complying with all the above requirements whether specifically referred to in this bills of quantities or otherwise. Note
The Tenderer is required to visit the site of the proposed work, as it is his responsibility to ascertain the conditions governing access to the site, the external working space, storage area and any other information he may find necessary before he can tender for the work. Note
Cost and expenses in connection with any other preliminary item which is not listed below, but is necessary for the due completion of works, is deemed to be included in the tender rates. Note
Mechanical plant and equipment which emits excessive noise, smoke, fumes, obnoxious gases etc., will not be allowed to be used in the Site, without the prior approval of the Employer. Note
The contractor shall be responsible for any loss or damage to the works, existing structures, adjoining structures and unfixed materials. Note
The contractor shall be responsible for hoisting of all materials to any given height of the building. Note
The contractor shall ensure supply and connection of temporary water and power solely for the works and work related purposes. The contractor shall price for the associated water & power and price bills under items q and r. Note
a) Mobilization, logistics and transportation services for construction materials, work crews/key personnel, plant, and equipment not locally available at the project site. This includes logistics from manufacturers’ factories or construction hardware suppliers to the designated wharf (Alotau, Lae, Port Moresby, or any other alternative town selected by the bidder for sourcing project materials, plant, and equipment), followed by onward shipment to the contractor’s storage facility at the project site as well as demobilization after completion of work. This item also covers all associated costs, including wharf facility charges, delivery and handling equipment during loading and unloading operations, and any applicable permits and statutory fees. Bidders are required to submit a method statement along with a detailed cost breakdown for this item as part of their bid submission. 1 Item 0.00
b) Allow for setting out of works in accordance with drawings; liaise with client to establish exact boundaries and other written information given by the Employer's Representative for setting out, street and building lines before commencements of construction; Checking of any setting out or of any line or level by the Employer's Representative shall not in any way relieve the Contractor of his responsibility for the accuracy thereof. 1 Item 0.00
c) The contractor shall allow for leasing of existing building with adequate space within the proximity of the project sites to serve as a temporary site office and store and fit it with the required facilities for his own site management staff as well as the Employer's Representative (1nr). An office set-up approved by the Employer can also be considered as an alternative. 1 Item 0.00
d) Allow for hoarding the project sites (approximately 250m long for each site) using iron sheets or any approved equivalent as may be directed by the site Employer's Representative. The hoarding height shall be not less than 3m high supported by timber poles with all necessary entry and exit gates to approval of the Employer's Representative. 5 Item 0.00
e) The contractor shall provide temporary toilet facilities for his workers and the Employer's Representatives within the Main Yard site as directed. The same shall be maintained in proper sanitary conditions throughout the contract period. 1 Item 0.00
f) Allow for submission of daily and monthly progress reports for ALL Project Sites. The reports shall be in electronic format and include photographs where necessary. The contractor shall also be required to maintain daily records in the manner required by the Employer to indicate factual details of: 1 Item 0.00
(i) Number of workmen in different categories and the number of foremen. Note
(ii) Particulars of materials and goods brought to the site. Note
(iii) Particulars of machinery & equipment brought to or taken out of site. Note
(iv) Rainfall records. Note
g) Allow for all cost in connection with preparing samples for testing, making arrangements for testing of materials, goods etc., as stipulated in the Specification, obtaining test reports and submitting the same to the Employer's Representative. (This item intends to cover all expenses incurred by the contractor in connection with sampling and testing of materials, goods etc., required in the specifications, other than those provided for in the bills of quantities.) 1 Item 0.00
h) Fabricate and erect a project sign board complete with lettering, mounted and supported on steel poles as per Architectural drawings, all subject to the approval of the Employer 5 Item
i) Prepare and submit Operation & Maintenance Manual for the Works to the Employer's approval. 5 Item
j) Prepare and submit "As-Built" or record drawings to the Employer's approval. 5 Item
k) Capacity Development and End-User Training on the Operation & Maintenance of the constructed facilities including the Dehydration Toilets 5 Item
Insurances, Bonds & Fees 0.00
Provision of insurance requirements for the contract over and above the Contractor's existing insurance covers, in line with the requirements outlined in ITB Section V Schedule B "Section 3.11 - Insurance Requirements"
l) Construction All Risk Insurance for Works, Plants and Materials 1 Item
m) Public Liability Insurance 1 Item
n) Worker's Compensation Insurance 1 Item
Levels and soil conditions confirmation 0.00
The contractor should allow for doing the confirmations for each site Note 0.00
p) The contractor shall confirm the soil conditions through trial pits of 2m maximum depth with a minimum spacing of 15m between each pit for each structure. Maximum of 4 pits per site. The contractor shall submit details of the trial pits including photographs to the Employer for approval 5 Item 0.00
Time-Related Charges
q) Allow for running and maintenance of generators or equivalent temporary power supply source for power supply to the construction sites. Item to include fuel and other consumables 5 Item 0.00
r) Allow for temporary continuous water supply to the construction sites for the works and associated usage 5 Item 0.00
General ESS and HSSE requirements
s) The contractor shall carry out an Environmental and Social (E&S) screening exercise to assess whether the project’s activities pose any specific risks. The exercise shall be performed as per guidelines provided in the UNOPS E&S screening templates. 1 Item 0.00
t) Allow for provision of Occupational, Health, Safety (OSH) and Environmental and Social (E&S) Management system for the execution of works under the contract. The bidder should submit his comprehensive OSH, and E&S Management. 1 Item 0.00
u) Allow for full compliance with all requirements in relation to Health and Safety, Social and Environmental Management issues. Item to include all necessary safety measures to workmen (provision of PPE), The Employer's Representative has the right to pay a percentage of the monthly component to suit the percentage accomplishment of the approved plan. 1 Item 0.00
TOTAL FOR 1-1 - PRELIMINARIES - CARRIED TO GRAND SUMMARY 0.00
United Nations Office for Project Services
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
THE GOVERNMENT OF PAPUA NEW GUINEA
PROPOSED WASH INTERVENTION FOR RABARABA TVET, PAPUA NEW GUINEA
BILL OF QUANTITIES (BOQ)
Consists of the following:
2-1 - Mainstream Dry Toilet blocks (5no.)
2-2 - Accessible Dehydrated Toilet blocks (1no.)
2-3 - Catchment Tank Plinth
2-4 - Plumbing & Drainage
2-5 - Electrical Installations
2-6 - Cesspools (2no.)
NOTE: It is a MANDATORY requirement for bidders to complete and return all parts of this BOQ. Failure to complete all sections of the BOQ may result in automatic disqualification of your bid.
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA TVET, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 2.1 TYPICAL MAINSTREAM DRY TOILETS (5NO.)
(All provisional)
Quantities presented in this bill are for 5no. Toilet blocks 5 Nr. Note
i) Plumbing and drainage work, including the water tank has been measured separately (Bill no. 2.4) Note
ii) Cesspool has been measured separately (Bill no. 2.6) Note
iii)All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS
a) Clear the site of all shrubs, bushes, small trees and debris; remove from site as directed [Approximate area: 90 m2 for Building footprint and 50% allowance] 5 Item 0.00
Oversite excavations
b) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Building footprint only] 300 m2 0.00
c) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 45 m3 0.00
d) Excavate in soft material for column bases; 0-1.50m deep [For timber columns] 40 m3 0.00
e) Return, fill in and ram selected excavated material around foundations 50 m3 0.00
Disposal of Surplus spoil
f) Load and cart away surplus excavated material from site to an approved dumping site 35 m3 0.00
Selected filling
g) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep [For water tank plinth] 20 m2 0.00
h) Selected and approved backill material, well watered and compacted [1100mm deep below the hardcore under the water tank plinth] 20 m3 0.00
i) 50mm Thick granular/gravel blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 20 m2 0.00
j) 150mm Thick granular/gravel spread finish to overall ground surfaces [Under the toilets] 190 m2 0.00
Anti-termite treatment
k) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to granular/gravel surfaces 210 m2 0.00
TOTAL FOR SITE PREPARATION, EXCAVATIONS & EARTHWORKS CARRIED TO BILL SUMMARY 0.00
2) CONCRETE WORKS
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 25 m2 0.00
b) 50mm Thick blinding under column bases 30 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Column bases 10 m3 0.00
d) Stub columns 10 m3 0.00
e) Foundation strip 5 m3 0.00
f) Tank platform [100mm thick ], finished smooth 5 m3 0.00
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 35 m2 0.00
TOTAL FOR CONCRETE WORKS CARRIED TO BILL SUMMARY 0.00
3) STEEL REINFORCEMENT
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 10 mm diameter bars (in column bases & strip footings) 600 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
b) Fabric mesh reinforcement to tank plinth concrete bed 35 m2 0.00
TOTAL FOR STEEL REINFORCEMENT CARRIED TO BILL SUMMARY 0.00
4) SHUTTERING & FORMWORK
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 15 m² 0.00
b) Vertical sides of column bases 65 m² 0.00
c) Vertical sides of stub columns 150 m² 0.00
d) Edges of Tank platform concrete bed, 100mm girth 50 m 0.00
TOTAL FOR SHUTTERING & FORMWORK CARRIED TO BILL SUMMARY 0.00
5) JOINERY & TIMBER WORKS
1. Rate for Timber sections shall include all necessary drilling of holes, bolting, cleats and other necessary connections that are not separately itemized for pricing Note
2. The Contractor shall provide shop drawings for approval. Once approved, the drawings shall be strictly adhered to during the fabrication and installation process. Note
3. The Contractor shall provide documentation verifying treatment type, retention levels, and compliance. Note
4. Rainwater down pipes have been measured under the plumbing and drainage bill Note
I Timber framework
Columns, rafters etc.
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished with 2 coats polyurethane varnish on completion; all as per Structural Engineer's drawings
a) 150x150mm Timber Column, encased in concrete column(m.s), secured with a threaded end or steel plate anchored in the timber column 620 m 0.00
b) 150x150mm Timber floor bearers bolted to timber columns (m.s) 140 m 0.00
c) 100x75mm Timber floor joists bolted to floor bearers (m.s) 130 m 0.00
d) 50x50mm Timber bracings bolted to timber columns (m.s) 540 m 0.00
e) 75x50mm Timber rafters, bolted to top of timber columns (m.s) 190 m 0.00
f) 25x50mm Ventilation slats fixed to timber columns (m.s) 230 m 0.00
g) 50x50mm Timber purlins fixed to rafters (m.s) 325 m 0.00
Softwood timber
h) 200x25mm Thick One-side wrot fascia and barge board 140 m 0.00
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished with 2 coats polyurethane varnish on completion; all as per Structural Engineer's drawings
a) 200x50mm Timber stringer 85 m 0.00
b) 300x25mm Timber platforms/treads fixed to stingers (m.s) 125 m 0.00
Approved 7.5mm Thick site-painted plank weather board; treated against termites and mositure ingress; finished with 2 coats polyurethane varnish on both sides
a) Supply and fix 7.5mm thick site-painted plank weather board; fixed to timber framework (m.s) with tying wires or other approved fixing accessories 460 m2 0.00
IV Wood planks floor finish
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Approved timber planks; treated against termites, moisture and unine acidity; finished with 2 coats polyurethane varnish on the top side
a) Supply and fix approved smooth planed 200x50mm wood planks; fixed to timber framework (m.s) with concealed bolts or screws 110 m2 0.00
b) Allow for creating squat pan spaces through the wood planks flooring; finishing around 20 Nr 0.00
The following in timber doors as per the details provided
Door Frames, architraves and beads
a) Ex 150x50mm hardwood frame rebated 110 m 0.00
b) 50x15mm hardwood architrave chamfered 110 m 0.00
c) 15x15mm hardwood quadrant bead 110 m 0.00
Supply and fix the following 40mm thick solid core, hardwood veneer faced door shutter with hardwood lipping all round
d) Single leaf door size 900x2200mm high with 100mm high aluminium kick plate on the inside 20 Nr 0.00
Supply and fix the following ironmongery with screws to match
e) Heavy duty natural aluminium hinges approved from samples 60 Nr 0.00
f) Three lever mortise lock complete with a set of lever furniture and approved from sample 20 Nr 0.00
g) Aluminium door handles including fixing to timber doors and approved from samples 40 Nr 0.00
Painting and Decorating
Aluminum wood primer
h) Back of wood frames over 100mm but not exceeding 200mm girth 110 m 0.00
Prepare and apply clear matt varnish to timber doors
i) Surfaces not exceeding 100mm girth 220 m 0.00
j) Ditto over 100mm not exceeding 200mm girth 110 m 0.00
k) General surfaces of doors 55 m2 0.00
TOTAL FOR JOINERY & TIMBER WORKS CARRIED TO BILL SUMMARY 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide 50 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 50 m2 0.00
c) 200mm Thick dwarf wall above ground 65 m2 0.00
TOTAL FOR BLOCKWORK CARRIED TO BILL SUMMARY 0.00
7) ROOF COVERING & RAINWATER GOODS
a) Supply and Fix Aluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets or approved equivalent; fixed to timber purlins (m.s) using manufacturer's proprietary bolts 225 m2 0.00
b) Allow for making holes through the roofing sheets for ventilation pipes at specified positions; finishing and sealing around the pipes to prevent leakages 20 Nr 0.00
Rainwater goods
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
c) Supply and install sheerline colorbond gutter fixed to fascia (m.s) with and including spring clips at 1200mm centres [Rate to include gutter stop ends]. The gutther to have a micro-mesh leaf guards 45 m 0.00
d) Extra over downpipe; for gutter outlet 5 Nr 0.00
e) Allow for connection of the downpipe to the water reservoir tank (tank measured separately) 5 Item 0.00
TOTAL FOR ROOF COVERING & RAINWATER GOODS CARRIED TO BILL SUMMARY 0.00
TYPICAL MAINSTREAM DRY TOILETS (5NO.)
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS 0.00
2) CONCRETE WORKS 0.00
3) STEEL REINFORCEMENT 0.00
4) SHUTTERING & FORMWORK 0.00
5) JOINERY & TIMBER WORKS 0.00
6) BLOCKWORK 0.00
7) ROOF COVERING & RAINWATER GOODS 0.00
TOTAL FOR 2-1- TYPICAL DRY TOILETS (5NO)- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA TVET, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 2.2 TYPICAL ACCESSIBLE DEHYDRATED TOILET (1NO.)
(All provisional) Note
Quantities are for 1no. Block Note
i) Plumbing and drainage work, including the water tank has been measured separately (Bill no. 2.4) Note
ii) Cesspool has been measured separately (Bill no. 2.6) Note
iii)All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS
a) Clear the site of all shrubs, bushes, small trees and debris; remove from site as directed [Approximate area: 145 m2 for Building footprint including ramps and 20% allowance] 1 Item 0.00
Oversite excavations
b) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Building footprint including ramp areas only] 75 m2 0.00
c) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 7 m3 0.00
d) Excavate in soft material for column bases; 0-1.50m deep [For timber columns] 63 m3 0.00
e) Return, fill in and ram selected excavated material around foundations 52 m3 0.00
Disposal of Surplus spoil
f) Load and cart away surplus excavated material from site to an approved dumping site 18 m3 0.00
Selected filling
g) Selected and approved backill material, well watered and compacted [1800mm deep under the water tank plinth] 4 m3 0.00
h) 50mm Thick murram blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 2 m2 0.00
i) 150mm Thick murram spread finish to overall ground surfaces [Under the toilets including ramp areas] 70 m2 0.00
Anti-termite treatment
j) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to murram surfaces 72 m2 0.00
TOTAL FOR SITE PREPARATION, EXCAVATIONS & EARTHWORKS CARRIED TO BILL SUMMARY 0.00
2) CONCRETE WORKS
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 5 m2 0.00
b) 50mm Thick blinding under column bases 42 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Column bases 7 m3 0.00
d) Stub columns 8 m3 0.00
e) Foundation strip 1 m3 0.00
f) Tank platform [150mm thick ], finished smooth 1 m3 0.00
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 4 m2 0.00
External Paved Areas
h) Locally available stone paving slabs jointed in cement and sand mortar and laid on and including 50mm thick sand bed (Sample of locally available stone slabs to be provided by the Contractor for approval by the site Engineer). Rate Only m2
TOTAL FOR CONCRETE WORKS CARRIED TO BILL SUMMARY 0.00
3) STEEL REINFORCEMENT
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 8 mm diameter bars 367 kg 0.00
b) 10 mm diameter bars 446 kg 0.00
c) 12 mm diameter bars 414 kg 0.00
TOTAL FOR STEEL REINFORCEMENT CARRIED TO BILL SUMMARY 0.00
4) SHUTTERING & FORMWORK
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 3 m² 0.00
b) Vertical sides of column bases 32 m² 0.00
c) Vertical sides of stub columns 106 m² 0.00
d) Edges of Tank platform concrete bed, 150mm girth 8 m 0.00
TOTAL FOR SHUTTERING & FORMWORK CARRIED TO BILL SUMMARY 0.00
5) JOINERY & TIMBER WORKS
1. Rate for Timber sections shall include all necessary drilling of holes, bolting, cleats and other necessary connections that are not separately itemized for pricing Note
2. The Contractor shall provide shop drawings for approval. Once approved, the drawings shall be strictly adhered to during the fabrication and installation process. Note
I Timber framework
Columns, rafters etc.
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites with approved wood preservative; including all jointing and connections (packing piece, Grade 8.8 bolts etc.) as necessary; in roof
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; all as per Structural Engineer's drawings
a) 150x150mm Timber Column, encased in concrete column(m.s) 125 m 0.00
b) 75x75mm Timber Column for ramp area, encased in concrete column(m.s) 89 m 0.00
c) 75x100mm Timber deck bearers bolted to timber columns (m.s) for the main floor area 28 m 0.00
d) 75x100mm Timber ramp bearers bolted to timber columns (m.s) for the ramp 15 m 0.00
e) 100x150mm Timber floor deck joists bolted to floor bearers (m.s) 35 m 0.00
f) 75x100mm Timber ramp joists bolted to floor bearers (m.s) 52 m 0.00
g) 75x50mm Timber tie beams bolted to timber columns (m.s) 28 m 0.00
h) 75x75mm Timber bracing bolted to timber columns (m.s) 55 m 0.00
j) 150x100mm Timber rafters, bolted to top of timber columns (m.s) 38 m 0.00
k) 25x50mm Ventilation slats fixed to timber columns (m.s) 95 m 0.00
l) 75x50mm Timber purlins fixed to rafters (m.s) 61 m 0.00
Softwood timber
m) 200x25mm Thick One-side wrot fascia and barge board 29 m 0.00
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished finished with 2 coats polyurethane varnish on completion; all as per Structural Engineer's drawings
a) 100x50mm Timber top rail 54 m 0.00
b) 40mm diameter circular timber handrail baluster fixed to stingers (m.s) at 150mm c/c 235 m 0.00
c) 50x100mm Timber bottom rail 54 m 0.00
Approved 7.5mm Thick site-painted plank weather board; treated against termites and mositure ingress; finished with 2 coats polyurethane varnish on both sides
a) Supply and fix 7.5mm thick site-painted plank weather board; fixed to timber framework (m.s) with tying wires or other approved fixing accessories 87 m2 0.00
Approved 7.5mm Thick site-painted timber screens; treated against termites and mositure ingress; finished with 2 coats polyurethane varnish on both sides
b) Supply and fix 7.5mm thick site-painted timber screens; fixed to timber framework (m.s) with tying wires or other approved fixing accessories 27 m2 0.00
IV Wood planks floor finish
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in floors
Approved timber planks; treated against termites, moisture and unine acidity; finished with 2 coats polyurethane varnish on the top side
a) Supply and fix approved smooth planed 100x25mm wood planks; fixed to timber framework (m.s) with concealed bolts or screws; for main floor 39 m2 0.00
b) Ditto: for Ramp including landings 38 m2 0.00
c) Allow for creating squat pan spaces through the wood planks flooring; finishing around 4 Nr 0.00
The following in timber doors as per the details provided
Door Frames, architraves and beads
a) Ex 100x50mm hardwood frame rebated 24 m 0.00
b) 50x15mm hardwood architrave chamfered 24 m 0.00
c) 15x15mm hardwood quadrant bead 24 m 0.00
Supply and fix the following semi-solid treated timber flush door shutter with hardwood lipping all round
d) Single leaf door overall size 1100x2400mm high with 100mm high aluminium kick plate on the inside (Door Type D01) 2 Nr 0.00
e) Single leaf door overall size 1100x2400mm high with 400mm high aluminium kick plate on the inside (Door Type D02) 2 Nr 0.00
Supply and fix the following ironmongery with screws to match
f) Heavy gauge steel door hinges approved from samples 12 Nr 0.00
g) Heavy duty two lever aluminium door lock complete with a set of lever furniture and approved from sample 4 Nr 0.00
h) 19mm Diameter , 300mm long, aluminium door grab handles with concealed fixing rose for horizontal and vertical handles 4 Nr 0.00
Painting and Decorating
Aluminum wood primer
j) Back of wood frames over 100mm but not exceeding 200mm girth 24 m 0.00
Prepare and apply clear matt varnish to timber doors
k) Surfaces not exceeding 100mm girth 48 m 0.00
l) Ditto over 100mm not exceeding 200mm girth 24 m 0.00
m) General surfaces of doors 16 m2 0.00
TOTAL FOR JOINERY & TIMBER WORKS CARRIED TO BILL SUMMARY 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide 8 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 7 m2 0.00
c) 200mm Thick dwarf wall above ground 12 m2 0.00
Cement and sand (1:4) to walls in
d) 12mm deep horizontal keying on masonry stone wall surfaces. 24 m2 0.00
TOTAL FOR BLOCKWORK CARRIED TO BILL SUMMARY 0.00
7) ROOF COVERING & RAINWATER GOODS
a) Supply and Fix Aluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets or approved equivalent; fixed to timber purlins (m.s) using manufacturer's proprietary bolts 49 m2 0.00
b) Allow for making holes through the roofing sheets for 4no. ventilation pipes at specified positions; finishing and sealing around the pipes to prevent leakages 1 Item 0.00
Rainwater goods
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
c) Supply and install sheerline colorbond gutter fixed to fascia (m.s) with and including spring clips at 1200mm centres [Rate to include gutter stop ends]. The gutther to have a micro-mesh leaf guards 9 m 0.00
d) Extra over for gutter stop ends 2 Nr 0.00
e) Extra over downpipe; for gutter outlet. 1 Nr 0.00
f) Allow for connection of the downpipe to the water reservoir tank (tank measured separately) 1 Item 0.00
TOTAL FOR ROOF COVERING & RAINWATER GOODS CARRIED TO BILL SUMMARY 0.00
ACCESSIBLE DEHYDRATED TOILET
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS 0.00
2) CONCRETE WORKS 0.00
3) STEEL REINFORCEMENT 0.00
4) SHUTTERING & FORMWORK 0.00
5) JOINERY & TIMBER WORKS 0.00
6) BLOCKWORK 0.00
7) ROOF COVERING & RAINWATER GOODS 0.00
TOTAL FOR 2-2- ACCESSIBLE DEHYDRATED TOILET (1NO)- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA TVET, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 2.3 CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA
(All provisional) Note
All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
A Notes: Quantities are for 1no. Plinth (4.2m long x 2.5m wide as per Structural drawings) 1 Nr. Note
I) Earthworks and Excavations
a) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Tank plinth footprint only] 16 m2 0.00
b) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 17 m3 0.00
c) Selected and approved backill material, well watered and compacted in layers 11 m3 0.00
Disposal of Surplus spoil
d) Load and cart away surplus excavated material from site to an approved dumping site 6 m3 0.00
Selected filling
e) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep [For water tank plinth] 8 m2 0.00
f) Selected and approved backill material, well watered and compacted [600mm deep below the hardcore under the water tank plinth] 4 m3 0.00
g) 50mm Thick murram blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 8 m2 0.00
Anti-termite treatment
h) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to murram surfaces 11 m2 0.00
II) Concrete works
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 10 m2 0.00
b) 50mm Thick blinding under 100mm thick concrete platform slab 6 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Foundation strip 2 m3 0.00
d) Raised Tank platform [100mm thick ], finished smooth 1 m3 0.00
e) 100mm Thick concrete platform form at water point, including forming a 100x50mm thick upstand; finished smooth 3 m2 0.00
f) 50mm Thick splash concrete pad, including forming a 50x50mm thick upstand; finished smooth 2 m2
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 11 m2 0.00
III) Steel Reinforcement
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 10 mm diameter bars 77 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
b) Fabric mesh reinforcement to tank plinth concrete bed 11 m2 0.00
IV) Shuttering & Formwork
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 6 m² 0.00
b) Edges of raise tank platform concrete bed, 100mm girth 11 m 0.00
c) Edges of ground concrete bed, 100mm girth 8 m 0.00
d) Edges of ground concrete bed, 50mm girth 6 m 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide (for upstand wall for taps only) 3 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 19 m2 0.00
c) 200mm Thicks walls above ground 9 m2 0.00
d) 200mm Thick upstand wall for taps 2 m2 0.00
15mm Cement and sand (1:3) render on block wall or concrete work to:-
e) Exposed wall surfaces including concrete plinth 13 m2 0.00
f) Tank plinth floor surfaces 12 m2 0.00
g) 300x50mm thick precast concrete coping bedded on top of walling in cement and sand (1:3) mortar including 10mm deep drip mould 3 m 0.00
h) Making holes through 200mm thick wall for taps 2 Nr 0.00
TOTAL FOR 1NO. CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA 0.00
TOTAL FOR NO. CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA - CARRIED TO BILL SUMMARY 0.00
B Notes: Quantities are for 1no. Plinth (11m long x 4.2m wide as per Structural drawings) 1 Nr. Note
I) Earthworks and Excavations
a) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Tank plinth footprint only] 54 m2 0.00
b) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 50 m3 0.00
c) Selected and approved backill material, well watered and compacted in layers 32 m3 0.00
Disposal of Surplus spoil
d) Load and cart away surplus excavated material from site to an approved dumping site 18 m3 0.00
Selected filling
e) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep [For water tank plinth] 39 m2 0.00
f) Selected and approved backill material, well watered and compacted [600mm deep below the hardcore under the water tank plinth] 18 m3 0.00
g) 50mm Thick murram blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 39 m2 0.00
Anti-termite treatment
h) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to murram surfaces 49 m2 0.00
II) Concrete works
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 29 m2 0.00
b) 50mm Thick blinding under 100mm thick concrete platform slab 29 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Foundation strip 5 m3 0.00
d) Raised Tank platform [100mm thick ], finished smooth 4 m3 0.00
e) 100mm Thick concrete platform form at water point, including forming a 100x50mm thick upstand; finished smooth 15 m2 0.00
f) 50mm Thick splash concrete pad, including forming a 50x50mm thick upstand; finished smooth 2 m2
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 11 m2 0.00
III) Steel Reinforcement
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 10 mm diameter bars 215 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
b) Fabric mesh reinforcement to tank plinth concrete bed 49 m2 0.00
IV) Shuttering & Formwork
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 17 m² 0.00
b) Edges of raise tank platform concrete bed, 100mm girth 29 m 0.00
c) Edges of ground concrete bed, 100mm girth 14 m 0.00
d) Edges of ground concrete bed, 50mm girth 23 m 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide (for upstand wall for taps only) 11 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 51 m2 0.00
c) 200mm Thicks walls above ground 23 m2 0.00
d) 200mm Thick upstand wall for taps 4 m2 0.00
15mm Cement and sand (1:3) render on block wall or concrete work to:-
e) Exposed wall surfaces including concrete plinth 35 m2 0.00
f) Tank plinth floor surfaces 45 m2 0.00
g) 300x50mm thick precast concrete coping bedded on top of walling in cement and sand (1:3) mortar including 10mm deep drip mould 11 m 0.00
h) Making holes through 200mm thick wall for taps 8 Nr 0.00
TOTAL FOR 1NO. CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA - CARRIED TO BILL SUMMARY 0.00
A 4.2m long x 2.5m wide-Plinth 0.00
B 11m long x 4.2m wide 0.00
TOTAL FOR 2-3- CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA (5NO.)- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA TVET, PAPUA NEW GUINEA
ITEM DESCRIPTION QTY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 2.4 PLUMBING & DRAINAGE
Notes: Quantities are for 6no. Toilet blocks Note
1.00 SANITARY FITTINGS
Supply, deliver, install, test and commission the following sanitary fittings and accessories. Fixing to be to manufacturer's printed instructions.
1.01 Water Closet. Western -type toilet pan divided in two sectors. The sector in the front is for urine diverter with 50mm hole allowing connection to 50mm dia pipe for urine collection while back sector with a 200mm hole for faeces to drop into waste tank directly below without need for flushing. The pan will be stainless steel or in vitreous China with all fixings required to install on a wooden floor. 22 Nr 0.00
1.02 Disabled Water Closet. Western -type toilet pan divided in two sectors. The sector in the front is for urine diverter with 50mm hole allowing connection to 50mm dia pipe for urine collection while back sector with a 200mm hole for faeces to drop into waste tank directly below without need for flushing. The pan will be stainless steel or in vitreous China with all fixings required to install on a wooden floor. 2 Nr 0.00
1.03 A pair of Stainless steel rear and side grab bars. Side Wall: Minimum 1065 mm long, placed max 300mm from the rear wall and extending at least 1380 from the rear wall. Rear Wall: Minimum 915 mm long, extending 300 mm minimum on one side of the toilet center line and 600 mm on the other side. 2 Nr 0.00
1.04 Roll Holder. Stainless steel holder fixed on the wall, size 150x150 mm. 24 Nr 0.00
1.05 Double Bowl Sink. Stainless steel double bowl wash hand sink bench unit as "Simply Stainless" or approved equivalent; overall size 1600mm wide x 700mm deep x 900mm high; manufactured from 304 grade stainless steel, 1.2mm thick sections. The sink unit to have at least 150mm high bevelled-edge splashback and mounted on heavy duty tubular legs. Each bowl to have a pre-punched hole to suit waste connection complete with chromed 20mm low pressure (0.1bar) lockable pillar tap for each of the two bowls, a 32mm diameter chrome plated waste and a 32mm plastic P- trap for each of two bowls. 11 Nr 0.00
1.06 Single Bowl Sink. Stainless steel single bowl wash hand sink bench unit as "Simply Stainless" or approved equivalent with 750mm bowl height for disabled access; overall size 500mm wide x 700mm deep x 750mm high; manufactured from 304 grade stainless steel, 1.2mm thick sections. The sink unit to have at least 150mm high bevelled-edge splashback and mounted on heavy duty tubular legs. Bowl to have a pre-punched hole to suit waste connection complete with chromed 20mm low pressure (0.1bar) lockable pillar tap, a 32mm diameter chrome plated waste and a 32mm plastic P- trap. 1 Nr 0.00
1.07 Waste tank. Composting toilet waste tank made of high density polyethylene and measuring 0.8m height, 1 m width by 2m length with 1,2m3, with adjustable chute up to 1m to reach toilet pan hole. The tank will have a hole at the top to allow connection of venting pipe 100 diameter, air tight hinged door to allow disposal of dried waste. 24 Nr 0.00
1.08 white vitreous china Urinal bowl 1 ½ inch diameter domed outlet plated urinal grating bottle trap and fixing screws on the timber wall. 11 Nr 0.00
2.00 INTERNAL PLUMBING AND WATER RETICULATION
Supply, deliver and install pipes, tubing and fittings as described and shown on the drawings. The pipes shall be PPR PN 20 pipes and all conforming to the current European standards for PPR installations and to the Engineers approval, pipe jointing shall be by polyfusion or use of electric coupling and to manufacturer's printed instructions. Rates must allow for all Metal/plastic threaded adaptors where required, valves, unions, sockets, sliding and fixed joints, support raceways, isolating sheaths, elastic material,expansion arms and bends, crossovers, couplings, clippings, connectors, joints and for the connection of sanitary fixtures etc. as required in the running lengths of pipework and also where necessary, for pipe fixing clips, holder bats plugged and screwed for the proper and satisfactory functioning of the system. The pipes will be pressure tested before the plastering of wall commences and as per the manufacturers recommended testing procedures. The sizes indicated are the minimum bore sizes.
2.01 20 mm diameter PPR pipe 39 m 0.00
2.02 25 mm ditto 21 m 0.00
2.03 32 mm ditto 6 m 0.00
2.04 40 mm ditto 6 m 0.00
2.05 50 mm ditto 6 m 0.00
2.06 63 mm ditto 6 m 0.00
Extra over PPR tubing for the following:-
2.07 20 mm diameter bend 15 Nr 0.00
2.08 32mm diameter bend 10 Nr 0.00
2.09 63 mm diameter bend 12 Nr 0.00
2.10 32 mm diameter tee 6 Nr 0.00
2.11 25mm diameter tee 11 Nr 0.00
2.12 25 x 20 mm diameter reducer 19 Nr 0.00
2.13 32 x 25 mm diameter reducer 16 Nr 0.00
2.14 40 x 32 mm diameter reducer 6 Nr 0.00
2.15 50 x 40 mm diameter reducer 6 Nr 0.00
2.16 63 x 50 mm diameter reducer 6 Nr 0.00
2.17 20mm diameter brass threaded female adopter 28 Nr 0.00
2.18 63mm back nut (bulkhead) with gasket 36 Nr 0.00
2.19 75mm x 63 mm upvc ppr adopter 12 Nr 0.00
2.20 63mm union for tank inlet and outlet 20 Nr 0.00
2.21 63 mm diameter spherical Gate valve PN 20 complete with connectors to the PPR pipework 12 Nr 0.00
2.22 Flexible Tubing 300mm long 23 Nr 0.00
2.23 20mm chrome plated angle regulating valve 23 Nr 0.00
2.24 32mm non return valve 2 Nr 0.00
2.25 Rain water Tanks. Rotary moulded cylindrical water tank with capacity of 9,000Ltrs,dimensions; 2430(d)* 2260(h)mm. The tank to have a Ø90mm top inlet & Ø63mm outlet connections, Ø90mm overflow with insect proof net. 8 Nr 0.00
2.26 Rain water Tanks. Rotary moulded cylindrical water tank with capacity of 3,000Ltrs,dimensions; 1530(d)* 1700(h)mm. The tank to have a Ø90mm top inlet & Ø63mm outlet connections, Ø90mm overflow with insect proof net. 6 Nr 0.00
2.27 20mm lockable brass tap with a matching padlock and keys 5 Nr 0.00
3.00 INTERNAL DRAINAGE
Supply and fix uPVC soil system to BS 4660 and BS 4515 and MuPVC waste system to BS 5255 with screwed and socketed joints to BS 21. Solvent welded joints shall be as per the system manufacturers written instructions. Tenderers must allow in their pipework prices for all the couplings, connectors, joints etc. as required in the running lengths of pipework and also where necessary for pipe fixing clips, holderbats, plugs and screwed. The installation must comply with BS 5572 and fixing to be to the manufacturer's printed instructions.
Note: Trade Names
Caradon Terrain Ltd's pipe and fittings have been used as a guide to the type and quality of materials required. Other brands must be equal and approved in writing by the Engineer before installation. One brand only shall be used and inconsistency shall not be accepted.
MuPVC Waste System Conforming to BS 5255:
3.01 32 mm diameter waste pipe 17 m 0.00
Extra over MuPVC waste pipework for the following:-
3.03 50X32 mm diameter reducer 40 Nr 0.00
3.04 50 mm ditto sweep bend 11 Nr 0.00
3.05 50 mm access cap 24 Nr 0.00
3.06 50 mm diameter sweep tee 74 Nr 0.00
uPVC Soil System Conforming to BS 4514:
3.07 100 mm diameter waste, soil and vent pipes 80 m 0.00
Extra over uPVC pipework for the following:-
3.08 100 mm vent cowl 24 Nr 0.00
3.09 100 mm weathering slate / apron 24 Nr 0.00
uPVC buried drain system Conforming to BS 4660:
3.10 100mm diameter golden brown pipe 18 m 0.00
3.11 150mmx150mm white plastic cover floor trap 50mm diameter outlet 9 Nr 0.00
3.12 Gully trap masonry chamber complete with 100 diameter P trap and 450x450 cast iron/fibre reinforced cover, including all excavation and back-filling 22 Nr 0.00
3.13 Construct masonry manhole chambers including excavation and making good depth not exceeding 2000 mm average 600 mm. Manhole to be complete with cast iron frame and cover, internal benching and upvc access beds for drop manholes 12 Nr 0.00
3.14 Excavate in trench murram/black cotton soil approximately 300 mm wide and with average depth of 750 mm for water drainage pipes, backfill, ram and cart away the remainder 90 m 0.00
4.00 RAIN WATER DRAINAGE
Supply and fix grey UPVC and uPVC soil system pipe work to BS 4660, BS 4515 and BS 5255. The pipework to be with screwed and socketed joints to BS 21.Solvent welded joints shall be as per the system manufacturers witten instructions. Solvent welded joints shall be as per the system manufacturers written instructions. Tenderers must allow in their pipework prices for all the couplings, connectors, joints etc. as required in the running lengths of pipework and also where necessary for pipe fixing clips, holderbats, plugs and screwed. The installation must comply with BS 5572 and fixing to be to the manufacturer's printed instructions.
Note: Trade Names
Caradon Terrain Ltd's pipe and fittings have been used as a guide to the type and quality of materials required. Other brands must be equal and approved in writing by the Engineer before installation. One brand only shall be used and inconsistency shall not be accepted.
4.01 Grey UPVC rainwater pipework
4.02 100mm diameter Class 41 UPVC rain water pipe 24 m 0.00
4.03 75mm diameter Class 41 UPVC rain water pipe 20 m 0.00
Extra over UPVC pipework for the following:
4.04 100mm diameter Bend 22 Nr 0.00
4.05 100mmx 75mm tee 11 Nr 0.00
4.06 Rain screen head (LXW)200mmx150mm with removable strainer installed horizontally allowing debris to slide off and a 100mm outlet diameter. 14 Nr 0.00
4.07 100mm diameter Rain water first flush diverter with a floating ball and all fittings to connect to 10mm diameter downpipe 14 Nr 0.00
Sheerline colorbond
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
Supply and install the following sheerline colorbond rain water goods
4.08 95mm diameter rain water pipe Rate only m
4.09 75mm diameter rain water pipe Rate Only m
4.10 Extra over 100mm diameter bend Rate Only Nr
4.11 Extra over 100mmx75mm tee Rate Only Nr
Testing, commissioning and maintenance
5.01 The soak away calculation is based on roamy soils with percolation rate (general average): 20 liters/m²/day (Means 1 m² of soak pit wall area can absorb ~20 liters/day). Allow for this conformity test and furnish the project engineer with the test result for approval. Soak away resizing must be done where percoration rate is confirmed to be less than 20 liters/m²/day 11 Item 0.00
5.02 Allow for setting to work, testing and commissioning of the whole plumbing system to the satisfaction of the Engineer. 1 Item 0.00
5.03 Allow provision of maintenance and operation manuals of all the equipment installed as directed by and to satisfaction of the Engineer. 1 Item 0.00
5.04 Allow trainining of client staff on operation of the entire installation to satisfaction of the Engineer. 1 Item 0.00
TOTAL FOR 2-4- PLUMBING AND DRAINAGE INSTALLATION- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA TVET, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 2.5 ELECTRICAL INSTALLATIONS
Where Trade Names are mentioned below, it is intended to indicate the level of quality required. The tenderer MAY supply alternatives which must be approved in writing by the Project Manager. Note
1) SOLAR SECURITY LIGHTING
a) Supply, install, test and set to work 200mm diameterx7.0mm thick x 6.0-metre high CHS steel lighting column, with good finish and all neccesary accessories, suitable for mounting 1x80W LED security flood lighting fittings (m.s) 4 Nr 0.00
b) Allow for mass concrete foundations for the steel lighting column, including all necessary excavations, reinforcement and fixing base plates and bolts 4 Item 0.00
Security lights
c) Supply and install all-in-one Integrated / Integrated solar light (single -arm) as per provided technical specifications; complete with the following: - Integrated 'Tier 1' solar panel- minimum 256Wp - LED light 80W, with automatic switching system and colour range temperature of 4000–5000 K; - AC/DC hybrid Charging controllers/converters - Integrated lithium battery (atleast 281.25Ah, 12.8V) capable of supporting light for at least 3 days. 4 Nr 0.00
d) Supply, install, test and set to work earthing installation comprising of a 4sq.mm copper PVC earth lead, 1800mm x 15mm diameter copper earth electrode and all neccesary accessories for the street lighting columns 4 Nr 0.00
e) Construct concrete earthing pit, size 600mmx600mmx 600mm deep; complete with waterproof cover for earth test / earth rod inspections and with earthing compound as bentonite. 4 Nr 0.00
f) Allow for testing and commissioning for the security light system and documentation of results to the satisfaction of the Engineer 1 Item 0
g) Allow for all the neccesary submittals comprising shop drawings, illustrations, schedules, product data, bronchures. 1 Item 0
TOTAL FOR SOLAR SECURITY LIGHTING - CARRIED TO BILL SUMMARY 0
2) LIGHTNING PROTECTION SYSTEM- (For DRY TOILETS)
a) Supply and install 25 mm x 3 mm bare copper tape conductor as Furse or approved equivalent complete with metallic DC tape clip, wall plugs, fixing screws and other necessary accessories 90 m 0.00
b) Supply and install 1500 mm long multiple air terminal complete with terminal base as Furse or approved equivalent and all necessary accessories 6 Nr 0.00
c) Supply and install screw down test clamps as Furse or approved equivalent and all necessary accessories 6 Nr 0.00
d) Supply and install 6.0sq.mm PVC insulated SC cable in and including 20mm dia PVC heavy gauge conduit; complete with all necessary accessories 30 m 0.00
e) Supply and install 12.5 mm x 1200 mm long copper earth rod complete with spike, driving stud, dowel clamps as Furse or approved equivalent and all necessary accessories 6 Nr 0.00
f) Supply and install copper earth 300mm x 300mm mats complete with trenching in black cotton soil /soft rock, earth termination pits, marconite backfill, backfilling, reinstatement of ground to meet the requirements of the technical specifications 6 Nr 0.00
g) Supply and install concrete inspection pit complete with waterproof cover for earth test / rod inspections and all other neccesary accessories 6 Nr 0.00
h) Allow for testing and commissioning of the entire electrical installation under this section 1 Ls 0.00
TOTAL FOR LIGHTNING PROTECTION SYSTEM (Dry Toilets) - CARRIED TO BILL SUMMARY 0
ELECTRICAL INSTALLATIONS
1) SOLAR SECURITY LIGHTING 0.00
2) LIGHTNING PROTECTION SYSTEM- (For DRY TOILETS) 0.00
TOTAL FOR 2-5- ELECTRICAL INSTALLATIONS - CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA TVET, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 2.6 CESS POOL/URINE ABSORPTION PIT
Quantities presented in this bill are for 2no. Cess pools/ Urine Absorption pit 2 Nr. Note
All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
a) Excavate for cess pool; 0-1.50m deep 32 m³ 0.00
b) Load and cart away surplus spoil 28 m³ 0.00
c) Backfill selected and approved excavated materials around foundations 4 m³ 0.00
Hollow concrete block walling; bedding, jointing and pointing in cement sand (1:3) mortar
d) 200 mm thick wall 20 m² 0.00
Vibrated reinforced concrete class 20/25 with minimum cube crushing strength of 25N/mm² at 28 days
e) Base beam 4 m3 0.00
f) Cover slab [150 mm thick] 2 m3 0.00
High yield deformed steel bar reinforcement to BS 4461
g) 8 mm diameter bars 70 kg 0.00
h) 10 mm diameter bars 100 kg 0.00
i) 12 mm diameter bars 120 kg 0.00
j) Soffits of cover slab 14 m² 0.00
k) Edges of base beam 16 m² 0.00
l) Cement and sand (1:3) screed applied on top of concrete slab 14 m² 0.00
Selected filling
m) Hardcore fillings into the cess pool 14 m3 0.00
n) Provide and install 600 x600 x 50mm thick pre-cast concrete cover slabs 2 nr 0.00
Inlet/distribution chamber
o) 600 x 600 x700 mm (internal dimensions) inlet chamber; built in 200mm thick masonry walls and 150 mm thick concrete base slab reinforced with 10mm diameter bars at 200mm centres both ways top and bottom: all necessary finishes and water proofing to wall and floor surfaces: 600 x 600 x50 mm thick PCC cover slab and all necessary pipe work. 4 nr 0.00
p) Allow for making 100 mm diameter openings in 200 mm Hollow concrete block walling 2 nr 0.00
q) Allow for making 50 mm diameter openings in 150mm thick cover slabs 2 nr 0.00
r) Boxing in 150mm thick cover slab for 600x600mm PCC cover 2 nr 0.00
TOTAL FOR 2-6- CESSPOOL (2NO.) CARRIED TO GRAND SUMMARY 0.00
United Nations Office for Project Services
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
THE GOVERNMENT OF PAPUA NEW GUINEA
PROPOSED WASH INTERVENTION FOR RABARABA PRIMARY SCHOOL, PAPUA NEW GUINEA
BILL OF QUANTITIES (BOQ)
Consists of the following:
3-1 - Mainstream Dry Toilet blocks (6no.)
3-2 - Accessible Dehydrated Toilet blocks (1no.)
3-3 - Assembly Hall (1no.)
3-4 - Catchment Tank Plinth (2No.)
3-5 - Plumbing & Drainage
3-6 - Electrical Installations
3-7 - Cesspools (3no.)
NOTE: It is a MANDATORY requirement for bidders to complete and return all parts of this BOQ. Failure to complete all sections of the BOQ may result in automatic disqualification of your bid.
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA PRIMARY SCHOOL, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 3.1 TYPICAL MAINSTREAM DRY TOILETS (6NO.)
(All provisional)
Quantities presented in this bill are for 6no. Toilet blocks 6 Nr. Note
i) Plumbing and drainage work, including the water tank has been measured separately (Bill no. 3.5) Note
ii) Cesspool has been measured separately (Bill no. 3.7) Note
iii)All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS
a) Clear the site of all shrubs, bushes, small trees and debris; remove from site as directed [Approximate area: 90 m2 for Building footprint and 50% allowance] 6 Item 0.00
Oversite excavations
b) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Building footprint only] 360 m2 0.00
c) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 54 m3 0.00
d) Excavate in soft material for column bases; 0-1.50m deep [For timber columns] 48 m3 0.00
e) Return, fill in and ram selected excavated material around foundations 60 m3 0.00
Disposal of Surplus spoil
f) Load and cart away surplus excavated material from site to an approved dumping site 42 m3 0.00
Selected filling
g) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep [For water tank plinth] 24 m2 0.00
h) Selected and approved backill material, well watered and compacted [1100mm deep below the hardcore under the water tank plinth] 24 m3 0.00
i) 50mm Thick granular/gravel blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 24 m2 0.00
j) 150mm Thick granular/gravel spread finish to overall ground surfaces [Under the toilets] 228 m2 0.00
Anti-termite treatment
k) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to granular/gravel surfaces 252 m2 0.00
TOTAL FOR SITE PREPARATION, EXCAVATIONS & EARTHWORKS CARRIED TO BILL SUMMARY 0.00
2) CONCRETE WORKS
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 30 m2 0.00
b) 50mm Thick blinding under column bases 36 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Column bases 12 m3 0.00
d) Stub columns 12 m3 0.00
e) Foundation strip 6 m3 0.00
f) Tank platform [100mm thick ], finished smooth 6 m3 0.00
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 42 m2 0.00
TOTAL FOR CONCRETE WORKS CARRIED TO BILL SUMMARY 0.00
3) STEEL REINFORCEMENT
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 10 mm diameter bars (in column bases & strip footings) 720 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
b) Fabric mesh reinforcement to tank plinth concrete bed 42 m2 0.00
TOTAL FOR STEEL REINFORCEMENT CARRIED TO BILL SUMMARY 0.00
4) SHUTTERING & FORMWORK
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 18 m² 0.00
b) Vertical sides of column bases 78 m² 0.00
c) Vertical sides of stub columns 180 m² 0.00
d) Edges of Tank platform concrete bed, 100mm girth 60 m 0.00
TOTAL FOR SHUTTERING & FORMWORK CARRIED TO BILL SUMMARY 0.00
5) JOINERY & TIMBER WORKS
1. Rate for Timber sections shall include all necessary drilling of holes, bolting, cleats and other necessary connections that are not separately itemized for pricing Note
2. The Contractor shall provide shop drawings for approval. Once approved, the drawings shall be strictly adhered to during the fabrication and installation process. Note
3. The Contractor shall provide documentation verifying treatment type, retention levels, and compliance. Note
4. Rainwater down pipes have been measured under the plumbing and drainage bill Note
I Timber framework
Columns, rafters etc.
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished with 2 coats polyurethane varnish on completion; all as per Structural Engineer's drawings
a) 150x150mm Timber Column, encased in concrete column(m.s), secured with a threaded end or steel plate anchored in the timber column 744 m 0.00
b) 150x150mm Timber floor bearers bolted to timber columns (m.s) 168 m 0.00
c) 100x75mm Timber floor joists bolted to floor bearers (m.s) 156 m 0.00
d) 50x50mm Timber bracings bolted to timber columns (m.s) 648 m 0.00
e) 75x50mm Timber rafters, bolted to top of timber columns (m.s) 228 m 0.00
f) 25x50mm Ventilation slats fixed to timber columns (m.s) 276 m 0.00
g) 50x50mm Timber purlins fixed to rafters (m.s) 390 m 0.00
Softwood timber
h) 200x25mm Thick One-side wrot fascia and barge board 168 m 0.00
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished with 2 coats polyurethane varnish on completion; all as per Structural Engineer's drawings
a) 200x50mm Timber stringer 102 m 0.00
b) 300x25mm Timber platforms/treads fixed to stingers (m.s) 150 m 0.00
Approved 7.5mm Thick site-painted plank weather board; treated against termites and mositure ingress; finished with 2 coats polyurethane varnish on both sides
a) Supply and fix 7.5mm thick site-painted plank weather board; fixed to timber framework (m.s) with tying wires or other approved fixing accessories 552 m2 0.00
IV Wood planks floor finish
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Approved timber planks; treated against termites, moisture and unine acidity; finished with 2 coats polyurethane varnish on the top side
a) Supply and fix approved smooth planed 200x50mm wood planks; fixed to timber framework (m.s) with concealed bolts or screws 132 m2 0.00
b) Allow for creating squat pan spaces through the wood planks flooring; finishing around 24 Nr 0.00
The following in timber doors as per the details provided
Door Frames, architraves and beads
a) Ex 150x50mm hardwood frame rebated 132 m 0.00
b) 50x15mm hardwood architrave chamfered 132 m 0.00
c) 15x15mm hardwood quadrant bead 132 m 0.00
Supply and fix the following 40mm thick solid core, hardwood veneer faced door shutter with hardwood lipping all round
d) Single leaf door size 900x2200mm high with 100mm high aluminium kick plate on the inside 24 Nr 0.00
Supply and fix the following ironmongery with screws to match
e) Heavy duty natural aluminium hinges approved from samples 72 Nr 0.00
f) Three lever mortise lock complete with a set of lever furniture and approved from sample 24 Nr 0.00
g) Aluminium door handles including fixing to timber doors and approved from samples 48 Nr 0.00
Painting and Decorating
Aluminum wood primer
h) Back of wood frames over 100mm but not exceeding 200mm girth 132 m 0.00
Prepare and apply clear matt varnish to timber doors
i) Surfaces not exceeding 100mm girth 264 m 0.00
j) Ditto over 100mm not exceeding 200mm girth 132 m 0.00
k) General surfaces of doors 66 m2 0.00
TOTAL FOR JOINERY & TIMBER WORKS CARRIED TO BILL SUMMARY 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide 60 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 60 m2 0.00
c) 200mm Thick dwarf wall above ground 78 m2 0.00
TOTAL FOR BLOCKWORK CARRIED TO BILL SUMMARY 0.00
7) ROOF COVERING & RAINWATER GOODS
a) Supply and Fix Aluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets or approved equivalent; fixed to timber purlins (m.s) using manufacturer's proprietary bolts 270 m2 0.00
b) Allow for making holes through the roofing sheets for ventilation pipes at specified positions; finishing and sealing around the pipes to prevent leakages 24 Nr 0.00
Rainwater goods
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
c) Supply and install sheerline colorbond gutter fixed to fascia (m.s) with and including spring clips at 1200mm centres [Rate to include gutter stop ends]. The gutter to have a micro-mesh leaf guards 54 m 0.00
d) Extra over downpipe; for gutter outlet 6 Nr 0.00
e) Allow for connection of the downpipe to the water reservoir tank (tank measured separately) 6 Item 0.00
TOTAL FOR ROOF COVERING & RAINWATER GOODS CARRIED TO BILL SUMMARY 0.00
TYPICAL MAINSTREAM DRY TOILETS (6NO.)
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS 0.00
2) CONCRETE WORKS 0.00
3) STEEL REINFORCEMENT 0.00
4) SHUTTERING & FORMWORK 0.00
5) JOINERY & TIMBER WORKS 0.00
6) BLOCKWORK 0.00
7) ROOF COVERING & RAINWATER GOODS 0.00
TOTAL FOR 3-1- TYPICAL DRY TOILETS (6NO)- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA PRIMARY SCHOOL, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 3.2 TYPICAL ACCESSIBLE DEHYDRATED TOILET
(All provisional) Note
Quantities are for 1no. Block
i) Plumbing and drainage work, including the water tank has been measured separately (Bill no. 3.5) Note
ii) Cesspool has been measured separately (Bill no. 3.7) Note
iii)All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS
a) Clear the site of all shrubs, bushes, small trees and debris; remove from site as directed [Approximate area: 145m2 for Building footprint including ramps and 20% allowance] 1 Item 0.00
Oversite excavations
b) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Building footprint including ramp areas only] 75 m2 0.00
c) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 7 m3 0.00
d) Excavate in soft material for column bases; 0-1.50m deep [For timber columns] 63 m3 0.00
e) Return, fill in and ram selected excavated material around foundations 52 m3 0.00
Disposal of Surplus spoil
f) Load and cart away surplus excavated material from site to an approved dumping site 18 m3 0.00
Selected filling
g) Selected and approved backill material, well watered and compacted [1800mm deep under the water tank plinth] 4 m3 0.00
h) 50mm Thick murram blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 2 m2 0.00
i) 150mm Thick murram spread finish to overall ground surfaces [Under the toilets including ramp areas] 70 m2 0.00
Anti-termite treatment
j) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to murram surfaces 72 m2 0.00
TOTAL FOR SITE PREPARATION, EXCAVATIONS & EARTHWORKS CARRIED TO BILL SUMMARY 0.00
2) CONCRETE WORKS
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 5 m2 0.00
b) 50mm Thick blinding under column bases 42 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Column bases 7 m3 0.00
d) Stub columns 8 m3 0.00
e) Foundation strip 1 m3 0.00
f) Tank platform [150mm thick ], finished smooth 1 m3 0.00
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 4 m2 0.00
External Paved Areas
h) Locally available stone paving slabs jointed in cement and sand mortar and laid on and including 50mm thick sand bed (Sample of locally available stone slabs to be provided by the Contractor for approval by the site Engineer). Rate Only m2
TOTAL FOR CONCRETE WORKS CARRIED TO BILL SUMMARY 0.00
3) STEEL REINFORCEMENT
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 8 mm diameter bars 367 kg 0.00
b) 10 mm diameter bars 446 kg 0.00
c) 12 mm diameter bars 414 kg 0.00
TOTAL FOR STEEL REINFORCEMENT CARRIED TO BILL SUMMARY 0.00
4) SHUTTERING & FORMWORK
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 3 m² 0.00
b) Vertical sides of column bases 32 m² 0.00
c) Vertical sides of stub columns 106 m² 0.00
d) Edges of Tank platform concrete bed, 150mm girth 8 m 0.00
TOTAL FOR SHUTTERING & FORMWORK CARRIED TO BILL SUMMARY 0.00
5) JOINERY & TIMBER WORKS
1. Rate for Timber sections shall include all necessary drilling of holes, bolting, cleats and other necessary connections that are not separately itemized for pricing Note
2. The Contractor shall provide shop drawings for approval. Once approved, the drawings shall be strictly adhered to during the fabrication and installation process. Note
I Timber framework
Columns, rafters etc.
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites with approved wood preservative; including all jointing and connections (packing piece, Grade 8.8 bolts etc.) as necessary; in roof
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; all as per Structural Engineer's drawings
a) 150x150mm Timber Column, encased in concrete column(m.s) 125 m 0.00
b) 75x75mm Timber Column for ramp area, encased in concrete column(m.s) 89 m 0.00
c) 75x100mm Timber deck bearers bolted to timber columns (m.s) for the main floor area 28 m 0.00
d) 75x100mm Timber ramp bearers bolted to timber columns (m.s) for the ramp 15 m 0.00
e) 100x150mm Timber floor deck joists bolted to floor bearers (m.s) 35 m 0.00
f) 75x100mm Timber ramp joists bolted to floor bearers (m.s) 52 m 0.00
g) 75x50mm Timber tie beams bolted to timber columns (m.s) 28 m 0.00
h) 75x75mm Timber bracing bolted to timber columns (m.s) 55 m 0.00
j) 150x100mm Timber rafters, bolted to top of timber columns (m.s) 38 m 0.00
k) 25x50mm Ventilation slats fixed to timber columns (m.s) 95 m 0.00
l) 75x50mm Timber purlins fixed to rafters (m.s) 61 m 0.00
Softwood timber
m) 200x25mm Thick One-side wrot fascia and barge board 29 m 0.00
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished finished with 2 coats polyurethane varnish on completion; all as per Structural Engineer's drawings
a) 100x50mm Timber top rail 54 m 0.00
b) 40mm diameter circular timber handrail baluster fixed to stingers (m.s) at 150mm c/c 235 m 0.00
c) 50x100mm Timber bottom rail 54 m 0.00
Approved 7.5mm Thick site-painted plank weather board; treated against termites and mositure ingress; finished with 2 coats polyurethane varnish on both sides
a) Supply and fix 7.5mm thick site-painted plank weather board; fixed to timber framework (m.s) with tying wires or other approved fixing accessories 87 m2 0.00
Approved 7.5mm Thick site-painted timber screens; treated against termites and mositure ingress; finished with 2 coats polyurethane varnish on both sides
b) Supply and fix 7.5mm thick site-painted timber screens; fixed to timber framework (m.s) with tying wires or other approved fixing accessories 27 m2 0.00
IV Wood planks floor finish
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in floors
Approved timber planks; treated against termites, moisture and unine acidity; finished with 2 coats polyurethane varnish on the top side
a) Supply and fix approved smooth planed 100x25mm wood planks; fixed to timber framework (m.s) with concealed bolts or screws; for main floor 39 m2 0.00
b) Ditto: for Ramp including landings 38 m2 0.00
c) Allow for creating squat pan spaces through the wood planks flooring; finishing around 4 Nr 0.00
The following in timber doors as per the details provided
Door Frames, architraves and beads
a) Ex 100x50mm hardwood frame rebated 24 m 0.00
b) 50x15mm hardwood architrave chamfered 24 m 0.00
c) 15x15mm hardwood quadrant bead 24 m 0.00
Supply and fix the following semi-solid treated timber flush door shutter with hardwood lipping all round
d) Single leaf door overall size 1100x2400mm high with 100mm high aluminium kick plate on the inside (Door Type D01) 2 Nr 0.00
e) Single leaf door overall size 1100x2400mm high with 400mm high aluminium kick plate on the inside (Door Type D02) 2 Nr 0.00
Supply and fix the following ironmongery with screws to match
f) Heavy gauge steel door hinges approved from samples 12 Nr 0.00
g) Heavy duty two lever aluminium door lock complete with a set of lever furniture and approved from sample 4 Nr 0.00
h) 19mm Diameter , 300mm long, aluminium door grab handles with concealed fixing rose for horizontal and vertical handles 4 Nr 0.00
Painting and Decorating
Aluminum wood primer
j) Back of wood frames over 100mm but not exceeding 200mm girth 24 m 0.00
Prepare and apply clear matt varnish to timber doors
k) Surfaces not exceeding 100mm girth 48 m 0.00
l) Ditto over 100mm not exceeding 200mm girth 24 m 0.00
m) General surfaces of doors 16 m2 0.00
TOTAL FOR JOINERY & TIMBER WORKS CARRIED TO BILL SUMMARY 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide 8 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 7 m2 0.00
c) 200mm Thick dwarf wall above ground 12 m2 0.00
Cement and sand (1:4) to walls in
d) 12mm deep horizontal keying on masonry stone wall surfaces. 24 m2 0.00
TOTAL FOR BLOCKWORK CARRIED TO BILL SUMMARY 0.00
7) ROOF COVERING & RAINWATER GOODS
a) Supply and Fix Aluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets or approved equivalent; fixed to timber purlins (m.s) using manufacturer's proprietary bolts 49 m2 0.00
b) Allow for making holes through the roofing sheets for 4no. ventilation pipes at specified positions; finishing and sealing around the pipes to prevent leakages 1 Item 0.00
Rainwater goods
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
c) Supply and install sheerline colorbond gutter fixed to fascia (m.s) with and including spring clips at 1200mm centres [Rate to include gutter stop ends]. The gutter to have a micro-mesh leaf guards 9 m 0.00
d) Extra over for gutter stop ends 2 Nr 0.00
e) Extra over downpipe; for gutter outlet. 1 Nr 0.00
f) Allow for connection of the downpipe to the water reservoir tank (tank measured separately) 1 Item 0.00
TOTAL FOR ROOF COVERING & RAINWATER GOODS CARRIED TO BILL SUMMARY 0.00
ACCESSIBLE DEHYDRATED TOILET
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS 0.00
2) CONCRETE WORKS 0.00
3) STEEL REINFORCEMENT 0.00
4) SHUTTERING & FORMWORK 0.00
5) JOINERY & TIMBER WORKS 0.00
6) BLOCKWORK 0.00
7) ROOF COVERING & RAINWATER GOODS 0.00
TOTAL FOR 3- 2- ACCESSIBLE DEHYDRATED TOILET (1NO)- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA PRIMARY SCHOOL, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 3.3 ASSEMBLY HALL
All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS
Site Clearance/Demolitions
The Contractor shall assess te extent of required demolitions Note
The waste arising from demolitions should be transported and disposed in a way to meet the guidelines of local authority, with the prior approval of Site Engineer’s representative. Sort out all Re-useable materials arising from demolition and hand over the same officially to the institution Note
a) Carefully demolish existing structure; complete with the foundations, frame, covering and finishes; remove all debris from site and prepare the site to receive new construction; (Approximately 225m2 plinth area) 1 Sum 0.00
Oversite excavations
b) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Building footprint only] 260 m2 0.00
c) Excavate in soft material for foundation trenches; 0-1.50m deep 44 m3 0.00
d) Excavate in soft material for column bases; 0-1.50m deep 41 m3 0.00
e) Return, fill in and ram selected excavated material around foundations 48 m3 0.00
Disposal of Surplus spoil
f) Load and cart away surplus excavated material from site to an approved dumping site 37 m3 0.00
Selected filling
g) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep 170 m2 0.00
h) 50mm Thick granular/gravel blinding to surfaces of hardcore; as per structural engineer's specifications 170 m2 0.00
Anti-termite treatment
i) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to granular/gravel surfaces 170 m2 0.00
TOTAL FOR SITE PREPARATION, EXCAVATIONS & EARTHWORKS CARRIED TO BILL SUMMARY 0.00
2) CONCRETE WORKS
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 31 m2 0.00
b) 50mm Thick blinding under column bases 27 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Foundation strip 6 m3 0.00
d) Column bases 11 m3 0.00
e) Stub columns 2 m3 0.00
f) Ramps (150mm thick) and steps 4 m3 0.00
g) Ground floor bed [150mm thick ] 25 m3 0.00
Damp proof membrane
h) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) 185 m2 0.00
i) Provide pockects for holding down anchor bolts to structural fabricators details 48 Nr 0.00
TOTAL FOR CONCRETE WORKS CARRIED TO BILL SUMMARY 0.00
3) STEEL REINFORCEMENT
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 8mm Diameter bars 90 kg 0.00
b) 10mm Diameter bars 610 kg 0.00
c) 12mm Diameter bars 225 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
d) Fabric mesh reinforcement to floor bed and ramps 185 m2 0.00
TOTAL FOR STEEL REINFORCEMENT CARRIED TO BILL SUMMARY 0.00
4) SHUTTERING & FORMWORK
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 20 m² 0.00
b) Vertical sides of column bases 29 m² 0.00
c) Vertical sides of stub columns 26 m² 0.00
d) Edges of the concrete bed and ramps, 150mm girth 70 m 0.00
e) Edges of steps, 150mm girth 11 m 0.00
TOTAL FOR SHUTTERING & FORMWORK CARRIED TO BILL SUMMARY 0.00
5) STRUCTURAL STEEL WORK & ROOF COVERING
(All provisional)
1. Rate for steel sections shall include all necessary drilling of holes and welding. A separate item has been included for pricing allowance for gusset plates, anchor plates, bolts, cold formed channels and other necessary connections that are not specifically included with the rest of the items
2. The Contractor shall provide shop drawings for approval. Once approved, the drawings shall be strictly adhered to during the fabrication and installation process.
Structural steelwork grade 4.3C (factory primed) to be executed by an approved sub-contractor.
Unframed mild steel including hoisting and fixing in position and including drilling holes,all necessary welding, bolts plates/gusset plates and other jointing whether or not specifically described herein or shown on the drawing and with one coat of red oxide primer after erection.(see the drawings)
Base plates, bolts etc.
a) 300x300x10mm Base plate comprising 4/20mm diameter holes to receive holding down bolts (m.s) ; welded to steel columns 12 Nr 0.00
b) 18mm x 150mm Long bolts (Grade 10.9), fixed into concrete columns; each having 50mm diameter x 5mm thick end plate 48 Nr 0.00
Columns, rafters etc.
Supply and fix the following in "I" sections; bolted and welded connections, including hoisting and fixing and priming surface of metal with one coat of red oxide primer before erection; all as per Structural Engineer's drawings
c) 150 UC 23.4 Columns, welded to base plate 1072 kg 0.00
d) 180 UB 22.2 Rafters, welded to columns 1495 kg 0.00
e) 150 UB 14.0 Ring beams, welded to columns 430 kg 0.00
f) Z150 (19) ZED purlins; welded to rafters at 1150mm centres 207 m 0.00
Connections etc.
g) Allow for gusset/connection plates and angles,brackets, bolted connections, splice joints, channels etc [not exceeding 20% of the total weight of measured structural steel items] 1 Item 0.00
h) Extra over base plates for 25mm thick class 15 levelling screed under mild steel plates 12 Nr 0.00
Two coats of approved automotive spray paint or other approved rust resistant paint to structural steel works on site after erection
i) Surfaces of all the foregoing steelwork 210 m2 0.00
j) Supply and Fix Aluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets or approved equivalent; fixed to timber purlins (m.s) using manufacturer's proprietary bolts 189 m2 0.00
k) Supply and Fix matching ridge cap 17 m 0.00
Rainwater goods
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
l) Supply and install sheerline colorbond gutter fixed to fascia (m.s) with and including spring clips at 1200mm centres [Rate to include gutter stop ends]. The gutter to have a micro-mesh leaf guards 33 m 0.00
m) Ditto:110mm rainwater downpipe, including all necessary accessories 11 m 0.00
n) Extra over downpipe; for gutter outlet 2 Nr 0.00
o) Allow for connection of the downpipe to the water reservoir tanks (tanks measured separately) 1 Nr 0.00
TOTAL FOR STRUCTURAL STEEL WORK & ROOFING CARRIED TO BILL SUMMARY 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide 62 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 93 m2 0.00
c) 200mm Thick dwarf wall above ground 38 m2 0.00
Precast Concrete units [PCC] class 25/20: Vibrated; reinforced for handling: fair faced finish on all exposed faces: bedded, jointed and pointed in Cement mortar (1:3)
d) 300mm wide x 50mm thick Coping, twice weathered and throated 62 m 0.00
TOTAL FOR BLOCKWORK CARRIED TO BILL SUMMARY 0.00
Note: Contractor to provide all samples for approval before incorporation into the final works.
Cement and Sand (1:4) screed Beds or backings as described in:
a) 50mm Thick hardened screed on floors; finished smooth (main hall floor) 165 m2 0.00
b) 50mm Thick hardened screed on floors; finished with anti-slip groves (in ramps) 17 m2 0.00
c) 25mm Thick hardened screed on floors; finished smooth (steps) 6 m2 0.00
15mm Cement and sand (1:3) render on block wall or concrete work to:-
d) Wall surfaces (Dwarf walls) 76 m2 0.00
Sand surfaces and fill uneven surfaces with stucco filler paste; Prepare and apply two undercoats of plastic emulsion paint and two finishing coats external quality paint as "Permaplast" manufactured by Crown paints or other equal and approved:-
e) Plastered wall surfaces (Dwarf walls) 76 m2 0.00
TOTAL FOR FINISHES CARRIED TO BILL SUMMARY 0.00
8) PAVED APPRONS
a) 600x600x50mm Thick precast concrete (PCC) paving slabs (standard) jointed in cement and sand mortar and laid on and including 50mm thick gravel/granular cushion and 300mm hardcore 77 m2 0.00
b) 200mm x 400mm high Thick edging wall built on and including 100mm thick class 20 mass concrete bed; including all necessary excavations and disposal; finished exposed edges to approval 65 m 0.00
TOTAL FOR PAVED APPRONS CARRIED TO BILL SUMMARY 0.00
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS 0.00
2) CONCRETE WORKS 0.00
3) STEEL REINFORCEMENT 0.00
4) SHUTTERING & FORMWORK 0.00
5) STRUCTURAL STEEL WORK & ROOF COVERING 0.00
6) BLOCKWORK 0.00
7) FINISHES 0.00
8) PAVED APPRONS 0.00
TOTAL FOR 3-3- ASSEMBLY HALL- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA PRIMARY SCHOOL, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 3.4 CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA)
(All provisional) Note
All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
A Notes: Quantities are for 1no. Plinth (4.2m long x 2.5m wide as per Structural drawings) 1 Nr. Note
I) Earthworks and Excavations
a) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Tank plinth footprint only] 16 m2 0.00
b) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 17 m3 0.00
c) Selected and approved backill material, well watered and compacted in layers 11 m3 0.00
Disposal of Surplus spoil
d) Load and cart away surplus excavated material from site to an approved dumping site 6 m3 0.00
Selected filling
e) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep [For water tank plinth] 8 m2 0.00
f) Selected and approved backill material, well watered and compacted [600mm deep below the hardcore under the water tank plinth] 4 m3 0.00
g) 50mm Thick murram blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 8 m2 0.00
Anti-termite treatment
h) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to murram surfaces 11 m2 0.00
II) Concrete works
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 10 m2 0.00
b) 50mm Thick blinding under 100mm thick concrete platform slab 6 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Foundation strip 2 m3 0.00
d) Raised Tank platform [100mm thick ], finished smooth 1 m3 0.00
e) 100mm Thick concrete platform form at water point, including forming a 100x50mm thick upstand; finished smooth 3 m2 0.00
f) 50mm Thick splash concrete pad, including forming a 50x50mm thick upstand; finished smooth 2 m2
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 11 m2 0.00
III) Steel Reinforcement
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 10 mm diameter bars 77 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
b) Fabric mesh reinforcement to tank plinth concrete bed 11 m2 0.00
IV) Shuttering & Formwork
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 6 m² 0.00
b) Edges of raise tank platform concrete bed, 100mm girth 11 m 0.00
c) Edges of ground concrete bed, 100mm girth 8 m 0.00
d) Edges of ground concrete bed, 50mm girth 6 m 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide (for upstand wall for taps only) 3 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 19 m2 0.00
c) 200mm Thicks walls above ground 9 m2 0.00
d) 200mm Thick upstand wall for taps 2 m2 0.00
15mm Cement and sand (1:3) render on block wall or concrete work to:-
e) Exposed wall surfaces including concrete plinth 13 m2 0.00
f) Tank plinth floor surfaces 12 m2 0.00
g) 300x50mm thick precast concrete coping bedded on top of walling in cement and sand (1:3) mortar including 10mm deep drip mould 3 m 0.00
h) Making holes through 200mm thick wall for taps 2 Nr 0.00
TOTAL FOR 1NO. CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA - CARRIED TO BILL SUMMARY 0.00
B Notes: Quantities are for 1no. Plinth (6m long x 4.2m wide as per Structural drawings) 1 Nr. Note
I) Earthworks and Excavations
a) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Tank plinth footprint only] 30 m2 0.00
b) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 32 m3 0.00
c) Selected and approved backill material, well watered and compacted in layers 20 m3 0.00
Disposal of Surplus spoil
d) Load and cart away surplus excavated material from site to an approved dumping site 12 m3 0.00
Selected filling
e) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep [For water tank plinth] 21 m2 0.00
f) Selected and approved backill material, well watered and compacted [600mm deep below the hardcore under the water tank plinth] 10 m3 0.00
g) 50mm Thick murram blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 20 m2 0.00
Anti-termite treatment
h) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to murram surfaces 27 m2 0.00
II) Concrete works
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 19 m2 0.00
b) 50mm Thick blinding under 100mm thick concrete platform slab 16 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Foundation strip 4 m3 0.00
d) Raised Tank platform [100mm thick ], finished smooth 2 m3 0.00
e) 100mm Thick concrete platform form at water point, including forming a 100x50mm thick upstand; finished smooth 8 m2 0.00
f) 50mm Thick splash concrete pad, including forming a 50x50mm thick upstand; finished smooth 2 m2
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 27 m2 0.00
III) Steel Reinforcement
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 10 mm diameter bars 134 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
b) Fabric mesh reinforcement to tank plinth concrete bed 27 m2 0.00
IV) Shuttering & Formwork
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 11 m² 0.00
b) Edges of raise tank platform concrete bed, 100mm girth 19 m 0.00
c) Edges of ground concrete bed, 100mm girth 9 m 0.00
d) Edges of ground concrete bed, 50mm girth 13 m 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide (for upstand wall for taps only) 6 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 32 m2 0.00
c) 200mm Thicks walls above ground 15 m2 0.00
d) 200mm Thick upstand wall for taps 2 m2 0.00
15mm Cement and sand (1:3) render on block wall or concrete work to:-
e) Exposed wall surfaces including concrete plinth 21 m2 0.00
f) Tank plinth floor surfaces 24 m2 0.00
g) 300x50mm thick precast concrete coping bedded on top of walling in cement and sand (1:3) mortar including 10mm deep drip mould 6 m 0.00
h) Making holes through 200mm thick wall for taps 4 Nr 0.00
TOTAL FOR 1NO. CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA - CARRIED TO BILL SUMMARY 0.00
A 4.2m long x 2.5m wide-Plinth 0.00
B 6m long x 4.2m wide 0.00
TOTAL FOR 3-4- CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA (2NO.)- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA PRIMARY SCHOOL, PAPUA NEW GUINEA
ITEM DESCRIPTION QTY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 3.5 PLUMBING & DRAINAGE
Notes: Quantities are for 7no. Toilet blocks Note
1.00 SANITARY FITTINGS
Supply, deliver, install, test and commission the following sanitary fittings and accessories. Fixing to be to manufacturer's printed instructions.
1.01 Water Closet. Western -type toilet pan divided in two sectors. The sector in the front is for urine diverter with 50mm hole allowing connection to 50mm dia pipe for urine collection while back sector with a 200mm hole for faeces to drop into waste tank directly below without need for flushing. The pan will be stainless steel or in vitreous China with all fixings required to install on a wooden floor. 28 Nr 0.00
1.02 Disabled Water Closet. Western -type toilet pan divided in two sectors. The sector in the front is for urine diverter with 50mm hole allowing connection to 50mm dia pipe for urine collection while back sector with a 200mm hole for faeces to drop into waste tank directly below without need for flushing. The pan will be stainless steel or in vitreous China with all fixings required to install on a wooden floor. 2 Nr 0.00
1.03 A pair of Stainless steel rear and side grab bars. Side Wall: Minimum 1065 mm long, placed max 300mm from the rear wall and extending at least 1380 from the rear wall. Rear Wall: Minimum 915 mm long, extending 300 mm minimum on one side of the toilet center line and 600 mm on the other side. 2 Nr 0.00
1.04 Roll Holder. Stainless steel holder fixed on the wall, size 150x150 mm. 28 Nr 0.00
1.05 Double Bowl Sink. Stainless steel double bowl wash hand sink bench unit as "Simply Stainless" or approved equivalent; overall size 1600mm wide x 700mm deep x 900mm high; manufactured from 304 grade stainless steel, 1.2mm thick sections. The sink unit to have at least 150mm high bevelled-edge splashback and mounted on heavy duty tubular legs. Each bowl to have a pre-punched hole to suit waste connection complete with chromed 20mm low pressure (0.1bar) lockable pillar tap for each of the two bowls, a 32mm diameter chrome plated waste and a 32mm plastic P- trap for each of two bowls. 13 Nr 0.00
1.06 Single Bowl Sink. Stainless steel single bowl wash hand sink bench unit as "Simply Stainless" or approved equivalent with 750mm bowl height for disabled access; overall size 500mm wide x 700mm deep x 750mm high; manufactured from 304 grade stainless steel, 1.2mm thick sections. The sink unit to have at least 150mm high bevelled-edge splashback and mounted on heavy duty tubular legs. Bowl to have a pre-punched hole to suit waste connection complete with chromed 20mm low pressure (0.1bar) lockable pillar tap, a 32mm diameter chrome plated waste and a 32mm plastic P- trap. 1 Nr 0.00
1.07 Waste tank. Composting toilet waste tank made of high density polyethylene and measuring 0.8m height, 1 m width by 2m length with 1,2m3, with adjustable chute up to 1m to reach toilet pan hole. The tank will have a hole at the top to allow connection of venting pipe 100 diameter, air tight hinged door to allow disposal of dried waste. 28 Nr 0.00
1.08 white vitreous china Urinal bowl 1 ½ inch diameter domed outlet plated urinal grating bottle trap and fixing screws on the timber wall. 13 Nr 0.00
2.00 INTERNAL PLUMBING AND WATER RETICULATION
Supply, deliver and install pipes, tubing and fittings as described and shown on the drawings. The pipes shall be PPR PN 20 pipes and all conforming to the current European standards for PPR installations and to the Engineers approval, pipe jointing shall be by polyfusion or use of electric coupling and to manufacturer's printed instructions. Rates must allow for all Metal/plastic threaded adaptors where required, valves, unions, sockets, sliding and fixed joints, support raceways, isolating sheaths, elastic material,expansion arms and bends, crossovers, couplings, clippings, connectors, joints and for the connection of sanitary fixtures etc. as required in the running lengths of pipework and also where necessary, for pipe fixing clips, holder bats plugged and screwed for the proper and satisfactory functioning of the system. The pipes will be pressure tested before the plastering of wall commences and as per the manufacturers recommended testing procedures. The sizes indicated are the minimum bore sizes.
2.01 20 mm diameter PPR pipe 42 m 0.00
2.02 25 mm ditto 25 m 0.00
2.03 32 mm ditto 7 m 0.00
2.04 40 mm ditto 7 m 0.00
2.05 50 mm ditto 7 m 0.00
2.06 63 mm ditto 7 m 0.00
Extra over PPR tubing for the following:-
2.07 20 mm diameter bend 17 Nr 0.00
2.08 32mm diameter bend 12 Nr 0.00
2.09 63 mm diameter bend 14 Nr 0.00
2.10 32 mm diameter tee 6 Nr 0.00
2.11 25mm diameter tee 12 Nr 0.00
2.12 25 x 20 mm diameter reducer 22 Nr 0.00
2.13 32 x 25 mm diameter reducer 19 Nr 0.00
2.14 40 x 32 mm diameter reducer 7 Nr 0.00
2.15 50 x 40 mm diameter reducer 7 Nr 0.00
2.16 63 x 50 mm diameter reducer 7 Nr 0.00
2.17 20mm diameter brass threaded female adopter 35 Nr 0.00
2.18 63mm back nut (bulkhead) with gasket 42 Nr 0.00
2.19 75mm x 63 mm upvc ppr adopter 14 Nr 0.00
2.20 63mm union for tank inlet and outlet 24 Nr 0.00
2.21 63 mm diameter spherical Gate valve PN 20 complete with connectors to the PPR pipework 14 Nr 0.00
2.22 Flexible Tubing 300mm long 29 Nr 0.00
2.23 20mm chrome plated angle regulating valve 29 Nr 0.00
2.24 32mm non return valve 2 Nr 0.00
2.25 Rain water Tanks. Rotary moulded cylindrical water tank with capacity of 9,000Ltrs,dimensions; 2430(d)* 2260(h)mm. The tank to have a Ø90mm top inlet & Ø63mm outlet connections, Ø90mm overflow with insect proof net. 3 Nr 0.00
2.26 Rain water Tanks. Rotary moulded cylindrical water tank with capacity of 3,000Ltrs,dimensions; 1530(d)* 1700(h)mm. The tank to have a Ø90mm top inlet & Ø63mm outlet connections, Ø90mm overflow with insect proof net. 7 Nr 0.00
2.27 20mm lockable brass tap with a matching padlock and keys 9 Nr 0.00
3.00 INTERNAL DRAINAGE
Supply and fix uPVC soil system to BS 4660 and BS 4515 and MuPVC waste system to BS 5255 with screwed and socketed joints to BS 21. Solvent welded joints shall be as per the system manufacturers written instructions. Tenderers must allow in their pipework prices for all the couplings, connectors, joints etc. as required in the running lengths of pipework and also where necessary for pipe fixing clips, holderbats, plugs and screwed. The installation must comply with BS 5572 and fixing to be to the manufacturer's printed instructions.
Note: Trade Names
Caradon Terrain Ltd's pipe and fittings have been used as a guide to the type and quality of materials required. Other brands must be equal and approved in writing by the Engineer before installation. One brand only shall be used and inconsistency shall not be accepted.
MuPVC Waste System Conforming to BS 5255:
3.01 32 mm diameter waste pipe 20 m 0.00
Extra over MuPVC waste pipework for the following:-
3.03 50X32 mm diameter reducer 46 Nr 0.00
3.04 50 mm ditto sweep bend 12 Nr 0.00
3.05 50 mm access cap 28 Nr 0.00
3.06 50 mm diameter sweep tee 87 Nr 0.00
uPVC Soil System Conforming to BS 4514:
3.07 100 mm diameter waste, soil and vent pipes 92 m 0.00
Extra over uPVC pipework for the following:-
3.08 100 mm vent cowl 28 Nr 0.00
3.09 100 mm weathering slate / apron 28 Nr 0.00
uPVC buried drain system Conforming to BS 4660:
3.10 100mm diameter golden brown pipe 30 m 0.00
3.11 150mmx150mm white plastic cover floor trap 50mm diameter outlet 10 Nr 0.00
3.12 Gully trap masonry chamber complete with 100 diameter P trap and 450x450 cast iron/fibre reinforced cover, including all excavation and back-filling 17 Nr 0.00
3.13 Construct masonry manhole chambers including excavation and making good depth not exceeding 2000 mm average 600 mm. Manhole to be complete with cast iron frame and cover, internal benching and upvc access beds for drop manholes 9 Nr 0.00
3.14 Excavate in trench murram/black cotton soil approximately 300 mm wide and with average depth of 750 mm for water drainage pipes, backfill, ram and cart away the remainder 50 m 0.00
4.00 RAIN WATER DRAINAGE
Supply and fix grey UPVC and uPVC soil system pipe work to BS 4660, BS 4515 and BS 5255. The pipework to be with screwed and socketed joints to BS 21.Solvent welded joints shall be as per the system manufacturers witten instructions. Solvent welded joints shall be as per the system manufacturers written instructions. Tenderers must allow in their pipework prices for all the couplings, connectors, joints etc. as required in the running lengths of pipework and also where necessary for pipe fixing clips, holderbats, plugs and screwed. The installation must comply with BS 5572 and fixing to be to the manufacturer's printed instructions.
Note: Trade Names
Caradon Terrain Ltd's pipe and fittings have been used as a guide to the type and quality of materials required. Other brands must be equal and approved in writing by the Engineer before installation. One brand only shall be used and inconsistency shall not be accepted.
4.01 Grey UPVC rainwater pipework
4.02 100mm diameter Class 41 UPVC rain water pipe 27 m 0.00
75mm diameter Class 41 UPVC rain water pipe 22 m 0.00
4.03 Extra over UPVC pipework for the following:
4.04 100mm diameter Bend 26 Nr 0.00
4.05 100mmx 75mm tee 13 Nr 0.00
4.06 Rain screen head (LXW)200mmx150mm with removable strainer installed horizontally allowing debris to slide off and a 100mm outlet diameter. 10 Nr 0.00
4.07 100mm diameter Rain water first flush diverter with a floating ball and all fittings to connect to 10mm diameter downpipe 10 Nr 0.00
4.08 Allow a sum for installation of water gutters complete with downpipes and all necessary accessories to manufacture's specifications and Site Engineer approval to the existing classrooms 1 Sum 0.00
Sheerline colorbond
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
Supply and install the following sheerline colorbond rain water goods
4.09 95mm diameter rain water pipe Rate only m
4.10 75mm diameter rain water pipe Rate Only m
4.11 Extra over 100mm diameter bend Rate Only Nr
4.12 Extra over 100mmx75mm tee Rate Only Nr
Testing, commissioning and maintenance
5.01 The soak away calculation is based on roamy soils with percolation rate (general average): 20 liters/m²/day (Means 1 m² of soak pit wall area can absorb ~20 liters/day). Allow for this conformity test and furnish the project engineer with the test result for approval. Soak away resizing must be done where percoration rate is confirmed to be less than 20 liters/m²/day 7 Item 0.00
5.02 Allow for setting to work, testing and commissioning of the whole plumbing system to the satisfaction of the Engineer. 1 Item 0.00
5.03 Allow provision of maintenance and operation manuals of all the equipment installed as directed by and to satisfaction of the Engineer. 1 Item 0.00
5.04 Allow trainining of client staff on operation of the entire installation to satisfaction of the Engineer. 1 Item 0.00
TOTAL FOR 3-5- PLUMBING AND DRAINAGE INSTALLATION- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA PRIMARY SCHOOL, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 3.6 ELECTRICAL INSTALLATIONS
Where Trade Names are mentioned below, it is intended to indicate the level of quality required. The tenderer MAY supply alternatives which must be approved in writing by the Project Manager. Note
1) SOLAR SECURITY LIGHTING
a) Supply, install, test and set to work 200mm diameterx7.0mm thick x 6.0-metre high CHS steel lighting column, with good finish and all neccesary accessories, suitable for mounting 1x80W LED security flood lighting fittings (m.s) 3 Nr 0.00
b) Allow for mass concrete foundations for the steel lighting column, including all necessary excavations, reinforcement and fixing base plates and bolts 3 Item 0.00
Security lights
c) Supply and install all-in-one Integrated / Integrated solar light (single -arm) as per provided technical specifications; complete with the following: - Integrated 'Tier 1' solar panel- minimum 256Wp - LED light 80W, with automatic switching system and colour range temperature of 4000–5000 K; - AC/DC hybrid Charging controllers/converters - Integrated lithium battery (atleast 281.25Ah, 12.8V) capable of supporting light for at least 3 days. 3 Nr 0.00
d) Supply, install, test and set to work earthing installation comprising of a 4sq.mm copper PVC earth lead, 1800mm x 15mm diameter copper earth electrode and all neccesary accessories for the street lighting columns 3 Nr 0.00
e) Construct concrete earthing pit, size 600mmx600mmx 600mm deep; complete with waterproof cover for earth test / earth rod inspections and with earthing compound as bentonite. 3 Nr 0.00
f) Allow for testing and commissioning for the security light system and documentation of results to the satisfaction of the Engineer 1 Item 0
g) Allow for all the neccesary submittals comprising shop drawings, illustrations, schedules, product data, bronchures. 1 Item 0
TOTAL FOR SOLAR SECURITY LIGHTING - CARRIED TO BILL SUMMARY 0
2) LIGHTNING PROTECTION SYSTEM- (For DRY TOILETS)
a) Supply and install 25 mm x 3 mm bare copper tape conductor as Furse or approved equivalent complete with metallic DC tape clip, wall plugs, fixing screws and other necessary accessories 105 m 0.00
b) Supply and install 1500 mm long multiple air terminal complete with terminal base as Furse or approved equivalent and all necessary accessories 7 Nr 0.00
c) Supply and install screw down test clamps as Furse or approved equivalent and all necessary accessories 7 Nr 0.00
d) Supply and install 6.0sq.mm PVC insulated SC cable in and including 20mm dia PVC heavy gauge conduit; complete with all necessary accessories 35 m 0.00
e) Supply and install 12.5 mm x 1200 mm long copper earth rod complete with spike, driving stud, dowel clamps as Furse or approved equivalent and all necessary accessories 7 Nr 0.00
f) Supply and install copper earth 300mm x 300mm mats complete with trenching in black cotton soil /soft rock, earth termination pits, marconite backfill, backfilling, reinstatement of ground to meet the requirements of the technical specifications 7 Nr 0.00
g) Supply and install concrete inspection pit complete with waterproof cover for earth test / rod inspections and all other neccesary accessories 7 Nr 0.00
h) Allow for testing and commissioning of the entire electrical installation under this section 1 Ls 0.00
TOTAL FOR LIGHTNING PROTECTION SYSTEM (Dry Toilets) - CARRIED TO BILL SUMMARY 0
3) LIGHTNING PROTECTION SYSTEM- (For ASSEMBLY HALL)
a) Supply and install 25 mm x 3 mm bare copper tape conductor as Furse or approved equivalent complete with metallic DC tape clip, wall plugs, fixing screws and other necessary accessories 21 m 0.00
b) Supply and install 1500 mm long multiple air terminal complete with terminal base as Furse or approved equivalent and all necessary accessories 1 Nr 0.00
c) Supply and install screw down test clamps as Furse or approved equivalent and all necessary accessories 1 Nr 0.00
d) Supply and install 6.0sq.mm PVC insulated SC cable in and including 20mm dia PVC heavy gauge conduit; complete with all necessary accessories 5 m 0.00
e) Supply and install 12.5 mm x 1200 mm long copper earth rod complete with spike, driving stud, dowel clamps as Furse or approved equivalent and all necessary accessories 1 Nr 0.00
f) Supply and install copper earth 300mm x 300mm mats complete with trenching in black cotton soil /soft rock, earth termination pits, marconite backfill, backfilling, reinstatement of ground to meet the requirements of the technical specifications 1 Nr 0.00
g) Supply and install concrete inspection pit complete with waterproof cover for earth test / rod inspections and all other neccesary accessories 1 Nr 0.00
h) Allow for testing and commissioning of the entire electrical installation under this section 1 Ls 0.00
TOTAL FOR LIGHTNING PROTECTION SYSTEM (Assembly hall) - CARRIED TO BILL SUMMARY 0
ELECTRICAL INSTALLATIONS
1) SOLAR SECURITY LIGHTING 0.00
2) LIGHTNING PROTECTION SYSTEM- (For DRY TOILETS) 0.00
3) LIGHTNING PROTECTION SYSTEM- (For ASSEMBLY HALL) 0.00
TOTAL FOR 3-6- ELECTRICAL INSTALLATIONS - CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA PRIMARY SCHOOL, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO.7 CESS POOL/URINE ABSORPTION PIT (3NO.)
Quantities presented in this bill are for 3no. Cess pools/ Urine Absorption pit 3 Nr. Note
All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
a) Excavate for cess pool; 0-1.50m deep 48 m³ 0.00
b) Load and cart away surplus spoil 42 m³ 0.00
c) Backfill selected and approved excavated materials around foundations 6 m³ 0.00
Hollow concrete block walling; bedding, jointing and pointing in cement sand (1:3) mortar
d) 200 mm thick wall 30 m² 0.00
Vibrated reinforced concrete class 20/25 with minimum cube crushing strength of 25N/mm² at 28 days
e) Base beam 6 m3 0.00
f) Cover slab [150 mm thick] 3 m3 0.00
High yield deformed steel bar reinforcement to BS 4461
g) 8 mm diameter bars 105 kg 0.00
h) 10 mm diameter bars 150 kg 0.00
i) 12 mm diameter bars 180 kg 0.00
j) Soffits of cover slab 21 m² 0.00
k) Edges of base beam 24 m² 0.00
l) Cement and sand (1:3) screed applied on top of concrete slab 21 m² 0.00
Selected filling
m) Hardcore fillings into the cess pool 21 m3 0.00
n) Provide and install 600 x600 x 50mm thick pre-cast concrete cover slabs 3 nr 0.00
Inlet/distribution chamber
o) 600 x 600 x700 mm (internal dimensions) inlet chamber; built in 200mm thick masonry walls and 150 mm thick concrete base slab reinforced with 10mm diameter bars at 200mm centres both ways top and bottom: all necessary finishes and water proofing to wall and floor surfaces: 600 x 600 x50 mm thick PCC cover slab and all necessary pipe work. 6 nr 0.00
p) Allow for making 100 mm diameter openings in 200 mm Hollow concrete block walling 3 nr 0.00
q) Allow for making 50 mm diameter openings in 150mm thick cover slabs 3 nr 0.00
r) Boxing in 150mm thick cover slab for 600x600mm PCC cover 3 nr 0.00
TOTAL FOR 3-7- CESSPOOL (3NO.) CARRIED TO GRAND SUMMARY 0.00
United Nations Office for Project Services
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
THE GOVERNMENT OF PAPUA NEW GUINEA
PROPOSED WASH INTERVENTION FOR RABARABA HEALTH CENTRE, PAPUA NEW GUINEA
BILL OF QUANTITIES (BOQ)
Consists of the following:
4-1 - Mainstream Dry Toilet blocks (1no.)
4-2 - Accessible Dehydrated Toilet blocks (2no.)
4-3 - Catchment Tank Plinth (1No.)
4-4 - Plumbing & Drainage
4-5 - Electrical Installations
4-6 - Cesspools (1no.)
NOTE: It is a MANDATORY requirement for bidders to complete and return all parts of this BOQ. Failure to complete all sections of the BOQ may result in automatic disqualification of your bid.
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA HEALTH CENTRE, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 4.1 TYPICAL MAINSTREAM DRY TOILETS (1NO.)
(All provisional)
Quantities are for 1no. Block Note
i) Plumbing and drainage work, including the water tank has been measured separately (Bill no. 4.4) Note
ii) Cesspool has been measured separately (Bill no. 4.6) Note
iii)All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS
a) Clear the site of all shrubs, bushes, small trees and debris; remove from site as directed [Approximate area: 90 m2 for Building footprint and 50% allowance] 1 Item 0.00
Oversite excavations
b) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Building footprint only] 60 m2 0.00
c) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 9 m3 0.00
d) Excavate in soft material for column bases; 0-1.50m deep [For timber columns] 8 m3 0.00
e) Return, fill in and ram selected excavated material around foundations 10 m3 0.00
Disposal of Surplus spoil
f) Load and cart away surplus excavated material from site to an approved dumping site 7 m3 0.00
Selected filling
g) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep [For water tank plinth] 4 m2 0.00
h) Selected and approved backill material, well watered and compacted [1100mm deep below the hardcore under the water tank plinth] 4 m3 0.00
i) 50mm Thick granular/gravel blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 4 m2 0.00
j) 150mm Thick granular/gravel spread finish to overall ground surfaces [Under the toilets] 38 m2 0.00
Anti-termite treatment
k) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to granular/gravel surfaces 42 m2 0.00
TOTAL FOR SITE PREPARATION, EXCAVATIONS & EARTHWORKS CARRIED TO BILL SUMMARY 0.00
2) CONCRETE WORKS
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 5 m2 0.00
b) 50mm Thick blinding under column bases 6 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Column bases 2 m3 0.00
d) Stub columns 2 m3 0.00
e) Foundation strip 1 m3 0.00
f) Tank platform [100mm thick ], finished smooth 1 m3 0.00
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 7 m2 0.00
TOTAL FOR CONCRETE WORKS CARRIED TO BILL SUMMARY 0.00
3) STEEL REINFORCEMENT
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 10 mm diameter bars (in column bases & strip footings) 120 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
b) Fabric mesh reinforcement to tank plinth concrete bed 7 m2 0.00
TOTAL FOR STEEL REINFORCEMENT CARRIED TO BILL SUMMARY 0.00
4) SHUTTERING & FORMWORK
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 3 m² 0.00
b) Vertical sides of column bases 13 m² 0.00
c) Vertical sides of stub columns 30 m² 0.00
d) Edges of Tank platform concrete bed, 100mm girth 10 m 0.00
TOTAL FOR SHUTTERING & FORMWORK CARRIED TO BILL SUMMARY 0.00
5) JOINERY & TIMBER WORKS
1. Rate for Timber sections shall include all necessary drilling of holes, bolting, cleats and other necessary connections that are not separately itemized for pricing Note
2. The Contractor shall provide shop drawings for approval. Once approved, the drawings shall be strictly adhered to during the fabrication and installation process. Note
3. The Contractor shall provide documentation verifying treatment type, retention levels, and compliance. Note
4. Rainwater down pipes have been measured under the plumbing and drainage bill Note
I Timber framework
Columns, rafters etc.
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished with 2 coats polyurethane varnish on completion; all as per Structural Engineer's drawings
a) 150x150mm Timber Column, encased in concrete column(m.s), secured with a threaded end or steel plate anchored in the timber column 124 m 0.00
b) 150x150mm Timber floor bearers bolted to timber columns (m.s) 28 m 0.00
c) 100x75mm Timber floor joists bolted to floor bearers (m.s) 26 m 0.00
d) 50x50mm Timber bracings bolted to timber columns (m.s) 108 m 0.00
e) 75x50mm Timber rafters, bolted to top of timber columns (m.s) 38 m 0.00
f) 25x50mm Ventilation slats fixed to timber columns (m.s) 46 m 0.00
g) 50x50mm Timber purlins fixed to rafters (m.s) 65 m 0.00
Softwood timber
h) 200x25mm Thick One-side wrot fascia and barge board 28 m 0.00
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished with 2 coats polyurethane varnish on completion; all as per Structural Engineer's drawings
a) 200x50mm Timber stringer 17 m 0.00
b) 300x25mm Timber platforms/treads fixed to stingers (m.s) 25 m 0.00
Approved 7.5mm Thick site-painted plank weather board; treated against termites and mositure ingress; finished with 2 coats polyurethane varnish on both sides
a) Supply and fix 7.5mm thick site-painted plank weather board; fixed to timber framework (m.s) with tying wires or other approved fixing accessories 92 m2 0.00
IV Wood planks floor finish
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Approved timber planks; treated against termites, moisture and unine acidity; finished with 2 coats polyurethane varnish on the top side
a) Supply and fix approved smooth planed 200x50mm wood planks; fixed to timber framework (m.s) with concealed bolts or screws 22 m2 0.00
b) Allow for creating squat pan spaces through the wood planks flooring; finishing around 4 Nr 0.00
The following in timber doors as per the details provided
Door Frames, architraves and beads
a) Ex 150x50mm hardwood frame rebated 22 m 0.00
b) 50x15mm hardwood architrave chamfered 22 m 0.00
c) 15x15mm hardwood quadrant bead 22 m 0.00
Supply and fix the following 40mm thick solid core, hardwood veneer faced door shutter with hardwood lipping all round
d) Single leaf door size 900x2200mm high with 100mm high aluminium kick plate on the inside 4 Nr 0.00
Supply and fix the following ironmongery with screws to match
e) Heavy duty natural aluminium hinges approved from samples 12 Nr 0.00
f) Three lever mortise lock complete with a set of lever furniture and approved from sample 4 Nr 0.00
g) Aluminium door handles including fixing to timber doors and approved from samples 8 Nr 0.00
Painting and Decorating
Aluminum wood primer
h) Back of wood frames over 100mm but not exceeding 200mm girth 22 m 0.00
Prepare and apply clear matt varnish to timber doors
i) Surfaces not exceeding 100mm girth 44 m 0.00
j) Ditto over 100mm not exceeding 200mm girth 22 m 0.00
k) General surfaces of doors 11 m2 0.00
TOTAL FOR JOINERY & TIMBER WORKS CARRIED TO BILL SUMMARY 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide 10 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 10 m2 0.00
c) 200mm Thick dwarf wall above ground 13 m2 0.00
TOTAL FOR BLOCKWORK CARRIED TO BILL SUMMARY 0.00
7) ROOF COVERING & RAINWATER GOODS
a) Supply and Fix Aluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets or approved equivalent; fixed to timber purlins (m.s) using manufacturer's proprietary bolts 45 m2 0.00
b) Allow for making holes through the roofing sheets for ventilation pipes at specified positions; finishing and sealing around the pipes to prevent leakages 4 Nr 0.00
Rainwater goods
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
c) Supply and install sheerline colorbond gutter fixed to fascia (m.s) with and including spring clips at 1200mm centres [Rate to include gutter stop ends]. The gutther to have a micro-mesh leaf guards 9 m 0.00
d) Extra over downpipe; for gutter outlet 1 Nr 0.00
e) Allow for connection of the downpipe to the water reservoir tank (tank measured separately) 1 Item 0.00
TOTAL FOR ROOF COVERING & RAINWATER GOODS CARRIED TO BILL SUMMARY 0.00
TYPICAL MAINSTREAM DRY TOILETS (1NO.)
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS 0.00
2) CONCRETE WORKS 0.00
3) STEEL REINFORCEMENT 0.00
4) SHUTTERING & FORMWORK 0.00
5) JOINERY & TIMBER WORKS 0.00
6) BLOCKWORK 0.00
7) ROOF COVERING & RAINWATER GOODS 0.00
TOTAL FOR 4-1- TYPICAL DRY TOILETS (1NO)- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA HEALTH CENTRE, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 4.2 TYPICAL ACCESSIBLE DEHYDRATED TOILET (2NO.)
(All provisional) Note
Quantities presented in this bill are for 2no. Toilet blocks 2 Nr. Note
i) Plumbing and drainage work, including the water tank has been measured separately (Bill no. 4.4) Note
ii) Cesspool has been measured separately (Bill no. 4.6) Note
iii)All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS
a) Clear the site of all shrubs, bushes, small trees and debris; remove from site as directed [Approximate area: 145 m2 for Building footprint including ramps and 20% allowance] 2 Item 0.00
Oversite excavations
b) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Building footprint including ramp areas only] 150 m2 0.00
c) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 14 m3 0.00
d) Excavate in soft material for column bases; 0-1.50m deep [For timber columns] 126 m3 0.00
e) Return, fill in and ram selected excavated material around foundations 103 m3 0.00
Disposal of Surplus spoil
f) Load and cart away surplus excavated material from site to an approved dumping site 37 m3 0.00
Selected filling
g) Selected and approved backill material, well watered and compacted [1800mm deep under the water tank plinth] 8 m3 0.00
h) 50mm Thick murram blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 4 m2 0.00
i) 150mm Thick murram spread finish to overall ground surfaces [Under the toilets including ramp areas] 140 m2 0.00
Anti-termite treatment
j) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to murram surfaces 144 m2 0.00
TOTAL FOR SITE PREPARATION, EXCAVATIONS & EARTHWORKS CARRIED TO BILL SUMMARY 0.00
2) CONCRETE WORKS
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 10 m2 0.00
b) 50mm Thick blinding under column bases 84 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Column bases 14 m3 0.00
d) Stub columns 16 m3 0.00
e) Foundation strip 2 m3 0.00
f) Tank platform [150mm thick ], finished smooth 2 m3 0.00
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 8 m2 0.00
External Paved Areas
h) Locally available stone paving slabs jointed in cement and sand mortar and laid on and including 50mm thick sand bed (Sample of locally available stone slabs to be provided by the Contractor for approval by the site Engineer). Rate Only m2
TOTAL FOR CONCRETE WORKS CARRIED TO BILL SUMMARY 0.00
3) STEEL REINFORCEMENT
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 8 mm diameter bars 734 kg 0.00
b) 10 mm diameter bars 892 kg 0.00
c) 12 mm diameter bars 828 kg 0.00
TOTAL FOR STEEL REINFORCEMENT CARRIED TO BILL SUMMARY 0.00
4) SHUTTERING & FORMWORK
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 6 m² 0.00
b) Vertical sides of column bases 64 m² 0.00
c) Vertical sides of stub columns 212 m² 0.00
d) Edges of Tank platform concrete bed, 150mm girth 16 m 0.00
TOTAL FOR SHUTTERING & FORMWORK CARRIED TO BILL SUMMARY 0.00
5) JOINERY & TIMBER WORKS
1. Rate for Timber sections shall include all necessary drilling of holes, bolting, cleats and other necessary connections that are not separately itemized for pricing Note
2. The Contractor shall provide shop drawings for approval. Once approved, the drawings shall be strictly adhered to during the fabrication and installation process. Note
I Timber framework
Columns, rafters etc.
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites with approved wood preservative; including all jointing and connections (packing piece, Grade 8.8 bolts etc.) as necessary; in roof
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; all as per Structural Engineer's drawings
a) 150x150mm Timber Column, encased in concrete column(m.s) 250 m 0.00
b) 75x75mm Timber Column for ramp area, encased in concrete column(m.s) 178 m 0.00
c) 75x100mm Timber deck bearers bolted to timber columns (m.s) for the main floor area 56 m 0.00
d) 75x100mm Timber ramp bearers bolted to timber columns (m.s) for the ramp 30 m 0.00
e) 100x150mm Timber floor deck joists bolted to floor bearers (m.s) 70 m 0.00
f) 75x100mm Timber ramp joists bolted to floor bearers (m.s) 104 m 0.00
g) 75x50mm Timber tie beams bolted to timber columns (m.s) 56 m 0.00
h) 75x75mm Timber bracing bolted to timber columns (m.s) 110 m 0.00
j) 150x100mm Timber rafters, bolted to top of timber columns (m.s) 76 m 0.00
k) 25x50mm Ventilation slats fixed to timber columns (m.s) 190 m 0.00
l) 75x50mm Timber purlins fixed to rafters (m.s) 122 m 0.00
Softwood timber
m) 200x25mm Thick One-side wrot fascia and barge board 58 m 0.00
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished finished with 2 coats polyurethane varnish on completion; all as per Structural Engineer's drawings
a) 100x50mm Timber top rail 108 m 0.00
b) 40mm diameter circular timber handrail baluster fixed to stingers (m.s) at 150mm c/c 470 m 0.00
c) 50x100mm Timber bottom rail 108 m 0.00
Approved 7.5mm Thick site-painted plank weather board; treated against termites and mositure ingress; finished with 2 coats polyurethane varnish on both sides
a) Supply and fix 7.5mm thick site-painted plank weather board; fixed to timber framework (m.s) with tying wires or other approved fixing accessories 174 m2 0.00
Approved 7.5mm Thick site-painted timber screens; treated against termites and mositure ingress; finished with 2 coats polyurethane varnish on both sides
b) Supply and fix 7.5mm thick site-painted timber screens; fixed to timber framework (m.s) with tying wires or other approved fixing accessories 54 m2 0.00
IV Wood planks floor finish
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in floors
Approved timber planks; treated against termites, moisture and unine acidity; finished with 2 coats polyurethane varnish on the top side
a) Supply and fix approved smooth planed 100x25mm wood planks; fixed to timber framework (m.s) with concealed bolts or screws; for main floor 78 m2 0.00
b) Ditto: for Ramp including landings 76 m2 0.00
c) Allow for creating squat pan spaces through the wood planks flooring; finishing around 8 Nr 0.00
The following in timber doors as per the details provided
Door Frames, architraves and beads
a) Ex 100x50mm hardwood frame rebated 48 m 0.00
b) 50x15mm hardwood architrave chamfered 48 m 0.00
c) 15x15mm hardwood quadrant bead 48 m 0.00
Supply and fix the following semi-solid treated timber flush door shutter with hardwood lipping all round
d) Single leaf door overall size 1100x2400mm high with 100mm high aluminium kick plate on the inside (Door Type D01) 4 Nr 0.00
e) Single leaf door overall size 1100x2400mm high with 400mm high aluminium kick plate on the inside (Door Type D02) 4 Nr 0.00
Supply and fix the following ironmongery with screws to match
f) Heavy gauge steel door hinges approved from samples 24 Nr 0.00
g) Heavy duty two lever aluminium door lock complete with a set of lever furniture and approved from sample 8 Nr 0.00
h) 19mm Diameter , 300mm long, aluminium door grab handles with concealed fixing rose for horizontal and vertical handles 8 Nr 0.00
Painting and Decorating
Aluminum wood primer
j) Back of wood frames over 100mm but not exceeding 200mm girth 48 m 0.00
Prepare and apply clear matt varnish to timber doors
k) Surfaces not exceeding 100mm girth 96 m 0.00
l) Ditto over 100mm not exceeding 200mm girth 48 m 0.00
m) General surfaces of doors 32 m2 0.00
TOTAL FOR JOINERY & TIMBER WORKS CARRIED TO BILL SUMMARY 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide 16 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 14 m2 0.00
c) 200mm Thick dwarf wall above ground 24 m2 0.00
Cement and sand (1:4) to walls in
d) 12mm deep horizontal keying on masonry stone wall surfaces. 48 m2 0.00
TOTAL FOR BLOCKWORK CARRIED TO BILL SUMMARY 0.00
7) ROOF COVERING & RAINWATER GOODS
a) Supply and Fix Aluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets or approved equivalent; fixed to timber purlins (m.s) using manufacturer's proprietary bolts 98 m2 0.00
b) Allow for making holes through the roofing sheets for 4no. ventilation pipes at specified positions; finishing and sealing around the pipes to prevent leakages 2 Item 0.00
Rainwater goods
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
c) Supply and install sheerline colorbond gutter fixed to fascia (m.s) with and including spring clips at 1200mm centres [Rate to include gutter stop ends]. The gutther to have a micro-mesh leaf guards 18 m 0.00
d) Extra over for gutter stop ends 4 Nr 0.00
e) Extra over downpipe; for gutter outlet. 2 Nr 0.00
f) Allow for connection of the downpipe to the water reservoir tank (tank measured separately) 2 Item 0.00
TOTAL FOR ROOF COVERING & RAINWATER GOODS CARRIED TO BILL SUMMARY 0.00
ACCESSIBLE DEHYDRATED TOILET
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS 0.00
2) CONCRETE WORKS 0.00
3) STEEL REINFORCEMENT 0.00
4) SHUTTERING & FORMWORK 0.00
5) JOINERY & TIMBER WORKS 0.00
6) BLOCKWORK 0.00
7) ROOF COVERING & RAINWATER GOODS 0.00
TOTAL FOR 4- 2- ACCESSIBLE DEHYDRATED TOILET (2NO)- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA HEALTH CENTRE, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 4.3 CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA)
(All provisional) Note
All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
A Notes: Quantities are for 1no. Plinth (4.2m long x 2.5m wide as per Structural drawings) 1 Nr. Note
I) Earthworks and Excavations
a) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Tank plinth footprint only] 16 m2 0.00
b) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 17 m3 0.00
c) Selected and approved backill material, well watered and compacted in layers 11 m3 0.00
Disposal of Surplus spoil
d) Load and cart away surplus excavated material from site to an approved dumping site 6 m3 0.00
Selected filling
e) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep [For water tank plinth] 8 m2 0.00
f) Selected and approved backill material, well watered and compacted [600mm deep below the hardcore under the water tank plinth] 4 m3 0.00
g) 50mm Thick murram blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 8 m2 0.00
Anti-termite treatment
h) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to murram surfaces 11 m2 0.00
II) Concrete works
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 10 m2 0.00
b) 50mm Thick blinding under 100mm thick concrete platform slab 6 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Foundation strip 2 m3 0.00
d) Raised Tank platform [100mm thick ], finished smooth 1 m3 0.00
e) 100mm Thick concrete platform form at water point, including forming a 100x50mm thick upstand; finished smooth 3 m2 0.00
f) 50mm Thick splash concrete pad, including forming a 50x50mm thick upstand; finished smooth 2 m2
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 11 m2 0.00
III) Steel Reinforcement
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 10 mm diameter bars 77 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
b) Fabric mesh reinforcement to tank plinth concrete bed 11 m2 0.00
IV) Shuttering & Formwork
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 6 m² 0.00
b) Edges of raise tank platform concrete bed, 100mm girth 11 m 0.00
c) Edges of ground concrete bed, 100mm girth 8 m 0.00
d) Edges of ground concrete bed, 50mm girth 6 m 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide (for upstand wall for taps only) 3 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 19 m2 0.00
c) 200mm Thicks walls above ground 9 m2 0.00
d) 200mm Thick upstand wall for taps 2 m2 0.00
15mm Cement and sand (1:3) render on block wall or concrete work to:-
e) Exposed wall surfaces including concrete plinth 13 m2 0.00
f) Tank plinth floor surfaces 12 m2 0.00
g) 300x50mm thick precast concrete coping bedded on top of walling in cement and sand (1:3) mortar including 10mm deep drip mould 3 m 0.00
h) Making holes through 200mm thick wall for taps 2 Nr 0.00
TOTAL FOR 4-3- CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA (1NO.)- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA HEALTH CENTRE, PAPUA NEW GUINEA
ITEM DESCRIPTION QTY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 4.4 PLUMBING & DRAINAGE
Notes: Quantities are for 3no. Toilet blocks Note
1.00 SANITARY FITTINGS
Supply, deliver, install, test and commission the following sanitary fittings and accessories. Fixing to be to manufacturer's printed instructions.
1.01 Water Closet. Western -type toilet pan divided in two sectors. The sector in the front is for urine diverter with 50mm hole allowing connection to 50mm dia pipe for urine collection while back sector with a 200mm hole for faeces to drop into waste tank directly below without need for flushing. The pan will be stainless steel or in vitreous China with all fixings required to install on a wooden floor. 8 Nr 0.00
1.02 Disabled Water Closet. Western -type toilet pan divided in two sectors. The sector in the front is for urine diverter with 50mm hole allowing connection to 50mm dia pipe for urine collection while back sector with a 200mm hole for faeces to drop into waste tank directly below without need for flushing. The pan will be stainless steel or in vitreous China with all fixings required to install on a wooden floor. 4 Nr 0.00
1.03 A pair of Stainless steel rear and side grab bars. Side Wall: Minimum 1065 mm long, placed max 300mm from the rear wall and extending at least 1380 from the rear wall. Rear Wall: Minimum 915 mm long, extending 300 mm minimum on one side of the toilet center line and 600 mm on the other side. 4 Nr 0.00
1.04 Roll Holder. Stainless steel holder fixed on the wall, size 150x150 mm. 12 Nr 0.00
1.05 Double Bowl Sink. Stainless steel double bowl wash hand sink bench unit as "Simply Stainless" or approved equivalent; overall size 1600mm wide x 700mm deep x 900mm high; manufactured from 304 grade stainless steel, 1.2mm thick sections. The sink unit to have at least 150mm high bevelled-edge splashback and mounted on heavy duty tubular legs. Each bowl to have a pre-punched hole to suit waste connection complete with chromed 20mm low pressure (0.1bar) lockable pillar tap for each of the two bowls, a 32mm diameter chrome plated waste and a 32mm plastic P- trap for each of two bowls. 6 Nr 0.00
1.06 Single Bowl Sink. Stainless steel single bowl wash hand sink bench unit as "Simply Stainless" or approved equivalent with 750mm bowl height for disabled access; overall size 500mm wide x 700mm deep x 750mm high; manufactured from 304 grade stainless steel, 1.2mm thick sections. The sink unit to have at least 150mm high bevelled-edge splashback and mounted on heavy duty tubular legs. Bowl to have a pre-punched hole to suit waste connection complete with chromed 20mm low pressure (0.1bar) lockable pillar tap, a 32mm diameter chrome plated waste and a 32mm plastic P- trap. 2 Nr 0.00
1.07 Waste tank. Composting toilet waste tank made of high density polyethylene and measuring 0.8m height, 1 m width by 2m length with 1,2m3, with adjustable chute up to 1m to reach toilet pan hole. The tank will have a hole at the top to allow connection of venting pipe 100 diameter, air tight hinged door to allow disposal of dried waste. 12 Nr 0.00
1.08 white vitreous china Urinal bowl 1 ½ inch diameter domed outlet plated urinal grating bottle trap and fixing screws on the timber wall. 4 Nr 0.00
2.00 INTERNAL PLUMBING AND WATER RETICULATION
Supply, deliver and install pipes, tubing and fittings as described and shown on the drawings. The pipes shall be PPR PN 20 pipes and all conforming to the current European standards for PPR installations and to the Engineers approval, pipe jointing shall be by polyfusion or use of electric coupling and to manufacturer's printed instructions. Rates must allow for all Metal/plastic threaded adaptors where required, valves, unions, sockets, sliding and fixed joints, support raceways, isolating sheaths, elastic material,expansion arms and bends, crossovers, couplings, clippings, connectors, joints and for the connection of sanitary fixtures etc. as required in the running lengths of pipework and also where necessary, for pipe fixing clips, holder bats plugged and screwed for the proper and satisfactory functioning of the system. The pipes will be pressure tested before the plastering of wall commences and as per the manufacturers recommended testing procedures. The sizes indicated are the minimum bore sizes.
2.01 20 mm diameter PPR pipe 51 m 0.00
2.02 25 mm ditto 6 m 0.00
2.03 32 mm ditto 3 m 0.00
2.04 40 mm ditto 3 m 0.00
2.05 50 mm ditto 3 m 0.00
2.06 63 mm ditto 3 m 0.00
Extra over PPR tubing for the following:-
2.07 20 mm diameter bend 12 Nr 0.00
2.08 32mm diameter bend 2 Nr 0.00
2.09 63 mm diameter bend 6 Nr 0.00
2.10 32 mm diameter tee 3 Nr 0.00
2.11 25mm diameter tee 4 Nr 0.00
2.12 25 x 20 mm diameter reducer 11 Nr 0.00
2.13 32 x 25 mm diameter reducer 5 Nr 0.00
2.14 40 x 32 mm diameter reducer 3 Nr 0.00
2.15 50 x 40 mm diameter reducer 3 Nr 0.00
2.16 63 x 50 mm diameter reducer 3 Nr 0.00
2.17 20mm diameter brass threaded female adopter 15 Nr 0.00
2.18 63mm back nut (bulkhead) with gasket 18 Nr 0.00
2.19 75mm x 63 mm upvc ppr adopter 6 Nr 0.00
2.20 63mm union for tank inlet and outlet 4 Nr 0.00
2.21 63 mm diameter spherical Gate valve PN 20 complete with connectors to the PPR pipework 2 Nr 0.00
2.22 Flexible Tubing 300mm long 14 Nr 0.00
2.23 20mm chrome plated angle regulating valve 14 Nr 0.00
2.24 32mm non return valve 3 Nr 0.00
2.25 Rain water Tanks. Rotary moulded cylindrical water tank with capacity of 9,000Ltrs,dimensions; 2430(d)* 2260(h)mm. The tank to have a Ø65mm top inlet & Ø63mm outlet connections, Ø63mm overflow with insect proof net. 1 Nr 0.00
2.26 Rain water Tanks. Rotary moulded cylindrical water tank with capacity of 3,000Ltrs,dimensions; 1530(d)* 1700(h)mm. The tank to have a Ø65mm top inlet & Ø63mm outlet connections, Ø63mm overflow with insect proof net. 3 Nr 0.00
2.27 20mm lockable brass tap with a matching padlock and keys 3 Nr 0.00
3.00 INTERNAL DRAINAGE
Supply and fix uPVC soil system to BS 4660 and BS 4515 and MuPVC waste system to BS 5255 with screwed and socketed joints to BS 21. Solvent welded joints shall be as per the system manufacturers written instructions. Tenderers must allow in their pipework prices for all the couplings, connectors, joints etc. as required in the running lengths of pipework and also where necessary for pipe fixing clips, holderbats, plugs and screwed. The installation must comply with BS 5572 and fixing to be to the manufacturer's printed instructions.
Note: Trade Names
Caradon Terrain Ltd's pipe and fittings have been used as a guide to the type and quality of materials required. Other brands must be equal and approved in writing by the Engineer before installation. One brand only shall be used and inconsistency shall not be accepted.
MuPVC Waste System Conforming to BS 5255:
3.01 32 mm diameter waste pipe 7 m 0.00
3.02 50 mm ditto 90 m 0.00
Extra over MuPVC waste pipework for the following:-
3.03 50X32 mm diameter reducer 26 Nr 0.00
3.04 50 mm ditto sweep bend 13 Nr 0.00
3.05 50 mm access cap 12 Nr 0.00
3.06 50 mm diameter sweep tee 31 Nr 0.00
uPVC Soil System Conforming to BS 4514:
3.07 100 mm diameter waste, soil and vent pipes 52 m
Extra over uPVC pipework for the following:-
3.08 100 mm vent cowl 12 Nr 0.00
3.09 100 mm weathering slate / apron 12 Nr 0.00
uPVC buried drain system Conforming to BS 4660:
3.10 100mm diameter golden brown pipe 18 m 0.00
3.11 150mmx150mm white plastic cover floor trap 50mm diameter outlet 1 Nr 0.00
3.12 Gully trap masonry chamber complete with 100 diameter P trap and 450x450 cast iron/fibre reinforced cover, including all excavation and back-filling 11 Nr 0.00
3.13 Construct masonry manhole chambers including excavation and making good depth not exceeding 2000 mm average 600 mm. Manhole to be complete with cast iron frame and cover, internal benching and upvc access beds for drop manholes 4 Nr 0.00
3.14 Excavate in trench murram/black cotton soil approximately 300 mm wide and with average depth of 750 mm for water drainage pipes, backfill, ram and cart away the remainder 30 m 0.00
4.00 RAIN WATER DRAINAGE
Supply and fix grey UPVC and uPVC soil system pipe work to BS 4660, BS 4515 and BS 5255. The pipework to be with screwed and socketed joints to BS 21.Solvent welded joints shall be as per the system manufacturers witten instructions. Solvent welded joints shall be as per the system manufacturers written instructions. Tenderers must allow in their pipework prices for all the couplings, connectors, joints etc. as required in the running lengths of pipework and also where necessary for pipe fixing clips, holderbats, plugs and screwed. The installation must comply with BS 5572 and fixing to be to the manufacturer's printed instructions.
Note: Trade Names
Caradon Terrain Ltd's pipe and fittings have been used as a guide to the type and quality of materials required. Other brands must be equal and approved in writing by the Engineer before installation. One brand only shall be used and inconsistency shall not be accepted.
4.01 Grey UPVC rainwater pipework
4.02 100mm diameter Class 41 UPVC rain water pipe 21 m 0.00
4.03 75mm diameter Class 41 UPVC rain water pipe 22 m 0.00
Extra over UPVC pipework for the following:
4.04 100mm diameter Bend 8 Nr 0.00
4.05 100mmx 75mm tee 4 Nr 0.00
4.06 Rain screen head (LXW)200mmx150mm with removable strainer installed horizontally allowing debris to slide off and a 100mm outlet diameter. 4 Nr 0.00
4.07 100mm diameter Rain water first flush diverter with a floating ball and all fittings to connect to 10mm diameter downpipe 4 Nr 0.00
4.08 Allow a sum for installation of water gutters complete with downpipes and all necessary accessories to manufacture's specifications and Site Engineer approval to the existing vaccine Building 1 Sum 0.00
Sheerline colorbond
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
Supply and install the following sheerline colorbond rain water goods
4.09 95mm diameter rain water pipe Rate only m
4.10 75mm diameter rain water pipe Rate Only m
4.11 Extra over 100mm diameter bend Rate Only Nr
4.12 Extra over 100mmx75mm tee Rate Only Nr
Testing, commissioning and maintenance
5.01 The soak away calculation is based on roamy soils with percolation rate (general average): 20 liters/m²/day (Means 1 m² of soak pit wall area can absorb ~20 liters/day). Allow for this conformity test and furnish the project engineer with the test result for approval. Soak away resizing must be done where percoration rate is confirmed to be less than 20 liters/m²/day 3 Item 0.00
5.02 Allow for setting to work, testing and commissioning of the whole plumbing system to the satisfaction of the Engineer. 1 Item 0.00
5.03 Allow provision of maintenance and operation manuals of all the equipment installed as directed by and to satisfaction of the Engineer. 1 Item 0.00
5.04 Allow trainining of client staff on operation of the entire installation to satisfaction of the Engineer. 1 Item 0.00
TOTAL FOR 4-4- PLUMBING AND DRAINAGE INSTALLATION- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA HEALTH CENTRE, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 4.5 ELECTRICAL INSTALLATIONS
Where Trade Names are mentioned below, it is intended to indicate the level of quality required. The tenderer MAY supply alternatives which must be approved in writing by the Project Manager. Note
1) SOLAR SECURITY LIGHTING
a) Supply, install, test and set to work 200mm diameterx7.0mm thick x 6.0-metre high CHS steel lighting column, with good finish and all neccesary accessories, suitable for mounting 1x80W LED security flood lighting fittings (m.s) 2 Nr 0.00
b) Allow for mass concrete foundations for the steel lighting column, including all necessary excavations, reinforcement and fixing base plates and bolts 2 Item 0.00
Security lights
c) Supply and install all-in-one Integrated / Integrated solar light (single -arm) as per provided technical specifications; complete with the following: - Integrated 'Tier 1' solar panel- minimum 256Wp - LED light 80W, with automatic switching system and colour range temperature of 4000–5000 K; - AC/DC hybrid Charging controllers/converters - Integrated lithium battery (atleast 281.25Ah, 12.8V) capable of supporting light for at least 3 days. 2 Nr 0.00
d) Supply, install, test and set to work earthing installation comprising of a 4sq.mm copper PVC earth lead, 1800mm x 15mm diameter copper earth electrode and all neccesary accessories for the street lighting columns 2 Nr 0.00
e) Construct concrete earthing pit, size 600mmx600mmx 600mm deep; complete with waterproof cover for earth test / earth rod inspections and with earthing compound as bentonite. 2 Nr 0.00
f) Allow for testing and commissioning for the security light system and documentation of results to the satisfaction of the Engineer 1 Item 0
g) Allow for all the neccesary submittals comprising shop drawings, illustrations, schedules, product data, bronchures. 1 Item 0
TOTAL FOR SOLAR SECURITY LIGHTING - CARRIED TO BILL SUMMARY 0
2) LIGHTNING PROTECTION SYSTEM- (For DRY TOILETS)
a) Supply and install 25 mm x 3 mm bare copper tape conductor as Furse or approved equivalent complete with metallic DC tape clip, wall plugs, fixing screws and other necessary accessories 45 m 0.00
b) Supply and install 1500 mm long multiple air terminal complete with terminal base as Furse or approved equivalent and all necessary accessories 3 Nr 0.00
c) Supply and install screw down test clamps as Furse or approved equivalent and all necessary accessories 3 Nr 0.00
d) Supply and install 6.0sq.mm PVC insulated SC cable in and including 20mm dia PVC heavy gauge conduit; complete with all necessary accessories 15 m 0.00
e) Supply and install 12.5 mm x 1200 mm long copper earth rod complete with spike, driving stud, dowel clamps as Furse or approved equivalent and all necessary accessories 3 Nr 0.00
f) Supply and install copper earth 300mm x 300mm mats complete with trenching in black cotton soil /soft rock, earth termination pits, marconite backfill, backfilling, reinstatement of ground to meet the requirements of the technical specifications 3 Nr 0.00
g) Supply and install concrete inspection pit complete with waterproof cover for earth test / rod inspections and all other neccesary accessories 3 Nr 0.00
h) Allow for testing and commissioning of the entire electrical installation under this section 1 Ls 0.00
TOTAL FOR LIGHTNING PROTECTION SYSTEM (Dry Toilets) - CARRIED TO BILL SUMMARY 0
ELECTRICAL INSTALLATIONS
1) SOLAR SECURITY LIGHTING 0.00
2) LIGHTNING PROTECTION SYSTEM- (For DRY TOILETS) 0.00
TOTAL FOR 4-5- ELECTRICAL INSTALLATIONS - CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA HEALTH CENTRE, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 4.6 CESS POOL/URINE ABSORPTION PIT
Quantities are for 1no. Urine absorption unit Note
All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
a) Excavate for cess pool; 0-1.50m deep 16 m³ 0.00
b) Load and cart away surplus spoil 14 m³ 0.00
c) Backfill selected and approved excavated materials around foundations 2 m³ 0.00
Hollow concrete block walling; bedding, jointing and pointing in cement sand (1:3) mortar
d) 200 mm thick wall 10 m² 0.00
Vibrated reinforced concrete class 20/25 with minimum cube crushing strength of 25N/mm² at 28 days
e) Base beam 2 m3 0.00
f) Cover slab [150 mm thick] 1 m3 0.00
High yield deformed steel bar reinforcement to BS 4461
g) 8 mm diameter bars 35 kg 0.00
h) 10 mm diameter bars 50 kg 0.00
i) 12 mm diameter bars 60 kg 0.00
j) Soffits of cover slab 7 m² 0.00
k) Edges of base beam 8 m² 0.00
l) Cement and sand (1:3) screed applied on top of concrete slab 7 m² 0.00
Selected filling
m) Hardcore fillings into the cess pool 7 m3 0.00
n) Provide and install 600 x600 x 50mm thick pre-cast concrete cover slabs 1 nr 0.00
Inlet/distribution chamber
o) 600 x 600 x700 mm (internal dimensions) inlet chamber; built in 200mm thick masonry walls and 150 mm thick concrete base slab reinforced with 10mm diameter bars at 200mm centres both ways top and bottom: all necessary finishes and water proofing to wall and floor surfaces: 600 x 600 x50 mm thick PCC cover slab and all necessary pipe work. 2 nr 0.00
p) Allow for making 100 mm diameter openings in 200 mm Hollow concrete block walling 1 nr 0.00
q) Allow for making 50 mm diameter openings in 150mm thick cover slabs 1 nr 0.00
r) Boxing in 150mm thick cover slab for 600x600mm PCC cover 1 nr 0.00
TOTAL FOR 4-6- CESSPOOL (1NO.) CARRIED TO GRAND SUMMARY 0.00
United Nations Office for Project Services
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
THE GOVERNMENT OF PAPUA NEW GUINEA
PROPOSED WASH INTERVENTION FOR RABARABA DISTRICT DEVELOPMENT AUTHORITY OFFICES, PAPUA NEW GUINEA
BILL OF QUANTITIES (BOQ)
Consists of the following:
5-1 - Catchment Tank Plinth (1No.)
5-2 - Plumbing & Drainage
NOTE: It is a MANDATORY requirement for bidders to complete and return all parts of this BOQ. Failure to complete all sections of the BOQ may result in automatic disqualification of your bid.
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA DISTRICT DEVELOPMENT AUTHORITY OFFICES, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 5.1 CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA
(All provisional) Note
All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
Notes: Quantities are for 1no. Plinth (6m long x 4.2m wide as per Structural drawings) 1 Nr. Note
I) Earthworks and Excavations
a) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Tank plinth footprint only] 30 m2 0.00
b) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 32 m3 0.00
c) Selected and approved backill material, well watered and compacted in layers 20 m3 0.00
Disposal of Surplus spoil
d) Load and cart away surplus excavated material from site to an approved dumping site 12 m3 0.00
Selected filling
e) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep [For water tank plinth] 21 m2 0.00
f) Selected and approved backill material, well watered and compacted [600mm deep below the hardcore under the water tank plinth] 10 m3 0.00
g) 50mm Thick murram blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 20 m2 0.00
Anti-termite treatment
h) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to murram surfaces 27 m2 0.00
II) Concrete works
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 19 m2 0.00
b) 50mm Thick blinding under 100mm thick concrete platform slab 16 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Foundation strip 4 m3 0.00
d) Raised Tank platform [100mm thick ], finished smooth 2 m3 0.00
e) 100mm Thick concrete platform form at water point, including forming a 100x50mm thick upstand; finished smooth 8 m2 0.00
f) 50mm Thick splash concrete pad, including forming a 50x50mm thick upstand; finished smooth 2 m2
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 27 m2 0.00
III) Steel Reinforcement
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 10 mm diameter bars 134 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
b) Fabric mesh reinforcement to tank plinth concrete bed 27 m2 0.00
IV) Shuttering & Formwork
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 11 m² 0.00
b) Edges of raise tank platform concrete bed, 100mm girth 19 m 0.00
c) Edges of ground concrete bed, 100mm girth 9 m 0.00
d) Edges of ground concrete bed, 50mm girth 13 m 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide (for upstand wall for taps only) 6 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 32 m2 0.00
c) 200mm Thicks walls above ground 15 m2 0.00
d) 200mm Thick upstand wall for taps 2 m2 0.00
15mm Cement and sand (1:3) render on block wall or concrete work to:-
e) Exposed wall surfaces including concrete plinth 21 m2 0.00
f) Tank plinth floor surfaces 24 m2 0.00
g) 300x50mm thick precast concrete coping bedded on top of walling in cement and sand (1:3) mortar including 10mm deep drip mould 6 m 0.00
h) Making holes through 200mm thick wall for taps 4 Nr 0.00
TOTAL FOR 5-1 CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA - CARRIED TO BILL SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA DISTRICT DEVELOPMENT AUTHORITY OFFICES, PAPUA NEW GUINEA
ITEM DESCRIPTION QTY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 5.2 MECHANICAL INSTALLATION
1.00 INTERNAL PLUMBING AND WATER RETICULATION
Supply, deliver and install pipes, tubing and fittings as described and shown on the drawings. The pipes shall be PPR PN 20 pipes and all conforming to the current European standards for PPR installations and to the Engineers approval, pipe jointing shall be by polyfusion or use of electric coupling and to manufacturer's printed instructions. Rates must allow for all Metal/plastic threaded adaptors where required, valves, unions, sockets, sliding and fixed joints, support raceways, isolating sheaths, elastic material,expansion arms and bends, crossovers, couplings, clippings, connectors, joints and for the connection of sanitary fixtures etc. as required in the running lengths of pipework and also where necessary, for pipe fixing clips, holder bats plugged and screwed for the proper and satisfactory functioning of the system. The pipes will be pressure tested before the plastering of wall commences and as per the manufacturers recommended testing procedures. The sizes indicated are the minimum bore sizes.
1.01 20 mm diameter PPR pipe 1 m 0.00
1.02 25 mm ditto 1 m 0.00
1.03 32 mm ditto 1 m 0.00
1.04 40 mm ditto 1 m 0.00
1.05 50 mm ditto 1 m 0.00
1.06 63 mm ditto 1 m 0.00
Extra over PPR tubing for the following:-
1.07 20 mm diameter bend 4 Nr 0.00
1.08 63 mm diameter bend 4 Nr 0.00
1.09 32 mm diameter tee 2 Nr 0.00
1.10 25 x 20 mm diameter reducer 4 Nr 0.00
1.11 32 x 25 mm diameter reducer 4 Nr 0.00
1.12 40 x 32 mm diameter reducer 4 Nr 0.00
1.13 50 x 40 mm diameter reducer 4 Nr 0.00
1.14 63 x 50 mm diameter reducer 4 Nr 0.00
1.15 20mm diameter brass threaded female adopter 6 Nr 0.00
1.16 63mm back nut (bulkhead) with gasket 12 Nr 0.00
1.17 75mm x 63 mm upvc ppr adopter 3 Nr 0.00
1.18 63 mm diameter spherical Gate valve PN 20 complete with connectors to the PPR pipework 10 Nr 0.00
1.19 32 mm diameter spherical Gate valve PN 20 complete with connectors to the PPR pipework 2 Nr 0.00
1.20 Rain water Tanks. Rotary moulded cylindrical water tank with capacity of 5,000Ltrs,dimensions; Overall Dimensions (H)2180 x (dia)2130. The tank to have a Ø90mm top inlet & Ø63mm outlet connections, Ø90mm overflow with insect proof net. 2 Nr 0.00
1.21 Rain water Tanks. Rotary moulded cylindrical water tank with capacity of 1,000Ltrs,dimensions; (H)1200 x (dia)1085mm. The tank to have a Ø65mm top inlet & Ø63mm outlet connections, Ø63mm overflow with insect proof net. 1 Nr 0.00
1.22 20mm lockable brass tap with a matching padlock and keys 6 Nr 0.00
Supply and fix uPVC soil system to BS 4660 and BS 4515 and MuPVC waste system to BS 5255 with screwed and socketed joints to BS 21. Solvent welded joints shall be as per the system manufacturers written instructions. Tenderers must allow in their pipework prices for all the couplings, connectors, joints etc. as required in the running lengths of pipework and also where necessary for pipe fixing clips, holderbats, plugs and screwed. The installation must comply with BS 5572 and fixing to be to the manufacturer's printed instructions.
Note: Trade Names
Caradon Terrain Ltd's pipe and fittings have been used as a guide to the type and quality of materials required. Other brands must be equal and approved in writing by the Engineer before installation. One brand only shall be used and inconsistency shall not be accepted.
MuPVC Waste System Conforming to BS 5255:
2.01 32 mm diameter waste pipe 3 m 0.00
2.02 50 mm ditto 10 m 0.00
uPVC Soil System Conforming to BS 4514:
Extra over uPVC pipework for the following:-
uPVC buried drain system Conforming to BS 4660:
2.03 100mm diameter golden brown pipe 15 m 0.00
2.04 150mmx150mm floor trap 50mm diameter outlet with white plastic cover 2 Nr 0.00
2.05 Gully trap masonry chamber complete with 100 diameter P trap and 450x450 cast iron/fibre reinforced cover, including all excavation and back-filling 2 Nr 0.00
2.06 Construct masonry manhole chambers including excavation and making good depth not exceeding 2000 mm average 600 mm. Manhole to be complete with cast iron frame and cover, internal benching and upvc access beds for drop manholes 2 Nr 0.00
2.07 Excavate in trench murram/black cotton soil approximately 300 mm wide and with average depth of 750 mm for water drainage pipes, backfill, ram and cart away the remainder 20 m 0.00
3.00 RAIN WATER DRAINAGE
Supply and fix grey UPVC and uPVC soil system pipe work to BS 4660, BS 4515 and BS 5255. The pipework to be with screwed and socketed joints to BS 21.Solvent welded joints shall be as per the system manufacturers witten instructions. Solvent welded joints shall be as per the system manufacturers written instructions. Tenderers must allow in their pipework prices for all the couplings, connectors, joints etc. as required in the running lengths of pipework and also where necessary for pipe fixing clips, holderbats, plugs and screwed. The installation must comply with BS 5572 and fixing to be to the manufacturer's printed instructions.
Note: Trade Names
Caradon Terrain Ltd's pipe and fittings have been used as a guide to the type and quality of materials required. Other brands must be equal and approved in writing by the Engineer before installation. One brand only shall be used and inconsistency shall not be accepted.
3.01 Grey UPVC rainwater pipework
3.02 100mm diameter Class 41 UPVC rain water pipe 15 m 0.00
3.03 75mm diameter Class 41 UPVC rain water pipe 20 m 0.00
Extra over UPVC pipework for the following:
3.04 100mm diameter Bend 2 Nr 0.00
3.05 100mmx 75mm tee 2 Nr 0.00
3.06 Rain screen head (LXW)200mmx150mm with removable strainer installed horizontally allowing debris to slide off and a 100mm outlet diameter. 2 Nr 0.00
3.07 100mm diameter Rain water first flush diverter with a floating ball and all fittings to connect to 10mm diameter downpipe 2 Nr 0.00
3.08 Allow a sum for installation of water gutters complete with downpipes and all necessary accessories to manufacture's specifications and Site Engineer approval to the existing coffice building 1 Sum 0.00
Sheerline colorbond
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
Supply and install the following sheerline colorbond rain water goods
3.09 95mm diameter rain water pipe Rate only m
3.10 75mm diameter rain water pipe Rate Only m
3.11 Extra over 100mm diameter bend Rate Only Nr
3.12 Extra over 100mmx75mm tee Rate Only Nr
4.00 Testing, commissioning and maintenance
4.01 The soak away calculation is based on roamy soils with percolation rate (general average): 20 liters/m²/day (Means 1 m² of soak pit wall area can absorb ~20 liters/day). Allow for this conformity test and furnish the project engineer with the test result for approval. Soak away resizing must be done where percoration rate is confirmed to be less than 20 liters/m²/day 1 Item 0.00
4.02 Allow for setting to work, testing and commissioning of the whole plumbing system to the satisfaction of the Engineer. 1 Item 0.00
4.03 Allow provision of maintenance and operation manuals of all the equipment installed as directed by and to satisfaction of the Engineer. 1 Item 0.00
4.04 Allow trainining of client staff on operation of the entire installation to satisfaction of the Engineer. 1 Item 0.00
TOTAL FOR 5-2- PLUMBING AND DRAINAGE INSTALLATION- CARRIED TO GRAND SUMMARY 0.00
United Nations Office for Project Services
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
THE GOVERNMENT OF PAPUA NEW GUINEA
PROPOSED WASH INTERVENTION FOR RABARABA LOCAL LEVEL GOVERNMENT AUTHORITY OFFICES, PAPUA NEW GUINEA
BILL OF QUANTITIES (BOQ)
Consists of the following:
6-1 - Mainstream Dry Toilet blocks (1no.)
6-2 - Catchment Tank Plinth (1No.)
6-3 - Plumbing & Drainage
6-4 - Electrical Installations
6-5 - Cesspools (1no.)
NOTE: It is a MANDATORY requirement for bidders to complete and return all parts of this BOQ. Failure to complete all sections of the BOQ may result in automatic disqualification of your bid.
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA LOCAL LEVEL GOVERNMENT AUTHORITY OFFICES, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 6.1 TYPICAL ACCESSIBLE DEHYDRATED TOILET (1NO.)
(All provisional) Note
Quantities are for 1no. Block Note
i) Plumbing and drainage work, including the water tank has been measured separately (Bill no. 6.3) Note
ii) Cesspool has been measured separately (Bill no. 6.5) Note
iii)All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS
a) Clear the site of all shrubs, bushes, small trees and debris; remove from site as directed [Approximate area: 145 m2 for Building footprint including ramps and 20% allowance] 1 Item 0.00
Oversite excavations
b) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Building footprint including ramp areas only] 75 m2 0.00
c) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 7 m3 0.00
d) Excavate in soft material for column bases; 0-1.50m deep [For timber columns] 63 m3 0.00
e) Return, fill in and ram selected excavated material around foundations 52 m3 0.00
Disposal of Surplus spoil
f) Load and cart away surplus excavated material from site to an approved dumping site 18 m3 0.00
Selected filling
g) Selected and approved backill material, well watered and compacted [1800mm deep under the water tank plinth] 4 m3 0.00
h) 50mm Thick murram blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 2 m2 0.00
i) 150mm Thick murram spread finish to overall ground surfaces [Under the toilets including ramp areas] 70 m2 0.00
Anti-termite treatment
j) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to murram surfaces 72 m2 0.00
TOTAL FOR SITE PREPARATION, EXCAVATIONS & EARTHWORKS CARRIED TO BILL SUMMARY 0.00
2) CONCRETE WORKS
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 5 m2 0.00
b) 50mm Thick blinding under column bases 42 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Column bases 7 m3 0.00
d) Stub columns 8 m3 0.00
e) Foundation strip 1 m3 0.00
f) Tank platform [150mm thick ], finished smooth 1 m3 0.00
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 4 m2 0.00
External Paved Areas
h) Locally available stone paving slabs jointed in cement and sand mortar and laid on and including 50mm thick sand bed (Sample of locally available stone slabs to be provided by the Contractor for approval by the site Engineer). Rate Only m2
TOTAL FOR CONCRETE WORKS CARRIED TO BILL SUMMARY 0.00
3) STEEL REINFORCEMENT
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 8 mm diameter bars 367 kg 0.00
b) 10 mm diameter bars 446 kg 0.00
c) 12 mm diameter bars 414 kg 0.00
TOTAL FOR STEEL REINFORCEMENT CARRIED TO BILL SUMMARY 0.00
4) SHUTTERING & FORMWORK
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 3 m² 0.00
b) Vertical sides of column bases 32 m² 0.00
c) Vertical sides of stub columns 106 m² 0.00
d) Edges of Tank platform concrete bed, 150mm girth 8 m 0.00
TOTAL FOR SHUTTERING & FORMWORK CARRIED TO BILL SUMMARY 0.00
5) JOINERY & TIMBER WORKS
1. Rate for Timber sections shall include all necessary drilling of holes, bolting, cleats and other necessary connections that are not separately itemized for pricing Note
2. The Contractor shall provide shop drawings for approval. Once approved, the drawings shall be strictly adhered to during the fabrication and installation process. Note
I Timber framework
Columns, rafters etc.
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites with approved wood preservative; including all jointing and connections (packing piece, Grade 8.8 bolts etc.) as necessary; in roof
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; all as per Structural Engineer's drawings
a) 150x150mm Timber Column, encased in concrete column(m.s) 125 m 0.00
b) 75x75mm Timber Column for ramp area, encased in concrete column(m.s) 89 m 0.00
c) 75x100mm Timber deck bearers bolted to timber columns (m.s) for the main floor area 28 m 0.00
d) 75x100mm Timber ramp bearers bolted to timber columns (m.s) for the ramp 15 m 0.00
e) 100x150mm Timber floor deck joists bolted to floor bearers (m.s) 35 m 0.00
f) 75x100mm Timber ramp joists bolted to floor bearers (m.s) 52 m 0.00
g) 75x50mm Timber tie beams bolted to timber columns (m.s) 28 m 0.00
h) 75x75mm Timber bracing bolted to timber columns (m.s) 55 m 0.00
j) 150x100mm Timber rafters, bolted to top of timber columns (m.s) 38 m 0.00
k) 25x50mm Ventilation slats fixed to timber columns (m.s) 95 m 0.00
l) 75x50mm Timber purlins fixed to rafters (m.s) 61 m 0.00
Softwood timber
m) 200x25mm Thick One-side wrot fascia and barge board 29 m 0.00
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished finished with 2 coats polyurethane varnish on completion; all as per Structural Engineer's drawings
a) 100x50mm Timber top rail 54 m 0.00
b) 40mm diameter circular timber handrail baluster fixed to stingers (m.s) at 150mm c/c 235 m 0.00
c) 50x100mm Timber bottom rail 54 m 0.00
Approved 7.5mm Thick site-painted plank weather board; treated against termites and mositure ingress; finished with 2 coats polyurethane varnish on both sides
a) Supply and fix 7.5mm thick site-painted plank weather board; fixed to timber framework (m.s) with tying wires or other approved fixing accessories 87 m2 0.00
Approved 7.5mm Thick site-painted timber screens; treated against termites and mositure ingress; finished with 2 coats polyurethane varnish on both sides
b) Supply and fix 7.5mm thick site-painted timber screens; fixed to timber framework (m.s) with tying wires or other approved fixing accessories 27 m2 0.00
IV Wood planks floor finish
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in floors
Approved timber planks; treated against termites, moisture and unine acidity; finished with 2 coats polyurethane varnish on the top side
a) Supply and fix approved smooth planed 100x25mm wood planks; fixed to timber framework (m.s) with concealed bolts or screws; for main floor 39 m2 0.00
b) Ditto: for Ramp including landings 38 m2 0.00
c) Allow for creating squat pan spaces through the wood planks flooring; finishing around 4 Nr 0.00
The following in timber doors as per the details provided
Door Frames, architraves and beads
a) Ex 100x50mm hardwood frame rebated 24 m 0.00
b) 50x15mm hardwood architrave chamfered 24 m 0.00
c) 15x15mm hardwood quadrant bead 24 m 0.00
Supply and fix the following semi-solid treated timber flush door shutter with hardwood lipping all round
d) Single leaf door overall size 1100x2400mm high with 100mm high aluminium kick plate on the inside (Door Type D01) 2 Nr 0.00
e) Single leaf door overall size 1100x2400mm high with 400mm high aluminium kick plate on the inside (Door Type D02) 2 Nr 0.00
Supply and fix the following ironmongery with screws to match
f) Heavy gauge steel door hinges approved from samples 12 Nr 0.00
g) Heavy duty two lever aluminium door lock complete with a set of lever furniture and approved from sample 4 Nr 0.00
h) 19mm Diameter , 300mm long, aluminium door grab handles with concealed fixing rose for horizontal and vertical handles 4 Nr 0.00
Painting and Decorating
Aluminum wood primer
j) Back of wood frames over 100mm but not exceeding 200mm girth 24 m 0.00
Prepare and apply clear matt varnish to timber doors
k) Surfaces not exceeding 100mm girth 48 m 0.00
l) Ditto over 100mm not exceeding 200mm girth 24 m 0.00
m) General surfaces of doors 16 m2 0.00
TOTAL FOR JOINERY & TIMBER WORKS CARRIED TO BILL SUMMARY 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide 8 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 7 m2 0.00
c) 200mm Thick dwarf wall above ground 12 m2 0.00
Cement and sand (1:4) to walls in
d) 12mm deep horizontal keying on masonry stone wall surfaces. 24 m2 0.00
TOTAL FOR BLOCKWORK CARRIED TO BILL SUMMARY 0.00
7) ROOF COVERING & RAINWATER GOODS
a) Supply and Fix Aluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets or approved equivalent; fixed to timber purlins (m.s) using manufacturer's proprietary bolts 49 m2 0.00
b) Allow for making holes through the roofing sheets for 4no. ventilation pipes at specified positions; finishing and sealing around the pipes to prevent leakages 1 Item 0.00
Rainwater goods
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
c) Supply and install sheerline colorbond gutter fixed to fascia (m.s) with and including spring clips at 1200mm centres [Rate to include gutter stop ends]. The gutther to have a micro-mesh leaf guards 9 m 0.00
d) Extra over for gutter stop ends 2 Nr 0.00
e) Extra over downpipe; for gutter outlet. 1 Nr 0.00
f) Allow for connection of the downpipe to the water reservoir tank (tank measured separately) 1 Item 0.00
TOTAL FOR ROOF COVERING & RAINWATER GOODS CARRIED TO BILL SUMMARY 0.00
ACCESSIBLE DEHYDRATED TOILET
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS 0.00
2) CONCRETE WORKS 0.00
3) STEEL REINFORCEMENT 0.00
4) SHUTTERING & FORMWORK 0.00
5) JOINERY & TIMBER WORKS 0.00
6) BLOCKWORK 0.00
7) ROOF COVERING & RAINWATER GOODS 0.00
TOTAL FOR 6-1- ACCESSIBLE DEHYDRATED TOILET (1NO)- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA LOCAL LEVEL GOVERNMENT AUTHORITY OFFICES, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 6.2 CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA)
(All provisional) Note
All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
A Notes: Quantities are for 1no. Plinth (4.2m long x 2.5m wide as per Structural drawings) 1 Nr. Note
I) Earthworks and Excavations
a) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Tank plinth footprint only] 16 m2 0.00
b) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 17 m3 0.00
c) Selected and approved backill material, well watered and compacted in layers 11 m3 0.00
Disposal of Surplus spoil
d) Load and cart away surplus excavated material from site to an approved dumping site 6 m3 0.00
Selected filling
e) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep [For water tank plinth] 8 m2 0.00
f) Selected and approved backill material, well watered and compacted [600mm deep below the hardcore under the water tank plinth] 4 m3 0.00
g) 50mm Thick murram blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 8 m2 0.00
Anti-termite treatment
h) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to murram surfaces 11 m2 0.00
II) Concrete works
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 10 m2 0.00
b) 50mm Thick blinding under 100mm thick concrete platform slab 6 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Foundation strip 2 m3 0.00
d) Raised Tank platform [100mm thick ], finished smooth 1 m3 0.00
e) 100mm Thick concrete platform form at water point, including forming a 100x50mm thick upstand; finished smooth 3 m2 0.00
f) 50mm Thick splash concrete pad, including forming a 50x50mm thick upstand; finished smooth 2 m2
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 11 m2 0.00
III) Steel Reinforcement
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 10 mm diameter bars 77 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
b) Fabric mesh reinforcement to tank plinth concrete bed 11 m2 0.00
IV) Shuttering & Formwork
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 6 m² 0.00
b) Edges of raise tank platform concrete bed, 100mm girth 11 m 0.00
c) Edges of ground concrete bed, 100mm girth 8 m 0.00
d) Edges of ground concrete bed, 50mm girth 6 m 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide (for upstand wall for taps only) 3 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 19 m2 0.00
c) 200mm Thicks walls above ground 9 m2 0.00
d) 200mm Thick upstand wall for taps 2 m2 0.00
15mm Cement and sand (1:3) render on block wall or concrete work to:-
e) Exposed wall surfaces including concrete plinth 13 m2 0.00
f) Tank plinth floor surfaces 12 m2 0.00
g) 300x50mm thick precast concrete coping bedded on top of walling in cement and sand (1:3) mortar including 10mm deep drip mould 3 m 0.00
h) Making holes through 200mm thick wall for taps 2 Nr 0.00
TOTAL FOR 6-2- CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA (1NO.)- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA LOCAL LEVEL GOVERNMENT AUTHORITY OFFICES, PAPUA NEW GUINEA
ITEM DESCRIPTION QTY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 6.3 PLUMBING & DRAINAGE
Notes: Quantities are for 1no. Toilet blocks Note
1.00 SANITARY FITTINGS
Supply, deliver, install, test and commission the following sanitary fittings and accessories. Fixing to be to manufacturer's printed instructions.
1.01 Water Closet. Western -type toilet pan divided in two sectors. The sector in the front is for urine diverter with 50mm hole allowing connection to 50mm dia pipe for urine collection while back sector with a 200mm hole for faeces to drop into waste tank directly below without need for flushing. The pan will be stainless steel or in vitreous China with all fixings required to install on a wooden floor. 2 Nr 0.00
1.02 Disabled Water Closet. Western -type toilet pan divided in two sectors. The sector in the front is for urine diverter with 50mm hole allowing connection to 50mm dia pipe for urine collection while back sector with a 200mm hole for faeces to drop into waste tank directly below without need for flushing. The pan will be stainless steel or in vitreous China with all fixings required to install on a wooden floor. 2 Nr 0.00
1.03 A pair of Stainless steel rear and side grab bars. Side Wall: Minimum 1065 mm long, placed max 300mm from the rear wall and extending at least 1380 from the rear wall. Rear Wall: Minimum 915 mm long, extending 300 mm minimum on one side of the toilet center line and 600 mm on the other side. 2 Nr 0.00
1.04 Roll Holder. Stainless steel holder fixed on the wall, size 150x150 mm. 4 Nr 0.00
1.05 Double Bowl Sink. Stainless steel double bowl wash hand sink bench unit as "Simply Stainless" or approved equivalent; overall size 1600mm wide x 700mm deep x 900mm high; manufactured from 304 grade stainless steel, 1.2mm thick sections. The sink unit to have at least 150mm high bevelled-edge splashback and mounted on heavy duty tubular legs. Each bowl to have a pre-punched hole to suit waste connection complete with chromed 20mm low pressure (0.1bar) lockable pillar tap for each of the two bowls, a 32mm diameter chrome plated waste and a 32mm plastic P- trap for each of two bowls. 2 Nr 0.00
1.06 Single Bowl Sink. Stainless steel single bowl wash hand sink bench unit as "Simply Stainless" or approved equivalent with 750mm bowl height for disabled access; overall size 500mm wide x 700mm deep x 750mm high; manufactured from 304 grade stainless steel, 1.2mm thick sections. The sink unit to have at least 150mm high bevelled-edge splashback and mounted on heavy duty tubular legs. Bowl to have a pre-punched hole to suit waste connection complete with chromed 20mm low pressure (0.1bar) lockable pillar tap, a 32mm diameter chrome plated waste and a 32mm plastic P- trap. 1 Nr 0.00
1.07 Waste tank. Composting toilet waste tank made of high density polyethylene and measuring 0.8m height, 1 m width by 2m length with 1,2m3, with adjustable chute up to 1m to reach toilet pan hole. The tank will have a hole at the top to allow connection of venting pipe 100 diameter, air tight hinged door to allow disposal of dried waste. 4 Nr 0.00
1.08 white vitreous china Urinal bowl 1 ½ inch diameter domed outlet plated urinal grating bottle trap and fixing screws on the timber wall. 1 Nr 0.00
2.00 INTERNAL PLUMBING AND WATER RETICULATION
Supply, deliver and install pipes, tubing and fittings as described and shown on the drawings. The pipes shall be PPR PN 20 pipes treated with UV restantant stabilizers or coating and all conforming to the current European standards for PPR installations and to the Engineers approval, pipe jointing shall be by polyfusion or use of electric coupling and to manufacturer's printed instructions. Rates must allow for all Metal/plastic threaded adaptors where required, valves, unions, sockets, sliding and fixed joints, support raceways, isolating sheaths, elastic material,expansion arms and bends, crossovers, couplings, clippings, connectors, joints and for the connection of sanitary fixtures etc. as required in the running lengths of pipework and also where necessary, for pipe fixing clips, holder bats plugged and screwed for the proper and satisfactory functioning of the system. The pipes will be pressure tested before the plastering of wall commences and as per the manufacturers recommended testing procedures. The sizes indicated are the minimum bore sizes.
2.01 20 mm diameter PPR pipe 24 m 0.00
2.02 25 mm ditto 1 m 0.00
2.03 32 mm ditto 1 m 0.00
2.04 40 mm ditto 1 m 0.00
2.05 50 mm ditto 1 m 0.00
2.06 63 mm ditto 1 m 0.00
Extra over PPR tubing for the following:-
2.07 20 mm diameter bend 5 Nr 0.00
2.08 63 mm diameter bend 2 Nr 0.00
2.09 32 mm diameter tee 1 Nr 0.00
2.10 25mm diameter tee 1 Nr 0.00
2.11 25 x 20 mm diameter reducer 4 Nr 0.00
2.12 32 x 25 mm diameter reducer 1 Nr 0.00
2.13 40 x 32 mm diameter reducer 1 Nr 0.00
2.14 50 x 40 mm diameter reducer 1 Nr 0.00
2.15 63 x 50 mm diameter reducer 1 Nr 0.00
2.16 20mm diameter brass threaded female adopter 5 Nr 0.00
2.17 63mm back nut (bulkhead) with gasket 6 Nr 0.00
2.18 75mm x 63 mm upvc ppr adopter 2 Nr 0.00
2.19 63 mm diameter spherical Gate valve PN 20 complete with connectors to the PPR pipework 2 Nr 0.00
2.20 Flexible Tubing 300mm long 5 Nr 0.00
2.21 20mm chrome plated angle regulating valve 5 Nr 0.00
2.22 32mm non return valve 1 Nr 0.00
2.23 Rain water Tanks. Rotary moulded cylindrical water tank with capacity of 3,000Ltrs,dimensions; 1400(d)* 2000(h)mm. The tank to have a Ø65mm top inlet & Ø63mm outlet connections, Ø63mm overflow with insect proof net. 1 Nr 0.00
3.00 INTERNAL DRAINAGE
Supply and fix uPVC soil system to BS 4660 and BS 4515 and MuPVC waste system to BS 5255 with screwed and socketed joints to BS 21. Solvent welded joints shall be as per the system manufacturers written instructions. Tenderers must allow in their pipework prices for all the couplings, connectors, joints etc. as required in the running lengths of pipework and also where necessary for pipe fixing clips, holderbats, plugs and screwed. The installation must comply with BS 5572 and fixing to be to the manufacturer's printed instructions.
Note: Trade Names
Caradon Terrain Ltd's pipe and fittings have been used as a guide to the type and quality of materials required. Other brands must be equal and approved in writing by the Engineer before installation. One brand only shall be used and inconsistency shall not be accepted.
MuPVC Waste System Conforming to BS 5255:
3.01 32 mm diameter waste pipe 2 m 0.00
3.02 50 mm ditto 35 m 0.00
Extra over MuPVC waste pipework for the following:-
3.03 50X32 mm diameter reducer 10 Nr 0.00
3.04 50 mm ditto sweep bend 6 Nr 0.00
3.05 50 mm access cap 4 Nr 0.00
3.06 50 mm diameter sweep tee 9 Nr 0.00
uPVC Soil System Conforming to BS 4514:
3.07 100 mm diameter waste, soil and vent pipes 20 m
Extra over uPVC pipework for the following:-
3.08 100 mm vent cowl 4 Nr 0.00
3.09 100 mm weathering slate / apron 4 Nr 0.00
uPVC buried drain system Conforming to BS 4660:
3.10 100mm diameter golden brown pipe 8 m 0.00
3.11 Gully trap masonry chamber complete with 100 diameter P trap and 450x450 cast iron/fibre reinforced cover, including all excavation and back-filling 4 Nr 0.00
3.12 Construct masonry manhole chambers including excavation and making good depth not exceeding 2000 mm average 600 mm. Manhole to be complete with plastic frame and cover, internal benching and upvc access beds for drop manholes 1 Nr 0.00
3.13 Excavate in trench murram/black cotton soil approximately 300 mm wide and with average depth of 750 mm for water drainage pipes, backfill, ram and cart away the remainder 15 m 0.00
4.00 RAIN WATER DRAINAGE
Supply and fix grey UPVC and uPVC soil system pipe work to BS 4660, BS 4515 and BS 5255. The pipework to be with screwed and socketed joints to BS 21.Solvent welded joints shall be as per the system manufacturers witten instructions. Solvent welded joints shall be as per the system manufacturers written instructions. Tenderers must allow in their pipework prices for all the couplings, connectors, joints etc. as required in the running lengths of pipework and also where necessary for pipe fixing clips, holderbats, plugs and screwed. The installation must comply with BS 5572 and fixing to be to the manufacturer's printed instructions.
Note: Trade Names
Caradon Terrain Ltd's pipe and fittings have been used as a guide to the type and quality of materials required. Other brands must be equal and approved in writing by the Engineer before installation. One brand only shall be used and inconsistency shall not be accepted.
4.01 Grey UPVC rainwater pipework
4.02 100mm diameter Class 41 UPVC rain water pipe 9 m 0.00
4.03 75mm diameter Class 41 UPVC rain water pipe 10 m 0.00
Extra over UPVC pipework for the following:
4.04 100mm diameter Bend 2 Nr 0.00
4.05 100mmx 75mm tee 1 Nr 0.00
4.06 Rain screen head (LXW)200mmx150mm with removable strainer installed horizontally allowing debris to slide off and a 100mm outlet diameter. 1 Nr 0.00
4.07 100mm diameter Rain water first flush diverter with a floating ball and all fittings to connect to 100mm diameter downpipe 1 Nr 0.00
Sheerline colorbond
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
Supply and install the following sheerline colorbond rain water goods
4.08 95mm diameter rain water pipe Rate only m
4.09 75mm diameter rain water pipe Rate Only m
4.10 Extra over 100mm diameter bend Rate Only Nr
4.11 Extra over 100mmx75mm tee Rate Only Nr
Testing, commissioning and maintenance
5.01 The soak away calculation is based on roamy soils with percolation rate (general average): 20 liters/m²/day (Means 1 m² of soak pit wall area can absorb ~20 liters/day). Allow for this conformity test and furnish the project engineer with the test result for approval. Soak away resizing must be done where percoration rate is confirmed to be less than 20 liters/m²/day 1 Item 0.00
5.02 Allow for setting to work, testing and commissioning of the whole plumbing system to the satisfaction of the Engineer. 1 Item 0.00
5.03 Allow provision of maintenance and operation manuals of all the equipment installed as directed by and to satisfaction of the Engineer. 1 Item 0.00
5.04 Allow trainining of client staff on operation of the entire installation to satisfaction of the Engineer. 1 Item 0.00
TOTAL FOR 6-3- PLUMBING AND DRAINAGE INSTALLATION- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA LOCAL LEVEL GOVERNMENT AUTHORITY OFFICES, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 6.4 ELECTRICAL INSTALLATIONS
Where Trade Names are mentioned below, it is intended to indicate the level of quality required. The tenderer MAY supply alternatives which must be approved in writing by the Project Manager. Note
1) SOLAR SECURITY LIGHTING
a) Supply, install, test and set to work 200mm diameterx7.0mm thick x 6.0-metre high CHS steel lighting column, with good finish and all neccesary accessories, suitable for mounting 1x80W LED security flood lighting fittings (m.s) 1 Nr 0.00
b) Allow for mass concrete foundations for the steel lighting column, including all necessary excavations, reinforcement and fixing base plates and bolts 1 Item 0.00
Security lights
c) Supply and install all-in-one Integrated / Integrated solar light (single -arm) as per provided technical specifications; complete with the following: - Integrated 'Tier 1' solar panel- minimum 256Wp - LED light 80W, with automatic switching system and colour range temperature of 4000–5000 K; - AC/DC hybrid Charging controllers/converters - Integrated lithium battery (atleast 281.25Ah, 12.8V) capable of supporting light for at least 3 days. 1 Nr 0.00
d) Supply, install, test and set to work earthing installation comprising of a 4sq.mm copper PVC earth lead, 1800mm x 15mm diameter copper earth electrode and all neccesary accessories for the street lighting columns 1 Nr 0.00
e) Construct concrete earthing pit, size 600mmx600mmx 600mm deep; complete with waterproof cover for earth test / earth rod inspections and with earthing compound as bentonite. 1 Nr 0.00
f) Allow for testing and commissioning for the security light system and documentation of results to the satisfaction of the Engineer 1 Item 0
g) Allow for all the neccesary submittals comprising shop drawings, illustrations, schedules, product data, bronchures. 1 Item 0
TOTAL FOR SOLAR SECURITY LIGHTING - CARRIED TO BILL SUMMARY 0
2) LIGHTNING PROTECTION SYSTEM- (For DRY TOILETS)
a) Supply and install 25 mm x 3 mm bare copper tape conductor as Furse or approved equivalent complete with metallic DC tape clip, wall plugs, fixing screws and other necessary accessories 15 m 0.00
b) Supply and install 1500 mm long multiple air terminal complete with terminal base as Furse or approved equivalent and all necessary accessories 1 Nr 0.00
c) Supply and install screw down test clamps as Furse or approved equivalent and all necessary accessories 1 Nr 0.00
d) Supply and install 6.0sq.mm PVC insulated SC cable in and including 20mm dia PVC heavy gauge conduit; complete with all necessary accessories 5 m 0.00
e) Supply and install 12.5 mm x 1200 mm long copper earth rod complete with spike, driving stud, dowel clamps as Furse or approved equivalent and all necessary accessories 1 Nr 0.00
f) Supply and install copper earth 300mm x 300mm mats complete with trenching in black cotton soil /soft rock, earth termination pits, marconite backfill, backfilling, reinstatement of ground to meet the requirements of the technical specifications 1 Nr 0.00
g) Supply and install concrete inspection pit complete with waterproof cover for earth test / rod inspections and all other neccesary accessories 1 Nr 0.00
h) Allow for testing and commissioning of the entire electrical installation under this section 1 Ls 0.00
TOTAL FOR LIGHTNING PROTECTION SYSTEM (1no. Dry Toilets) - CARRIED TO BILL SUMMARY 0
ELECTRICAL INSTALLATIONS
1) SOLAR SECURITY LIGHTING 0.00
2) LIGHTNING PROTECTION SYSTEM- (For DRY TOILETS) 0.00
TOTAL FOR 6-4- ELECTRICAL INSTALLATIONS - CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR RABARABA LOCAL LEVEL GOVERNMENT AUTHORITY OFFICES, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 6.5 CESS POOL/URINE ABSORPTION PIT
Quantities are for 1no. Urine Absorption Pit Note
iii)All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
a) Excavate for cess pool; 0-1.50m deep 16 m³ 0.00
b) Load and cart away surplus spoil 14 m³ 0.00
c) Backfill selected and approved excavated materials around foundations 2 m³ 0.00
Hollow concrete block walling; bedding, jointing and pointing in cement sand (1:3) mortar
d) 200 mm thick wall 10 m² 0.00
Vibrated reinforced concrete class 20/25 with minimum cube crushing strength of 25N/mm² at 28 days
e) Base beam 2 m3 0.00
f) Cover slab [150 mm thick] 1 m3 0.00
High yield deformed steel bar reinforcement to BS 4461
g) 8 mm diameter bars 35 kg 0.00
h) 10 mm diameter bars 50 kg 0.00
i) 12 mm diameter bars 60 kg 0.00
j) Soffits of cover slab 7 m² 0.00
k) Edges of base beam 8 m² 0.00
l) Cement and sand (1:3) screed applied on top of concrete slab 7 m² 0.00
Selected filling
m) Hardcore fillings into the cess pool 7 m3 0.00
n) Provide and install 600 x600 x 50mm thick pre-cast concrete cover slabs 1 nr 0.00
Inlet/distribution chamber
o) 600 x 600 x700 mm (internal dimensions) inlet chamber; built in 200mm thick masonry walls and 150 mm thick concrete base slab reinforced with 10mm diameter bars at 200mm centres both ways top and bottom: all necessary finishes and water proofing to wall and floor surfaces: 600 x 600 x50 mm thick PCC cover slab and all necessary pipe work. 2 nr 0.00
p) Allow for making 100 mm diameter openings in 200 mm Hollow concrete block walling 1 nr 0.00
q) Allow for making 50 mm diameter openings in 150mm thick cover slabs 1 nr 0.00
r) Boxing in 150mm thick cover slab for 600x600mm PCC cover 1 nr 0.00
TOTAL FOR 6-5- CESSPOOL (1NO.) CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
CONSTRUCTION WORKS FOR WASH INTERVENTIONS IN RABARABA & ESA'ALA, MILNE BAY, PAPUA NEW GUINEA
ITEM DESCRIPTION QTY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 7 DAY WORKS
Any Daywork ordered shall be executed at the following rates: Note
Labour: The Prime Cost to which *______ per centum shall be added Per cent
Materials: The Prime Cost (delivered to Site) to which *____per centum shall be added Per Cent
Plant: The Net Hire Charge to which *_______centum shall be added Per Cent
These percentage additions shall cover all insurances, use of small tools and non-mechanical plant, sharpening tools, water, supervision, watching, power and lighting, establishment and overhead charges. Note
Dayworks will be allowed only where specifically ordered by the Site Engineer in writing. Note
All Daywork Sheets must be signed by the Site Engineer and the contractor or their authorized representatives. Note
Time engaged in the actual works only will be allowed. Idle time will not be allowed. Note
All rates in this Day work Schedule shall be fixed for the duration of the Contract Note
Any other labour / material plant and equipment category employed but not included below shall be priced at rates analogous to those rates included under the relevant categories. Note
Only a nominal quantity is inserted against each item for computation purposes only. Note
The following labour rates are to be applied for the days worked and are to be all inclusive Note
A day shall mean an 8 hour day. Note
Gangers and trade chargehands when working with their gangs shall be paid for at the below rates for labourers and the applicable craftsman respectively Note
The said rates are to include, inter alia, for all supervision, importation of labour including transport, travelling time, fares, subsistence and lodging allowances, operation of incentive schemes and costs of overtime working, guaranteed time, sick pay and any other disbursements arising from the employment of labour, for the use and repair of all non-mechanical tools (including paint brushes), sharpening of tools and use of standing scaffolding and other Contractor's Equipment and for overheads and profit of the Contractor. Note
The Tenderer shall state the rates required for labour per day irrespective of public holidays, week-ends, etc., required for work ordered to be executed as Day works or Extra Work. Note
The said rates are to be based on the rates of wages and other emoluments and expenses, including holiday credits (if any), and insurances, payable by the Contractor. Note
a Mason 10 day 0.00
b Carpenter / Joiner 10 day 0.00
c Pipe Layer / Fitter / Plumber 10 day 0.00
d Mechanics 10 day 0.00
e Welder 10 day 0.00
f Electrician 10 day 0.00
g Bar Bender 10 day 0.00
h Skilled Labourer (other categories) 10 day 0.00
j Unskilled Labourer 10 day 0.00
TOTAL FOR LABOUR CARRIED TO DAY WORK BILL SUMMARY 0.00
The rates for the below listed materials are to be used for Day Work or Extra Work at the site of the works Note
The rates shall cover all the expenses such as loading, delivery to site, unloading, storing and protecting, profit and overheads less all trade discounts, rebates and allowances and all cash discounts. Note
a Ordinary Portland cement 50 kg 10 bag 0.00
b Aggregates for concrete as per specification. 10 m³ 0.00
c Burnt clay bricks, standard size 100 nr 0.00
d Solid concrete blocks, standard size 100 nr 0.00
e Local foundation stones, 9"x9" 100 nr 0.00
f Formwork with sawn timber 50 m² 0.00
g Formwork with plywood 50 m² 0.00
h Concrete grade 25 if ready mixed / 1:1.5:3-20mm - if site mixed. 5 m³ 0.00
i Y-8 Reinforcement bars 1 Kg 0.00
j Y-12 Reinforcement bars 1 Kg 0.00
k Y16 Reinforcement bars 1 Kg 0.00
l 300x300x10mm non-slip ceramic floor tiles 1 m² 0.00
m 150x150x6mm white glazed ceramic wall tiles 1 m² 0.00
n Heavy duty Manhole Cover size 600x600mm 1 nr 0.00
o 150x50mm Hardwood Timber 1 m 0.00
p 100x50mm Hardwood Timber 1 m 0.00
q 150x150mm Hardwood Timber 1 m 0.00
r GI Sheets (0.9x3m) - 24 gauge 1 nr 0.00
s GI Sheets (0.9x3m) - 26 gauge 1 nr 0.00
t GI Sheets (0.9x3m) - 28 gauge 1 nr 0.00
u 150mm diameter PVC gutters 1 m 0.00
v First Grade Plastic Emulsion Paint 1 Litre 0.00
w First Grade Super Gloss Oil Paint 1 Litre 0.00
x 625x595mm stainless steel squat pan water closet 1 nr 0.00
y European type ceramic water closet 1 nr 0.00
z 75x 50x 4mm thick RHS (6m length) 1 nr 0.00
a1 75x75x3mm thick steel angles (6m length) 1 nr 0.00
b1 Water pump, 1HP 1 nr 0.00
c1 1 cubic meter plastic water tank 1 nr 0.00
d1 2 cubic meters plastic water tank 1 nr 0.00
TOTAL FOR MATERIALS CARRIED TO DAY WORK BILL SUMMARY 0.00
7C PLANT AND EQUIPMENT
The following rates for plant and equipment are to be applied to the days worked and use of such plant/equipment in good working condition . Note
A day shall mean an 8 hour day. Note
The rates are to include all operational and maintenance costs, fuel, oil, grease, transport to and from site and other consumables, operator and attendants wages, supervision, overheads and profit. Note
Only for the time which the plant / equipment was been actually employed upon the work shall be paid for and the rates shall include for idle time, travelling time and overtime. Note
All items of plant and equipment shall be priced. Note
a Pumping set - 3 kW 2 day 0.00
b Concrete mixer - 0.5 m³ 2 day 0.00
c Poker Vibrator Plant including 25,32, 50mm poker 2 day 0.00
d Motor Lorry - 5 ton 2 day 0.00
e Tipper truck - 8 ton 2 day 0.00
f Plate compactor / Vibrator - 2 Tonne 2 day 0.00
g Excavator, crawler mounted - 0.7 m³ 2 day 0.00
h Loader and backhoe, wheel mounted - 1.4 m³ 2 day 0.00
i Portable diesel generator - 5 kVA 2 day 0.00
j Portable Air Compressor including rock breakers & hammers - 175 cfm 2 day 0.00
k Water Bowser - 6000 Ltr 2 day 0.00
TOTAL FOR PLANT AND EQUIPMENT CARRIED TO DAY WORK BILL SUMMARY 0.00
DAY WORK BILL SUMMARY
7B MATERIALS 0.00
7C PLANT AND EQUIPMENT 0.00
TOTAL FOR DAY WORKS (THIS TOTAL SHALL NOT BE CARRIED TO THE GRAND SUMMARY) 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
CONSTRUCTION WORKS FOR WASH INTERVENTIONS IN RABARABA & ESA'ALA, MILNE BAY, PAPUA NEW GUINEA
ITEM DESCRIPTION QTY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 8 SCHEDULE OF RATES - GENERAL (NOTE: IT IS MANDATORY FOR BIDDERS TO COMPLETE THIS SECTION)
Note: The rates provided in this section will ONLY be used to value variation items whose rates are not provided in the measured work bills.
a Cutting, clearing and dumping away all shrubs, debris and unnecessary materials. 10 m2 0.00
b Cutting of trees not exceeding 450mm girth including removing from site as directed 5 nr 0.00
c Cutting of trees exceeding 450mm but not exceeding 600mm girth ditto 5 nr 0.00
d Cutting of trees exceeding 600mm but not exceeding 900mm girth ditto 5 nr 0.00
e Cutting of trees exceeding 900mm but not exceeding 1200mm girth ditto 5 nr 0.00
f Cutting of trees exceeding 1200mm girth ditto 5 nr 0.00
g Removing stumps of trees not exceeding 600mm girth and carting away debris 5 nr 0.00
h Removing stumps of trees exceeding 600mm but not exceeding 1200mm girth ditto 5 nr 0.00
i Removing stumps of trees exceeding 1200mm girth ditto 5 nr 0.00
j Excavate the unconsolidated top soil to an average depth of 150mm 5 m2 0.00
k Cutting of surface rock outcrops and removing debris from site 5 m2 0.00
l Backfill to make up levels 10 m3 0.00
2 FOUNDATION EXCAVATION 0.00
a Excavate on normal soil to a depth of 1500mm from ground level 10 m3 0.00
b Excavate on normal soil to a depth of 3000mm from ground level 10 m3 0.00
c Extra-over for excavating in rock class I 10 m3 0.00
d Extra-over for excavating in rock class II 10 m3 0.00
e Extra-over for excavating in clay soil 10 m3 0.00
f Extra-over for excavating in hard material 10 m3 0.00
3 FOUNDATION WALLING 0.00
a 400mm thick rubble stone foundation walling bedded and jointed in cement and sand (1:3)mortar 10 m2 0.00
b 200mm thick natural stone foundation walling bedded and jointed in cement and sand (1:3)mortar 10 m2 0.00
4 CONCRETE WORK 0.00
a Provide all materials and cast insitu plain concrete class 15/20 (1:3:6) blinding under foundation 10 m3 0.00
b Provide all materials and cast insitu plain concrete class 20/20 (1:2:4); vibrated 10 m3 0.00
c Provide all materials and cast insitu plain concrete class 25/20 (1:11/2:3); vibrated 10 m3 0.00
Sawn formwork to insitu concrete as described:- 0.00
d To sides of ring beams 10 m2 0.00
e To soffits of suspended slabs 10 m2 0.00
f To sides of columns 10 m2 0.00
Extra over formwork for:- 0.00
g Fair face finish 10 m2 0.00
a Provide materials and construct 100mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course 10 m2 0.00
b Provide materials and construct 150mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course 10 m2 0.00
c Provide materials and construct 200mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course 10 m2 0.00
d Provide materials and construct 200mm thick hollow concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course 10 m2 0.00
6 ROOF CONSTRUCTION, COVERING AND RAIN WATER GOODS 0.00
a Supply and fix gauge 26 IT4 roofing sheets 10 m2 0.00
b Galvanized iron plain sheet 26 gauge 10 m2 0.00
Approved pressure impregnated and treated hardwood timber 0.00
c 150x150mm section timber members 10 m 0.00
d 150x50mm section timber members 10 m 0.00
e 100x50mm section timber members 10 m 0.00
f 75x50mm section timber members 10 m 0.00
g 50x50mm section - timber purlin 10 m 0.00
h Provide and fix timber fascia board 250x25mm section nailed to the timber beams 10 m 0.00
Approved pressure impregnated and treated softwood timber 0.00
i 150x50mm section timber members 10 m 0.00
j 100x50mm section timber members 10 m 0.00
k 75x50mm section timber members 10 m 0.00
l 50x50mm section - timber purlin 10 m 0.00
m Provide and fix timber fascia board 250x25mm section nailed to the timber beams 10 m 0.00
n Provide and fix 150x150mm box gutter fixed to fascia board with/and including brackets at rafter center and two coat of oil paint. The slopes to be considered according to the drawings 10 m 0.00
p Supply and fix premanufactured 150x100mm PVC rain water gutter fixed to fascia board with mild steel brackets at 1200mm centres 10 m 0.00
7 WALL FINISHES 0.00
a Plaster with 18mm thick mortar on walls and beams, both inside and outside: Walls to be cured at least for one week after 24 hours of plastering. 10 m2 0.00
b Plaster with 12mm thick mortar on walls and beams, both inside and outside: Walls to be cured at least for one week after 24 hours of plastering. 10 m2 0.00
c Supply and apply two coats of white wash on all plastered surfaces with uniforms colours. 10 m2 0.00
d Supply and fix ceramic wall tiles size 200x150x6mm thick 10 m2 0.00
8 FLOOR FINISHES 0.00
Cement and sand screed 0.00
a 25mm thick insitu cement and sand (1:3) screeded beds, with steel trowelled finish , on concrete 10 m2 0.00
Ceramic floor tiles 0.00
b Supply and fix ceramic floor tiles 10 m2 0.00
c 100mm high ceramic tiles skirting 10 m 0.00
Concrete Tiles 0.00
d Provide and install 600x600x50mm precast concrete tiles around the building 10 m2 0.00
9 CEILING FINISHES 0.00
Gypsum Board Ceiling 0.00
a Supply of materials and installation of gypsum board ceiling complete with timber brandering 10 m2 0.00
Chipboard Ceiling 0.00
b 12mm thick chipboard ceiling fixed to and including 50x50mm cypress branderings at 600mm c/c both ways, with clout headed nails and set out in symmetrical panels with 'V' joints 10 m2 0.00
Plywood Ceiling 0.00
c 8mm thick plywood ceiling (8'x4') boards on and including 50 x 50 mm softwood brandering 10 m2 0.00
d Ex 75x50mm softwood moulded timber cornice 10 m 0.00
10 PAINTING 0.00
Prepare and apply three coats plastic emulsion paint to:- 0.00
a Plastered surfaces 10 m2 0.00
Prepare and apply two coats gloss oil paint to:- 0.00
b Plastered surfaces 10 m2 0.00
Aluminium primer or other equal and approved wood primer before fixing: - 0.00
c Backs of frame, board, etc over 100mm but not exceeding 200mm girth 10 m 0.00
Prepare and apply three coats polyurethane clear matt varnish on woodwork internally 0.00
d General surfaces of flush doors and frames 10 m2 0.00
Prepare and apply three coats permaplast weather proof paint to:- 0.00
e Walling and concrete ; external 10 m2 0.00
a Supply and fix 30" mahogany veneered timber flush door size 900x2100mm high with hardwood lipping all round 10 Nr. 0.00
b Door size 800x2100mm high 10 Nr. 0.00
Wrot mahogany 0.00
Framed frames and framings 0.00
c 150 x 50 mm; 2 No. labours; plugged door frame 10 m 0.00
d 50 x 15 mm architrave 10 m 0.00
e 15x15mm quadrant beading 10 m 0.00
Iron mongery 0.00
f Supply and fix three lever mortise lock complete with set lever handle furniture - fixed to timber doors 10 Nr. 0.00
g 100mm steel butt hinges 10 prs 0.00
h 900x100mm high standard Aluminium kicking plate 10 Nr 0.00
i Four lever mortise lock complete with set lever handle furniture - fixed to steel doors 1 Nr. 0.00
12 WATER AND SANITATION 0.00
Supply and fix the following sanitary appliances complete with all the connections to services, waste, jointing to supply overflows and plugging and screwing to the floors. Where trade names are mensioned below, the reference is intended to be as a guide to the type of fitting. 0.00
Water Closet 0.00
a 600x500mm deep Anti Vandal stainless steel squat type WC pan cast in concrete floor slab; complete with cistern and all necessary accessories 1 Nr 0.00
Wash hand basin (WHB) 0.00
b Ceramic Wash Hand basin complete with pedestal and all necessary accessories 1 Nr 0.00
Urinal Bowl 0.00
c Wall hung ceramic urinal complete with all accessories and fixtures 1 Nr 0.00
d Anti-vandal type stainless steel mirror 1 Nr 0.00
Dhobi sinks 0.00
e Supply materials and construct concrete dhobi sink overall size 900x550mm wide 1 Nr. 0.00
f Approved anti- vandal water tap 1 Nr 0.00
Water Tanks 0.00
g Supply and install PVC water tanks with a capacity of 2 m3 complete with all fittings 1 Nr 0.00
h Supply and install fibre glass tanks with a capacity of 5 m3 complete with all fittings 1 Nr 0.00
i Install 10,000m3 Bulk Water Storage Fibre Glass tank complete with accessories 1 Nr 0.00
Supply and install G.I. Class "B" Pipes complete with Fittings 0.00
j 32mm Diameter Pipe 10 Lm 0.00
k 20mm ditto 10 Lm 0.00
m 15mm ditto 10 Lm 0.00
Supply and install PN 20 PPRC conforming to the current European standards for PPR installations and to the Engineer's approval, pipes jointing shall be by polyfusion or use of electric coupling. 0.00
n 50mm dia pipe 10 Lm 0.00
o 32mm dia pipe 10 Lm 0.00
p 25mm ditto 10 Lm 0.00
PPR to GI Adoption pieces 0.00
Gate Valves. 0.00
q 32mm diameter high pressure approved pattern brass rising stem full way gate valve with wheel head and jointing to tubing as 'PEGLAR' or approved equivalent. 1 Nr. 0.00
Copper Tubing. 0.00
r 12mm diameter 300mm long Copper tubing bent as required including jointing to GMS pipe and fitting. 1 Nr. 0.00
Supply and install uPVC soil system to BS4660 and BS4515and muPVC waste systems to BS 5255withscrewed and socketed joints to BS 21. solvent welded joints shall be as per the system's manufacturer's written instruction. Tenderer must allow in their pipe work prices for all the couplings, connectors, joints etc as required in the running lengths of the pipe work and also where necessary for fixing clips, holder bats plugged and screwed. 0.00
s 100mm diameter grey heavy duty high pressure pipes 10 Lm 0.00
t 50mm diameter waste pipes ditto 10 Lm 0.00
u Supplying materials and construction of Inspection Chamber (IC) 600x600mm using solid concrete blocks for walls and casting concrete for the manhole base with thickness not less than 150mm; including cement plastering for inside walls. 1 Nr 0.00
13 ELECTRICAL SUPPLY INSTALLATIONS 0.00
Supply, fix and install wires 1.5mm for lighting and 2.5mm for sockets, distribution panel boards with necessary circuit breakers, testing and earthing boards, cables, sockets, switches, fans, and lighting fixtures as specified in the drawings. All the price of the below items must include the materials and installations cost 0.00
a Main Distribution Panel Board of 150 AMP. 1 Nr 0.00
b Twin sockets (13amp) 1 Nr 0.00
c Single socket (13amp) 1 Nr 0.00
d switches one gang (5amp) one way 1 Nr 0.00
e switches one way (5amp) two gang 1 Nr 0.00
f Fluorescent lamps 40w 4 feet (Twin Unit) 1 Nr 0.00
g Fluorescent lamps 40w 4 feet (Twin Unit) c/w Emergency Maintained Fluorescent fitting. 1 Nr 0.00
14 FENCING 0.00
Supply and erect pre-cast concrete Fencing Posts-Cranked 2400mm high 0.00
Chain Link Fencing 0.00
c Supply and install 2400mm high x 14 gauge chain link fencing on and including 100x125 cranked precast concrete fencing posts on concrete bases 10 m 0.00
Barbed Wire 0.00
d Supply and install 12 1/2 Gauge x 4 strands galvanized barbed wire nailed to timber or concrete posts (Measured Separately) 10 m 0.00
Razor Wire 0.00
Supply and install 12 1/2 Gauge galvanized steel razor wire complete with 1000mm high 50x50x6mm thick angle iron posts at 1500mm centers; bottom part of posts built in concrete block walling 0.00
e 300mm diameter (stretched) 10 m 0.00
15 TIMBER BOARDS & PARTITIONS 0.00
Supply and fix the following:- 0.00
25 mm thick block board 0.00
a Plain 5 m2 0.00
b Veneered one side with mahogany or other approved 5 m2 0.00
c Veneered BOTH sides with mahogany 5 m2 0.00
d 3mm thick sheet 5 m2 0.00
Chip boards 8' X 4' 0.00
e 9 mm thick Plain Chip board 5 m2 0.00
f 12 mm thick ditto 5 m2 0.00
25 mm wrot T & G boarding 0.00
g Fabricated from 100 X 25 mm prime grade timber 5 m2 0.00
The price shall cover maintenance until well established
a Supply and install, spread and make good a minimum of 30cm agricultural soil in designated areas 10 m2 0.00
b Supply and plant indigenous trees. Price includes digging a minimum of 1.5m deep holes for each tree for the following: 5 Nr 0.00
TOTAL FOR SCHEDULE OF RATES BILL (NOTE: THIS TOTAL SHALL NOT BE CARRIED TO GRAND SUMMARY) 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
LOT 1 - RABARABA (TVET, PRIMARY SCHOOL, HEALTH CENTRE, DISTRICT DEVELOPMENT AUTHORITY OFFICE & LOCAL LEVEL GOVERNMENT OFFICE )
ITEM DESCRIPTION AMOUNT (USD)
BILL 01 -PRELIMINARIES AND GENERAL
Bill No. 1 PRELIMINARIES 0.00
BILL 01 - SUB TOTAL [A] 0.00
BILL 02 - RABARABA TVET
Bill No. 2 - 1 TYPICAL MAINSTREAM DRY TOILETS (5 NO.) 0.00
Bill No. 2 - 2 TYPICAL ACCESSIBLE DEHYDRATED TOILET 1 NO.) 0.00
Bill No. 2 - 3 CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA 0.00
Bill No. 2 - 4 PLUMBING & DRAINAGE 0.00
Bill No. 2 - 5 ELECTRICAL INSTALLATIONS 0.00
Bill No. 2 - 6 CESS POOL/URINE ABSORPTION PIT 0.00
BILL 02 - SUB TOTAL [B] 0.00
BILL 03 - RABARABA PRIMARY SCHOOL
Bill No. 3 - 1 TYPICAL MAINSTREAM DRY TOILETS ( 6NO.) 0.00
Bill No. 3 - 2 TYPICAL ACCESSIBLE DEHYDRATED TOILET (1 NO.) 0.00
Bill No. 3 - 3 ASSEMBLY HALL 0.00
Bill No. 3 - 4 CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA 0.00
Bill No. 3 - 5 PLUMBING & DRAINAGE 0.00
Bill No. 3 - 6 ELECTRICAL INSTALLATIONS 0.00
Bill No. 3 - 7 CESS POOL/URINE ABSORPTION PIT 0.00
BILL 03 - SUB TOTAL [C] 0.00
BILL 04 - RABARABA HEALTH CENTER
Bill No. 4- 1 TYPICAL MAINSTREAM DRY TOILETS (1NO.) 0.00
Bill No. 4 - 2 TYPICAL ACCESSIBLE DEHYDRATED TOILET (2NO.) 0.00
Bill No. 4 - 3 CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA 0.00
Bill No. 4 - 4 PLUMBING & DRAINAGE 0.00
Bill No. 4 - 5 ELECTRICAL INSTALLATIONS 0.00
Bill No. 4 - 6 CESS POOL/URINE ABSORPTION PIT 0.00
BILL 04 - SUB TOTAL [D] 0.00
BILL 05 - RABARABA DISTRICT DEVELOPMENT AUTHORITY (DDA) OFFICE
Bill No. 5- 1 CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA 0.00
Bill No. 5 - 2 PLUMBING & DRAINAGE 0.00
BILL 05 - SUB TOTAL [F] 0.00
BILL 06 - RABARABA LOCAL LEVEL GOVERNEMENT (LLG) OFFICE
Bill No. 6- 1 TYPICAL ACCESSIBLE DEHYDRATED TOILET (1 NO.) 0.00
Bill No. 6 - 2 CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA) 0.00
Bill No. 6 - 3 PLUMBING & DRAINAGE 0.00
Bill No. 6- 4 ELECTRICAL INSTALLATIONS 0.00
Bill No. 6 - 5 CESS POOL/URINE ABSORPTION PIT 0.00
BILL 06 - SUB TOTAL [G] 0.00
TOTAL PRICE [I = A+ B +C+D+F+G] 0.00
LESS DISCOUNT (IF ANY) [J]
TOTAL PRICE (POST DISCOUNT) [K = I-J] 0.00
United Nations Office for Project Services
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
THE GOVERNMENT OF PAPUA NEW GUINEA
CONSTRUCTION WORKS FOR WASH INTERVENTIONS IN RABARABA & ESA'ALA, MILNE BAY, PAPUA NEW GUINEA
LOT 2 - ESA'ALA (HEALTH CENTRE, PRIMARY SCHOOL & MARKET)
BILL OF QUANTITIES (BOQ)
Consists of the following:
- Pricing notes
- Bill 01 - Preliminaries
- Bill 02 - Esa'ala Health Centre
- Bill 03 - Esa'ala Primary School
- Bill 04 - Esa'ala Market
- Bill 05 - Day works
- Bill 06 - Schedule of rates
NOTE: It is a MANDATORY requirement for bidders to complete and return all parts of this BOQ. Failure to complete all sections of the BOQ may result in automatic disqualification of your bid.
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
CONSTRUCTION WORKS FOR WASH INTERVENTIONS IN RABARABA & ESA'ALA, MILNE BAY, PAPUA NEW GUINEA
These price notes form part of the Bills of Quantities.
1 The Permanent Works shall be measured notwithstanding any general or local custom except where otherwise specifically described or prescribed in the Contract.
2 The rates and prices in the Bill of Quantities shall, except where otherwise provided in the Contract, cover all the Contractor's obligations under the Contract and all matters and things necessary for the proper execution and maintenance of the Works.
3 The items provided in the Bill of Quantities shall be the only items against which payment shall be made, except that where additional items are required in respect of authorized additional works, payments may be made against such additional items.
4 The Contractor shall be deemed to have included in his rates entered against the items in the Bill of Quantities for all activities necessary to complete the Contract Works, including any items of Work, which, in his opinion has been omitted from the Bill of Quantities.
5 Except where otherwise detailed in the Bill of Quantities or specified, labor, including the supervision thereof, materials, Constructional Plant, Temporary Works, transport to and from the Site and in and about the Works, laboratory testing and other things of every kind required for the execution and maintenance of the Works shall not be measured and the cost thereof shall be deemed to be included in the rates and prices in the Bill of Quantities.
6 The total quantity included in the final measurement of each item shall be measured to the nearest integer relative to that item, or to one decimal place if so indicated in the Bill of Quantities.
7 The following abbreviations are used in the Bill of Quantities:
a. m² Square meter
b. mm Millimeter
c. m³ Cubic meter
f. km Kilometer
j. dia Diameter
k. Prov. Sum Provisional Sum
m. USD US dollar
p. HP Horse power
q. M.s Measured Separately
8 Where in the Bill of Quantities there is a Schedule or subsidiary bill setting out the quantities of component materials and work which comprise a unit of work measured under a single item in a Part of the Bill of Quantities, the said quantities shall be subject to measurement and valued at the rates and prices entered therein and the total thereof shall be the rate for the item.
9 For items which the unit of work is given as “Sum” and the quantity of work is given as “Item”, otherwise than the items brought forward from a subsidiary schedule as explained under paragraph 8 above, the proportions of payments in interim payments shall be made, according to ratios based on the percentage of work or components of work completed and/or, in installments defined by the period covered by the interim certificate to the total period for which such works/facilities are provided. Such ratios and installments shall be determined by the Employer's Representative. In his determination, the Employer's Representative is at liberty to consider a breakdown of lump-sum items provided by the Contractor. At any stage during the duration of the Contract, the Employer's Representative will be entitled to adjust such ratios and installments to correspond with any amendment to the duration of the works as related to completion of the Works.
10 Any item of work included in the Bill of Quantities for which no rate or price was specified shall be considered as included in other rates and prices in the Bill of Quantities and will not be paid for separately.
11 Definitive list of works is provided by the Bill of Quantities only and the quantities listed on the drawings and other tables are for information purposes only.
Provisional Quantities, Optional Works and Alternative Items
Provisional Quantities
12 Items in the Bill of Quantities for which the quantities are stated to be provisional shall only be executed if they are the subject of a written instruction from the Employer's Representative. The rates set out for such items shall be used for the valuation of works so ordered by the Employer's Representative in writing whether the quantities shown are used wholly or in part. If the amount of work ordered by the Employer's Representative to be executed under a Provisional Quantity item exceeds the quantity shown in the Bill of Quantities, the rate for that item set out in the Contract shall be deemed applicable to the excess.
Schedule of Rates
13 The activities covered by the Schedule of Rates are general activities of a routine nature which are similar or the same as some of the activities which shall be paid for under other items in the Bill of Quantities.
14 The Contractor shall be deemed to have drawn on his technical expertise in entering the Prices and shall have made all due allowances for conforming to relevant codes, standard practice and the Specifications.
Anomalous Rates
15 The rates entered in the Schedule of Rates will be scrutinized as follows:
Where a rate is entered for an item in the Schedule of Rates and an equivalent item is provided under the Bill of Quantities, the rate in the Schedule of Rates should match the rate in the Bills of Quantities. Where such rates do not match; the lower rate for such similar items will govern.
Where a rate is entered for an item in the Schedule of Rates and there is no equivalent item provided under the Bills of Quantities, the bidder may be requested to provide a breakdown of the constituent costs of any rate together with the constituent costs of rates for specified items within the priced Bill of Quantities and demonstrate that the rate in the Schedule of Rates is priced in a manner consistent with the rates provided in the Bill of Quantities. In the event that the bidder cannot demonstrate such consistency, at UNOPS discretion the rate in the Schedule of Rates shall be adjusted.
16 Items in the Bill of Quantities for which the quantities are stated to be optional shall only be executed if they are the subject of a written instruction from the Employer's Representative.
Alternative Items
17 Alternative Items will not be considered in the evaluation of the bids. However, UNOPS has the right to subsequently select the alternative item for implementation.
18 Provisional Sums for use when work is executed on a day work basis. Work shall not be executed as day work except by written instruction of the Employer's Representative.
19 Payment in respect of labor employed on a day work basis shall be at the rate entered in the day work rates and no payment shall be made in respect of overtime. A work day is defined as an 8 hour working day including weekends and public holidays.
Construction Equipment
20 Payment in respect of Construction Equipment employed in the execution of the work on a day work basis, shall be at the rates entered in Day work Bill
The time for which Construction Equipment is broken down or during which it is being serviced shall not be measured, nor shall that of any labor or other Constructional Equipment which is unable to work by reason of such breakdown or servicing.
The rates for construction equipment working shall include for all operation and maintenance costs, fuel, oil, inclusive of drivers and attendants.
Plant and Materials
21 Payment in respect of plant and materials used in the execution of work on a day work basis shall be according to the rates of plant and materials entered in Bill 5, which shall include the cost of taking the plant and materials from the store or stockpile on the Site to the place where they are used.
22 No separate payment shall be made for complying with the provisions of the following Clauses of the Technical Specification except where explicitly provided in the Bill of Quantities.
23 Payment for diversion and/or modification of existing utility and road crossings of whatsoever kind shall be made under the items as set out in the Bill of Quantities for “temporary access roads” and for “temporary diversion works” as appropriate.
24 Where the unit of such work is defined as a “Sum” in the Bill of Quantities, the amount entered for that “Sum” shall be deemed to cover all components of work in order to complete the work. Components of such work, (e.g. removal of existing services, excavation, supply, laying and jointing of pipes, concrete, reinforcement, pile forming /driving, all temporary arrangements, etc.) shall not be separately measured.
25 No separate payment shall be made for the Contractor servicing any cranes and handling devices on completion of works that he has made use of during the works.
26 While determining unit rates, the Contractor shall take into consideration any site specific construction complexities and include their cost into the respective unit rates.
27 No separate payment shall be made for complying with any of the requirements of the Technical Specification with regard to the Contractor’s activities and requirements for the Site except as explicitly set out in the Bill of Quantities and where such items are provided these shall be deemed to cover all matters, costs and expenses.
The Contractor shall be deemed to have included in his rates for:
_ Organization of construction works when deriving his rates.
Temporary Works
28 Eighty percent (80%) of total lump sum price of temporary works will be paid to the Contractor upon completion of these temporary facilities, and the remaining twenty percent (20%) of the total price will be paid after handing over to the Employer of these temporary facilities.
29 Payment for temporary access roads shall be made in percentage of total required work in accordance with the progress of these works carried out by the Contractor. Payment for construction of temporary access roads shall be deemed to be included in the Contractor’s rates if not stated as an extra item in the Bill of Quantities.
30 Payment for photographs as per UNOPS requirements shall be deemed to be included in the Contractor’s rates if not stated as an extra item in the Bill of Quantities.
Control of Water
31 Payment for control of ground and surface water shall be deemed to be included in the Contractor’s rates if not stated as an extra item in the Bill of Quantities.
Materials and Workmanship
32 No separate payment will be made for complying with the provisions of Technical Specifications with respect to obtaining the specified standards and class of workmanship or complying with Standards ordered by the Employer's Representative shall be paid at the net cost for supply of standards plus the percentage in the space provided for the relevant item.
33 No separate payment shall be made for complying with the provisions of earthworks except where explicitly provided, and no separate payment will be made for:
Fill / Backfill made by the Contractor for any purpose or reason, for over excavation or fill and for removal of material.
Payment for drainage pipes will be included in the Bill of Quantities. The payment will include all labor, equipment, tools and other incidentals for providing the slits and stops.
34 In case of separate Bill items for stripping, this will be measured for payment by the square meter and shall include a depth of 0.3 m below original ground surface. Quantities for payment will be computed by direct measurement of areas stripped, and will include only the locations directed by the Employer's Representative. Payment will be made at the unit rates per square meter tendered therefore in the Bill of Quantities.
Clearing and Grubbing
35 Clearing and Grubbing shall be measured in square meters and payment will be made at the unit rates per square meter tendered therefore in the Bill of Quantities.
Site Investigations
36 Measurement and payment for site investigations where ordered by the Employer's Representative shall be made on day-work report basis.
No separate payment shall be made for site investigations which are an integral part of the Contractor’s general activities under the Contract.
Clearance Works
37 Rates for removal of any type of existing structures and buildings (reinforced concrete, steelwork, etc.), their contents or general waste materials (including municipal waste) shall be included in the Contractor’s rates and prices except where it is expressly measured by a lump sum amount, or by volume as provided for in the Bill of Quantities.
The rate in the Bill of Quantities shall include all work necessary for the removal, transportation and safe disposal of materials in accordance with the Technical Specification.
38 Non-reinforced (plain) and reinforced concrete will each be measured for payment by cubic meter.
Precast concrete and reinforced concrete shall be measured in cubic meters except where the former is measured by number of units.
The unit rate for concrete works shall cover all costs that are necessary to obtain the concrete quality including, but not limited to the following items:
_ Delivery and storage of all materials
_ Preparation and submission of working drawings and calculations
_ all batching, mixing and transport equipment, including all required personnel and foremen
_ preparing, transporting and placing of concrete
_ finishing of surfaces
_ making and curing of test cubes, including laboratory tests;
_ curing of concrete, including materials and equipment;
_ drilling and cutting of concrete cores, including equipment and testing;
_ transportation, keeping on the site, including loading and unloading.
39 Shuttering shall be measured and paid for separately under the Bill of Quantities. No extra payment for cooling or soaking shuttering shall be made.
40 Unless otherwise stated in the Bills of Quantities no separate payment shall be made for reinforcement.
Where the item for concrete in the Bills of Quantities refers to a quantity or rate of reinforcement in the concrete, no separate measurement shall be made for reinforcement.
In such cases the concrete rates in the Bill of Quantities shall be deemed to include for reinforcement at the minimum of the density stated.
Where the Bills of Quantities provide for measurement of steel reinforcement bars, the weight shall be calculated on the basis of the relevant Technical Specification.
The rates for steel reinforcement, whether explicit or implicit, shall include all expenditures incurred in providing, cutting, bending, placing and fixing the reinforcement in its final position in the structure.
41 Finishes shall not be subject to additional payment and shall be deemed to be included in the rates for concrete.
42 No separate payment shall be made, for supply and testing of concrete ingredients; storage of materials; determination of mix proportions; making and testing of trial mixes; testing of concrete; control and mixing of concrete; transporting, placing and compacting concrete; finishes; construction joints (whether shown on the Drawings or not except that where a water stop is specified or ordered by the Employer's Representative to be incorporated in construction joints it shall be measured by length for each type and size required); moulds for transporting and fixing pre-cast work; precautions for concreting in unfavourable weather; curing; ascertaining requirements for reinforcement, bending, cutting and fixing reinforcement or working space for erection and handling of shuttering.
If the Employer's Representative so directs, samples of cement, water and fine and coarse aggregates shall be delivered by the Contractor to the Employer's Representative for independent testing; such testing shall be charged directly to the contractor.
Removal of concrete structures
43 Demolition works to concrete structures shall be measured net as volume.
No separate payment shall be made for disposal of debris and waste in accordance with the Specification or for making good any damage arising from retained elements.
Precast Concrete Structures
44 Precast concrete and reinforced concrete will be measured in cubic meters or in case of pipes and manhole rings per unit or length as stated in the Bill items.
The unit rates for reinforced concrete elements must cover all costs, the following items inclusive:
_ Submission of working drawings;
_ Delivery and storage of all materials;
_ All equipment, including devices for dosing, mixing and transportation, and operating personnel;
_ Preparing, transporting and placing of the concrete;
_ Finishing of surfaces;
_ Making and curing of test cubes, including laboratory tests;
_ Curing of concrete, including material and equipment;
_ Transportation and storage of prefabricated elements at the site
The rates for precast reinforced concrete pipes and box units shall be deemed to include for supply and laying, including all joints and connections, except where the Bills of Quantities specifically provide for otherwise.
45 Placing of rubble concrete shall be measured by square meters stating the thickness.
46 Stone masonry shall be measured in square meters complete and shall include for all preparation, materials and finishing, including all pointing
47 Unless otherwise provided for in the Bill of Quantities no separate measurement shall be made for complying with the requirements of the Technical Specification, the cost of which shall be included in the rates and prices relative to the items concerned.
Where items are provided in the Bill of Quantities for painting, it shall be measured as the surface area covered for the top coat only.
Rules of measurement
48 Works are measured and classified in accordance to the rules of Standard Method of Measurement -SMM7 and therefore, any variation or disputed quantities SHALL be measured and classified accordingly for purposes of pricing. Where there is a deviation from the SMM measurement process on a BOQ item, any variation on that item will be measured and assessed in accordance to the unit and description presented in the BOQ.
United Nations Office for Project Services
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
THE GOVERNMENT OF PAPUA NEW GUINEA
PROPOSED WASH INTERVENTION FOR ESA'ALA HEALTH CENTRE, PAPUA NEW GUINEA
BILL OF QUANTITIES (BOQ)
Consists of the following:
1-1 Preliminaries
NOTE: It is a MANDATORY requirement for bidders to complete and return all parts of this BOQ. Failure to complete all sections of the BOQ may result in automatic disqualification of your bid.
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
CONSTRUCTION WORKS FOR WASH INTERVENTIONS IN RABARABA & ESA'ALA, MILNE BAY, PAPUA NEW GUINEA
ITEM DESCRIPTION QTY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 1 PRELIMINARIES
For the purposes of this Bill of Quantities, items applicable to multiple project sites have been consolidated and included as a single lump sum item (Quantity: 1 Nr) while items that are site-specific have been separately quantified in accordance with standard measurement practice. Note
If no price has been stated against any item hereunder, the Contractor shall not be entitled to claim any money for such items even though he is obliged to execute the work or provide services described therein. Preliminary items priced by the Tenderer are deemed to include the cost of unpriced items. Note
The Tenderer shall read, understand and acquaint himself with the requirements in the Conditions of Contract, Instructions to Tenderers, Bidding Data, Bid Form, Appendix to Tender and Preamble notes. It is the Tenderer's responsibility to see that his price includes for complying with all the above requirements whether specifically referred to in this bills of quantities or otherwise. Note
The Tenderer is required to visit the site of the proposed work, as it is his responsibility to ascertain the conditions governing access to the site, the external working space, storage area and any other information he may find necessary before he can tender for the work. Note
Cost and expenses in connection with any other preliminary item which is not listed below, but is necessary for the due completion of works, is deemed to be included in the tender rates. Note
Mechanical plant and equipment which emits excessive noise, smoke, fumes, obnoxious gases etc., will not be allowed to be used in the Site, without the prior approval of the Employer. Note
The contractor shall be responsible for any loss or damage to the works, existing structures, adjoining structures and unfixed materials. Note
The contractor shall be responsible for hoisting of all materials to any given height of the building. Note
The contractor shall ensure supply and connection of temporary water and power solely for the works and work related purposes. The contractor shall price for the associated water & power and price bills under items q and r. Note
a) Mobilization, logistics and transportation services for construction materials, work crews/key personnel, plant, and equipment not locally available at the project site. This includes logistics from manufacturers’ factories or construction hardware suppliers to the designated wharf (Alotau, Lae, Port Moresby, or any other alternative town selected by the bidder for sourcing project materials, plant, and equipment), followed by onward shipment to the contractor’s storage facility at the project site as well as demobilization after completion of work. This item also covers all associated costs, including wharf facility charges, delivery and handling equipment during loading and unloading operations, and any applicable permits and statutory fees. Bidders are required to submit a method statement along with a detailed cost breakdown for this item as part of their bid submission. 1 Item 0.00
b) Allow for setting out of works in accordance with drawings; liaise with client to establish exact boundaries and other written information given by the Employer's Representative for setting out, street and building lines before commencements of construction; Checking of any setting out or of any line or level by the Employer's Representative shall not in any way relieve the Contractor of his responsibility for the accuracy thereof. 1 Item 0.00
c) The contractor shall allow for leasing of existing building with adequate space within the proximity of the project sites to serve as a temporary site office and store and fit it with the required facilities for his own site management staff as well as the Employer's Representative (1nr). An office set-up approved by the Employer can also be considered as an alternative. 1 Item 0.00
d) Allow for hoarding the project sites (approximately 250m long for each site) using iron sheets or any approved equivalent as may be directed by the site Employer's Representative. The hoarding height shall be not less than 3m high supported by timber poles with all necessary entry and exit gates to approval of the Employer's Representative. 3 Item 0.00
e) The contractor shall provide temporary toilet facilities for his workers and the Employer's Representatives within the Main Yard site as directed. The same shall be maintained in proper sanitary conditions throughout the contract period. 1 Item 0.00
f) Allow for submission of daily and monthly progress reports for ALL Project Sites. The reports shall be in electronic format and include photographs where necessary. The contractor shall also be required to maintain daily records in the manner required by the Employer to indicate factual details of: 1 Item 0.00
(i) Number of workmen in different categories and the number of foremen. Note
(ii) Particulars of materials and goods brought to the site. Note
(iii) Particulars of machinery & equipment brought to or taken out of site. Note
(iv) Rainfall records. Note
g) Allow for all cost in connection with preparing samples for testing, making arrangements for testing of materials, goods etc., as stipulated in the Specification, obtaining test reports and submitting the same to the Employer's Representative. (This item intends to cover all expenses incurred by the contractor in connection with sampling and testing of materials, goods etc., required in the specifications, other than those provided for in the bills of quantities.) 1 Item 0.00
h) Fabricate and erect a project sign board complete with lettering, mounted and supported on steel poles as per Architectural drawings, all subject to the approval of the Employer 3 Item
i) Prepare and submit Operation & Maintenance Manual for the Works to the Employer's approval. 3 Item
j) Prepare and submit "As-Built" or record drawings to the Employer's approval. 3 Item
k) Capacity Development and End-User Training on the Operation & Maintenance of the constructed facilities including the Dehydration Toilets 3 Item
Insurances, Bonds & Fees 0.00
Provision of insurance requirements for the contract over and above the Contractor's existing insurance covers, in line with the requirements outlined in ITB Section V Schedule B "Section 3.11 - Insurance Requirements"
l) Construction All Risk Insurance for Works, Plants and Materials 1 Item
m) Public Liability Insurance 1 Item
n) Worker's Compensation Insurance 1 Item
Levels and soil conditions confirmation 0.00
The contractor should allow for doing the confirmations for each site Note 0.00
p) The contractor shall confirm the soil conditions through trial pits of 2m maximum depth with a minimum spacing of 15m between each pit for each structure. Maximum of 4 pits per site. The contractor shall submit details of the trial pits including photographs to the Employer for approval 3 Item 0.00
Time-Related Charges
q) Allow for running and maintenance of generators or equivalent temporary power supply source for power supply to the construction sites. Item to include fuel and other consumables 3 Item 0.00
r) Allow for temporary continuous water supply to the construction sites for the works and associated usage 3 Item 0.00
General ESS and HSSE requirements
s) The contractor shall carry out an Environmental and Social (E&S) screening exercise to assess whether the project’s activities pose any specific risks. The exercise shall be performed as per guidelines provided in the UNOPS E&S screening templates. 1 Item 0.00
t) Allow for provision of Occupational, Health, Safety (OSH) and Environmental and Social (E&S) Management system for the execution of works under the contract. The bidder should submit his comprehensive OSH, and E&S Management. 1 Item 0.00
u) Allow for full compliance with all requirements in relation to Health and Safety, Social and Environmental Management issues. Item to include all necessary safety measures to workmen (provision of PPE), The Employer's Representative has the right to pay a percentage of the monthly component to suit the percentage accomplishment of the approved plan. 1 Item 0.00
TOTAL FOR BILL NO. 1 - PRELIMINARIES - CARRIED TO GRAND SUMMARY 0.00
United Nations Office for Project Services
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
THE GOVERNMENT OF PAPUA NEW GUINEA
PROPOSED WASH INTERVENTION FOR ESA'ALA HEALTH CENTRE, PAPUA NEW GUINEA
BILL OF QUANTITIES (BOQ)
Consists of the following:
2-1 - Mainstream Dry Toilet blocks (1no.)
2-2 - Accessible Dehydrated Toilet blocks (2no.)
2-3 - Catchment Tank Plinth
2-4 - Plumbing & Drainage
2-5 - Electrical Installations
2-6 - Cesspools (1no.)
NOTE: It is a MANDATORY requirement for bidders to complete and return all parts of this BOQ. Failure to complete all sections of the BOQ may result in automatic disqualification of your bid.
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR ESA'ALA HEALTH CENTRE, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 2.1 TYPICAL MAINSTREAM DRY TOILETS (1NO.)
(All provisional)
Quantities are for 1no. Block Note
i) Plumbing and drainage work, including the water tank has been measured separately (Bill no. 2.4) Note
ii) Cesspool has been measured separately (Bill no. 2.6) Note
iii)All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stockpilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS
a) Clear the site of all shrubs, bushes, small trees and debris; remove from site as directed [Approximate area: 90 m2 for Building footprint and 50% allowance] 1 Item 0.00
Oversite excavations
b) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Building footprint only] 60 m2 0.00
c) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 9 m3 0.00
d) Excavate in soft material for column bases; 0-1.50m deep [For timber columns] 8 m3 0.00
e) Return, fill in and ram selected excavated material around foundations 10 m3 0.00
Disposal of Surplus spoil
f) Load and cart away surplus excavated material from site to an approved dumping site 7 m3 0.00
Selected filling
g) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep [For water tank plinth] 4 m2 0.00
h) Selected and approved backill material, well watered and compacted [1100mm deep below the hardcore under the water tank plinth] 4 m3 0.00
i) 50mm Thick granular/gravel blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 4 m2 0.00
j) 150mm Thick granular/gravel spread finish to overall ground surfaces [Under the toilets] 38 m2 0.00
Anti-termite treatment
k) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to granular/gravel surfaces 42 m2 0.00
TOTAL FOR SITE PREPARATION, EXCAVATIONS & EARTHWORKS CARRIED TO BILL SUMMARY 0.00
2) CONCRETE WORKS
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 5 m2 0.00
b) 50mm Thick blinding under column bases 6 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Column bases 2 m3 0.00
d) Stub columns 2 m3 0.00
e) Foundation strip 1 m3 0.00
f) Tank platform [100mm thick ], finished smooth 1 m3 0.00
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 7 m2 0.00
TOTAL FOR CONCRETE WORKS CARRIED TO BILL SUMMARY 0.00
3) STEEL REINFORCEMENT
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 10 mm diameter bars (in column bases & strip footings) 120 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
b) Fabric mesh reinforcement to tank plinth concrete bed 7 m2 0.00
TOTAL FOR STEEL REINFORCEMENT CARRIED TO BILL SUMMARY 0.00
4) SHUTTERING & FORMWORK
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 3 m² 0.00
b) Vertical sides of column bases 13 m² 0.00
c) Vertical sides of stub columns 30 m² 0.00
d) Edges of Tank platform concrete bed, 100mm girth 10 m 0.00
TOTAL FOR SHUTTERING & FORMWORK CARRIED TO BILL SUMMARY 0.00
5) JOINERY & TIMBER WORKS
1. Rate for Timber sections shall include all necessary drilling of holes, bolting, cleats and other necessary connections that are not separately itemized for pricing Note
2. The Contractor shall provide shop drawings for approval. Once approved, the drawings shall be strictly adhered to during the fabrication and installation process. Note
3. The Contractor shall provide documentation verifying treatment type, retention levels, and compliance. Note
4. Rainwater down pipes have been measured under the plumbing and drainage bill Note
I Timber framework
Columns, rafters etc.
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished with 2 coats polyurethane varnish on completion; all as per Structural Engineer's drawings
a) 150x150mm Timber Column, encased in concrete column(m.s), secured with a threaded end or steel plate anchored in the timber column 124 m 0.00
b) 150x150mm Timber floor bearers bolted to timber columns (m.s) 28 m 0.00
c) 100x75mm Timber floor joists bolted to floor bearers (m.s) 26 m 0.00
d) 50x50mm Timber bracings bolted to timber columns (m.s) 108 m 0.00
e) 75x50mm Timber rafters, bolted to top of timber columns (m.s) 38 m 0.00
f) 25x50mm Ventilation slats fixed to timber columns (m.s) 46 m 0.00
g) 50x50mm Timber purlins fixed to rafters (m.s) 65 m 0.00
Softwood timber
h) 200x25mm Thick One-side wrot fascia and barge board 28 m 0.00
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished with 2 coats polyurethane varnish on completion; all as per Structural Engineer's drawings
a) 200x50mm Timber stringer 17 m 0.00
b) 300x25mm Timber platforms/treads fixed to stingers (m.s) 25 m 0.00
Approved 7.5mm Thick site-painted plank weather board; treated against termites and mositure ingress; finished with 2 coats polyurethane varnish on both sides
a) Supply and fix 7.5mm thick site-painted plank weather board; fixed to timber framework (m.s) with tying wires or other approved fixing accessories 92 m2 0.00
IV Wood planks floor finish
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Approved timber planks; treated against termites, moisture and unine acidity; finished with 2 coats polyurethane varnish on the top side
a) Supply and fix approved smooth planed 200x50mm wood planks; fixed to timber framework (m.s) with concealed bolts or screws 22 m2 0.00
b) Allow for creating squat pan spaces through the wood planks flooring; finishing around 4 Nr 0.00
The following in timber doors as per the details provided
Door Frames, architraves and beads
a) Ex 150x50mm hardwood frame rebated 22 m 0.00
b) 50x15mm hardwood architrave chamfered 22 m 0.00
c) 15x15mm hardwood quadrant bead 22 m 0.00
Supply and fix the following 40mm thick solid core, hardwood veneer faced door shutter with hardwood lipping all round
d) Single leaf door size 900x2200mm high with 100mm high aluminium kick plate on the inside 4 Nr 0.00
Supply and fix the following ironmongery with screws to match
e) Heavy duty natural aluminium hinges approved from samples 12 Nr 0.00
f) Three lever mortise lock complete with a set of lever furniture and approved from sample 4 Nr 0.00
g) Aluminium door handles including fixing to timber doors and approved from samples 8 Nr 0.00
Painting and Decorating
Aluminum wood primer
h) Back of wood frames over 100mm but not exceeding 200mm girth 22 m 0.00
Prepare and apply clear matt varnish to timber doors
i) Surfaces not exceeding 100mm girth 44 m 0.00
j) Ditto over 100mm not exceeding 200mm girth 22 m 0.00
k) General surfaces of doors 11 m2 0.00
TOTAL FOR JOINERY & TIMBER WORKS CARRIED TO BILL SUMMARY 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide 10 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 10 m2 0.00
c) 200mm Thick dwarf wall above ground 13 m2 0.00
TOTAL FOR BLOCKWORK CARRIED TO BILL SUMMARY 0.00
7) ROOF COVERING & RAINWATER GOODS
a) Supply and Fix Aluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets or approved equivalent; fixed to timber purlins (m.s) using manufacturer's proprietary bolts 45 m2 0.00
b) Allow for making holes through the roofing sheets for ventilation pipes at specified positions; finishing and sealing around the pipes to prevent leakages 4 Nr 0.00
Rainwater goods
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
c) Supply and install sheerline colorbond gutter fixed to fascia (m.s) with and including spring clips at 1200mm centres [Rate to include gutter stop ends]. The gutther to have a micro-mesh leaf guards 9 m 0.00
d) Extra over downpipe; for gutter outlet 1 Nr 0.00
e) Allow for connection of the downpipe to the water reservoir tank (tank measured separately) 1 Item 0.00
TOTAL FOR ROOF COVERING & RAINWATER GOODS CARRIED TO BILL SUMMARY 0.00
TYPICAL MAINSTREAM DRY TOILETS (1NO.)
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS 0.00
2) CONCRETE WORKS 0.00
3) STEEL REINFORCEMENT 0.00
4) SHUTTERING & FORMWORK 0.00
5) JOINERY & TIMBER WORKS 0.00
6) BLOCKWORK 0.00
7) ROOF COVERING & RAINWATER GOODS 0.00
TOTAL FOR BILL 2-1- TYPICAL DRY TOILETS (1NO)- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR ESA'ALA HEALTH CENTRE, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 2.2 TYPICAL ACCESSIBLE DRY TOILET (2NO.)
(All provisional) Note
Quantities presented in this bill are for 2no. Toilet blocks 2 Nr. Note
i) Plumbing and drainage work, including the water tank has been measured separately (Bill no. 2.4) Note
ii) Cesspool has been measured separately (Bill no. 2.6) Note
iii)All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS
a) Clear the site of all shrubs, bushes, small trees and debris; remove from site as directed [Approximate area: 145 m2 for Building footprint including ramps and 20% allowance] 2 Item 0.00
Oversite excavations
b) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Building footprint including ramp areas only] 150 m2 0.00
c) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 14 m3 0.00
d) Excavate in soft material for column bases; 0-1.50m deep [For timber columns] 126 m3 0.00
e) Return, fill in and ram selected excavated material around foundations 103 m3 0.00
Disposal of Surplus spoil
f) Load and cart away surplus excavated material from site to an approved dumping site 37 m3 0.00
Selected filling
g) Selected and approved backill material, well watered and compacted [1800mm deep under the water tank plinth] 8 m3 0.00
h) 50mm Thick murram blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 4 m2 0.00
i) 150mm Thick murram spread finish to overall ground surfaces [Under the toilets including ramp areas] 140 m2 0.00
Anti-termite treatment
j) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to murram surfaces 144 m2 0.00
TOTAL FOR SITE PREPARATION, EXCAVATIONS & EARTHWORKS CARRIED TO BILL SUMMARY 0.00
2) CONCRETE WORKS
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 10 m2 0.00
b) 50mm Thick blinding under column bases 84 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Column bases 14 m3 0.00
d) Stub columns 16 m3 0.00
e) Foundation strip 2 m3 0.00
f) Tank platform [150mm thick ], finished smooth 2 m3 0.00
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 8 m2 0.00
External Paved Areas
h) Locally available stone paving slabs jointed in cement and sand mortar and laid on and including 50mm thick sand bed (Sample of locally available stone slabs to be provided by the Contractor for approval by the site Engineer). Rate Only m2
TOTAL FOR CONCRETE WORKS CARRIED TO BILL SUMMARY 0.00
3) STEEL REINFORCEMENT
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 8 mm diameter bars 734 kg 0.00
b) 10 mm diameter bars 892 kg 0.00
c) 12 mm diameter bars 828 kg 0.00
TOTAL FOR STEEL REINFORCEMENT CARRIED TO BILL SUMMARY 0.00
4) SHUTTERING & FORMWORK
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 6 m² 0.00
b) Vertical sides of column bases 64 m² 0.00
c) Vertical sides of stub columns 212 m² 0.00
d) Edges of Tank platform concrete bed, 150mm girth 16 m 0.00
TOTAL FOR SHUTTERING & FORMWORK CARRIED TO BILL SUMMARY 0.00
5) JOINERY & TIMBER WORKS
1. Rate for Timber sections shall include all necessary drilling of holes, bolting, cleats and other necessary connections that are not separately itemized for pricing Note
2. The Contractor shall provide shop drawings for approval. Once approved, the drawings shall be strictly adhered to during the fabrication and installation process. Note
I Timber framework
Columns, rafters etc.
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites with approved wood preservative; including all jointing and connections (packing piece, Grade 8.8 bolts etc.) as necessary; in roof
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; all as per Structural Engineer's drawings
a) 150x150mm Timber Column, encased in concrete column(m.s) 250 m 0.00
b) 75x75mm Timber Column for ramp area, encased in concrete column(m.s) 178 m 0.00
c) 75x100mm Timber deck bearers bolted to timber columns (m.s) for the main floor area 56 m 0.00
d) 75x100mm Timber ramp bearers bolted to timber columns (m.s) for the ramp 30 m 0.00
e) 100x150mm Timber floor deck joists bolted to floor bearers (m.s) 70 m 0.00
f) 75x100mm Timber ramp joists bolted to floor bearers (m.s) 104 m 0.00
g) 75x50mm Timber tie beams bolted to timber columns (m.s) 56 m 0.00
h) 75x75mm Timber bracing bolted to timber columns (m.s) 110 m 0.00
j) 150x100mm Timber rafters, bolted to top of timber columns (m.s) 76 m 0.00
k) 25x50mm Ventilation slats fixed to timber columns (m.s) 190 m 0.00
l) 75x50mm Timber purlins fixed to rafters (m.s) 122 m 0.00
Softwood timber
m) 200x25mm Thick One-side wrot fascia and barge board 58 m 0.00
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished finished with 2 coats polyurethane varnish on completion; all as per Structural Engineer's drawings
a) 100x50mm Timber top rail 108 m 0.00
b) 40mm diameter circular timber handrail baluster fixed to stingers (m.s) at 150mm c/c 470 m 0.00
c) 50x100mm Timber bottom rail 108 m 0.00
Approved 7.5mm Thick site-painted plank weather board; treated against termites and mositure ingress; finished with 2 coats polyurethane varnish on both sides
a) Supply and fix 7.5mm thick site-painted plank weather board; fixed to timber framework (m.s) with tying wires or other approved fixing accessories 174 m2 0.00
Approved 7.5mm Thick site-painted timber screens; treated against termites and mositure ingress; finished with 2 coats polyurethane varnish on both sides
b) Supply and fix 7.5mm thick site-painted timber screens; fixed to timber framework (m.s) with tying wires or other approved fixing accessories 54 m2 0.00
IV Wood planks floor finish
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in floors
Approved timber planks; treated against termites, moisture and unine acidity; finished with 2 coats polyurethane varnish on the top side
a) Supply and fix approved smooth planed 100x25mm wood planks; fixed to timber framework (m.s) with concealed bolts or screws; for main floor 78 m2 0.00
b) Ditto: for Ramp including landings 76 m2 0.00
c) Allow for creating squat pan spaces through the wood planks flooring; finishing around 8 Nr 0.00
The following in timber doors as per the details provided
Door Frames, architraves and beads
a) Ex 100x50mm hardwood frame rebated 48 m 0.00
b) 50x15mm hardwood architrave chamfered 48 m 0.00
c) 15x15mm hardwood quadrant bead 48 m 0.00
Supply and fix the following semi-solid treated timber flush door shutter with hardwood lipping all round
d) Single leaf door overall size 1100x2400mm high with 100mm high aluminium kick plate on the inside (Door Type D01) 4 Nr 0.00
e) Single leaf door overall size 1100x2400mm high with 400mm high aluminium kick plate on the inside (Door Type D02) 4 Nr 0.00
Supply and fix the following ironmongery with screws to match
f) Heavy gauge steel door hinges approved from samples 24 Nr 0.00
g) Heavy duty two lever aluminium door lock complete with a set of lever furniture and approved from sample 8 Nr 0.00
h) 19mm Diameter , 300mm long, aluminium door grab handles with concealed fixing rose for horizontal and vertical handles 8 Nr 0.00
Painting and Decorating
Aluminum wood primer
j) Back of wood frames over 100mm but not exceeding 200mm girth 48 m 0.00
Prepare and apply clear matt varnish to timber doors
k) Surfaces not exceeding 100mm girth 96 m 0.00
l) Ditto over 100mm not exceeding 200mm girth 48 m 0.00
m) General surfaces of doors 32 m2 0.00
TOTAL FOR JOINERY & TIMBER WORKS CARRIED TO BILL SUMMARY 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide 16 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 14 m2 0.00
c) 200mm Thick dwarf wall above ground 24 m2 0.00
Cement and sand (1:4) to walls in
d) 12mm deep horizontal keying on masonry stone wall surfaces. 48 m2 0.00
TOTAL FOR BLOCKWORK CARRIED TO BILL SUMMARY 0.00
7) ROOF COVERING & RAINWATER GOODS
a) Supply and Fix Aluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets or approved equivalent; fixed to timber purlins (m.s) using manufacturer's proprietary bolts 98 m2 0.00
b) Allow for making holes through the roofing sheets for 4no. ventilation pipes at specified positions; finishing and sealing around the pipes to prevent leakages 2 Item 0.00
Rainwater goods
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
c) Supply and install sheerline colorbond gutter fixed to fascia (m.s) with and including spring clips at 1200mm centres [Rate to include gutter stop ends]. The gutther to have a micro-mesh leaf guards 18 m 0.00
d) Extra over for gutter stop ends 4 Nr 0.00
e) Extra over downpipe; for gutter outlet. 2 Nr 0.00
f) Allow for connection of the downpipe to the water reservoir tank (tank measured separately) 2 Item 0.00
TOTAL FOR ROOF COVERING & RAINWATER GOODS CARRIED TO BILL SUMMARY 0.00
ACCESSIBLE DEHYDRATED TOILET (2NO.)
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS 0.00
2) CONCRETE WORKS 0.00
3) STEEL REINFORCEMENT 0.00
4) SHUTTERING & FORMWORK 0.00
5) JOINERY & TIMBER WORKS 0.00
6) BLOCKWORK 0.00
7) ROOF COVERING & RAINWATER GOODS 0.00
TOTAL FOR BILL 2-2- ACCESSIBLE DRY TOILET (2NO)- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR ESA'ALA HEALTH CENTRE, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 2.3 CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA)
(All provisional) Note
All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
A Notes: Quantities are for 1no. Plinth (4.2m long x 2.5m wide as per Structural drawings) 1 Nr. Note
I) Earthworks and Excavations
a) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Tank plinth footprint only] 16 m2 0.00
b) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 17 m3 0.00
c) Selected and approved backill material, well watered and compacted in layers 11 m3 0.00
Disposal of Surplus spoil
d) Load and cart away surplus excavated material from site to an approved dumping site 6 m3 0.00
Selected filling
e) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep [For water tank plinth] 8 m2 0.00
f) Selected and approved backill material, well watered and compacted [600mm deep below the hardcore under the water tank plinth] 4 m3 0.00
g) 50mm Thick murram blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 8 m2 0.00
Anti-termite treatment
h) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to murram surfaces 11 m2 0.00
II) Concrete works
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 10 m2 0.00
b) 50mm Thick blinding under 100mm thick concrete platform slab 6 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Foundation strip 2 m3 0.00
d) Raised Tank platform [100mm thick ], finished smooth 1 m3 0.00
e) 100mm Thick concrete platform form at water point, including forming a 100x50mm thick upstand; finished smooth 3 m2 0.00
f) 50mm Thick splash concrete pad, including forming a 50x50mm thick upstand; finished smooth 2 m2
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 11 m2 0.00
III) Steel Reinforcement
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 10 mm diameter bars 77 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
b) Fabric mesh reinforcement to tank plinth concrete bed 11 m2 0.00
IV) Shuttering & Formwork
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 6 m² 0.00
b) Edges of raise tank platform concrete bed, 100mm girth 11 m 0.00
c) Edges of ground concrete bed, 100mm girth 8 m 0.00
d) Edges of ground concrete bed, 50mm girth 6 m 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide (for upstand wall for taps only) 3 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 19 m2 0.00
c) 200mm Thicks walls above ground 9 m2 0.00
d) 200mm Thick upstand wall for taps 2 m2 0.00
15mm Cement and sand (1:3) render on block wall or concrete work to:-
e) Exposed wall surfaces including concrete plinth 13 m2 0.00
f) Tank plinth floor surfaces 12 m2 0.00
g) 300x50mm thick precast concrete coping bedded on top of walling in cement and sand (1:3) mortar including 10mm deep drip mould 3 m 0.00
h) Making holes through 200mm thick wall for taps 2 Nr 0.00
TOTAL FOR BILL 2-3- CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA - CARRIED TO BILL SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR ESA'ALA HEALTH CENTRE, PAPUA NEW GUINEA
ITEM DESCRIPTION QTY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 2.4 PLUMBING & DRAINAGE
Notes: Quantities are for 3no. Toilet blocks Note
1.00 SANITARY FITTINGS
Supply, deliver, install, test and commission the following sanitary fittings and accessories. Fixing to be to manufacturer's printed instructions.
1.01 Water Closet. Western -type toilet pan divided in two sectors. The sector in the front is for urine diverter with 50mm hole allowing connection to 50mm dia pipe for urine collection while back sector with a 200mm hole for faeces to drop into waste tank directly below without need for flushing. The pan will be stainless steel or in vitreous China with all fixings required to install on a wooden floor. 8 Nr 0.00
1.02 Disabled Water Closet. Western -type toilet pan divided in two sectors. The sector in the front is for urine diverter with 50mm hole allowing connection to 50mm dia pipe for urine collection while back sector with a 200mm hole for faeces to drop into waste tank directly below without need for flushing. The pan will be stainless steel or in vitreous China with all fixings required to install on a wooden floor. 4 Nr 0.00
1.03 A pair of Stainless steel rear and side grab bars. Side Wall: Minimum 1065 mm long, placed max 300mm from the rear wall and extending at least 1380 from the rear wall. Rear Wall: Minimum 915 mm long, extending 300 mm minimum on one side of the toilet center line and 600 mm on the other side. 4 Nr 0.00
1.04 Roll Holder. Stainless steel holder fixed on the wall, size 150x150 mm. 12 Nr 0.00
1.05 Double Bowl Sink. Stainless steel double bowl wash hand sink bench unit as "Simply Stainless" or approved equivalent; overall size 1600mm wide x 700mm deep x 900mm high; manufactured from 304 grade stainless steel, 1.2mm thick sections. The sink unit to have at least 150mm high bevelled-edge splashback and mounted on heavy duty tubular legs. Each bowl to have a pre-punched hole to suit waste connection complete with chromed 20mm low pressure (0.1bar) lockable pillar tap for each of the two bowls, a 32mm diameter chrome plated waste and a 32mm plastic P- trap for each of two bowls. 6 Nr 0.00
1.06 Single Bowl Sink. Stainless steel single bowl wash hand sink bench unit as "Simply Stainless" or approved equivalent with 750mm bowl height for disabled access; overall size 500mm wide x 700mm deep x 750mm high; manufactured from 304 grade stainless steel, 1.2mm thick sections. The sink unit to have at least 150mm high bevelled-edge splashback and mounted on heavy duty tubular legs. Bowl to have a pre-punched hole to suit waste connection complete with chromed 20mm low pressure (0.1bar) lockable pillar tap, a 32mm diameter chrome plated waste and a 32mm plastic P- trap. 2 Nr 0.00
1.07 Waste tank. Composting toilet waste tank made of high density polyethylene and measuring 0.8m height, 1 m width by 2m length with 1,2m3, with adjustable chute up to 1m to reach toilet pan hole. The tank will have a hole at the top to allow connection of venting pipe 100 diameter, air tight hinged door to allow disposal of dried waste. 12 Nr 0.00
1.08 white vitreous china Urinal bowl 1 ½ inch diameter domed outlet plated urinal grating bottle trap and fixing screws on the timber wall. 4 Nr 0.00
2.00 INTERNAL PLUMBING AND WATER RETICULATION
Supply, deliver and install pipes, tubing and fittings as described and shown on the drawings. The pipes shall be PPR PN 20 pipes and all conforming to the current European standards for PPR installations and to the Engineers approval, pipe jointing shall be by polyfusion or use of electric coupling and to manufacturer's printed instructions. Rates must allow for all Metal/plastic threaded adaptors where required, valves, unions, sockets, sliding and fixed joints, support raceways, isolating sheaths, elastic material,expansion arms and bends, crossovers, couplings, clippings, connectors, joints and for the connection of sanitary fixtures etc. as required in the running lengths of pipework and also where necessary, for pipe fixing clips, holder bats plugged and screwed for the proper and satisfactory functioning of the system. The pipes will be pressure tested before the plastering of wall commences and as per the manufacturers recommended testing procedures. The sizes indicated are the minimum bore sizes.
2.01 20 mm diameter PPR pipe 51 m 0.00
2.02 25 mm ditto 6 m 0.00
2.03 32 mm ditto 3 m 0.00
2.04 40 mm ditto 3 m 0.00
2.05 50 mm ditto 3 m 0.00
2.06 63 mm ditto 3 m 0.00
Extra over PPR tubing for the following:-
2.07 20 mm diameter bend 12 Nr 0.00
2.08 32mm diameter bend 2 Nr 0.00
2.09 63 mm diameter bend 6 Nr 0.00
2.10 32 mm diameter tee 3 Nr 0.00
2.11 25mm diameter tee 4 Nr 0.00
2.12 25 x 20 mm diameter reducer 11 Nr 0.00
2.13 32 x 25 mm diameter reducer 5 Nr 0.00
2.14 40 x 32 mm diameter reducer 3 Nr 0.00
2.15 50 x 40 mm diameter reducer 3 Nr 0.00
2.16 63 x 50 mm diameter reducer 3 Nr 0.00
2.17 20mm diameter brass threaded female adopter 15 Nr 0.00
2.18 63mm back nut (bulkhead) with gasket 18 Nr 0.00
2.19 75mm x 63 mm upvc ppr adopter 6 Nr 0.00
2.20 63mm union for tank inlet and outlet 4 Nr 0.00
2.21 63 mm diameter spherical Gate valve PN 20 complete with connectors to the PPR pipework 2 Nr 0.00
2.22 Flexible Tubing 300mm long 14 Nr 0.00
2.23 20mm chrome plated angle regulating valve 14 Nr 0.00
2.24 32mm non return valve 3 Nr 0.00
2.25 Rain water Tanks. Rotary moulded cylindrical water tank with capacity of 9,000Ltrs,dimensions; (H)2610 x (dia)2560mm. The tank to have a Ø90mm top inlet & Ø63mm outlet connections, Ø90mm overflow with insect proof net. 1 Nr 0.00
2.26 Rain water Tanks. Rotary moulded cylindrical water tank with capacity of 3,000Ltrs,dimensions; (H)2120 x (dia)1690mm. The tank to have a Ø65mm top inlet & Ø63mm outlet connections, Ø63mm overflow with insect proof net. 3 Nr 0.00
2.27 20mm lockable brass tap with a matching padlock and keys 3 Nr 0.00
3.00 INTERNAL DRAINAGE
Supply and fix uPVC soil system to BS 4660 and BS 4515 and MuPVC waste system to BS 5255 with screwed and socketed joints to BS 21. Solvent welded joints shall be as per the system manufacturers written instructions. Tenderers must allow in their pipework prices for all the couplings, connectors, joints etc. as required in the running lengths of pipework and also where necessary for pipe fixing clips, holderbats, plugs and screwed. The installation must comply with BS 5572 and fixing to be to the manufacturer's printed instructions.
Note: Trade Names
Caradon Terrain Ltd's pipe and fittings have been used as a guide to the type and quality of materials required. Other brands must be equal and approved in writing by the Engineer before installation. One brand only shall be used and inconsistency shall not be accepted.
MuPVC Waste System Conforming to BS 5255:
3.01 32 mm diameter waste pipe 7 m 0.00
3.02 50 mm ditto 90 m 0.00
Extra over MuPVC waste pipework for the following:-
3.03 50X32 mm diameter reducer 26 Nr 0.00
3.04 50 mm ditto sweep bend 13 Nr 0.00
3.05 50 mm access cap 12 Nr 0.00
3.06 50 mm diameter sweep tee 31 Nr 0.00
uPVC Soil System Conforming to BS 4514:
3.07 100 mm diameter waste, soil and vent pipes 52 m 0.00
Extra over uPVC pipework for the following:-
3.08 100 mm vent cowl 12 Nr 0.00
3.09 100 mm weathering slate / apron 12 Nr 0.00
uPVC buried drain system Conforming to BS 4660:
3.10 100mm diameter golden brown pipe 18 m 0.00
3.11 150mmx150mm white plastic cover floor trap 50mm diameter outlet 9 Nr 0.00
3.12 Gully trap masonry chamber complete with 100 diameter P trap and 450x450 cast iron/fibre reinforced cover, including all excavation and back-filling 11 Nr 0.00
3.13 Construct masonry manhole chambers including excavation and making good depth not exceeding 2000 mm average 600 mm. Manhole to be complete with cast iron frame and cover, internal benching and upvc access beds for drop manholes 4 Nr 0.00
3.14 Excavate in trench murram/black cotton soil approximately 300 mm wide and with average depth of 750 mm for water drainage pipes, backfill, ram and cart away the remainder 30 m 0.00
4.00 RAIN WATER DRAINAGE
Supply and fix grey UPVC and uPVC soil system pipe work to BS 4660, BS 4515 and BS 5255. The pipework to be with screwed and socketed joints to BS 21.Solvent welded joints shall be as per the system manufacturers witten instructions. Solvent welded joints shall be as per the system manufacturers written instructions. Tenderers must allow in their pipework prices for all the couplings, connectors, joints etc. as required in the running lengths of pipework and also where necessary for pipe fixing clips, holderbats, plugs and screwed. The installation must comply with BS 5572 and fixing to be to the manufacturer's printed instructions.
Note: Trade Names
Caradon Terrain Ltd's pipe and fittings have been used as a guide to the type and quality of materials required. Other brands must be equal and approved in writing by the Engineer before installation. One brand only shall be used and inconsistency shall not be accepted.
4.01 Grey UPVC rainwater pipework
4.02 100mm diameter Class 41 UPVC rain water pipe 21 m 0.00
4.03 75mm diameter Class 41 UPVC rain water pipe 22 m 0.00
Extra over UPVC pipework for the following:
4.04 100mm diameter Bend 8 Nr 0.00
4.05 100mmx 75mm tee 4 Nr 0.00
4.06 Rain screen head (LXW)200mmx150mm with removable strainer installed horizontally allowing debris to slide off and a 100mm outlet diameter. 4 Nr 0.00
4.07 100mm diameter Rain water first flush diverter with a floating ball and all fittings to connect to 10mm diameter downpipe 4 Nr 0.00
4.08 Allow a sum for installation of water gutters complete with downpipes and all necessary accessories to manufacture's specifications and Site Engineer approval to the existing Ward 01 Building 1 Sum 0.00
Sheerline colorbond
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
Supply and install the following sheerline colorbond rain water goods
4.09 95mm diameter rain water pipe Rate only m
4.10 75mm diameter rain water pipe Rate Only m
4.11 Extra over 100mm diameter bend Rate Only Nr
4.12 Extra over 100mmx75mm tee Rate Only Nr
Testing, commissioning and maintenance
5.01 The soak away calculation is based on roamy soils with percolation rate (general average): 20 liters/m²/day (Means 1 m² of soak pit wall area can absorb ~20 liters/day). Allow for this conformity test and furnish the project engineer with the test result for approval. Soak away resizing must be done where percoration rate is confirmed to be less than 20 liters/m²/day 3 Item 0.00
5.02 Allow for setting to work, testing and commissioning of the whole plumbing system to the satisfaction of the Engineer. 1 Item 0.00
5.03 Allow provision of maintenance and operation manuals of all the equipment installed as directed by and to satisfaction of the Engineer. 1 Item 0.00
5.04 Allow trainining of client staff on operation of the entire installation to satisfaction of the Engineer. 1 Item 0.00
TOTAL FOR BILL 2-4- PLUMBING AND DRAINAGE INSTALLATION- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR ESA'ALA HEALTH CENTRE, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 2.5 ELECTRICAL INSTALLATIONS
Where Trade Names are mentioned below, it is intended to indicate the level of quality required. The tenderer MAY supply alternatives which must be approved in writing by the Project Manager. Note
1) SOLAR SECURITY LIGHTING
a) Supply, install, test and set to work 200mm diameterx7.0mm thick x 6.0-metre high CHS steel lighting column, with good finish and all neccesary accessories, suitable for mounting 1x80W LED security flood lighting fittings (m.s) 2 Nr 0.00
b) Allow for mass concrete foundations for the steel lighting column, including all necessary excavations, reinforcement and fixing base plates and bolts 2 Item 0.00
Security lights
c) Supply and install all-in-one Integrated / Integrated solar light (single -arm) as per provided technical specifications; complete with the following: - Integrated 'Tier 1' solar panel- minimum 256Wp - LED light 80W, with automatic switching system and colour range temperature of 4000–5000 K; - AC/DC hybrid Charging controllers/converters - Integrated lithium battery (atleast 281.25Ah, 12.8V) capable of supporting light for at least 3 days. 2 Nr 0.00
d) Supply, install, test and set to work earthing installation comprising of a 4sq.mm copper PVC earth lead, 1800mm x 15mm diameter copper earth electrode and all neccesary accessories for the street lighting columns 2 Nr 0.00
e) Construct concrete earthing pit, size 600mmx600mmx 600mm deep; complete with waterproof cover for earth test / earth rod inspections and with earthing compound as bentonite. 2 Nr 0.00
f) Allow for testing and commissioning for the security light system and documentation of results to the satisfaction of the Engineer 1 Item 0
g) Allow for all the neccesary submittals comprising shop drawings, illustrations, schedules, product data, bronchures. 1 Item 0
TOTAL FOR SOLAR SECURITY LIGHTING - CARRIED TO BILL SUMMARY 0
2) LIGHTNING PROTECTION SYSTEM- (For 3NO. DRY TOILETS)
a) Supply and install 25 mm x 3 mm bare copper tape conductor as Furse or approved equivalent complete with metallic DC tape clip, wall plugs, fixing screws and other necessary accessories 45 m 0.00
b) Supply and install 1500 mm long multiple air terminal complete with terminal base as Furse or approved equivalent and all necessary accessories 3 Nr 0.00
c) Supply and install screw down test clamps as Furse or approved equivalent and all necessary accessories 3 Nr 0.00
d) Supply and install 6.0sq.mm PVC insulated SC cable in and including 20mm dia PVC heavy gauge conduit; complete with all necessary accessories 15 m 0.00
e) Supply and install 12.5 mm x 1200 mm long copper earth rod complete with spike, driving stud, dowel clamps as Furse or approved equivalent and all necessary accessories 3 Nr 0.00
f) Supply and install copper earth 300mm x 300mm mats complete with trenching in black cotton soil /soft rock, earth termination pits, marconite backfill, backfilling, reinstatement of ground to meet the requirements of the technical specifications 3 Nr 0.00
g) Supply and install concrete inspection pit complete with waterproof cover for earth test / rod inspections and all other neccesary accessories 3 Nr 0.00
h) Allow for testing and commissioning of the entire electrical installation under this section 1 Ls 0.00
TOTAL FOR LIGHTNING PROTECTION SYSTEM (3no. Dry Toilets) - CARRIED TO BILL SUMMARY 0
3) LIGHTNING- (For 2NO. DRY TOILETS )
Solar PV Lighting Kits
a) Complete solar PV toilet-lighting kit with all associated accessories, including one 235 Wp panel, integrated 25.6 V 50 Ah LiFePO4 battery with BMS, 15 A MPPT controller, regulated 24 V DC output, DC isolators and fuses, mounting rails/brackets/fixings, PV and battery cables, connectors, glands, junction boxes, roof seals, frame/rail bonding, labels, surface cable clips/fixings and all components required for a complete tested system. 2 Nr 0.00
Toilet Lights and Surface-Mounted Switching
b) 12 W LED toilet light fitting, 24 V DC, Class III, IP65, IK08, 4000 K, minimum CRI 80 and minimum 1,500 lumens. Surface mounted 6 Nr 0.00
c) 20 W LED toilet light fitting, 24 V DC, Class III, IP65, IK08, 4000 K, minimum CRI 80 and minimum 2,400 lumens. Surface mounted. 2 Nr 0.00
d) 1-way ON/OFF switch, 10 A at 24 V DC, IP55, surface mounted, one per toilet, including back box and fixings. 8 Nr 0.00
e) 2 x 2.5 mm² copper lighting cable for surface-mounted circuits and switch drops, including neat clips/fixings, junction boxes, terminals, glands and slack 53 m 0.00
Installation & Commissioning
f) Allow for testing and commissioning of the entire electrical installation under this section 1 Ls 0.00
TOTAL FOR LIGHTNING (2no. Dry Toilets) - CARRIED TO BILL SUMMARY 0
ELECTRICAL INSTALLATIONS
1) SOLAR SECURITY LIGHTING 0.00
2) LIGHTNING PROTECTION SYSTEM- (For 3NO. DRY TOILETS) 0.00
3 LIGHTNING- (For 2NO. DRY TOILETS ) 0.00
TOTAL FOR BILL 2-5- ELECTRICAL INSTALLATIONS - CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
CONSTRUCTION WORKS FOR WASH INTERVENTIONS IN RABARABA & ESA'ALA, MILNE BAY, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 2.6 CESS POOL/URINE ABSORPTION PIT
Quantities are for 1no. Urine absorption unit Note
iii)All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
a) Excavate for cess pool; 0-1.50m deep 16 m³ 0.00
b) Load and cart away surplus spoil 14 m³ 0.00
c) Backfill selected and approved excavated materials around foundations 2 m³ 0.00
Hollow concrete block walling; bedding, jointing and pointing in cement sand (1:3) mortar
d) 200 mm thick wall 10 m² 0.00
Vibrated reinforced concrete class 20/25 with minimum cube crushing strength of 25N/mm² at 28 days
e) Base beam 2 m3 0.00
f) Cover slab [150 mm thick] 1 m3 0.00
High yield deformed steel bar reinforcement to BS 4461
g) 8 mm diameter bars 35 kg 0.00
h) 10 mm diameter bars 50 kg 0.00
i) 12 mm diameter bars 60 kg 0.00
j) Soffits of cover slab 7 m² 0.00
k) Edges of base beam 8 m² 0.00
l) Cement and sand (1:3) screed applied on top of concrete slab 7 m² 0.00
Selected filling
m) Hardcore fillings into the cess pool 7 m3 0.00
n) Provide and install 600 x600 x 50mm thick pre-cast concrete cover slabs 1 nr 0.00
Inlet/distribution chamber
o) 600 x 600 x700 mm (internal dimensions) inlet chamber; built in 200mm thick masonry walls and 150 mm thick concrete base slab reinforced with 10mm diameter bars at 200mm centres both ways top and bottom: all necessary finishes and water proofing to wall and floor surfaces: 600 x 600 x50 mm thick PCC cover slab and all necessary pipe work. 2 nr 0.00
p) Allow for making 100 mm diameter openings in 200 mm Hollow concrete block walling 1 nr 0.00
q) Allow for making 50 mm diameter openings in 150mm thick cover slabs 1 nr 0.00
r) Boxing in 150mm thick cover slab for 600x600mm PCC cover 1 nr 0.00
TOTAL FOR BILL NO. 6- CESSPOOL (1NO.) CARRIED TO GRAND SUMMARY 0.00
United Nations Office for Project Services
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
THE GOVERNMENT OF PAPUA NEW GUINEA
PROPOSED WASH INTERVENTION FOR ESA'ALA PRIMARY SCHOOL, PAPUA NEW GUINEA
BILL OF QUANTITIES (BOQ)
Consists of the following:
3-1 - Mainstream Dry Toilet blocks (5no.)
3-2 - Accessible Dehydrated Toilet blocks (2no.)
3-3 - Catchment Tank Plinth (2No.)
3-4 - Plumbing & Drainage
3-5 - Electrical Installations
3-6 - Cesspools (3no.)
NOTE: It is a MANDATORY requirement for bidders to complete and return all parts of this BOQ. Failure to complete all sections of the BOQ may result in automatic disqualification of your bid.
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR ESA'ALA PRIMARY SCHOOL, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 3.1 TYPICAL MAINSTREAM DRY TOILETS (5NO.)
(All provisional)
Quantities presented in this bill are for 5no. Toilet blocks 5 Nr. Note
i) Plumbing and drainage work, including the water tank has been measured separately (Bill no. 3.4) Note
ii) Cesspool has been measured separately (Bill no. 3.6) Note
iii)All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS
a) Clear the site of all shrubs, bushes, small trees and debris; remove from site as directed [Approximate area: 90 m2 for Building footprint and 50% allowance] 5 Item 0.00
Oversite excavations
b) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Building footprint only] 300 m2 0.00
c) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 45 m3 0.00
d) Excavate in soft material for column bases; 0-1.50m deep [For timber columns] 40 m3 0.00
e) Return, fill in and ram selected excavated material around foundations 50 m3 0.00
Disposal of Surplus spoil
f) Load and cart away surplus excavated material from site to an approved dumping site 35 m3 0.00
Selected filling
g) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep [For water tank plinth] 20 m2 0.00
h) Selected and approved backill material, well watered and compacted [1100mm deep below the hardcore under the water tank plinth] 20 m3 0.00
i) 50mm Thick granular/gravel blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 20 m2 0.00
j) 150mm Thick granular/gravel spread finish to overall ground surfaces [Under the toilets] 190 m2 0.00
Anti-termite treatment
k) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to granular/gravel surfaces 210 m2 0.00
TOTAL FOR SITE PREPARATION, EXCAVATIONS & EARTHWORKS CARRIED TO BILL SUMMARY 0.00
2) CONCRETE WORKS
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 25 m2 0.00
b) 50mm Thick blinding under column bases 30 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Column bases 10 m3 0.00
d) Stub columns 10 m3 0.00
e) Foundation strip 5 m3 0.00
f) Tank platform [100mm thick ], finished smooth 5 m3 0.00
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 35 m2 0.00
TOTAL FOR CONCRETE WORKS CARRIED TO BILL SUMMARY 0.00
3) STEEL REINFORCEMENT
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 10 mm diameter bars (in column bases & strip footings) 600 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
b) Fabric mesh reinforcement to tank plinth concrete bed 35 m2 0.00
TOTAL FOR STEEL REINFORCEMENT CARRIED TO BILL SUMMARY 0.00
4) SHUTTERING & FORMWORK
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 15 m² 0.00
b) Vertical sides of column bases 65 m² 0.00
c) Vertical sides of stub columns 150 m² 0.00
d) Edges of Tank platform concrete bed, 100mm girth 50 m 0.00
TOTAL FOR SHUTTERING & FORMWORK CARRIED TO BILL SUMMARY 0.00
5) JOINERY & TIMBER WORKS
1. Rate for Timber sections shall include all necessary drilling of holes, bolting, cleats and other necessary connections that are not separately itemized for pricing Note
2. The Contractor shall provide shop drawings for approval. Once approved, the drawings shall be strictly adhered to during the fabrication and installation process. Note
3. The Contractor shall provide documentation verifying treatment type, retention levels, and compliance. Note
4. Rainwater down pipes have been measured under the plumbing and drainage bill Note
I Timber framework
Columns, rafters etc.
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished with 2 coats polyurethane varnish on completion; all as per Structural Engineer's drawings
a) 150x150mm Timber Column, encased in concrete column(m.s), secured with a threaded end or steel plate anchored in the timber column 620 m 0.00
b) 150x150mm Timber floor bearers bolted to timber columns (m.s) 140 m 0.00
c) 100x75mm Timber floor joists bolted to floor bearers (m.s) 130 m 0.00
d) 50x50mm Timber bracings bolted to timber columns (m.s) 540 m 0.00
e) 75x50mm Timber rafters, bolted to top of timber columns (m.s) 190 m 0.00
f) 25x50mm Ventilation slats fixed to timber columns (m.s) 230 m 0.00
g) 50x50mm Timber purlins fixed to rafters (m.s) 325 m 0.00
Softwood timber
h) 200x25mm Thick One-side wrot fascia and barge board 140 m 0.00
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished with 2 coats polyurethane varnish on completion; all as per Structural Engineer's drawings
a) 200x50mm Timber stringer 85 m 0.00
b) 300x25mm Timber platforms/treads fixed to stingers (m.s) 125 m 0.00
Approved 7.5mm Thick site-painted plank weather board; treated against termites and mositure ingress; finished with 2 coats polyurethane varnish on both sides
a) Supply and fix 7.5mm thick site-painted plank weather board; fixed to timber framework (m.s) with tying wires or other approved fixing accessories 460 m2 0.00
IV Wood planks floor finish
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Approved timber planks; treated against termites, moisture and unine acidity; finished with 2 coats polyurethane varnish on the top side
a) Supply and fix approved smooth planed 200x50mm wood planks; fixed to timber framework (m.s) with concealed bolts or screws 110 m2 0.00
b) Allow for creating squat pan spaces through the wood planks flooring; finishing around 20 Nr 0.00
The following in timber doors as per the details provided
Door Frames, architraves and beads
a) Ex 150x50mm hardwood frame rebated 110 m 0.00
b) 50x15mm hardwood architrave chamfered 110 m 0.00
c) 15x15mm hardwood quadrant bead 110 m 0.00
Supply and fix the following 40mm thick solid core, hardwood veneer faced door shutter with hardwood lipping all round
d) Single leaf door size 900x2200mm high with 100mm high aluminium kick plate on the inside 20 Nr 0.00
Supply and fix the following ironmongery with screws to match
e) Heavy duty natural aluminium hinges approved from samples 60 Nr 0.00
f) Three lever mortise lock complete with a set of lever furniture and approved from sample 20 Nr 0.00
g) Aluminium door handles including fixing to timber doors and approved from samples 40 Nr 0.00
Painting and Decorating
Aluminum wood primer
h) Back of wood frames over 100mm but not exceeding 200mm girth 110 m 0.00
Prepare and apply clear matt varnish to timber doors
i) Surfaces not exceeding 100mm girth 220 m 0.00
j) Ditto over 100mm not exceeding 200mm girth 110 m 0.00
k) General surfaces of doors 55 m2 0.00
TOTAL FOR JOINERY & TIMBER WORKS CARRIED TO BILL SUMMARY 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide 50 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 50 m2 0.00
c) 200mm Thick dwarf wall above ground 65 m2 0.00
TOTAL FOR BLOCKWORK CARRIED TO BILL SUMMARY 0.00
7) ROOF COVERING & RAINWATER GOODS
a) Supply and Fix Aluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets or approved equivalent; fixed to timber purlins (m.s) using manufacturer's proprietary bolts 225 m2 0.00
b) Allow for making holes through the roofing sheets for ventilation pipes at specified positions; finishing and sealing around the pipes to prevent leakages 20 Nr 0.00
Rainwater goods
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
c) Supply and install sheerline colorbond gutter fixed to fascia (m.s) with and including spring clips at 1200mm centres [Rate to include gutter stop ends]. The gutter to have a micro-mesh leaf guards 45 m 0.00
d) Extra over downpipe; for gutter outlet 5 Nr 0.00
e) Allow for connection of the downpipe to the water reservoir tank (tank measured separately) 6 Item 0.00
TOTAL FOR ROOF COVERING & RAINWATER GOODS CARRIED TO BILL SUMMARY 0.00
TYPICAL MAINSTREAM DRY TOILETS (5NO.)
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS 0.00
2) CONCRETE WORKS 0.00
3) STEEL REINFORCEMENT 0.00
4) SHUTTERING & FORMWORK 0.00
5) JOINERY & TIMBER WORKS 0.00
6) BLOCKWORK 0.00
7) ROOF COVERING & RAINWATER GOODS 0.00
TOTAL FOR BILL 3-1- TYPICAL DRY TOILETS (5NO)- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR ESA'ALA PRIMARY SCHOOL, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 3.2 TYPICAL ACCESSIBLE DEHYDRATED TOILET (2NO.)
(All provisional) Note
Quantities presented in this bill are for 2no. Toilet blocks 2 Nr. Note
i) Plumbing and drainage work, including the water tank has been measured separately (Bill no. 3.4) Note
ii) Cesspool has been measured separately (Bill no. 3.6) Note
iii)All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS
a) Clear the site of all shrubs, bushes, small trees and debris; remove from site as directed [Approximate area: 145m2 for Building footprint including ramps and 20% allowance] 2 Item 0.00
Oversite excavations
b) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Building footprint including ramp areas only] 150 m2 0.00
c) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 14 m3 0.00
d) Excavate in soft material for column bases; 0-1.50m deep [For timber columns] 126 m3 0.00
e) Return, fill in and ram selected excavated material around foundations 103 m3 0.00
Disposal of Surplus spoil
f) Load and cart away surplus excavated material from site to an approved dumping site 37 m3 0.00
Selected filling
g) Selected and approved backill material, well watered and compacted [1800mm deep under the water tank plinth] 8 m3 0.00
h) 50mm Thick murram blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 4 m2 0.00
i) 150mm Thick murram spread finish to overall ground surfaces [Under the toilets including ramp areas] 140 m2 0.00
Anti-termite treatment
j) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to murram surfaces 144 m2 0.00
TOTAL FOR SITE PREPARATION, EXCAVATIONS & EARTHWORKS CARRIED TO BILL SUMMARY 0.00
2) CONCRETE WORKS
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 10 m2 0.00
b) 50mm Thick blinding under column bases 84 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Column bases 14 m3 0.00
d) Stub columns 16 m3 0.00
e) Foundation strip 2 m3 0.00
f) Tank platform [150mm thick ], finished smooth 2 m3 0.00
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 8 m2 0.00
External Paved Areas
h) Locally available stone paving slabs jointed in cement and sand mortar and laid on and including 50mm thick sand bed (Sample of locally available stone slabs to be provided by the Contractor for approval by the site Engineer). Rate Only m2
TOTAL FOR CONCRETE WORKS CARRIED TO BILL SUMMARY 0.00
3) STEEL REINFORCEMENT
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 8 mm diameter bars 734 kg 0.00
b) 10 mm diameter bars 892 kg 0.00
c) 12 mm diameter bars 828 kg 0.00
TOTAL FOR STEEL REINFORCEMENT CARRIED TO BILL SUMMARY 0.00
4) SHUTTERING & FORMWORK
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 6 m² 0.00
b) Vertical sides of column bases 64 m² 0.00
c) Vertical sides of stub columns 212 m² 0.00
d) Edges of Tank platform concrete bed, 150mm girth 16 m 0.00
TOTAL FOR SHUTTERING & FORMWORK CARRIED TO BILL SUMMARY 0.00
5) JOINERY & TIMBER WORKS
1. Rate for Timber sections shall include all necessary drilling of holes, bolting, cleats and other necessary connections that are not separately itemized for pricing Note
2. The Contractor shall provide shop drawings for approval. Once approved, the drawings shall be strictly adhered to during the fabrication and installation process. Note
I Timber framework
Columns, rafters etc.
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites with approved wood preservative; including all jointing and connections (packing piece, Grade 8.8 bolts etc.) as necessary; in roof
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; all as per Structural Engineer's drawings
a) 150x150mm Timber Column, encased in concrete column(m.s) 250 m 0.00
b) 75x75mm Timber Column for ramp area, encased in concrete column(m.s) 178 m 0.00
c) 75x100mm Timber deck bearers bolted to timber columns (m.s) for the main floor area 56 m 0.00
d) 75x100mm Timber ramp bearers bolted to timber columns (m.s) for the ramp 30 m 0.00
e) 100x150mm Timber floor deck joists bolted to floor bearers (m.s) 70 m 0.00
f) 75x100mm Timber ramp joists bolted to floor bearers (m.s) 104 m 0.00
g) 75x50mm Timber tie beams bolted to timber columns (m.s) 56 m 0.00
h) 75x75mm Timber bracing bolted to timber columns (m.s) 110 m 0.00
j) 150x100mm Timber rafters, bolted to top of timber columns (m.s) 76 m 0.00
k) 25x50mm Ventilation slats fixed to timber columns (m.s) 190 m 0.00
l) 75x50mm Timber purlins fixed to rafters (m.s) 122 m 0.00
Softwood timber
m) 200x25mm Thick One-side wrot fascia and barge board 58 m 0.00
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished finished with 2 coats polyurethane varnish on completion; all as per Structural Engineer's drawings
a) 100x50mm Timber top rail 108 m 0.00
b) 40mm diameter circular timber handrail baluster fixed to stingers (m.s) at 150mm c/c 470 m 0.00
c) 50x100mm Timber bottom rail 108 m 0.00
Approved 7.5mm Thick site-painted plank weather board; treated against termites and mositure ingress; finished with 2 coats polyurethane varnish on both sides
a) Supply and fix 7.5mm thick site-painted plank weather board; fixed to timber framework (m.s) with tying wires or other approved fixing accessories 174 m2 0.00
Approved 7.5mm Thick site-painted timber screens; treated against termites and mositure ingress; finished with 2 coats polyurethane varnish on both sides
b) Supply and fix 7.5mm thick site-painted timber screens; fixed to timber framework (m.s) with tying wires or other approved fixing accessories 54 m2 0.00
IV Wood planks floor finish
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in floors
Approved timber planks; treated against termites, moisture and unine acidity; finished with 2 coats polyurethane varnish on the top side
a) Supply and fix approved smooth planed 100x25mm wood planks; fixed to timber framework (m.s) with concealed bolts or screws; for main floor 78 m2 0.00
b) Ditto: for Ramp including landings 76 m2 0.00
c) Allow for creating squat pan spaces through the wood planks flooring; finishing around 8 Nr 0.00
The following in timber doors as per the details provided
Door Frames, architraves and beads
a) Ex 100x50mm hardwood frame rebated 48 m 0.00
b) 50x15mm hardwood architrave chamfered 48 m 0.00
c) 15x15mm hardwood quadrant bead 48 m 0.00
Supply and fix the following semi-solid treated timber flush door shutter with hardwood lipping all round
d) Single leaf door overall size 1100x2400mm high with 100mm high aluminium kick plate on the inside (Door Type D01) 4 Nr 0.00
e) Single leaf door overall size 1100x2400mm high with 400mm high aluminium kick plate on the inside (Door Type D02) 4 Nr 0.00
Supply and fix the following ironmongery with screws to match
f) Heavy gauge steel door hinges approved from samples 24 Nr 0.00
g) Heavy duty two lever aluminium door lock complete with a set of lever furniture and approved from sample 8 Nr 0.00
h) 19mm Diameter , 300mm long, aluminium door grab handles with concealed fixing rose for horizontal and vertical handles 8 Nr 0.00
Painting and Decorating
Aluminum wood primer
j) Back of wood frames over 100mm but not exceeding 200mm girth 48 m 0.00
Prepare and apply clear matt varnish to timber doors
k) Surfaces not exceeding 100mm girth 96 m 0.00
l) Ditto over 100mm not exceeding 200mm girth 48 m 0.00
m) General surfaces of doors 32 m2 0.00
TOTAL FOR JOINERY & TIMBER WORKS CARRIED TO BILL SUMMARY 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide 16 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 14 m2 0.00
c) 200mm Thick dwarf wall above ground 24 m2 0.00
Cement and sand (1:4) to walls in
d) 12mm deep horizontal keying on masonry stone wall surfaces. 48 m2 0.00
TOTAL FOR BLOCKWORK CARRIED TO BILL SUMMARY 0.00
7) ROOF COVERING & RAINWATER GOODS
a) Supply and Fix Aluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets or approved equivalent; fixed to timber purlins (m.s) using manufacturer's proprietary bolts 98 m2 0.00
b) Allow for making holes through the roofing sheets for 4no. ventilation pipes at specified positions; finishing and sealing around the pipes to prevent leakages 2 Item 0.00
Rainwater goods
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
c) Supply and install sheerline colorbond gutter fixed to fascia (m.s) with and including spring clips at 1200mm centres [Rate to include gutter stop ends]. The gutter to have a micro-mesh leaf guards 18 m 0.00
d) Extra over for gutter stop ends 4 Nr 0.00
e) Extra over downpipe; for gutter outlet. 2 Nr 0.00
f) Allow for connection of the downpipe to the water reservoir tank (tank measured separately) 2 Item 0.00
TOTAL FOR ROOF COVERING & RAINWATER GOODS CARRIED TO BILL SUMMARY 0.00
ACCESSIBLE DEHYDRATED TOILET (2NO.)
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS 0.00
2) CONCRETE WORKS 0.00
3) STEEL REINFORCEMENT 0.00
4) SHUTTERING & FORMWORK 0.00
5) JOINERY & TIMBER WORKS 0.00
6) BLOCKWORK 0.00
7) ROOF COVERING & RAINWATER GOODS 0.00
TOTAL FOR BILL 3-2- ACCESSIBLE DEHYDRATED TOILET (2NO)- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR ESA'ALA PRIMARY SCHOOL, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO.3.3 CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA (2NO.)
(All provisional) Note
All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
A Notes: Quantities are for 1no. Plinth (4.2m long x 2.5m wide as per Structural drawings) 1 Nr. Note
I) Earthworks and Excavations
a) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Tank plinth footprint only] 16 m2 0.00
b) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 17 m3 0.00
c) Selected and approved backill material, well watered and compacted in layers 11 m3 0.00
Disposal of Surplus spoil
d) Load and cart away surplus excavated material from site to an approved dumping site 6 m3 0.00
Selected filling
e) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep [For water tank plinth] 8 m2 0.00
f) Selected and approved backill material, well watered and compacted [600mm deep below the hardcore under the water tank plinth] 4 m3 0.00
g) 50mm Thick murram blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 8 m2 0.00
Anti-termite treatment
h) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to murram surfaces 11 m2 0.00
II) Concrete works
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 10 m2 0.00
b) 50mm Thick blinding under 100mm thick concrete platform slab 6 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Foundation strip 2 m3 0.00
d) Raised Tank platform [100mm thick ], finished smooth 1 m3 0.00
e) 100mm Thick concrete platform form at water point, including forming a 100x50mm thick upstand; finished smooth 3 m2 0.00
f) 50mm Thick splash concrete pad, including forming a 50x50mm thick upstand; finished smooth 2 m2
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 11 m2 0.00
III) Steel Reinforcement
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 10 mm diameter bars 77 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
b) Fabric mesh reinforcement to tank plinth concrete bed 11 m2 0.00
IV) Shuttering & Formwork
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 6 m² 0.00
b) Edges of raise tank platform concrete bed, 100mm girth 11 m 0.00
c) Edges of ground concrete bed, 100mm girth 8 m 0.00
d) Edges of ground concrete bed, 50mm girth 6 m 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide (for upstand wall for taps only) 3 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 19 m2 0.00
c) 200mm Thicks walls above ground 9 m2 0.00
d) 200mm Thick upstand wall for taps 2 m2 0.00
15mm Cement and sand (1:3) render on block wall or concrete work to:-
e) Exposed wall surfaces including concrete plinth 13 m2 0.00
f) Tank plinth floor surfaces 12 m2 0.00
g) 300x50mm thick precast concrete coping bedded on top of walling in cement and sand (1:3) mortar including 10mm deep drip mould 3 m 0.00
h) Making holes through 200mm thick wall for taps 2 Nr 0.00
TOTAL FOR 1NO. CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA - CARRIED TO BILL SUMMARY 0.00
B Notes: Quantities are for 1no. Plinth (6m long x 4.2m wide as per Structural drawings) 1 Nr. Note
I) Earthworks and Excavations
a) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Tank plinth footprint only] 30 m2 0.00
b) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 32 m3 0.00
c) Selected and approved backill material, well watered and compacted in layers 20 m3 0.00
Disposal of Surplus spoil
d) Load and cart away surplus excavated material from site to an approved dumping site 12 m3 0.00
Selected filling
e) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep [For water tank plinth] 21 m2 0.00
f) Selected and approved backill material, well watered and compacted [600mm deep below the hardcore under the water tank plinth] 10 m3 0.00
g) 50mm Thick murram blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 20 m2 0.00
Anti-termite treatment
h) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to murram surfaces 27 m2 0.00
II) Concrete works
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 19 m2 0.00
b) 50mm Thick blinding under 100mm thick concrete platform slab 16 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Foundation strip 4 m3 0.00
d) Raised Tank platform [100mm thick ], finished smooth 2 m3 0.00
e) 100mm Thick concrete platform form at water point, including forming a 100x50mm thick upstand; finished smooth 8 m2 0.00
f) 50mm Thick splash concrete pad, including forming a 50x50mm thick upstand; finished smooth 2 m2
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 27 m2 0.00
III) Steel Reinforcement
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 10 mm diameter bars 134 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
b) Fabric mesh reinforcement to tank plinth concrete bed 27 m2 0.00
IV) Shuttering & Formwork
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 11 m² 0.00
b) Edges of raise tank platform concrete bed, 100mm girth 19 m 0.00
c) Edges of ground concrete bed, 100mm girth 9 m 0.00
d) Edges of ground concrete bed, 50mm girth 13 m 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide (for upstand wall for taps only) 6 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 32 m2 0.00
c) 200mm Thicks walls above ground 15 m2 0.00
d) 200mm Thick upstand wall for taps 2 m2 0.00
15mm Cement and sand (1:3) render on block wall or concrete work to:-
e) Exposed wall surfaces including concrete plinth 21 m2 0.00
f) Tank plinth floor surfaces 24 m2 0.00
g) 300x50mm thick precast concrete coping bedded on top of walling in cement and sand (1:3) mortar including 10mm deep drip mould 6 m 0.00
h) Making holes through 200mm thick wall for taps 4 Nr 0.00
TOTAL FOR 1NO. CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA - CARRIED TO BILL SUMMARY 0.00
A 4.2m long x 2.5m wide-Plinth 0.00
B 6m long x 4.2m wide 0.00
TOTAL FOR BILL 3-3- CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA (3NO.)- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR ESA'ALA PRIMARY SCHOOL, PAPUA NEW GUINEA
ITEM DESCRIPTION QTY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 3.4 PLUMBING & DRAINAGE
Notes: Quantities are for 7no. Toilet blocks Note
1.00 SANITARY FITTINGS
Supply, deliver, install, test and commission the following sanitary fittings and accessories. Fixing to be to manufacturer's printed instructions.
1.01 Water Closet. Western -type toilet pan divided in two sectors. The sector in the front is for urine diverter with 50mm hole allowing connection to 50mm dia pipe for urine collection while back sector with a 200mm hole for faeces to drop into waste tank directly below without need for flushing. The pan will be stainless steel or in vitreous China with all fixings required to install on a wooden floor. 24 Nr 0.00
1.02 Disabled Water Closet. Western -type toilet pan divided in two sectors. The sector in the front is for urine diverter with 50mm hole allowing connection to 50mm dia pipe for urine collection while back sector with a 200mm hole for faeces to drop into waste tank directly below without need for flushing. The pan will be stainless steel or in vitreous China with all fixings required to install on a wooden floor. 4 Nr 0.00
1.03 A pair of Stainless steel rear and side grab bars. Side Wall: Minimum 1065 mm long, placed max 300mm from the rear wall and extending at least 1380 from the rear wall. Rear Wall: Minimum 915 mm long, extending 300 mm minimum on one side of the toilet center line and 600 mm on the other side. 4 Nr 0.00
1.04 Roll Holder. Stainless steel holder fixed on the wall, size 150x150 mm. 28 Nr 0.00
1.05 Double Bowl Sink. Stainless steel double bowl wash hand sink bench unit as "Simply Stainless" or approved equivalent; overall size 1600mm wide x 700mm deep x 900mm high; manufactured from 304 grade stainless steel, 1.2mm thick sections. The sink unit to have at least 150mm high bevelled-edge splashback and mounted on heavy duty tubular legs. Each bowl to have a pre-punched hole to suit waste connection complete with chromed 20mm low pressure (0.1bar) lockable pillar tap for each of the two bowls, a 32mm diameter chrome plated waste and a 32mm plastic P- trap for each of two bowls. 12 Nr 0.00
1.06 Single Bowl Sink. Stainless steel single bowl wash hand sink bench unit as "Simply Stainless" or approved equivalent with 750mm bowl height for disabled access; overall size 500mm wide x 700mm deep x 750mm high; manufactured from 304 grade stainless steel, 1.2mm thick sections. The sink unit to have at least 150mm high bevelled-edge splashback and mounted on heavy duty tubular legs. Bowl to have a pre-punched hole to suit waste connection complete with chromed 20mm low pressure (0.1bar) lockable pillar tap, a 32mm diameter chrome plated waste and a 32mm plastic P- trap. 2 Nr 0.00
1.07 Waste tank. Composting toilet waste tank made of high density polyethylene and measuring 0.8m height, 1 m width by 2m length with 1,2m3, with adjustable chute up to 1m to reach toilet pan hole. The tank will have a hole at the top to allow connection of venting pipe 100 diameter, air tight hinged door to allow disposal of dried waste. 28 Nr 0.00
1.08 white vitreous china Urinal bowl 1 ½ inch diameter domed outlet plated urinal grating bottle trap and fixing screws on the timber wall. 12 Nr 0.00
2.00 INTERNAL PLUMBING AND WATER RETICULATION
Supply, deliver and install pipes, tubing and fittings as described and shown on the drawings. The pipes shall be PPR PN 20 pipes and all conforming to the current European standards for PPR installations and to the Engineers approval, pipe jointing shall be by polyfusion or use of electric coupling and to manufacturer's printed instructions. Rates must allow for all Metal/plastic threaded adaptors where required, valves, unions, sockets, sliding and fixed joints, support raceways, isolating sheaths, elastic material,expansion arms and bends, crossovers, couplings, clippings, connectors, joints and for the connection of sanitary fixtures etc. as required in the running lengths of pipework and also where necessary, for pipe fixing clips, holder bats plugged and screwed for the proper and satisfactory functioning of the system. The pipes will be pressure tested before the plastering of wall commences and as per the manufacturers recommended testing procedures. The sizes indicated are the minimum bore sizes.
2.01 20 mm diameter PPR pipe 63 m 0.00
2.02 25 mm ditto 22 m 0.00
2.03 32 mm ditto 7 m 0.00
2.04 40 mm ditto 7 m 0.00
2.05 50 mm ditto 7 m 0.00
2.06 63 mm ditto 7 m 0.00
Extra over PPR tubing for the following:-
2.07 20 mm diameter bend 20 Nr 0.00
2.08 32mm diameter bend 10 Nr 0.00
2.09 63 mm diameter bend 14 Nr 0.00
2.10 32 mm diameter tee 7 Nr 0.00
2.11 25mm diameter tee 12 Nr 0.00
2.12 25 x 20 mm diameter reducer 23 Nr 0.00
2.13 32 x 25 mm diameter reducer 17 Nr 0.00
2.14 40 x 32 mm diameter reducer 7 Nr 0.00
2.15 50 x 40 mm diameter reducer 7 Nr 0.00
2.16 63 x 50 mm diameter reducer 7 Nr 0.00
2.17 20mm diameter brass threaded female adopter 31 Nr 0.00
2.18 63mm back nut (bulkhead) with gasket 42 Nr 0.00
2.19 75mm x 63 mm upvc ppr adopter 14 Nr 0.00
2.20 63mm union for tank inlet and outlet 20 Nr 0.00
2.21 63 mm diameter spherical Gate valve PN 20 complete with connectors to the PPR pipework 14 Nr 0.00
2.22 Flexible Tubing 300mm long 26 Nr 0.00
2.23 20mm chrome plated angle regulating valve 26 Nr 0.00
2.24 Rain water Tanks. Rotary moulded cylindrical water tank with capacity of 9,000Ltrs,dimensions; 2430(d)* 2260(h)mm. The tank to have a Ø90mm top inlet & Ø63mm outlet connections, Ø90mm overflow with insect proof net. 3 Nr 0.00
2.25 Rain water Tanks. Rotary moulded cylindrical water tank with capacity of 3,000Ltrs,dimensions; 1530(d)* 1700(h)mm. The tank to have a Ø65mm top inlet & Ø63mm outlet connections, Ø63mm overflow with insect proof net. 7 Nr 0.00
2.26 20mm lockable brass tap with a matching padlock and keys 9 Nr 0.00
3.00 INTERNAL DRAINAGE
Supply and fix uPVC soil system to BS 4660 and BS 4515 and MuPVC waste system to BS 5255 with screwed and socketed joints to BS 21. Solvent welded joints shall be as per the system manufacturers written instructions. Tenderers must allow in their pipework prices for all the couplings, connectors, joints etc. as required in the running lengths of pipework and also where necessary for pipe fixing clips, holderbats, plugs and screwed. The installation must comply with BS 5572 and fixing to be to the manufacturer's printed instructions.
Note: Trade Names
Caradon Terrain Ltd's pipe and fittings have been used as a guide to the type and quality of materials required. Other brands must be equal and approved in writing by the Engineer before installation. One brand only shall be used and inconsistency shall not be accepted.
MuPVC Waste System Conforming to BS 5255:
3.01 32 mm diameter waste pipe 19 m 0.00
Extra over MuPVC waste pipework for the following:-
3.03 50X32 mm diameter reducer 50 Nr 0.00
3.04 50 mm ditto sweep bend 17 Nr 0.00
3.05 50 mm access cap 28 Nr 0.00
3.06 50 mm diameter sweep tee 83 Nr 0.00
uPVC Soil System Conforming to BS 4514:
3.07 100 mm diameter waste, soil and vent pipes 100 m 0.00
Extra over uPVC pipework for the following:-
3.08 100 mm vent cowl 28 Nr 0.00
3.09 100 mm weathering slate / apron 28 Nr 0.00
uPVC buried drain system Conforming to BS 4660:
3.10 100mm diameter golden brown pipe 26 m 0.00
3.11 150mmx150mm white plastic cover floor trap 50mm diameter outlet 3 Nr 0.00
3.12 Gully trap masonry chamber complete with 100 diameter P trap and 450x450 cast iron/fibre reinforced cover, including all excavation and back-filling 25 Nr 0.00
3.13 Construct masonry manhole chambers including excavation and making good depth not exceeding 2000 mm average 600 mm. Manhole to be complete with cast iron frame and cover, internal benching and upvc access beds for drop manholes 3 Nr 0.00
3.14 Excavate in trench murram/black cotton soil approximately 300 mm wide and with average depth of 750 mm for water drainage pipes, backfill, ram and cart away the remainder 70 m 0.00
4.00 RAIN WATER DRAINAGE
Supply and fix grey UPVC and uPVC soil system pipe work to BS 4660, BS 4515 and BS 5255. The pipework to be with screwed and socketed joints to BS 21.Solvent welded joints shall be as per the system manufacturers witten instructions. Solvent welded joints shall be as per the system manufacturers written instructions. Tenderers must allow in their pipework prices for all the couplings, connectors, joints etc. as required in the running lengths of pipework and also where necessary for pipe fixing clips, holderbats, plugs and screwed. The installation must comply with BS 5572 and fixing to be to the manufacturer's printed instructions.
Note: Trade Names
Caradon Terrain Ltd's pipe and fittings have been used as a guide to the type and quality of materials required. Other brands must be equal and approved in writing by the Engineer before installation. One brand only shall be used and inconsistency shall not be accepted.
4.01 Grey UPVC rainwater pipework
4.02 100mm diameter Class 41 UPVC rain water pipe 33 m 0.00
4.03 75mm diameter Class 41 UPVC rain water pipe 30 m 0.00
Extra over UPVC pipework for the following: 0
4.04 100mm diameter Bend 24 Nr 0.00
4.05 100mmx 75mm tee 12 Nr 0.00
4.06 Rain screen head (LXW)200mmx150mm with removable strainer installed horizontally allowing debris to slide off and a 100mm outlet diameter. 10 Nr 0.00
4.07 100mm diameter Rain water first flush diverter with a floating ball and all fittings to connect to 10mm diameter downpipe 10 Nr 0.00
4.08 Allow a sum for installation of water gutters complete with downpipes and all necessary accessories to manufacture's specifications and Site Engineer approval to the existing primary schoool hall 1 Sum 0.00
Sheerline colorbond
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
Supply and install the following sheerline colorbond rain water goods
4.09 95mm diameter rain water pipe Rate only m
4.10 75mm diameter rain water pipe Rate Only m
4.11 Extra over 100mm diameter bend Rate Only Nr
4.12 Extra over 100mmx75mm tee Rate Only Nr
Testing, commissioning and maintenance
5.01 The soak away calculation is based on roamy soils with percolation rate (general average): 20 liters/m²/day (Means 1 m² of soak pit wall area can absorb ~20 liters/day). Allow for this conformity test and furnish the project engineer with the test result for approval. Soak away resizing must be done where percoration rate is confirmed to be less than 20 liters/m²/day 8 Item 0.00
5.02 Allow for setting to work, testing and commissioning of the whole plumbing system to the satisfaction of the Engineer. 1 Item
5.03 Allow provision of maintenance and operation manuals of all the equipment installed as directed by and to satisfaction of the Engineer. 1 Item
5.04 Allow trainining of client staff on operation of the entire installation to satisfaction of the Engineer. 1 Item
TOTAL FOR BILL 3-4- PLUMBING AND DRAINAGE INSTALLATION- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR ESA'ALA PRIMARY SCHOOL, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 3.5 ELECTRICAL INSTALLATIONS
Where Trade Names are mentioned below, it is intended to indicate the level of quality required. The tenderer MAY supply alternatives which must be approved in writing by the Project Manager. Note
1) SOLAR SECURITY LIGHTING
a) Supply, install, test and set to work 200mm diameterx7.0mm thick x 6.0-metre high CHS steel lighting column, with good finish and all neccesary accessories, suitable for mounting 1x80W LED security flood lighting fittings (m.s) 4 Nr 0.00
b) Allow for mass concrete foundations for the steel lighting column, including all necessary excavations, reinforcement and fixing base plates and bolts 4 Item 0.00
Security lights
c) Supply and install all-in-one Integrated / Integrated solar light (single -arm) as per provided technical specifications; complete with the following: - Integrated 'Tier 1' solar panel- minimum 256Wp - LED light 80W, with automatic switching system and colour range temperature of 4000–5000 K; - AC/DC hybrid Charging controllers/converters - Integrated lithium battery (atleast 281.25Ah, 12.8V) capable of supporting light for at least 3 days. 4 Nr 0.00
d) Supply, install, test and set to work earthing installation comprising of a 4sq.mm copper PVC earth lead, 1800mm x 15mm diameter copper earth electrode and all neccesary accessories for the street lighting columns 4 Nr 0.00
e) Construct concrete earthing pit, size 600mmx600mmx 600mm deep; complete with waterproof cover for earth test / earth rod inspections and with earthing compound as bentonite. 4 Nr 0.00
f) Allow for testing and commissioning for the security light system and documentation of results to the satisfaction of the Engineer 1 Item 0
g) Allow for all the neccesary submittals comprising shop drawings, illustrations, schedules, product data, bronchures. 1 Item 0
TOTAL FOR SOLAR SECURITY LIGHTING - CARRIED TO BILL SUMMARY 0
2) LIGHTNING PROTECTION SYSTEM- (For DRY TOILETS)
a) Supply and install 25 mm x 3 mm bare copper tape conductor as Furse or approved equivalent complete with metallic DC tape clip, wall plugs, fixing screws and other necessary accessories 105 m 0.00
b) Supply and install 1500 mm long multiple air terminal complete with terminal base as Furse or approved equivalent and all necessary accessories 7 Nr 0.00
c) Supply and install screw down test clamps as Furse or approved equivalent and all necessary accessories 7 Nr 0.00
d) Supply and install 6.0sq.mm PVC insulated SC cable in and including 20mm dia PVC heavy gauge conduit; complete with all necessary accessories 35 m 0.00
e) Supply and install 12.5 mm x 1200 mm long copper earth rod complete with spike, driving stud, dowel clamps as Furse or approved equivalent and all necessary accessories 7 Nr 0.00
f) Supply and install copper earth 300mm x 300mm mats complete with trenching in black cotton soil /soft rock, earth termination pits, marconite backfill, backfilling, reinstatement of ground to meet the requirements of the technical specifications 7 Nr 0.00
g) Supply and install concrete inspection pit complete with waterproof cover for earth test / rod inspections and all other neccesary accessories 7 Nr 0.00
h) Allow for testing and commissioning of the entire electrical installation under this section 1 Ls 0.00
TOTAL FOR LIGHTNING PROTECTION SYSTEM (7no. Dry Toilets) - CARRIED TO BILL SUMMARY 0
ELECTRICAL INSTALLATIONS
1) SOLAR SECURITY LIGHTING 0.00
2) LIGHTNING PROTECTION SYSTEM- (For DRY TOILETS) 0.00
TOTAL FOR BILL 3-5- ELECTRICAL INSTALLATIONS - CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR ESA'ALA PRIMARY SCHOOL, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 3.6 CESS POOL/URINE ABSORPTION PIT (3NO.)
Quantities presented in this bill are for 3no. Cess pools/ Urine Absorption pit 3 Nr. Note
iii)All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
a) Excavate for cess pool; 0-1.50m deep 48 m³ 0.00
b) Load and cart away surplus spoil 42 m³ 0.00
c) Backfill selected and approved excavated materials around foundations 6 m³ 0.00
Hollow concrete block walling; bedding, jointing and pointing in cement sand (1:3) mortar
d) 200 mm thick wall 30 m² 0.00
Vibrated reinforced concrete class 20/25 with minimum cube crushing strength of 25N/mm² at 28 days
e) Base beam 6 m3 0.00
f) Cover slab [150 mm thick] 3 m3 0.00
High yield deformed steel bar reinforcement to BS 4461
g) 8 mm diameter bars 105 kg 0.00
h) 10 mm diameter bars 150 kg 0.00
i) 12 mm diameter bars 180 kg 0.00
j) Soffits of cover slab 21 m² 0.00
k) Edges of base beam 24 m² 0.00
l) Cement and sand (1:3) screed applied on top of concrete slab 21 m² 0.00
Selected filling
m) Hardcore fillings into the cess pool 21 m3 0.00
n) Provide and install 600 x600 x 50mm thick pre-cast concrete cover slabs 3 nr 0.00
Inlet/distribution chamber
o) 600 x 600 x700 mm (internal dimensions) inlet chamber; built in 200mm thick masonry walls and 150 mm thick concrete base slab reinforced with 10mm diameter bars at 200mm centres both ways top and bottom: all necessary finishes and water proofing to wall and floor surfaces: 600 x 600 x50 mm thick PCC cover slab and all necessary pipe work. 6 nr 0.00
p) Allow for making 100 mm diameter openings in 200 mm Hollow concrete block walling 3 nr 0.00
q) Allow for making 50 mm diameter openings in 150mm thick cover slabs 3 nr 0.00
r) Boxing in 150mm thick cover slab for 600x600mm PCC cover 3 nr 0.00
TOTAL FOR BILL 3-6- CESSPOOL (3NO.) CARRIED TO GRAND SUMMARY 0.00
United Nations Office for Project Services
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
THE GOVERNMENT OF PAPUA NEW GUINEA
PROPOSED WASH INTERVENTION FOR ESA'ALA MARKET, PAPUA NEW GUINEA
BILL OF QUANTITIES (BOQ)
Consists of the following:
4-1 - Mainstream Dry Toilet blocks (1no.)
4-2 - Catchment Tank Plinth (1No.)
4-3 - Plumbing & Drainage
4-4 - Electrical Installations
4-5 - Cesspools (1no.)
NOTE: It is a MANDATORY requirement for bidders to complete and return all parts of this BOQ. Failure to complete all sections of the BOQ may result in automatic disqualification of your bid.
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR ESA'ALA MARKET, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 4.1 TYPICAL MAINSTREAM DRY TOILETS (1NO.)
(All provisional)
Quantities are for 1no. Block Note
i) Plumbing and drainage work, including the water tank has been measured separately (Bill no. 4.3) Note
ii) Cesspool has been measured separately (Bill no. 4.5) Note
iii)All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS
a) Clear the site of all shrubs, bushes, small trees and debris; remove from site as directed [Approximate area: 90 m2 for Building footprint and 50% allowance] 1 Item 0.00
Oversite excavations
b) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Building footprint only] 60 m2 0.00
c) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 9 m3 0.00
d) Excavate in soft material for column bases; 0-1.50m deep [For timber columns] 8 m3 0.00
e) Return, fill in and ram selected excavated material around foundations 10 m3 0.00
Disposal of Surplus spoil
f) Load and cart away surplus excavated material from site to an approved dumping site 7 m3 0.00
Selected filling
g) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep [For water tank plinth] 4 m2 0.00
h) Selected and approved backill material, well watered and compacted [1100mm deep below the hardcore under the water tank plinth] 4 m3 0.00
i) 50mm Thick granular/gravel blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 4 m2 0.00
j) 150mm Thick granular/gravel spread finish to overall ground surfaces [Under the toilets] 38 m2 0.00
Anti-termite treatment
k) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to granular/gravel surfaces 42 m2 0.00
TOTAL FOR SITE PREPARATION, EXCAVATIONS & EARTHWORKS CARRIED TO BILL SUMMARY 0.00
2) CONCRETE WORKS
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 5 m2 0.00
b) 50mm Thick blinding under column bases 6 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Column bases 2 m3 0.00
d) Stub columns 2 m3 0.00
e) Foundation strip 1 m3 0.00
f) Tank platform [100mm thick ], finished smooth 1 m3 0.00
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 7 m2 0.00
TOTAL FOR CONCRETE WORKS CARRIED TO BILL SUMMARY 0.00
3) STEEL REINFORCEMENT
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 10 mm diameter bars (in column bases & strip footings) 120 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
b) Fabric mesh reinforcement to tank plinth concrete bed 7 m2 0.00
TOTAL FOR STEEL REINFORCEMENT CARRIED TO BILL SUMMARY 0.00
4) SHUTTERING & FORMWORK
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 3 m² 0.00
b) Vertical sides of column bases 13 m² 0.00
c) Vertical sides of stub columns 30 m² 0.00
d) Edges of Tank platform concrete bed, 100mm girth 10 m 0.00
TOTAL FOR SHUTTERING & FORMWORK CARRIED TO BILL SUMMARY 0.00
5) JOINERY & TIMBER WORKS
1. Rate for Timber sections shall include all necessary drilling of holes, bolting, cleats and other necessary connections that are not separately itemized for pricing Note
2. The Contractor shall provide shop drawings for approval. Once approved, the drawings shall be strictly adhered to during the fabrication and installation process. Note
3. The Contractor shall provide documentation verifying treatment type, retention levels, and compliance. Note
4. Rainwater down pipes have been measured under the plumbing and drainage bill Note
I Timber framework
Columns, rafters etc.
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished with 2 coats polyurethane varnish on completion; all as per Structural Engineer's drawings
a) 150x150mm Timber Column, encased in concrete column(m.s), secured with a threaded end or steel plate anchored in the timber column 124 m 0.00
b) 150x150mm Timber floor bearers bolted to timber columns (m.s) 28 m 0.00
c) 100x75mm Timber floor joists bolted to floor bearers (m.s) 26 m 0.00
d) 50x50mm Timber bracings bolted to timber columns (m.s) 108 m 0.00
e) 75x50mm Timber rafters, bolted to top of timber columns (m.s) 38 m 0.00
f) 25x50mm Ventilation slats fixed to timber columns (m.s) 46 m 0.00
g) 50x50mm Timber purlins fixed to rafters (m.s) 65 m 0.00
Softwood timber
h) 200x25mm Thick One-side wrot fascia and barge board 28 m 0.00
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished with 2 coats polyurethane varnish on completion; all as per Structural Engineer's drawings
a) 200x50mm Timber stringer 17 m 0.00
b) 300x25mm Timber platforms/treads fixed to stingers (m.s) 25 m 0.00
Approved 7.5mm Thick site-painted plank weather board; treated against termites and mositure ingress; finished with 2 coats polyurethane varnish on both sides
a) Supply and fix 7.5mm thick site-painted plank weather board; fixed to timber framework (m.s) with tying wires or other approved fixing accessories 92 m2 0.00
IV Wood planks floor finish
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Approved timber planks; treated against termites, moisture and unine acidity; finished with 2 coats polyurethane varnish on the top side
a) Supply and fix approved smooth planed 200x50mm wood planks; fixed to timber framework (m.s) with concealed bolts or screws 22 m2 0.00
b) Allow for creating squat pan spaces through the wood planks flooring; finishing around 4 Nr 0.00
The following in timber doors as per the details provided
Door Frames, architraves and beads
a) Ex 150x50mm hardwood frame rebated 22 m 0.00
b) 50x15mm hardwood architrave chamfered 22 m 0.00
c) 15x15mm hardwood quadrant bead 22 m 0.00
Supply and fix the following 40mm thick solid core, hardwood veneer faced door shutter with hardwood lipping all round
d) Single leaf door size 900x2200mm high with 100mm high aluminium kick plate on the inside 4 Nr 0.00
Supply and fix the following ironmongery with screws to match
e) Heavy duty natural aluminium hinges approved from samples 12 Nr 0.00
f) Three lever mortise lock complete with a set of lever furniture and approved from sample 4 Nr 0.00
g) Aluminium door handles including fixing to timber doors and approved from samples 8 Nr 0.00
Painting and Decorating
Aluminum wood primer
h) Back of wood frames over 100mm but not exceeding 200mm girth 22 m 0.00
Prepare and apply clear matt varnish to timber doors
i) Surfaces not exceeding 100mm girth 44 m 0.00
j) Ditto over 100mm not exceeding 200mm girth 22 m 0.00
k) General surfaces of doors 11 m2 0.00
TOTAL FOR JOINERY & TIMBER WORKS CARRIED TO BILL SUMMARY 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide 10 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 10 m2 0.00
c) 200mm Thick dwarf wall above ground 13 m2 0.00
TOTAL FOR BLOCKWORK CARRIED TO BILL SUMMARY 0.00
7) ROOF COVERING & RAINWATER GOODS
a) Supply and Fix Aluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets or approved equivalent; fixed to timber purlins (m.s) using manufacturer's proprietary bolts 45 m2 0.00
b) Allow for making holes through the roofing sheets for ventilation pipes at specified positions; finishing and sealing around the pipes to prevent leakages 4 Nr 0.00
Rainwater goods
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
c) Supply and install sheerline colorbond gutter fixed to fascia (m.s) with and including spring clips at 1200mm centres [Rate to include gutter stop ends]. The gutther to have a micro-mesh leaf guards 9 m 0.00
d) Extra over downpipe; for gutter outlet 1 Nr 0.00
e) Allow for connection of the downpipe to the water reservoir tank (tank measured separately) 1 Item 0.00
TOTAL FOR ROOF COVERING & RAINWATER GOODS CARRIED TO BILL SUMMARY 0.00
TYPICAL MAINSTREAM DRY TOILETS (1NO.)
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS 0.00
2) CONCRETE WORKS 0.00
3) STEEL REINFORCEMENT 0.00
4) SHUTTERING & FORMWORK 0.00
5) JOINERY & TIMBER WORKS 0.00
6) BLOCKWORK 0.00
7) ROOF COVERING & RAINWATER GOODS 0.00 -
TOTAL FOR BILL 4-1- TYPICAL DRY TOILETS (1NO)- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR ESA'ALA MARKET, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 4.2 CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA (1NO.)
(All provisional) Note
All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
A Notes: Quantities are for 1no. Plinth (4.2m long x 2.5m wide as per Structural drawings) 1 Nr. Note
I) Earthworks and Excavations
a) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Tank plinth footprint only] 16 m2 0.00
b) Excavate in soft material for foundation trenches; 0-1.50m deep [For water tank plinth] 17 m3 0.00
c) Selected and approved backill material, well watered and compacted in layers 11 m3 0.00
Disposal of Surplus spoil
d) Load and cart away surplus excavated material from site to an approved dumping site 6 m3 0.00
Selected filling
e) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep [For water tank plinth] 8 m2 0.00
f) Selected and approved backill material, well watered and compacted [600mm deep below the hardcore under the water tank plinth] 4 m3 0.00
g) 50mm Thick murram blinding to surfaces of hardcore; as per structural engineer's specifications[For water tank plinth] 8 m2 0.00
Anti-termite treatment
h) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to murram surfaces 11 m2 0.00
II) Concrete works
Lean concrete C16 /20
a) 50mm Thick blinding under strip foundation 10 m2 0.00
b) 50mm Thick blinding under 100mm thick concrete platform slab 6 m2 0.00
Insitu concrete C20/25, vibrated and reinforced as described, in:-
c) Foundation strip 2 m3 0.00
d) Raised Tank platform [100mm thick ], finished smooth 1 m3 0.00
e) 100mm Thick concrete platform form at water point, including forming a 100x50mm thick upstand; finished smooth 3 m2 0.00
f) 50mm Thick splash concrete pad, including forming a 50x50mm thick upstand; finished smooth 2 m2
Damp proof membrane
g) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) [on tank platform] 11 m2 0.00
III) Steel Reinforcement
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 10 mm diameter bars 77 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
b) Fabric mesh reinforcement to tank plinth concrete bed 11 m2 0.00
IV) Shuttering & Formwork
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 6 m² 0.00
b) Edges of raise tank platform concrete bed, 100mm girth 11 m 0.00
c) Edges of ground concrete bed, 100mm girth 8 m 0.00
d) Edges of ground concrete bed, 50mm girth 6 m 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide (for upstand wall for taps only) 3 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 19 m2 0.00
c) 200mm Thicks walls above ground 9 m2 0.00
d) 200mm Thick upstand wall for taps 2 m2 0.00
15mm Cement and sand (1:3) render on block wall or concrete work to:-
e) Exposed wall surfaces including concrete plinth 13 m2 0.00
f) Tank plinth floor surfaces 12 m2 0.00
g) 300x50mm thick precast concrete coping bedded on top of walling in cement and sand (1:3) mortar including 10mm deep drip mould 3 m 0.00
h) Making holes through 200mm thick wall for taps 2 Nr 0.00
TOTAL FOR BILL 4-2- CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA (1NO.)- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR ESA'ALA MARKET, PAPUA NEW GUINEA
ITEM DESCRIPTION QTY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 4.3 PLUMBING & DRAINAGE
Notes: Quantities are for 1no. Toilet blocks Note
1.00 SANITARY FITTINGS
Supply, deliver, install, test and commission the following sanitary fittings and accessories. Fixing to be to manufacturer's printed instructions.
1.01 Water Closet. Western -type toilet pan divided in two sectors. The sector in the front is for urine diverter with 50mm hole allowing connection to 50mm dia pipe for urine collection while back sector with a 200mm hole for faeces to drop into waste tank directly below without need for flushing. The pan will be stainless steel or in vitreous China with all fixings required to install on a wooden floor. 8 Nr 0.00
1.02 Disabled Water Closet. Western -type toilet pan divided in two sectors. The sector in the front is for urine diverter with 50mm hole allowing connection to 50mm dia pipe for urine collection while back sector with a 200mm hole for faeces to drop into waste tank directly below without need for flushing. The pan will be stainless steel or in vitreous China with all fixings required to install on a wooden floor. 2 Nr 0.00
1.03 A pair of Stainless steel rear and side grab bars. Side Wall: Minimum 1065 mm long, placed max 300mm from the rear wall and extending at least 1380 from the rear wall. Rear Wall: Minimum 915 mm long, extending 300 mm minimum on one side of the toilet center line and 600 mm on the other side. 2 Nr 0.00
1.04 Roll Holder. Stainless steel holder fixed on the wall, size 150x150 mm. 8 Nr 0.00
1.05 Double Bowl Sink. Stainless steel double bowl wash hand sink bench unit as "Simply Stainless" or approved equivalent; overall size 1600mm wide x 700mm deep x 900mm high; manufactured from 304 grade stainless steel, 1.2mm thick sections. The sink unit to have at least 150mm high bevelled-edge splashback and mounted on heavy duty tubular legs. Each bowl to have a pre-punched hole to suit waste connection complete with chromed 20mm low pressure (0.1bar) lockable pillar tap for each of the two bowls, a 32mm diameter chrome plated waste and a 32mm plastic P- trap for each of two bowls. 2 Nr 0.00
1.06 Single Bowl Sink. Stainless steel single bowl wash hand sink bench unit as "Simply Stainless" or approved equivalent with 750mm bowl height for disabled access; overall size 500mm wide x 700mm deep x 750mm high; manufactured from 304 grade stainless steel, 1.2mm thick sections. The sink unit to have at least 150mm high bevelled-edge splashback and mounted on heavy duty tubular legs. Bowl to have a pre-punched hole to suit waste connection complete with chromed 20mm low pressure (0.1bar) lockable pillar tap, a 32mm diameter chrome plated waste and a 32mm plastic P- trap. 1 Nr 0.00
1.07 Waste tank. Composting toilet waste tank made of high density polyethylene and measuring 0.8m height, 1 m width by 2m length with 1,2m3, with adjustable chute up to 1m to reach toilet pan hole. The tank will have a hole at the top to allow connection of venting pipe 100 diameter, air tight hinged door to allow disposal of dried waste. 8 Nr 0.00
1.08 white vitreous china Urinal bowl 1 ½ inch diameter domed outlet plated urinal grating bottle trap and fixing screws on the timber wall. 3 Nr 0.00
2.00 INTERNAL PLUMBING AND WATER RETICULATION
Supply, deliver and install pipes, tubing and fittings as described and shown on the drawings. The pipes shall be PPR PN 20 pipes and all conforming to the current European standards for PPR installations and to the Engineers approval, pipe jointing shall be by polyfusion or use of electric coupling and to manufacturer's printed instructions. Rates must allow for all Metal/plastic threaded adaptors where required, valves, unions, sockets, sliding and fixed joints, support raceways, isolating sheaths, elastic material,expansion arms and bends, crossovers, couplings, clippings, connectors, joints and for the connection of sanitary fixtures etc. as required in the running lengths of pipework and also where necessary, for pipe fixing clips, holder bats plugged and screwed for the proper and satisfactory functioning of the system. The pipes will be pressure tested before the plastering of wall commences and as per the manufacturers recommended testing procedures. The sizes indicated are the minimum bore sizes.
2.01 20 mm diameter PPR pipe 30 m 0.00
2.02 25 mm ditto 6 m 0.00
2.03 32 mm ditto 2 m 0.00
2.04 40 mm ditto 2 m 0.00
2.05 50 mm ditto 2 m 0.00
2.06 63 mm ditto 2 m 0.00
Extra over PPR tubing for the following:-
2.07 20 mm diameter bend 8 Nr 0.00
2.08 32mm diameter bend 4 Nr 0.00
2.09 63 mm diameter bend 5 Nr 0.00
2.10 32 mm diameter tee 2 Nr 0.00
2.11 25mm diameter tee 2 Nr 0.00
2.12 25 x 20 mm diameter reducer 3 Nr 0.00
2.13 32 x 25 mm diameter reducer 3 Nr 0.00
2.14 40 x 32 mm diameter reducer 2 Nr 0.00
2.15 50 x 40 mm diameter reducer 2 Nr 0.00
2.16 63 x 50 mm diameter reducer 2 Nr 0.00
2.17 20mm diameter brass threaded female adopter 10 Nr 0.00
2.18 63mm back nut (bulkhead) with gasket 6 Nr 0.00
2.19 75mm x 63 mm upvc ppr adopter 2 Nr 0.00
2.20 63mm union for tank inlet and outlet 4 Nr 0.00
2.21 63 mm diameter spherical Gate valve PN 20 complete with connectors to the PPR pipework 1 Nr 0.00
2.22 32mm non return valve 1 Nr 0.00
2.23 Flexible Tubing 300mm long 9 Nr 0.00
2.24 20mm chrome plated angle regulating valve 4 Nr 0.00
2.25 Rain water Tanks. Rotary moulded cylindrical water tank with capacity of 9,000Ltrs,dimensions; 2430(d)* 2260(h)mm. The tank to have a Ø90mm top inlet & Ø63mm outlet connections, Ø90mm overflow with insect proof net. 1 Nr 0.00
2.26 Rain water Tanks. Rotary moulded cylindrical water tank with capacity of 3,000Ltrs,dimensions; 1530(d)* 1700(h)mm. The tank to have a Ø90mm top inlet & Ø63mm outlet connections, Ø90mm overflow with insect proof net. 2 Nr 0.00
2.27 20mm lockable brass tap with a matching padlock and keys 3 Nr 0.00
3.00 INTERNAL DRAINAGE
Supply and fix uPVC soil system to BS 4660 and BS 4515 and MuPVC waste system to BS 5255 with screwed and socketed joints to BS 21. Solvent welded joints shall be as per the system manufacturers written instructions. Tenderers must allow in their pipework prices for all the couplings, connectors, joints etc. as required in the running lengths of pipework and also where necessary for pipe fixing clips, holderbats, plugs and screwed. The installation must comply with BS 5572 and fixing to be to the manufacturer's printed instructions.
Note: Trade Names
Caradon Terrain Ltd's pipe and fittings have been used as a guide to the type and quality of materials required. Other brands must be equal and approved in writing by the Engineer before installation. One brand only shall be used and inconsistency shall not be accepted.
MuPVC Waste System Conforming to BS 5255:
3.01 32 mm diameter waste pipe 6 m 0.00
3.02 50 mm ditto 55 m 0.00
Extra over MuPVC waste pipework for the following:-
3.03 50X32 mm diameter reducer 16 Nr 0.00
3.04 50 mm ditto sweep bend 7 Nr 0.00
3.05 50 mm access cap 8 Nr 0.00
3.06 50 mm diameter sweep tee 22 Nr 0.00
uPVC Soil System Conforming to BS 4514:
3.07 100 mm diameter waste, soil and vent pipes 32 m 0.00
Extra over uPVC pipework for the following:-
3.08 100 mm vent cowl 8 Nr 0.00
3.09 100 mm weathering slate / apron 8 Nr 0.00
uPVC buried drain system Conforming to BS 4660:
3.10 100mm diameter golden brown pipe 12 m 0.00
3.11 150mmx150mm white plastic cover floor trap 50mm diameter outlet 1 Nr 0.00
3.12 Gully trap masonry chamber complete with 100 diameter P trap and 450x450 cast iron/fibre reinforced cover, including all excavation and back-filling 7 Nr 0.00
3.13 Construct masonry manhole chambers including excavation and making good depth not exceeding 2000 mm average 600 mm. Manhole to be complete with cast iron frame and cover, internal benching and upvc access beds for drop manholes 3 Nr 0.00
3.14 Excavate in trench murram/black cotton soil approximately 300 mm wide and with average depth of 750 mm for water drainage pipes, backfill, ram and cart away the remainder 25 m 0.00
4.00 RAIN WATER DRAINAGE
Supply and fix grey UPVC and uPVC soil system pipe work to BS 4660, BS 4515 and BS 5255. The pipework to be with screwed and socketed joints to BS 21.Solvent welded joints shall be as per the system manufacturers witten instructions. Solvent welded joints shall be as per the system manufacturers written instructions. Tenderers must allow in their pipework prices for all the couplings, connectors, joints etc. as required in the running lengths of pipework and also where necessary for pipe fixing clips, holderbats, plugs and screwed. The installation must comply with BS 5572 and fixing to be to the manufacturer's printed instructions.
Note: Trade Names
Caradon Terrain Ltd's pipe and fittings have been used as a guide to the type and quality of materials required. Other brands must be equal and approved in writing by the Engineer before installation. One brand only shall be used and inconsistency shall not be accepted.
4.01 Grey UPVC rainwater pipework
4.02 100mm diameter Class 41 UPVC rain water pipe 12 m 0.00
4.03 75mm diameter Class 41 UPVC rain water pipe 12 m 0.00
Extra over UPVC pipework for the following:
4.04 100mm diameter Bend 6 Nr 0.00
4.05 100mmx 75mm tee 3 Nr 0.00
4.06 Rain screen head (LXW)200mmx150mm with removable strainer installed horizontally allowing debris to slide off and a 100mm outlet diameter. 3 Nr 0.00
4.07 100mm diameter Rain water first flush diverter with a floating ball and all fittings to connect to 10mm diameter downpipe 3 Nr 0.00
4.08 Allow a sum for installation of water gutters complete with downpipes and all necessary accessories to manufacture's specifications and Site Engineer approval to the existing Market Building 1 Sum 0.00
Sheerline colorbond
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Site Engineer approval
Supply and install the following sheerline colorbond rain water goods
4.09 95mm diameter rain water pipe Rate only m
4.10 75mm diameter rain water pipe Rate Only m
4.11 Extra over 100mm diameter bend Rate Only Nr
4.12 Extra over 100mmx75mm tee Rate Only Nr
Testing, commissioning and maintenance
5.01 The soak away calculation is based on roamy soils with percolation rate (general average): 20 liters/m²/day (Means 1 m² of soak pit wall area can absorb ~20 liters/day). Allow for this conformity test and furnish the project engineer with the test result for approval. Soak away resizing must be done where percoration rate is confirmed to be less than 20 liters/m²/day 3 Item 0.00
5.02 Allow for setting to work, testing and commissioning of the whole plumbing system to the satisfaction of the Engineer. 1 Item
5.03 Allow provision of maintenance and operation manuals of all the equipment installed as directed by and to satisfaction of the Engineer. 1 Item
5.04 Allow trainining of client staff on operation of the entire installation to satisfaction of the Engineer. 1 Item
TOTAL FOR BILL 4-3- PLUMBING AND DRAINAGE INSTALLATION- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR ESA'ALA MARKET, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 4.4 ELECTRICAL INSTALLATIONS
Where Trade Names are mentioned below, it is intended to indicate the level of quality required. The tenderer MAY supply alternatives which must be approved in writing by the Project Manager. Note
1) SOLAR SECURITY LIGHTING
a) Supply, install, test and set to work 200mm diameterx7.0mm thick x 6.0-metre high CHS steel lighting column, with good finish and all neccesary accessories, suitable for mounting 1x80W LED security flood lighting fittings (m.s) 2 Nr 0.00
b) Allow for mass concrete foundations for the steel lighting column, including all necessary excavations, reinforcement and fixing base plates and bolts 2 Item 0.00
Security lights
c) Supply and install all-in-one Integrated / Integrated solar light (single -arm) as per provided technical specifications; complete with the following: - Integrated 'Tier 1' solar panel- minimum 256Wp - LED light 80W, with automatic switching system and colour range temperature of 4000–5000 K; - AC/DC hybrid Charging controllers/converters - Integrated lithium battery (atleast 281.25Ah, 12.8V) capable of supporting light for at least 3 days. 2 Nr 0.00
d) Supply, install, test and set to work earthing installation comprising of a 4sq.mm copper PVC earth lead, 1800mm x 15mm diameter copper earth electrode and all neccesary accessories for the street lighting columns 2 Nr 0.00
e) Construct concrete earthing pit, size 600mmx600mmx 600mm deep; complete with waterproof cover for earth test / earth rod inspections and with earthing compound as bentonite. 2 Nr 0.00
f) Allow for testing and commissioning for the security light system and documentation of results to the satisfaction of the Engineer 1 Item 0
g) Allow for all the neccesary submittals comprising shop drawings, illustrations, schedules, product data, bronchures. 1 Item 0
TOTAL FOR SOLAR SECURITY LIGHTING - CARRIED TO BILL SUMMARY 0
2) LIGHTNING PROTECTION SYSTEM- (For 1NO. DRY TOILETS)
a) Supply and install 25 mm x 3 mm bare copper tape conductor as Furse or approved equivalent complete with metallic DC tape clip, wall plugs, fixing screws and other necessary accessories 15 m 0.00
b) Supply and install 1500 mm long multiple air terminal complete with terminal base as Furse or approved equivalent and all necessary accessories 1 Nr 0.00
c) Supply and install screw down test clamps as Furse or approved equivalent and all necessary accessories 1 Nr 0.00
d) Supply and install 6.0sq.mm PVC insulated SC cable in and including 20mm dia PVC heavy gauge conduit; complete with all necessary accessories 5 m 0.00
e) Supply and install 12.5 mm x 1200 mm long copper earth rod complete with spike, driving stud, dowel clamps as Furse or approved equivalent and all necessary accessories 1 Nr 0.00
f) Supply and install copper earth 300mm x 300mm mats complete with trenching in black cotton soil /soft rock, earth termination pits, marconite backfill, backfilling, reinstatement of ground to meet the requirements of the technical specifications 1 Nr 0.00
g) Supply and install concrete inspection pit complete with waterproof cover for earth test / rod inspections and all other neccesary accessories 1 Nr 0.00
h) Allow for testing and commissioning of the entire electrical installation under this section 1 Ls 0.00
TOTAL FOR LIGHTNING PROTECTION SYSTEM (1no. Dry Toilets) - CARRIED TO BILL SUMMARY 0
ELECTRICAL INSTALLATIONS
1) SOLAR SECURITY LIGHTING 0.00
2) LIGHTNING PROTECTION SYSTEM- (For 1NO. DRY TOILETS) 0.00
TOTAL FOR BILL 4-4- ELECTRICAL INSTALLATIONS - CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED WASH INTERVENTION FOR ESA'ALA MARKET, PAPUA NEW GUINEA
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 4.5 CESS POOL/URINE ABSORPTION PIT
Quantities are for 1no. Urine absorption unit Note
iii)All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
a) Excavate for cess pool; 0-1.50m deep 16 m³ 0.00
b) Load and cart away surplus spoil 14 m³ 0.00
c) Backfill selected and approved excavated materials around foundations 2 m³ 0.00
Hollow concrete block walling; bedding, jointing and pointing in cement sand (1:3) mortar
d) 200 mm thick wall 10 m² 0.00
Vibrated reinforced concrete class 20/25 with minimum cube crushing strength of 25N/mm² at 28 days
e) Base beam 2 m3 0.00
f) Cover slab [150 mm thick] 1 m3 0.00
High yield deformed steel bar reinforcement to BS 4461
g) 8 mm diameter bars 35 kg 0.00
h) 10 mm diameter bars 50 kg 0.00
i) 12 mm diameter bars 60 kg 0.00
j) Soffits of cover slab 7 m² 0.00
k) Edges of base beam 8 m² 0.00
l) Cement and sand (1:3) screed applied on top of concrete slab 7 m² 0.00
Selected filling
m) Hardcore fillings into the cess pool 7 m3 0.00
n) Provide and install 600 x600 x 50mm thick pre-cast concrete cover slabs 1 nr 0.00
Inlet/distribution chamber
o) 600 x 600 x700 mm (internal dimensions) inlet chamber; built in 200mm thick masonry walls and 150 mm thick concrete base slab reinforced with 10mm diameter bars at 200mm centres both ways top and bottom: all necessary finishes and water proofing to wall and floor surfaces: 600 x 600 x50 mm thick PCC cover slab and all necessary pipe work. 2 nr 0.00
p) Allow for making 100 mm diameter openings in 200 mm Hollow concrete block walling 1 nr 0.00
q) Allow for making 50 mm diameter openings in 150mm thick cover slabs 1 nr 0.00
r) Boxing in 150mm thick cover slab for 600x600mm PCC cover 1 nr 0.00
TOTAL FOR BILL 4- 5- CESSPOOL (1NO.) CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
CONSTRUCTION WORKS FOR WASH INTERVENTIONS IN RABARABA & ESA'ALA, MILNE BAY, PAPUA NEW GUINEA
ITEM DESCRIPTION QTY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 5 DAY WORKS
Any Daywork ordered shall be executed at the following rates: Note
Labour: The Prime Cost to which *_______ per centum shall be added Per cent
Materials: The Prime Cost (delivered to Site) to which *___________per centum shall be added Per Cent
Plant: The Net Hire Charge to which *_______centum shall be added Per Cent
These percentage additions shall cover all insurances, use of small tools and non-mechanical plant, sharpening tools, water, supervision, watching, power and lighting, establishment and overhead charges. Note
Dayworks will be allowed only where specifically ordered by the Site Employer's Representative in writing. Note
All Daywork Sheets must be signed by the Site Employer's Representative and the contractor or their authorized representatives. Note
Time engaged in the actual works only will be allowed. Idle time will not be allowed. Note
All rates in this Day work Schedule shall be fixed for the duration of the Contract Note
Any other labour / material plant and equipment category employed but not included below shall be priced at rates analogous to those rates included under the relevant categories. Note
Only a nominal quantity is inserted against each item for computation purposes only. Note
The following labour rates are to be applied for the days worked and are to be all inclusive Note
A day shall mean an 8 hour day. Note
Gangers and trade chargehands when working with their gangs shall be paid for at the below rates for labourers and the applicable craftsman respectively Note
The said rates are to include, inter alia, for all supervision, importation of labour including transport, travelling time, fares, subsistence and lodging allowances, operation of incentive schemes and costs of overtime working, guaranteed time, sick pay and any other disbursements arising from the employment of labour, for the use and repair of all non-mechanical tools (including paint brushes), sharpening of tools and use of standing scaffolding and other Contractor's Equipment and for overheads and profit of the Contractor. Note
The Tenderer shall state the rates required for labour per day irrespective of public holidays, week-ends, etc., required for work ordered to be executed as Day works or Extra Work. Note
The said rates are to be based on the rates of wages and other emoluments and expenses, including holiday credits (if any), and insurances, payable by the Contractor. Note
a Mason 10 day 0.00
b Carpenter / Joiner 10 day 0.00
c Pipe Layer / Fitter / Plumber 10 day 0.00
d Mechanics 10 day 0.00
e Welder 10 day 0.00
f Electrician 10 day 0.00
g Bar Bender 10 day 0.00
h Skilled Labourer (other categories) 10 day 0.00
j Unskilled Labourer 10 day 0.00
TOTAL FOR LABOUR CARRIED TO DAY WORK BILL SUMMARY 0.00
The rates for the below listed materials are to be used for Day Work or Extra Work at the site of the works Note
The rates shall cover all the expenses such as loading, delivery to site, unloading, storing and protecting, profit and overheads less all trade discounts, rebates and allowances and all cash discounts. Note
a Ordinary Portland cement 50 kg 10 bag 0.00
b Aggregates for concrete as per specification. 10 m³ 0.00
c Burnt clay bricks, standard size 100 nr 0.00
d Solid concrete blocks, standard size 100 nr 0.00
e Local foundation stones, 9"x9" 100 nr 0.00
f Formwork with sawn timber 50 m² 0.00
g Formwork with plywood 50 m² 0.00
h Concrete grade 25 if ready mixed / 1:1.5:3-20mm - if site mixed. 5 m³ 0.00
i Y-8 Reinforcement bars 1 Kg 0.00
j Y-12 Reinforcement bars 1 Kg 0.00
k Y-16 Reinforcement bars 1 Kg 0.00
l 300x300x10mm non-slip ceramic floor tiles 1 m² 0.00
m 150x150x6mm white glazed ceramic wall tiles 1 m² 0.00
n Heavy duty Manhole Cover size 600x600mm 1 nr 0.00
o 150x50mm Hardwood Timber 1 m 0.00
p 100x50mm Hardwood Timber 1 m 0.00
q 150x150mm Hardwood Timber 1 m 0.00
r GI Sheets (0.9x3m) - 24 gauge 1 nr 0.00
s GI Sheets (0.9x3m) - 26 gauge 1 nr 0.00
t GI Sheets (0.9x3m) - 28 gauge 1 nr 0.00
u 150mm diameter PVC gutters 1 m 0.00
v First Grade Plastic Emulsion Paint 1 Litre 0.00
w First Grade Super Gloss Oil Paint 1 Litre 0.00
x 625x595mm stainless steel squat pan water closet 1 nr 0.00
y European type ceramic water closet 1 nr 0.00
z 75x 50x 4mm thick RHS (6m length) 1 nr 0.00
a1 75x75x3mm thick steel angles (6m length) 1 nr 0.00
b1 Water pump, 1HP 1 nr 0.00
c1 1 cubic meter plastic water tank 1 nr 0.00
d1 2 cubic meters plastic water tank 1 nr 0.00
TOTAL FOR MATERIALS CARRIED TO DAY WORK BILL SUMMARY 0.00
5C PLANT AND EQUIPMENT
The following rates for plant and equipment are to be applied to the days worked and use of such plant/equipment in good working condition . Note
A day shall mean an 8 hour day. Note
The rates are to include all operational and maintenance costs, fuel, oil, grease, transport to and from site and other consumables, operator and attendants wages, supervision, overheads and profit. Note
Only for the time which the plant / equipment was been actually employed upon the work shall be paid for and the rates shall include for idle time, travelling time and overtime. Note
All items of plant and equipment shall be priced. Note
a Pumping set - 3 kW 2 day 0.00
b Concrete mixer - 0.5 m³ 2 day 0.00
c Poker Vibrator Plant including 25,32, 50mm poker 2 day 0.00
d Motor Lorry - 5 ton 2 day 0.00
e Tipper truck - 8 ton 2 day 0.00
f Plate compactor / Vibrator - 2 Tonne 2 day 0.00
g Excavator, crawler mounted - 0.7 m³ 2 day 0.00
h Loader and backhoe, wheel mounted - 1.4 m³ 2 day 0.00
i Portable diesel generator - 5 kVA 2 day 0.00
j Portable Air Compressor including rock breakers & hammers - 175 cfm 2 day 0.00
k Water Bowser - 6000 Ltr 2 day 0.00
TOTAL FOR PLANT AND EQUIPMENT CARRIED TO DAY WORK BILL SUMMARY 0.00
DAY WORK BILL SUMMARY
5B MATERIALS 0.00
5C PLANT AND EQUIPMENT 0.00
TOTAL FOR DAY WORKS (THIS TOTAL SHALL NOT BE CARRIED TO THE GRAND SUMMARY) 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
CONSTRUCTION WORKS FOR WASH INTERVENTIONS IN RABARABA & ESA'ALA, MILNE BAY, PAPUA NEW GUINEA
ITEM DESCRIPTION QTY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 6 SCHEDULE OF RATES - GENERAL (NOTE: IT IS MANDATORY FOR BIDDERS TO COMPLETE THIS SECTION)
Note: The rates provided in this section will ONLY be used to value variation items whose rates are not provided in the measured work bills.
a Cutting, clearing and dumping away all shrubs, debris and unnecessary materials. 10 m2 0.00
b Cutting of trees not exceeding 450mm girth including removing from site as directed 5 nr 0.00
c Cutting of trees exceeding 450mm but not exceeding 600mm girth ditto 5 nr 0.00
d Cutting of trees exceeding 600mm but not exceeding 900mm girth ditto 5 nr 0.00
e Cutting of trees exceeding 900mm but not exceeding 1200mm girth ditto 5 nr 0.00
f Cutting of trees exceeding 1200mm girth ditto 5 nr 0.00
g Removing stumps of trees not exceeding 600mm girth and carting away debris 5 nr 0.00
h Removing stumps of trees exceeding 600mm but not exceeding 1200mm girth ditto 5 nr 0.00
i Removing stumps of trees exceeding 1200mm girth ditto 5 nr 0.00
j Excavate the unconsolidated topsoil to an average depth of 150mm 5 m2 0.00
k Cutting of surface rock outcrops and removing debris from site 5 m2 0.00
l Backfill to make up levels 10 m3 0.00
2 FOUNDATION EXCAVATION 0.00
a Excavate on normal soil to a depth of 1500mm from ground level 10 m3 0.00
b Excavate on normal soil to a depth of 3000 mm from ground level 10 m3 0.00
c Extra-over for excavating in rock class I 10 m3 0.00
d Extra-over for excavating in rock class II 10 m3 0.00
e Extra-over for excavating in clay soil 10 m3 0.00
f Extra-over for excavating in hard material 10 m3 0.00
3 FOUNDATION WALLING 0.00
a 400mm thick rubble stone foundation walling bedded and jointed in cement and sand (1:3)mortar 10 m2 0.00
b 200mm thick natural stone foundation walling bedded and jointed in cement and sand (1:3)mortar 10 m2 0.00
4 CONCRETE WORK 0.00
a Provide all materials and cast insitu plain concrete class 15/20 (1:3:6) blinding under foundation 10 m3 0.00
b Provide all materials and cast insitu plain concrete class 20/20 (1:2:4); vibrated 10 m3 0.00
c Provide all materials and cast insitu plain concrete class 25/20 (1:11/2:3); vibrated 10 m3 0.00
Sawn formwork to insitu concrete as described:- 0.00
d To sides of ring beams 10 m2 0.00
e To soffits of suspended slabs 10 m2 0.00
f To sides of columns 10 m2 0.00
Extra over formwork for:- 0.00
g Fair face finish 10 m2 0.00
a Provide materials and construct 100mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course 10 m2 0.00
b Provide materials and construct 150mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course 10 m2 0.00
c Provide materials and construct 200mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course 10 m2 0.00
d Provide materials and construct 200mm thick hollow concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course 10 m2 0.00
6 ROOF CONSTRUCTION, COVERING AND RAINWATER GOODS 0.00
a Supply and fix gauge 26 IT4 roofing sheets 10 m2 0.00
b Galvanized iron plain sheet 26 gauge 10 m2 0.00
Approved pressure impregnated and treated hardwood timber 0.00
c 150x150mm section timber members 10 m 0.00
d 150x50mm section timber members 10 m 0.00
e 100x50mm section timber members 10 m 0.00
f 75x50mm section timber members 10 m 0.00
g 50x50mm section - timber purlin 10 m 0.00
h Provide and fix timber fascia board 250x25mm section nailed to the timber beams 10 m 0.00
Approved pressure impregnated and treated softwood timber 0.00
i 150x50mm section timber members 10 m 0.00
j 100x50mm section timber members 10 m 0.00
k 75x50mm section timber members 10 m 0.00
l 50x50mm section - timber purlin 10 m 0.00
m Provide and fix timber fascia board 250x25mm section nailed to the timber beams 10 m 0.00
n Provide and fix 150x150mm box gutter fixed to fascia board with/and including brackets at rafter center and two coat of oil paint. The slopes to be considered according to the drawings 10 m 0.00
p Supply and fix premanufactured 150x100mm PVC rainwater gutter fixed to fascia board with mild steel brackets at 1200mm centres 10 m 0.00
7 WALL FINISHES 0.00
a Plaster with 18mm thick mortar on walls and beams, both inside and outside: Walls to be cured at least for one week after 24 hours of plastering. 10 m2 0.00
b Plaster with 12mm thick mortar on walls and beams, both inside and outside: Walls to be cured at least for one week after 24 hours of plastering. 10 m2 0.00
c Supply and apply two coats of white wash on all plastered surfaces with uniforms colours. 10 m2 0.00
d Supply and fix ceramic wall tiles size 200x150x6mm thick 10 m2 0.00
8 FLOOR FINISHES 0.00
Cement and sand screed 0.00
a 25mm thick in situ cement and sand (1:3) screeded beds, with steel trowelled finish , on concrete 10 m2 0.00
Ceramic floor tiles 0.00
b Supply and fix ceramic floor tiles 10 m2 0.00
c 100mm high ceramic tiles skirting 10 m 0.00
Concrete Tiles 0.00
d Provide and install 600x600x50mm precast concrete tiles around the building 10 m2 0.00
9 CEILING FINISHES 0.00
Gypsum Board Ceiling 0.00
a Supply of materials and installation of gypsum board ceiling complete with timber brandering 10 m2 0.00
Chipboard Ceiling 0.00
b 12mm thick chipboard ceiling fixed to and including 50x50mm cypress branderings at 600mm c/c both ways, with clout headed nails and set out in symmetrical panels with 'V' joints 10 m2 0.00
Plywood Ceiling 0.00
c 8mm thick plywood ceiling (8'x4') boards on and including 50 x 50 mm softwood brandering 10 m2 0.00
d Ex 75x50mm softwood moulded timber cornice 10 m 0.00
10 PAINTING 0.00
Prepare and apply three coats plastic emulsion paint to:- 0.00
a Plastered surfaces 10 m2 0.00
Prepare and apply two coats gloss oil paint to:- 0.00
b Plastered surfaces 10 m2 0.00
Aluminium primer or other equal and approved wood primer before fixing: - 0.00
c Backs of frame, board, etc over 100mm but not exceeding 200mm girth 10 m 0.00
Prepare and apply three coats polyurethane clear matt varnish on woodwork internally 0.00
d General surfaces of flush doors and frames 10 m2 0.00
Prepare and apply three coats permaplast weather proof paint to:- 0.00
e Walling and concrete ; external 10 m2 0.00
a Supply and fix 30" mahogany veneered timber flush door size 900x2100mm high with hardwood lipping all round 10 Nr. 0.00
b Door size 800x2100mm high 10 Nr. 0.00
Wrot mahogany 0.00
Framed frames and framings 0.00
c 150 x 50 mm; 2 No. labours; plugged door frame 10 m 0.00
d 50 x 15 mm architrave 10 m 0.00
e 15x15mm quadrant beading 10 m 0.00
Ironmongery 0.00
f Supply and fix three lever mortise lock complete with set lever handle furniture - fixed to timber doors 10 Nr. 0.00
g 100mm steel butt hinges 10 prs 0.00
h 900x100mm high standard Aluminium kicking plate 10 Nr 0.00
i Four lever mortise lock complete with set lever handle furniture - fixed to steel doors 1 Nr. 0.00
12 WATER AND SANITATION 0.00
Supply and fix the following sanitary appliances complete with all the connections to services, waste, jointing to supply overflows and plugging and screwing to the floors. Where trade names are mentioned below, the reference is intended to be as a guide to the type of fitting. 0.00
Water Closet 0.00
a 600x500mm deep Anti Vandal stainless steel squat type WC pan cast in concrete floor slab; complete with cistern and all necessary accessories 1 Nr 0.00
Wash hand basin (WHB) 0.00
b Ceramic Wash Hand basin complete with pedestal and all necessary accessories 1 Nr 0.00
Urinal Bowl 0.00
c Wall hung ceramic urinal complete with all accessories and fixtures 1 Nr 0.00
d Anti-vandal type stainless steel mirror 1 Nr 0.00
Dhobi sinks 0.00
e Supply materials and construct concrete dhobi sink overall size 900x550mm wide 1 Nr. 0.00
f Approved anti- vandal water tap 1 Nr 0.00
Water Tanks 0.00
g Supply and install PVC water tanks with a capacity of 2 m3 complete with all fittings 1 Nr 0.00
h Supply and install fiberglass tanks with a capacity of 5 m3 complete with all fittings 1 Nr 0.00
i Install 10,000m3 Bulk Water Storage Fibre Glass tank complete with accessories 1 Nr 0.00
Supply and install G.I. Class "B" Pipes complete with Fittings 0.00
j 32mm Diameter Pipe 10 Lm 0.00
k 20mm ditto 10 Lm 0.00
m 15mm ditto 10 Lm 0.00
Supply and install PN 20 PPRC conforming to the current European standards for PPR installations and to the Employer's Representative's approval, pipes jointing shall be by polyfusion or use of electric coupling. 0.00
n 50mm dia pipe 10 Lm 0.00
o 32mm dia pipe 10 Lm 0.00
p 25mm ditto 10 Lm 0.00
PPR to GI Adoption pieces 0.00
Gate Valves. 0.00
q 32mm diameter high pressure approved pattern brass rising stem full way gate valve with wheel head and jointing to tubing as 'PEGLAR' or approved equivalent. 1 Nr. 0.00
Copper Tubing. 0.00
r 12mm diameter 300mm long Copper tubing bent as required including jointing to GMS pipe and fitting. 1 Nr. 0.00
Supply and install uPVC soil system to BS4660 and BS4515and muPVC waste systems to BS 5255withscrewed and socketed joints to BS 21. solvent welded joints shall be as per the system's manufacturer's written instruction. Tenderer must allow in their pipe work prices for all the couplings, connectors, joints etc as required in the running lengths of the pipe work and also where necessary for fixing clips, holder bats plugged and screwed. 0.00
s 100mm diameter grey heavy duty high pressure pipes 10 Lm 0.00
t 50mm diameter waste pipes ditto 10 Lm 0.00
u Supplying materials and construction of Inspection Chamber (IC) 600x600mm using solid concrete blocks for walls and casting concrete for the manhole base with thickness not less than 150mm; including cement plastering for inside walls. 1 Nr 0.00
13 ELECTRICAL SUPPLY INSTALLATIONS 0.00
Supply, fix and install wires 1.5mm for lighting and 2.5mm for sockets, distribution panel boards with necessary circuit breakers, testing and earthing boards, cables, sockets, switches, fans, and lighting fixtures as specified in the drawings. All the price of the below items must include the materials and installations cost 0.00
a Main Distribution Panel Board of 150 AMP. 1 Nr 0.00
b Twin sockets (13amp) 1 Nr 0.00
c Single socket (13amp) 1 Nr 0.00
d switches one gang (5amp) one way 1 Nr 0.00
e switches one way (5amp) two gang 1 Nr 0.00
f Fluorescent lamps 40w 4 feet (Twin Unit) 1 Nr 0.00
g Fluorescent lamps 40w 4 feet (Twin Unit) c/w Emergency Maintained Fluorescent fitting. 1 Nr 0.00
14 FENCING 0.00
Supply and erect pre-cast concrete Fencing Posts-Cranked 2400mm high 0.00
Chain Link Fencing 0.00
c Supply and install 2400mm high x 14 gauge chain link fencing on and including 100x125 cranked precast concrete fencing posts on concrete bases 10 m 0.00
Barbed Wire 0.00
d Supply and install 12 1/2 Gauge x 4 strands galvanized barbed wire nailed to timber or concrete posts (Measured Separately) 10 m 0.00
Razor Wire 0.00
Supply and install 12 1/2 Gauge galvanized steel razor wire complete with 1000mm high 50x50x6mm thick angle iron posts at 1500mm centers; bottom part of posts built in concrete block walling 0.00
e 300mm diameter (stretched) 10 m 0.00
15 TIMBER BOARDS & PARTITIONS 0.00
Supply and fix the following:- 0.00
25 mm thick block board 0.00
a Plain 5 m2 0.00
b Veneered one side with mahogany or other approved 5 m2 0.00
c Veneered BOTH sides with mahogany 5 m2 0.00
d 3mm thick sheet 5 m2 0.00
Chip boards 8' X 4' 0.00
e 9 mm thick Plain Chip board 5 m2 0.00
f 12 mm thick ditto 5 m2 0.00
25 mm wrot T & G boarding 0.00
g Fabricated from 100 X 25 mm prime grade timber 5 m2 0.00
The price shall cover maintenance until well established
a Supply and install, spread and make good a minimum of 30cm agricultural soil in designated areas 10 m2 0.00
b Supply and plant indigenous trees. Price includes digging a minimum of 1.5m deep holes for each tree for the following: 5 Nr 0.00
TOTAL FOR SCHEDULE OF RATES BILL (NOTE: THIS TOTAL SHALL NOT BE CARRIED TO GRAND SUMMARY) 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
LOT 2 - ESA'ALA (HEALTH CENTRE, PRIMARY SCHOOL & MARKET)
ITEM DESCRIPTION AMOUNT (USD)
BILL 01 -PRELIMINARIES AND GENERAL
Bill No. 1 PRELIMINARIES 0.00
BILL 01 - SUB TOTAL [A] 0.00
BILL 02 -ESA'ALA HEALTH CENTRE
Bill No. 2 - 1 TYPICAL MAINSTREAM DRY TOILETS (1NO.) 0.00
Bill No. 2 - 2 TYPICAL ACCESSIBLE DEHYDRATED TOILET (2NO.) 0.00
Bill No. 2 - 3 CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA) 0.00
Bill No. 2 - 4 PLUMBING & DRAINAGE 0.00
Bill No. 2 - 5 ELECTRICAL INSTALLATIONS 0.00
Bill No. 2 - 6 CESS POOL/URINE ABSORPTION PIT 0.00
BILL 02 - SUB TOTAL [B] 0.00
BILL 03 -ESA'ALA PRIMARY SCHOOL
Bill No. 3 - 1 TYPICAL MAINSTREAM DRY TOILETS (1NO.) 0.00
Bill No. 3 - 2 TYPICAL ACCESSIBLE DEHYDRATED TOILET (2NO.) 0.00
Bill No. 3 - 3 CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA) 0.00
Bill No. 3 - 4 PLUMBING & DRAINAGE 0.00
Bill No. 3 - 5 ELECTRICAL INSTALLATIONS 0.00
Bill No. 3 - 6 CESS POOL/URINE ABSORPTION PIT 0.00
BILL 03 - SUB TOTAL [C] 0.00
BILL 04 -ESA'ALA MARKET
Bill No. 4- 1 TYPICAL MAINSTREAM DRY TOILETS (1NO.) 0.00
Bill No. 4 - 2 CATCHMENT TANK PLINTH, WATER POINT & SPLASH AREA) 0.00
Bill No. 4 - 3 PLUMBING & DRAINAGE 0.00
Bill No. 4 - 4 ELECTRICAL INSTALLATIONS 0.00
Bill No. 4 - 5 CESS POOL/URINE ABSORPTION PIT 0.00
BILL 04 - SUB TOTAL [D] 0.00
TOTAL PRICE [E = A+ B +C+D] 0.00
LESS DISCOUNT (IF ANY) [F]
TOTAL PRICE (POST DISCOUNT) [G = E-F] 0.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Annex 1_Drawings.pdf
Bidding document • 0.04 MB
Annex 2_Technical Specifications_Lot 1 Rabaraba.pdf
Bidding document • 1.24 MB
Annex 2_Technical Specifications_Lot 2_Esaala.pdf
Bidding document • 1.35 MB
Annex 3_Lot 1_BoQ_Rabaraba_Construction Works for WASH interventions for Rabaraba_PNG_BoQ.xlsx
Bidding document • 0.95 MB
Annex 3_Lot 2_BoQ_Esaala_Construction Works for WASH interventions for Esa_ala in PNG_BoQ.xlsx
Bidding document • 0.69 MB
Annex 4 - Quality Management Plan.zip
Bidding document • 2.58 MB
Annex 5 - Health and Safety Management Plan (HSMP).zip
Bidding document • 1.68 MB
Annex 6 - Social and Environemental Management Plan (SEMP).zip
Bidding document • 0.45 MB
Annex 7 - Gender Action Plan (GAP) .pdf
Bidding document • 0.04 MB
Annex 8 - Prevention of Sexual exploitation and abuse and Harassment (PSEAH).zip
Bidding document • 4.08 MB
Annex 9 - Sustainability Plan.zip
Bidding document • 1.07 MB
Section II. Milne Bay (Rabaraba, Esaála) Quick Wins_Small Works - 6 Solicitation - ITB 04 Sections II, III, IV, V.pdf.pdf
Bidding document • 14.85 MB
Small_Works_ITB_Section_I_Instructions to Bidders.pdf
Bidding document • 2.15 MB
Small_Works_ITB_Section_VI_Returnable Schedules.docx
Bidding document • 0.58 MB
Pre-bid meeting minutes_ITB_2026_65113.pdf
Bidding document • 2.09 MB
Pre-bid meeting slides_ITB_2026_65113.pdf
Bidding document • 5.17 MB
Annex 1a - Drawings Rabaraba LLG Toilet_REV01.pdf
Bidding document • 0.04 MB
Notice on UNGM.html
Notice page • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .