Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
Bid Security (EMD)
Refer Docs
Closing Date
2 Dec 2026, 07:30 (UTC)2 Dec 2026, 1:00 pm IST
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender description: ITB for Rehabilitation of plum concrete surface Gozar #01, District#03 and Gozar #03, District #06, Pol-e-Khomri city Baghlan Province (2 Lots), Afghanistan IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
322890
ITB/2026/65598
Invitation to bid
Afghanistan
INVITATION
UTC
21 Nov 2026
18 Nov 2026
UNOPS Afghanistan Country Office (AFCO)
UNOCA Compound Jalalabad Road P.O. Box 1772, Central Post Office Kabul, Afghanistan
Email [email protected] | T +93 799295¬393 | www.unops.org | UNOPS is ISO 9001 Certified
Schedule 4.1 [Bills of Quantities and Rates]
WB Project - Community Resilience and Livelihood Project CRLP
Baghlan, Afghanistan
Project Name/Components:
Rehabilitation of Karta Naw streets with plum concrete surface with a total length of 400m in Gozar #01, District#03, Pol-e-Khomri city
NOTICE TO ALL BIDDERS - COMPLETE PROJECT PRICE:
a) This BOQ is part of the complete project documents and must be read together with the other parts. Complete project documents may include contract, drawings, BOQ, Specifications, Schedules, Preambles, etc. b) Bidders must inform UNOPS for any discrepancies between documents prior to pricing the items in the BoQ. c) Prices given by the bidders on this BOQ are to cover everything mentioned in the complete Contract documents. d) Changes to the exchange rate or market prices during project period as well as unavailability or shortage of materials/items are to the responsibility of the Contractor with no extra payment or adjustment.
Currency: Afghani
Project No: AF2-BGN-D3-SP03
Project Name: Rehabilitation of Karta Naw streets with plum concrete surface with a total length of 400m in Gozar #01, District#03, Pol-e-Khomri city
Location: Baghlan, Afghanistan
Original Issue: Sunday, November 15, 2026
Revision No.: N/A
Revision Date: N/A
Afghanistan Community Resilience and livelihoods Project
Bills of Quantities
Project No: AF2-BGN-D3-SP03
Project Name: Rehabilitation of Karta Naw streets with plum concrete surface with a total length of 400m in Gozar #01, District#03, Pol-e-Khomri city,
Location: Baghlan, Afghanistan
Original Issue: November 15, 2026
Currency: Afghani
Revision No.: N/A
Revised Date: N/A
1 Labor Wage Payments and Pricing Instructions: AIB Bank as an authority will directly disburse wages to laborers at a rate of AFN 450 per day for unskilled laborers and AFN 700 per day for skilled laborers, with payments scheduled every 21 calendar days notified by Contractor/UNOPS. The labor administration item in the Bills of Quantities (BoQ) treated as fixed price payable based on actual number of labourer days generated. This item (labor administration cost) covers the Contractor’s costs for labor recruitment, documentation, coordination of wage distribution and other relevant costs, as outlined in the contract documents (General Conditions of the Contract, Particular Conditions Clause 2.5 and Schedule 3.12, 3.13 and 3.14, Annex 5 Labor Management Procedure or LMP (all terms and conditions of the LMP apply, except for the wage payment procedure, which will be managed by the AIB), Annex 1.2 TOR), and line item 1314.01C of this BoQ. This item shall be paid according to the actual labor-days generated as a provisional sum.
2 a) This BOQ is part of the complete project documents and must be read together with the other parts. Complete project documents may include contract, drawings, BOQ, Specifications, Schedules, Preambles, etc. b) Bidders must inform UNOPS for any discrepancies between documents prior to pricing the items in the BoQ. c) Prices given by the bidders on this BOQ are to cover everything mentioned in the complete Contract documents. d) Changes to the exchange rate or market prices during project period as well as unavailability or shortage of materials/items are to the responsibility of the Contractor with no extra payment or adjustment.
3 Mainly, the unit cost of items/activities in the BoQ are without the cost of unskilled and skilled laborers in those activities. Costs of direct laborers for all items are being priced collectively under separate line-items 1314.01A and 1314.01B which will be paid by the AIB Bank.
4 Contractor is only paid for the Items included in Part 1 of this BoQ (Non-Labor Wage / Material Part (Items Payable to the Contractor)), Part 2 will be paid to AIB which is part of the total contract price.
Series and section numbers in this document are based on the given Specifications.
Part 1: Non-Labor Wage / Material Part, (Items Payable to the Contractor)
Series and Section Description Unit of Measure Quantity Unit price Sub Total
Read relevant sections in the given Specifications for each of the items in Bills of Quantities prior to pricing !
Series 1000 - General Items AFN 181,009.00
Duration for this subproject required by UNOPS to be as 105 calendar days. The Bidder/Contractor is solely responsible to prepare their Work-Plan accordingly.
1116j Environment and Social Management (provisional sum) Lump sum 1.00 AFN 129,849.00 AFN 129,849.00
The provisional sum for this item covers all UNOPS's requirements for the implementation of ESMP items & series of 1100 to 1300 of the given Specification and Engineer consent. The contractor should be paid based on the approved and done items (breakdowns) stated in the ESMP.
1203.01 Mobilisation Lump sum 1.00 AFN 0.00 AFN 0.00
Cost for this item covers all relevant due expenses mentioned in series 1100 to 1500 of the given Specifications.
1203.03 Demobilisation Lump sum 1.00 AFN 0.00 AFN 0.00
Cost for this item covers, but not limited, series 1200 related to Demobilisation of the given Specifications.
1314.01C Labor Administration Price Labourer days 5,116.00 AFN 10.00 AFN 51,160.00
The labor administration items encompass all expenses (administrative support for labor recruitment, printing , logistic support, communication expenses, supervision of labor deployment, arrangements for seating, order, crowd control and verification desk for labor wage distribution by AIB bank field agent) incurred by the Contractor to deliver the following services: 1. Labor recruitment, documentation and on site coordination with AIB, 2. Labor deployment, 3. Attendance and biometric verification, 4. Pre-wage distribution documentation, 5. On-site coordination for wage distribution, 6. Any others.
Series 4000 - Earthworks AFN 0.00
4701.01A Excavation and transportation of suitable and unsuitable material in all areas - mainly by labour Cu.m 913.00 AFN 0.00 AFN 0.00
Cost for this item includes all excavations or cutting for all soil types (except hard cut/hard excavation) anywhere in the job to conform design shapes. The cost includes immediate disposal and/or salvage of materials. Any deviation from the required depth/dimensions not only won't be paid but also have to be reinstated it to its original condition by the contractor at his/her own cost. All issues to be as per given drawings, Specifications and approval of Engineer.
4701.04A Fill (imported materials- by crushed aggregate material) Cu.m 53.00 AFN 0.00 AFN 0.00
This item covers all gravel/sand layers and backfills at the foundations or anywhere of all structures (e.g. drainages, culverts, walls, etc. related to this project) shown on the design. (For base course layer at roads see item 7205.01). The cost includes provision, haulage, spreading, levelling, moisturizing and compaction of the layer as required as per given design and Specifications. Soil derived from excavation is not allowed to be used in filling.
4701.04D Fill (existing materials) Cu.m 111.00 AFN 0.00 AFN 0.00
This item covers backfills done by materials derived from the excavation process as shown in the design. The filling could be at roads raised subgrade and/or around the structures (e.g. drainages, culverts, walls, curbs, etc. related to this project) that need to get proper level/shape. The cost includes sorting of excavated materials to the given specifications for filling, transportation, haulage, spreading, levelling, moisturizing and compaction required as per given design. All issues to be as per given drawings, Specifications and approval of Engineer.
4701.05 Subgrade preparation (existing/excavated embankment) Sq.m 2,827.00 AFN 0.00 AFN 0.00
This item covers formation of subgrade (embankment) for roads/shoulders, and also preparation of foundation surfaces for walls/culverts/stone-masonry-drainages/sidewalks. This job is a surface-improvement as cut-to-fill & compaction for the top 150mm all along the work line. In case natural subgrade materials are not suitable to fulfil specified requirements in the Specification, extra required materials to be provided by Contractor without extra payment. The cost for this item includes all task for a prepared and well-compacted, smooth surface and as well as removal of waste/excessive materials (if any) from the underwork area, provision of imported required materials etc. All issues to be as per given drawings, Specifications and approval of Engineer.
Series 5000 - Concrete Structures AFN 0.00
5901.03 Concrete of the required strength as shown on the drawings as (25Mpa) Cu.m 114.00 AFN 0.00 AFN 0.00
This item covers 25Mpa PCC/RCC (plain/reinforcement cement concrete) anywhere shown in the design. This item covers both monolithic/pre-cast type of concrete. Commonly areas to use this concrete are at drainages, culverts, walls, beams, columns, slabs, parapets, curbs, roads-speed-breakers, barriers and all other features in the design that shown as 25Mpa concrete. The cost for this item covers all required auxiliary materials, molding, shuttering, curing, construction joints and joint fillers, traffic painting marks/lines/signs (e.g. at roads, speed breakers, curbs, barriers etc.) using approved & specific painting materials/system, to a complete job. All issues to be as per given drawings, Specifications and approval of Engineer.
Series 7000 - Pavements AFN 0.00
7205.01 Crushed aggregate base course Cu.m 268.00 AFN 0.00 AFN 0.00
This item covers crushed aggregate base course layers by imported materials illustrated in the Specifications. Materials shall be spread all along the road and to be leveled and compacted as per given Specifications/drawings. Cost includes full compensation, furnishing, crushing and screening (if required), transporting and the removal of oversize materials, testing, protecting and maintaining the work specified in this section, except the skilled and unskilled labor's wages. All issues to be as per given drawings, Specifications and approval of Engineer.
7705.01A Plum concrete pavement (thicknesses of 130mm/150mm/170mm) Cu.m 304.00 AFN 0.00 AFN 0.00
This item covers plum concrete pavement with the size and characteristics of the given design. The cost includes all required materials, shuttering, anchors, and other auxiliary materials as needed. If construction joints shown, the cost also includes all materials and efforts to construct the joints. All issues to be as per given drawings, Specifications and approval of Engineer.
Series 8000 - Ancillary Works AFN 0.00
N/A Steel grilles over drains Sq.m 3.00 AFN 0.00 AFN 0.00
The cost for this item covers complete steel grilles, the provision, installation, 2 coats of anti-rust and 2 coats of oil-based painting, etc. to functional grilles. The cost includes all materials, efforts, auxiliary items etc. that are required for the job as per given drawings. All issues to be as per given drawings and approval of Engineer.
Sub Total Part 1: AFN 181,009.00
Part 2: Labor Wage Part, (Items Payable to AIB Bank and not Payable to Contractor)
Series 1000 - General Items AFN 2,409,700.00
1314.01A Unskilled labor-days necessary for the execution of activities listed in this BoQ. The Payment will be done directly by AIB at a fixed rate of AFN 450 per unskilled labor-day to the labourers. Labourer days 4,686.00 AFN 450.00 AFN 2,108,700.00
For example, for a duration of 45 working days there would be a need of more or less 105 unskilled labourers per day to be provided. See 'General Notes' above and Section 1300 of the Specifications for labourers issues. The Contractor is not required to allocate or include any cost for this line item, as labor payments will be made directly by AIB."
1314.01B Skilled labor-days necessary for the execution of activities listed in this BoQ. The Payment will be done directly by AIB at a fixed rate of AFN 700 per unskilled labor-day to the labourers. Labourer days 430.00 AFN 700.00 AFN 301,000.00
For example, for a duration of 45 working days there would be a need of more or less 10 skilled labourers per day to be provided. See 'General Notes' above and Section 1300 of the Specifications for labourers issues. The Contractor is not required to allocate or include any cost for this line item, as labor payments will be made directly by AIB."
Sub Total Part 2: AFN 2,409,700.00
Grand Total (Part 1 + Part 2)
Grand Total (Part 1 + Part 2): AFN 2,590,709.00
Two Million Five Hundred Ninety Thousand Seven Hundred Nine Afghani and Puls
Note: The Contractor is required to price only the unpriced or yellow highlighted cells in the bills of quantities. Two Million Five Hundred Ninety Thousand Seven Hundred Nine Afghani and Puls
UNOPS Afghanistan Country Office (AFCO)
UNOCA Compound Jalalabad Road P.O. Box 1772, Central Post Office Kabul, Afghanistan
Email [email protected] | T +93 799295¬393 | www.unops.org | UNOPS is ISO 9001 Certified
Schedule 4.1 [Bills of Quantities and Rates]
WB Project - Community Resilience and Livelihood Project CRLP
Baghlan, Afghanistan
Project Name/Components:
Rehabilitation of Karta-e-Quwayee Kar plum concrete surface streets (L=380 m), and construction of PCC drain (L=95 m) in Gozar #03, District #06, Pol-e-Khomri city
NOTICE TO ALL BIDDERS - COMPLETE PROJECT PRICE:
a) This BOQ is part of the complete project documents and must be read together with the other parts. Complete project documents may include contract, drawings, BOQ, Specifications, Schedules, Preambles, etc. b) Bidders must inform UNOPS for any discrepancies between documents prior to pricing the items in the BoQ. c) Prices given by the bidders on this BOQ are to cover everything mentioned in the complete Contract documents. d) Changes to the exchange rate or market prices during project period as well as unavailability or shortage of materials/items are to the responsibility of the Contractor with no extra payment or adjustment.
Currency: Afghani
Project No: AF2-BGN-D6-SP02
Project Name: Rehabilitation of Karta-e-Quwayee Kar plum concrete surface streets (L=380 m), and construction of PCC drain (L=95 m) in Gozar #03, District #06, Pol-e-Khomri city
Location: Baghlan, Afghanistan
Original Issue: Sunday, November 15, 2026
Revision No.: N/A
Revision Date: N/A
Afghanistan Community Resilience and livelihoods Project
Bills of Quantities
Project No: AF2-BGN-D6-SP02
Project Name: Rehabilitation of Karta-e-Quwayee Kar plum concrete surface streets (L=380 m), and construction of PCC drain (L=95 m) in Gozar #03, District #06, Pol-e-Khomri city,
Location: Baghlan, Afghanistan
Original Issue: November 15, 2026
Currency: Afghani
Revision No.: N/A
Revised Date: N/A
1 Labor Wage Payments and Pricing Instructions: AIB Bank as an authority will directly disburse wages to laborers at a rate of AFN 450 per day for unskilled laborers and AFN 700 per day for skilled laborers, with payments scheduled every 21 calendar days notified by Contractor/UNOPS. The labor administration item in the Bills of Quantities (BoQ) treated as fixed price payable based on actual number of labourer days generated. This item (labor administration cost) covers the Contractor’s costs for labor recruitment, documentation, coordination of wage distribution and other relevant costs, as outlined in the contract documents (General Conditions of the Contract, Particular Conditions Clause 2.5 and Schedule 3.12, 3.13 and 3.14, Annex 5 Labor Management Procedure or LMP (all terms and conditions of the LMP apply, except for the wage payment procedure, which will be managed by the AIB), Annex 1.2 TOR), and line item 1314.01C of this BoQ. This item shall be paid according to the actual labor-days generated as a provisional sum.
2 a) This BOQ is part of the complete project documents and must be read together with the other parts. Complete project documents may include contract, drawings, BOQ, Specifications, Schedules, Preambles, etc. b) Bidders must inform UNOPS for any discrepancies between documents prior to pricing the items in the BoQ. c) Prices given by the bidders on this BOQ are to cover everything mentioned in the complete Contract documents. d) Changes to the exchange rate or market prices during project period as well as unavailability or shortage of materials/items are to the responsibility of the Contractor with no extra payment or adjustment.
3 Mainly, the unit cost of items/activities in the BoQ are without the cost of unskilled and skilled laborers in those activities. Costs of direct laborers for all items are being priced collectively under separate line-items 1314.01A and 1314.01B which will be paid by the AIB Bank.
4 Contractor is only paid for the Items included in Part 1 of this BoQ (Non-Labor Wage / Material Part (Items Payable to the Contractor)), Part 2 will be paid to AIB which is part of the total contract price.
Series and section numbers in this document are based on the given Specifications.
Part 1: Non-Labor Wage / Material Part, (Items Payable to the Contractor)
Series and Section Description Unit of Measure Quantity Unit price Sub Total
Read relevant sections in the given Specifications for each of the items in Bills of Quantities prior to pricing !
Series 1000 - General Items AFN 258,557.00
Duration for this subproject required by UNOPS to be as 120 calendar days. The Bidder/Contractor is solely responsible to prepare their Work-Plan accordingly.
1116j Environment and Social Management (provisional sum) Lump sum 1.00 AFN 190,017.00 AFN 190,017.00
The provisional sum for this item covers all UNOPS's requirements for the implementation of ESMP items & series of 1100 to 1300 of the given Specification and Engineer consent. The contractor should be paid based on the approved and done items (breakdowns) stated in the ESMP.
1203.01 Mobilisation Lump sum 1.00 AFN 0.00 AFN 0.00
Cost for this item covers all relevant due expenses mentioned in series 1100 to 1500 of the given Specifications.
1203.03 Demobilisation Lump sum 1.00 AFN 0.00 AFN 0.00
Cost for this item covers, but not limited, series 1200 related to Demobilisation of the given Specifications.
1314.01C Labor Administration Price Labourer days 6,854.00 AFN 10.00 AFN 68,540.00
The labor administration items encompass all expenses (administrative support for labor recruitment, printing , logistic support, communication expenses, supervision of labor deployment, arrangements for seating, order, crowd control and verification desk for labor wage distribution by AIB bank field agent) incurred by the Contractor to deliver the following services: 1. Labor recruitment, documentation and on site coordination with AIB, 2. Labor deployment, 3. Attendance and biometric verification, 4. Pre-wage distribution documentation, 5. On-site coordination for wage distribution, 6. Any others.
Series 4000 - Earthworks AFN 0.00
4701.01A Excavation and transportation of suitable and unsuitable material in all areas - mainly by labour Cu.m 1,138.00 AFN 0.00 AFN 0.00
Cost for this item includes all excavations or cutting for all soil types (except hard cut/hard excavation) anywhere in the job to conform design shapes. The cost includes immediate disposal and/or salvage of materials. Any deviation from the required depth/dimensions not only won't be paid but also have to be reinstated it to its original condition by the contractor at his/her own cost. All issues to be as per given drawings, Specifications and approval of Engineer.
4701.04A Fill (imported materials- by crushed aggregate material) Cu.m 77.00 AFN 0.00 AFN 0.00
This item covers all gravel/sand layers and backfills at the foundations or anywhere of all structures (e.g. drainages, culverts, walls, etc. related to this project) shown on the design. (For base course layer at roads see item 7205.01). The cost includes provision, haulage, spreading, levelling, moisturizing and compaction of the layer as required as per given design and Specifications. Soil derived from excavation is not allowed to be used in filling.
4701.04D Fill (existing materials) Cu.m 290.00 AFN 0.00 AFN 0.00
This item covers backfills done by materials derived from the excavation process as shown in the design. The filling could be at roads raised subgrade and/or around the structures (e.g. drainages, culverts, walls, curbs, etc. related to this project) that need to get proper level/shape. The cost includes sorting of excavated materials to the given specifications for filling, transportation, haulage, spreading, levelling, moisturizing and compaction required as per given design. All issues to be as per given drawings, Specifications and approval of Engineer.
4701.05 Subgrade preparation (existing/excavated embankment) Sq.m 3,044.00 AFN 0.00 AFN 0.00
This item covers formation of subgrade (embankment) for roads/shoulders, and also preparation of foundation surfaces for walls/culverts/stone-masonry-drainages/sidewalks. This job is a surface-improvement as cut-to-fill & compaction for the top 150mm all along the work line. In case natural subgrade materials are not suitable to fulfil specified requirements in the Specification, extra required materials to be provided by Contractor without extra payment. The cost for this item includes all task for a prepared and well-compacted, smooth surface and as well as removal of waste/excessive materials (if any) from the underwork area, provision of imported required materials etc. All issues to be as per given drawings, Specifications and approval of Engineer.
Series 5000 - Concrete Structures AFN 0.00
5901.01 Concrete of the required strength as shown on the drawings as (15Mpa) Cu.m 7.00 AFN 0.00 AFN 0.00
This item covers anywhere 15Mpa PCC (plain cement concrete) in the design. The cost includes all auxiliary materials, shuttering, efforts, curing etc. to the complete job. All issues to be as per given drawings, Specifications and approval of Engineer.
5901.03 Concrete of the required strength as shown on the drawings as (25Mpa) Cu.m 151.00 AFN 0.00 AFN 0.00
This item covers 25Mpa PCC/RCC (plain/reinforcement cement concrete) anywhere shown in the design. This item covers both monolithic/pre-cast type of concrete. Commonly areas to use this concrete are at drainages, culverts, walls, beams, columns, slabs, parapets, curbs, roads-speed-breakers, barriers and all other features in the design that shown as 25Mpa concrete. The cost for this item covers all required auxiliary materials, molding, shuttering, curing, construction joints and joint fillers, traffic painting marks/lines/signs (e.g. at roads, speed breakers, curbs, barriers etc.) using approved & specific painting materials/system, to a complete job. All issues to be as per given drawings, Specifications and approval of Engineer.
Series 6000 - Reinforcement for concrete structures AFN 0.00
6401.01 Supply and place reinforcement Kg 400.00 AFN 0.00 AFN 0.00
The cost for this item covers all materials, efforts, auxiliary items etc. that are required for steel reinforcement/anchorage anywhere shown on the drawings. All issues to be as per given drawings, Specifications and approval of Engineer.
Series 7000 - Pavements AFN 0.00
7205.01 Crushed aggregate base course Cu.m 264.00 AFN 0.00 AFN 0.00
This item covers crushed aggregate base course layers by imported materials illustrated in the Specifications. Materials shall be spread all along the road and to be leveled and compacted as per given Specifications/drawings. Cost includes full compensation, furnishing, crushing and screening (if required), transporting and the removal of oversize materials, testing, protecting and maintaining the work specified in this section, except the skilled and unskilled labor's wages. All issues to be as per given drawings, Specifications and approval of Engineer.
7705.01A Plum concrete pavement (thicknesses of 130mm/150mm/170mm) Cu.m 299.00 AFN 0.00 AFN 0.00
This item covers plum concrete pavement with the size and characteristics of the given design. The cost includes all required materials, shuttering, anchors, and other auxiliary materials as needed. If construction joints shown, the cost also includes all materials and efforts to construct the joints. All issues to be as per given drawings, Specifications and approval of Engineer.
Series 8000 - Ancillary Works AFN 0.00
Section 8100 - Pitching and stonework
8106.06 Cement-mortared stone masonry walls/works Cu.m 198.00 AFN 0.00 AFN 0.00
This item covers application of stone masonry at walls/features as shown. The cost also covers 10mm deep pointing 1:3 to all grooves of the exposed face of the new stone masonry. The cost also includes auxiliary items, anchorages etc. as per design. This item also covers provision and installation of any PVC pipes at stone walls (if shown), and as well as the construction of invert filter at the intakes of the mentioned PVC pipes (if shown) as per given drawings. All issues to be as per given drawings, Specifications and approval of Engineer.
N/A Steel grilles over drains Sq.m 11.00 AFN 0.00 AFN 0.00
The cost for this item covers complete steel grilles, the provision, installation, 2 coats of anti-rust and 2 coats of oil-based painting, etc. to functional grilles. The cost includes all materials, efforts, auxiliary items etc. that are required for the job as per given drawings. All issues to be as per given drawings and approval of Engineer.
N/A Steel guardrails - steel pipes Lin.m of pipe 120.00 AFN 0.00 AFN 0.00
The cost for this item covers hot-dip galvanized steel guardrails shown in the design including its provision and installation to a complete and functional guardrails. The cost includes all materials, efforts, auxiliary items, etc. that are required for the job as per given drawings. All issues to be as per given drawings and approval of Engineer.
Sub Total Part 1: AFN 258,557.00
Part 2: Labor Wage Part, (Items Payable to AIB Bank and not Payable to Contractor)
Series 1000 - General Items AFN 3,280,550.00
1314.01A Unskilled labor-days necessary for the execution of activities listed in this BoQ. The Payment will be done directly by AIB at a fixed rate of AFN 450 per unskilled labor-day to the labourers. Labourer days 6,069.00 AFN 450.00 AFN 2,731,050.00
For example, for a duration of 60 working days there would be a need of more or less 102 unskilled labourers per day to be provided. See 'General Notes' above and Section 1300 of the Specifications for labourers issues. The Contractor is not required to allocate or include any cost for this line item, as labor payments will be made directly by AIB."
1314.01B Skilled labor-days necessary for the execution of activities listed in this BoQ. The Payment will be done directly by AIB at a fixed rate of AFN 700 per unskilled labor-day to the labourers. Labourer days 785.00 AFN 700.00 AFN 549,500.00
For example, for a duration of 60 working days there would be a need of more or less 14 skilled labourers per day to be provided. See 'General Notes' above and Section 1300 of the Specifications for labourers issues. The Contractor is not required to allocate or include any cost for this line item, as labor payments will be made directly by AIB."
Sub Total Part 2: AFN 3,280,550.00
Grand Total (Part 1 + Part 2)
Grand Total (Part 1 + Part 2): AFN 3,539,107.00
Three Million Five Hundred Thirty-Nine Thousand One Hundred Seven Afghani and Puls
Note: The Contractor is required to price only the unpriced or yellow highlighted cells in the bills of quantities. Three Million Five Hundred Thirty-Nine Thousand One Hundred Seven Afghani and Puls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
1.2 .Section IV Annex 1.2 TOR - AF2-BGN-D6-SP02.docx.pdf
Bidding document • 2.28 MB
Annex 10 - Quality Management Plan Template - Revised on 14 June 2026.docx
Bidding document • 2.20 MB
ITB Secion V Annex 4_ Occupational Health and Safety (OHS) Procedure.docx
Bidding document • 0.34 MB
ITB Section V Annex 2 - Technical Specification Rev 8.pdf
Bidding document • 1.77 MB
ITB Section V Annex 5_ Labor Management Procedures.docx.pdf
Bidding document • 0.17 MB
ITB Section V Annex 6 Links for safeguard documents & toolbox talks.pdf
Bidding document • 0.12 MB
ITB Section V Annex 7_ Gender Action Plan.pdf
Bidding document • 0.07 MB
ITB Section V Annex 9.2 - Preamble to the BOQ.pdf
Bidding document • 0.20 MB
Key Staff, Machinery, Equipment and Tools.docx
Bidding document • 0.01 MB
Lot 1 - 1.2 .Section IV Annex 1.2 TOR - AF2-BGN-D3-SP03.docx.pdf
Bidding document • 2.25 MB
Lot 1 - Section IV Annex 1.1 Project Brief AF2-BGN-D3-SP03.pdf
Bidding document • 5.06 MB
Lot 1 - Section V Annex 3_ Sub-project ESMP.pdf
Bidding document • 0.19 MB
Lot 1 - Section V annex 8- Design Package - AF2-BGN-D3-SP03.pdf
Bidding document • 7.63 MB
Lot 1 - Section V Annex 9.1 BOQ-AF2-BGN-D3-SP03.pdf
Bidding document • 0.39 MB
Lot 1 - Section V Annex 9.1 BOQ-AF2-BGN-D3-SP03.xlsm.xlsx
Bidding document • 0.16 MB
Lot 2 - 1.2 .Section IV Annex 1.2 TOR - AF2-BGN-D6-SP02.docx.pdf
Bidding document • 2.28 MB
Lot 2 - Section IV Annex 1.1 Project Brief AF2-BGN-D6-SP02.pdf
Bidding document • 7.83 MB
Lot 2 - Section V Annex 3_ Sub-project ESMP.pdf
Bidding document • 0.19 MB
Lot 2 - Section V Annex 9.1 BOQ-AF2-BGN-D6-SP02.pdf
Bidding document • 0.41 MB
Lot 2 - Section V Annex 9.1 BOQ-AF2-BGN-D6-SP02.xlsm.xlsx
Bidding document • 0.15 MB
Lot 2 - SectionVannex8-DesignPackage-AF2-BGN-D6-SP02.pdf
Bidding document • 5.09 MB
Small Works - ITB 03 Section I - Instructions to Bidders.pdf
Bidding document • 2.21 MB
Small Works - ITB 04 Sections II, III, IV, V - ITB 2026 65598.docx
Bidding document • 0.63 MB
Small Works - ITB 05 Section VI - Returnable Schedules - ITB 2026 65598.docx
Bidding document • 0.62 MB
Notice on UNGM.html
Notice page • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .