Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Amendment #3
Amendment No. 3 is issued to extend the submission deadline to November 23, 2026, and the clarification deadline to November 19, 2026. Please refer to the particulars tab on eSourcing.All other terms and conditions remain the same
Clarification
Question:We kindly request an extension to the deadline to submit offers.UNOPS answer:Please be informed that an extension of the RFQ submission deadline cannot be granted. The bidders are kindly requested to submit the offer by the specified deadline
Clarification
Question: 1. Delivery time: The RFQ requires delivery and installation of Item 1 (PTZ cameras with solar power systems) within 6 weeks, and Items 1 and 2 combined within 12 weeks. Is it acceptable to offer 12 weeks for Item 1 alone, and also 12 weeks for Items 1 and 2 combined?2. Detection distance: The RFQ specifies 25× optical zoom and 150 m IR night vision, but no detection distance. Please confirm the minimum required wildfire detection distance, for both day and night.UNOPS answer:The bidder shall comply with all the specifications and requirements set out in the Section II: Schedule of Requirements.The RFQ does not specify a minimum wildfire detection distance for either daytime or nighttime operation. The 25× optical zoom and 150 m IR illumination specifications define the camera's capabilities for effective wildfire monitoring.
Clarification
Question:As Per project requirements: The camera mounting poles shall be installed on prefabricated concrete foundations. The poles shall be mounted directly onto the pre-installed anchor bolts embedded in the foundations, ensuring proper alignment, structural stability, and secure anchorage. But No civil works are required.Are the prefabricated foundations in the winning contractors scope (should the pole option be selected) ?What criteria and code are required for the wind load analysisUNOPS answer:No, the prefabricated foundations are excluded from the project scope.The poles and mounting structures shall be suitable for long-term outdoor use and shall comply with applicable engineering standards and the manufacturer's recommendations.
Clarification
Question:Should the mounting structure/camera poles be out of budget, how/on which supporting structure will the cameras and the respective power supply system be installed?UNOPS answer:In case the camera poles/mounting structures are excluded from the budget, a site inspection will be conducted to identify suitable existing supporting structures for the installation of the cameras and their respective power supply systems. Further details on the proposed installation arrangements will be provided following the site assessment.
Clarification
Question: Kindly advise if the system is required to provide automatic forest fire detection using video analytics.Kindly advise if automatic notification is required when smoke or fire is detected.Kindly advise if the system should provide an approximate GPS location or direction of the detected fire to facilitate response by forest protection teams.Kindly advise where is the location of the centralized monitoring room and what is its size ? Is a video wall required ?UNOPS answer:in same sequential order:Video analytics technology is not required. As specified in Section II: Schedule of Requirements of the project scope, the Bidder is required to provide outdoor IP PTZ cameras.The outdoor IP PTZ cameras shall be capable of detecting movement within their field of view and automatically triggering notifications upon motion detection.Once the location of each camera has been selected, its corresponding GPS coordinates shall be provided to the control room. However the provision of GPS coordinates for the exact fire location is not required.The cameras will be monitored by the respective Unions of Municipalities and/or Municipalities from three separate control rooms. The provision of a video wall are not included in the project scope.
Clarification
Questions:Camera Monitoring: Will the cameras be monitored centrally by the (MOE) or separately by each municipality? Will monitoring take place from a single location or multiple locations?Control Room: Is a centralized control room required to monitor all cameras, or will monitoring be managed separately by each municipality?Recording and Storage: Is centralized video recording required at the MOE level, or should recordings be stored locally within each municipality?Cloud-Based Solution: Would it be acceptable to propose a cloud-based solution in which cameras record footage both locally on SD cards and in the cloud? This would allow an access to the cloud platform from anywhere for live monitoring, video playback, and analytics.UNOPS answers - in same sequential order:The cameras will be monitored by the respective Unions of Municipalities and/or Municipalities from three separate control rooms.Monitoring will be managed independently by each Municipality and/or Union of Municipalities from three separate control rooms.As specified in requirement 2.11 in Section II: Schedule of Requirements, each camera must have sufficient storage capacity to retain up to 24 hours of footage per day for a period of 30 days. No centralized recording required at the MoE level. The cameras will be monitored by the respective Unions of Municipalities and/or Municipalities from three separate control rooms.If the proposed cloud-based solution is compatible with the requirements specified below, then it would be acceptable: As specified in requirement 2.11 in Section II: Schedule of Requirements, the Bidder has to Provide a complete recording and storage solution supporting live monitoring, recording, playback, search, and export of recorded footage, with a retention period of 30 days. Only fully remote storage solutions shall be used, such as SD/microSD card storage or equivalent integrated storage solutions. No cable connections or conventional DVR systems shall be used. Each camera must have sufficient storage capacity to retain up to 24 hours of footage per day for a period of 30 days.
Clarification
Questions:Installation Locations & Civil Works: As exact locations are unavailable, kindly clarify whether mounting poles must be supplied or existing structures utilized, including the required mounting types (poles, walls, rooftops), heights, brackets, foundations, and associated civil works. Site coordinates or indicative locations are essential to assess accessibility, transportation, manpower, accommodation, and installation costs.Control Rooms & Servers: How many control rooms are required? Please clarify whether servers, workstations, monitors and associated infrastructure are included in the scope or provided by the beneficiary.PTZ Joysticks: Are dedicated PTZ joysticks/keyboards required? If so, kindly specify the quantities.Connectivity & Storage: Please confirm the intended communication method, responsibility for SIM cards/data subscriptions, and whether the required 30-day recording must be stored entirely within each camera or whether additional local storage equipment is acceptable.Shipping & Delivery: The specified six-week delivery period may be achievable through airfreight, subject to equipment availability, but significantly increases costs. Sea freight, including procurement and import arrangements, may require approximately 3–4 months, particularly as these specialized items are not readily available locally. Considering the additional installation and commissioning requirements, kindly clarify whether the six-week deadline applies to delivery only or full operational handover.To ensure equal competition, we respectfully suggest establishing a common shipping basis for all bidders, with airfreight and sea freight costs identified separately, and considering an extended delivery period for the more economical sea-freight option.Pricing & Site Variations: Given that final installation locations will only be confirmed after award, kindly clarify how unforeseen civil works, difficult site access, or additional infrastructure requirements will be addressed, particularly considering the fixed unit pricing and permitted ±30% quantity variation.UNOPS Answers - in same sequential order:As specified in Section II: Schedule of Requirements, Item # 2 – Mounting Structure / Camera Pole (OPTIONAL), the pricing for this item is mandaotry, however the award is subject to fund availability. For the complete technical specifications and requirements applicable to the mounting poles, please refer to Item # 2 of Section II: Schedule of Requirements. The construction of pole foundations and any other civil works are not included in the scope of this tender. Site coordinates or indicative locations are not available at this stage. The PTZ cameras will be installed in different forests across Lebanon for wildfire monitoring purposes.The PTZ cameras will be managed and monitored from three control rooms. The equipment required for this scope of work is limited to the items listed in Section II: Schedule of Requirements. Associated equipment and infrastructure are provided by the beneficiaryThe equipment required for this scope of work is limited to the items listed in Section II: Schedule of Requirements.As specified in requirement 2.11 in Section II: Schedule of Requirements, the Bidder has to Provide a complete recording and storage solution supporting live monitoring, recording, playback, search, and export of recorded footage, with a retention period of 30 days. Only fully remote storage solutions shall be used, such as SD/microSD card storage or equivalent integrated storage solutions. No cable connections or conventional DVR systems shall be used. Each camera must have sufficient storage capacity to retain up to 24 hours of footage per day for a period of 30 days. An internet connection shall be provided by the Bidder for testing and commissioning purposes. However the internet data plan required for the subsequent operation of the cameras are excluded from the project scope.Bidders must comply with the Delivery and installation time specified in Scheduled of Requirements REV 1 for completing the deliverable and installation of goods, regardless of the mode of shipping used (e.g., airfreight or sea freight). Installation should commence as soon as the equipment is delivered, even if delivery occurs prior to the end of the 12-weeks period.The PTZ cameras will be installed at various forest locations across Lebanon for wildfire monitoring purposes. No civil works are included in the scope of this tender. The scope is limited to the supply and installation of the equipment, listed in Section II: Schedule of Requirements. Delivery terms are included in the Section II: Schedule of Requirements.
Clarification
Question 1:Who provides and pays for the SIM data plans, and for how long after handover?Answer 1:As specified in the project scope Section II: Schedule of Requirements the Bidder shall supply, deliver, install, configure, test, commission, and hand over outdoor IP PTZ cameras intended for monitoring purposes. The SD/microSD card storage or equivalent integrated storage solutions shall be provided by the Bidder as specified in Section II: Schedule of Requirements, Recording & Storage - requirement no. 2.11. An internet connection shall be provided by the Bidder for testing and commissioning purposes. However the internet data plan required for the subsequent operation of the cameras are excluded from the project scope.Question 2:Are poles or masts and their foundations in scope? If yes, what height?Answer 2:Please refer to the revised Section II: Schedule of Requirements: Item # 2 – Mounting Structure / Camera Pole (OPTIONAL): the pricing for this item is mandaotry, however the award is subject to fund availability. The poles shall have a minimum height of 10 meters and be made of galvanized steel or other materials offering equivalent corrosion protection. Please note that the construction of foundations is excluded from the scope of this tender. For the complete technical specifications and requirements applicable to the mounting poles, please refer to Item # 2 of Section II: Schedule of Requirements - REV 1Question 3:Where should the monitoring client or workstation be installed: MoE, Civil Defense or the municipalities?Answer 3:The PTZ cameras will be installed in different forests across Lebanon for wildfire monitoring purposes. As specifiedin Section II: Schedule of Requirements, Section C - Delivery place and Incoterms rules, Delivery shall be carried out in accordance with the instructions issued by the Ministry of Environment (MoE) to the municipalities within Akkar, Dennieh, and Chouf areas. The exact delivery locations shall be confirmed by the MoE at the time of delivery.Question 4:Can you confirm that edge recording on SD with remote playback over 4G meets "fully remote storage solutions"?Answer 4:The objective is to ensure that footage is stored either exclusively on the camera’s local SD card or also transmitted to a remote server or cloud platform. No wired connections should be used; all data storage and transmission must be wireless.Question 5:Does the 6-week deadline cover delivery only, or installation too?Answer 5:Please refer to Section II: Schedule of Requirements - REV 1: Delivery and installation time: Bidder shall deliver (and install) the goods as follows:Item 1 only: within six (6) weeks from Contract signature date.Item 1 and 2 combined: within twelve (12) weeks from Contract signature date.
Amendment #2
Amendment No. 2 is issued to:Amend the requirements. Please refer to the Documents tab on eSourcing. Changes made to the "RFQ_Section_II_ScheduleofRequirements_REV 1" and to the "RFQ_Section_III_ReturnableBiddingForms_REV 1" are made in blue color.Upload UNOPS Minimum Health and Safety Requirements for Contractors. Please refer to the Documents tab on eSourcing.Extend the deadlines for clarification and submission. Please refer to the particulars tab on eSourcing.All other terms and conditions remain the same
Amendment #1
Amendment No. 1 is issued to extend the submission deadline to November 2, 2026, and the clarification deadline to October 26, 2026.
Tender Value
Refer Docs
Bid Security (EMD)
Refer Docs
Closing Date
23 Nov 2026, 09:00 (UTC)Due tomorrow23 Nov 2026, 2:30 pm IST
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender description: Procurement of PTZ Camera Systems for Wildfire Monitoring Operations in Lebanon ----- IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
317362
RFQ/2026/64607
Request for quotation
Lebanon
RFQ
UTC
21 Nov 2026
8 Oct 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
RFQ - Contract Forms.docx
Bidding document • 0.82 MB
RFQ_Section_I_InstructionstoBidders (4).pdf
Bidding document • 0.12 MB
RFQ_Section_III_ReturnableBiddingForms_Wildfire PTZ Cameras_June2026 REV 1.docx
Bidding document • 1.06 MB
RFQ_Section_II_ScheduleofRequirements_Wildfire PTZ Cameras REV 1.docx
Bidding document • 1.67 MB
UNOPS Minimum Health and Safety Requirements for Contractors .pdf
Bidding document • 0.75 MB
Notice on UNGM.html
Notice page • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .