Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Clarification
Clarification# 1: As we are working to prepare our submission for this tender, we have noted that local registration is required. Please confirm if we can demostrate the presence of a local partner makes us compliant to the requiremenrent.Response: The criteria states "The bidder should have a valid business registration and Tax ID to operate in Yemen. In case of Joint Venture (JV), at least one of the joint venture members must meet it". Thus, international bidders can fulfill this requirement using the Joint Venture Partner Information Form with a local partner.
Amendment #1
Dear Bidders,This purpose of this amendment is to:1. Add the prebid meeting minutes to the eSourcing document tab.Therefore;eSourcing Document Tab is amended to add the following documents:1. Minutes for Pre-bid Meeting RFQ-2026-65468ALL OTHER TERMS AND CONDITIONS FOR THIS TENDER REMAINS THE SAME...
Tender Value
Refer Docs
Bid Security (EMD)
Refer Docs
Closing Date
6 Dec 2026, 09:00 (UTC)6 Dec 2026, 2:30 pm IST
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Provision of a Hybrid Solar and Battery Energy Storage System for Aden Vaccines Warehouse Complex ----------------------------- IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
321965
RFQ/2026/65468
Request for quotation
Yemen
RFQ
UTC
21 Nov 2026
10 Nov 2026
Provision of a Hybrid Solar and Battery Energy Storage System for Aden Vaccines Warehouse Complex.
Bill of Quantities.
Aden Governorate - Republic of Yemen.
Project Ref.: VSC-RW-ADN-01
Preamble To Bills of Quantities (BoQs):
Units Abbreviations.
The following abbreviations are used throughout the Bills of Quantities:
Note BoQ Item related description.
L.m Linear meter.
Sqm Square meter.
Cu.m Cubic meter.
Set Groups of related Items.
Ton Metric Ton.
Ref. Reference.
A. Architectural and Structural BoQs.
Ref. Description Unit QTY Rate USD Amount USD
A Architectural / Civil Works.
The Bidders are requested to refer the General Notes, Pricing Preambles, Drawings, Specifications, Conditions of Contract, Special Conditions of Contract, all other relevant documents and to visit the site prior to pricing of the following items. Implementing Contractor is responsible for the wellbeing of ministry assets and services in areas of project activities. Meanwhile, the contractor is bound to keep the facility sections in smooth operable mode, all in terms of vehicles traffic, employees and visitor’s movement, utility services inflow/outflow, safety measures, and sound pollution. Note
A1 Steel Mounting Structure
General Scope of BoQ Item: The scope includes the complete supply, fabrication, delivery, and installation of steel mounting structures. This covers base plates, columns, beams, rafters, purlins, eaves members, bracing, brackets, plates, IPE sections, L-sections, UPE sections and other structural steel sections, wire Mich together and connections using plates, channels, angles, gusset plates, anchor bolts, and cleats. The work must be executed in full compliance with tender drawings, technical specifications, approved shop drawings, and site conditions to the satisfaction of the Supervising Engineer. Note
Price Rates Inclusions: The quoted rates shall be deemed all-inclusive, covering: – Materials, labor, tools, plants, equipment, and temporary work (staging/scaffolding). – All necessary lifting, hoisting, assembly, jointing, welding, drilling, and cutting. – All accessories, including nuts, bolts, washers, anchor bolts, and fasteners. – Bolt grouting and site-specific implementation requirements at all heights and locations. – Costs for sampling, testing, inspections, and quality control procedures as mandated by technical specifications. – All incidental costs are required for a complete, stable, and functional structure. Note
Post-Award Contract Activities: Upon contract award, the Contractor shall: – Inspect and verify existing site conditions, including dimensions, levels, access constraints, and structural interfaces. – Prepare and submit detailed shop drawings and material approval requests based on actual site conditions, tender documents, and market availability. – Establish and obtain approval for the project benchmark and leveling network. – Accurately set out all structural interface locations (e.g., column and beam positions) using professional surveying methods (e.g., total station equipment). – Ensure all approvals are secured prior to the commencement of fabrication or installation. Note
Steel Sections & Material Information: – All steel members shall have a minimum yield strength of 280 MPa. – All structural work shall be compliant with EC3, ACI 318M-2014, ASCE 7-15 and ASCE standards. – Connections shall utilize high-strength bolts (Grade 8.8 / Anti-thief type for specific applications, or as per A325/A490/EC3 standards) with corresponding washers, nuts, and plates. – Anchor bolts for concrete interfaces shall be secured using non-shrink cement grout (min. compressive strength of 50 MPa, compliant with ASTM). Note
Protective Coatings Methodology: – All steel members shall be cold galvanized with a coating thickness ranging from 80–120 microns. – Welding shall be performed using fillet welds in the fabrication workshop; galvanizing must be applied after welding processes are complete. – Where specified, additional protective coatings shall include one coat of approved zinc chromite primer and two coats of synthetic enamel paint. Note
Access, Maintenance Walkways and Ladders The scope of structural steelwork shall include the design, supply, fabrication, delivery, hoisting and complete installation of all access and maintenance facilities required for safe inspection, cleaning, operation and maintenance of the structure, including but not limited to: – Maintenance and cleaning walkways/platforms provided along and/or within the structure as indicated on the approved drawings, including supporting steel members, brackets, frames, decking/grating and all necessary fixings and connections. –Fixed access and transition ladders/stairs installed on the maintenance walkways/platforms to provide safe movement between different levels and sections of the structure. –Access ladder extending from the ground/lower level of the structure up to the maintenance walkways/platforms, including all supporting members, brackets, fixings and connection details. –Safety guards and protective systems for all ladders, including ladder cages/guards, handrails, guardrails, intermediate rails, toe boards and other safety components as required by the approved drawings and applicable safety standards. –Lockable safety gate/closing gate at the access ladder opening, complete with hinges, locking arrangement, latching mechanism and all necessary accessories. –Structural base/support for the access ladder, including steel base frame, support plates, brackets, anchor bolts, connection components and all required non-shrink grout or other approved fixing materials. –All walkways, ladders, platforms, guardrails, gates and supporting steelwork shall be properly connected, braced, aligned and securely fixed to the main structure and shall be designed and installed to safely withstand the applicable dead, live, maintenance and access loads. –All steel components shall receive the specified protective coating/galvanizing system, including repair of any coating damaged during transportation, fabrication or erection. Note
Methodology of Measurement: – The unit of measurement is square meters (sq.m). – Quantities for the installed steel mounting structure shall be calculated using the final as-built horizontal surface area. – The horizontal dimensions (length and width) of this area are measured between the outer projections of the steel columns or the extended beams, as detailed in the design drawings. – Measurement calculations shall exclude the height of the mounting structure, solar panel projections, and any inclined lengths or widths. – For additional technical details, see drawings DWG 04-35. Note
a Elevated Solar Zone Mounting Structures Sqm 1,361.00 0.00 0.00
b Rooftop Solar Zone Mounting Structure Sqm 2,453.00 0.00 0.00
A2 Miscellaneous.
The Contractor shall produce samples on request by the Employer's representative and shall obtain prior approval for the products before commencing work. The Contractor should furnish all technical literature, catalogues, brochures and any other technical details available along with his offer for the approval of Representative. Note
a Project Name Sign Board: Supply and installation of Project Name Board (2.0m x 1.9m sign board and 1.2m from ground) as per drawing Comprised of 5 reflected Aluminum sheets of (190 cm wide, 30 cm height and 3 mm thick. With its supports, fittings and concrete footings, and doing all it takes according to the drawings and Employer’s Representative. The works include: (1) Unclassified excavation for R. C footings, cut existing pavement using electrical saw, backfilling or borrow fill with compacting using suitable equipments, dispose all disposal materials to approved location. (2) Cast in situ Reinforced concrete for footings (Cube Fc'=20mpa), conformed to ACI-318M codes requirements. (3) Steel anchor channel to be epoxy coated 3 layers, 100 micron each. (4) Stainless steel tubes with a diameter of 150 mm and a thickness of 40 mm for columns and timber. (5) Sign board shall be bolted to 150 x 75mm timber support. (6) Support and 1ø14mm bolt with washer and nut to be imbedded in the timber as per drawing. (7) Disposal and hauling of waste material to the approved location. (8) All works shall be done according to standards, drawings, and specifications. No 1.00 0.00 0.00
B. Electrical BoQs.
Ref. Description Unit QTY Rate USD Amount USD
B Electrical BoQs.
General Conditions: Note
1. This BoQ shall be read in conjunction with the Electrical Drawings and technical specifications as well as these General Conditions . Note
2. Contractor shall visit & verify existing site condition, location and condition of the existing MDSs, SDBs, heavy loads, inspect the electrical and other cables attached to them, which must be moved & put solutions on his account and load them into the items, as well as the location of the solar panels and any interferences in them. Also, the location of the control room and any interferences in it. Note
3. The contractor should take into account The site condition in terms of obstacles and shadings Outdoor cables shall be housed inside galvanized steel cable trays. Note
4. Supply of materials and equipment. All equipment shall be manufactured by a world wide well known manufactures, high quality, approved standard and test certificate from inde-pendent third part. All materials and equipment to be supported by all details and technical data. Note
5. The unit price of each item shall include the supply and install safety labels, warning signs, nameplates for PV+BESS system, DC and AC hazard labels, equipment identification plates, single line diagram posting, emergency instructions, and bilingual Arabic/English labels as required. Note
6. The unit price of each item shall include the supply, installation, delivery and testing of materials. As well as all civil works, removing concrete, previous blocks, and relocating all obstacles such as water tanks, electric cables, and any obstacles reconnect them again as before and transporting waste to the specified sites, as well as supplying, installing and repairing and operating anything that caused damage, a piece of clothing to the contractor during work, such as electricity and telephone cables, water and sewage pipes, etc., and according to the directions of the UNOPS engineer. Note
7. The contractor should do third party test reports for battery, inverters , solar panels, circuit breakers , cables, MDB…etc. as per applicable standards. Note
8. The contractor will be responsible for providing training course focusing on system operation, maintenance and management, the scope of training and schedule shall be proposed by the contractor and approved by UNOPS engineer. Note
9. The contractor will be responsible for maintenance of the system one year Including Preventive Maintenance Visits. Note
10. Earthing test should be done in commissioning stage. Note
11. The contractor must remove the waste as soon as possible from the project site to the places specified by the competent authorities. Note
12. The Contractor shall maintain the protection of nearby persons and property throughout the progress of the work to provide safe working conditions for workers and citizens. It must put protective barriers around the project and put up guiding signs for citizens and cars passing near the project. Note
13. The contractor shall be fully responsible for the coordination and liaison with all Government Dept. and Semi Government Dept. (Electrical Company, Telecommunication company, etc.) for obtaining all required approvals, permits and licenses for all electrical systems and service. Note
14. All mounting hardware, fasteners, and LPS components must be Grade 316 Stainless Steel. Note
15. The Bidder/Contractor shall be fully responsible for the final detailed electrical design, equipment selection, sizing, coordination and integration of the complete PV-BESS system. Any configuration shown on the Tender Drawings shall be considered indicative unless specifically identified as a mandatory Employer's requirement. Note
16. The number of PV modules per string, total number of strings, allocation of strings to DC Combiner Boxes, number of inputs per Combiner Box, and allocation to BESS/PCS DC inputs or MPPTs shall be determined by the Bidder based on the characteristics and limitations of the offered equipment. Note
17. The total PV array shall comprise 1080 PV modules, with 540 modules oriented East and 540 modules oriented West. PV modules having different orientations shall not be connected within the same string. Note
18.String configurations of 15 modules/string, 18 modules/string, combined 22/23 modules/string, or other technically compliant configurations may be adopted. These arrangements are indicative only and shall not restrict the Bidder from proposing another compliant configuration suitable for the offered BESS/PCS system. Note
19.The Contractor shall verify the maximum string open-circuit voltage (Voc) at the minimum design temperature, the operating voltage (Vmp) over the full expected temperature range, string short-circuit current (Isc), maximum DC input current, MPPT operating range, maximum permissible DC voltage and all other limitations of the proposed BESS/PCS/inverter equipment. Note
20. Any changes in string configuration, number of strings, DC input allocation, MPPT allocation, cable arrangement or other electrical configuration resulting from the Bidder's proposed equipment and design shall be deemed included in the Tender Price and shall not constitute a Variation or additional payment. Note
21.The proposed PV module manufacturer and BESS/Battery manufacturer shall be Tier 1. The Bidder shall provide evidence of current Tier 1 listing with the Technical Proposal. Note
22. The proposed PCS/Inverter shall be from an internationally recognized manufacturer with proven utility-scale PV/BESS experience and an established service and technical support network. Note
B1 Solar PV Modules:
a Supply, install, test and commissioning of PV modules rated not less than 760 Wp, bifacial dual-glass (glass/glass), N-type HJT or N-type TOPCon, suitable for coastal and hot climate, complete with all accessories and as per Employer’s design and drawings. - System voltage: 1500 VDC. - Module efficiency: ≥ 24.5% or highest commercially available for the 760Wp class (supported by manufacturer datasheet). - Bifaciality factor (φPmax): ≥ 80%. - Power tolerance: 0 to +5 W. - Junction box & connectors: IP68 junction box with bypass diodes; Original MC4 or certified equivalent, UV-resistant cables. - Warranties: Product warranty ≥ 15 years., Performance warranty ≥ 30 years (linear) with end-of-warranty power not less than 87%. - Manufacturer: Tier-1 PV module manufacturer, with proven references and traceable serial numbers. - It must meet IEC 61215 and 61730 requirements. - Scope includes: module supply, installation, testing and commissioning, labeling/serial tracking, lifting/handling, module-side connectors/cables, and all module-related accessories as required to deliver a complete working system as per Employer’s design. Pc. 1,080.00
B2 PV DC Combiner Boxes:
a Supply, install, test, and commissioning of PV DC combiner box as per schematic diagram (6 inputs / 1 output), suitable for min 1500VDC system. Minimum requirements (each box): - Enclosure: outdoor, UV resistant, IP66, corrosion resistant (SS316 or coated steel/aluminium). - Inputs: 6 strings with gPV fuses or DC MCBs per string (rated ≥ 30A, 1500VDC) and blocking diodes. - Output: DC MCCB/isolator rated ≥ 1500VDC, current as per design. All wires/cables must be terminated through cable lugs; - Surge protection: Type II DC SPD (Ucpv ≥ 1500VDC) with replaceable cartridges and remote alarm. - Monitoring (preferred): string current monitoring + RS485/Modbus. - Cable glands, terminals, labels, and earthing bar. - Product warranty shall be 2 years. Pc. 12.00
B3 Battery Energy Storage System (BESS):
a Supply, installation, testing, commissioning, and handover of one complete Battery Energy Storage System (BESS), OEM-standard containerized/modular type, with minimum nominal storage capacity of 4.3 MWh, liquid-cooled high-voltage lithium iron phosphate (LFP) batteries, and hybrid PCS/inverters with total installed output capacity not less than 1000 kW AC at 400/415V, 50Hz, and total installed PV-side DC input capacity not less than 1250 kWdc. The Contractor shall provide the system as a complete factory-assembled and factory-tested integrated solution, including, but not limited to, all battery modules/racks, BMS, EMS, PCS/inverters, AC and DC distribution panels, auxiliary systems, UPS, thermal management system, ventilation system, fire detection and alarm system, fire suppression system, gas detection system, protection devices, monitoring and control system, HMI, earthing and bonding, labeling, all internal and external power, control and communication cabling, civil and interface works, installation, programming, FAT, SAT, testing, commissioning, training, operation and maintenance documentation, warranties, and one-year preventive maintenance, complete in all respects and in accordance with the Technical Specifications, drawings, and Employer’s requirements. Set 1.00 0.00 0.00
B4 DC, AC Cabling and Cable Tray & Under Ground Trench.
B4.1 DC Cabling:
Supply, install, test, and commissioning of DC cables, glands, trays, and terminations. - Conductor: stranded copper, tinned for marine/coastal environments. - Insulation: UV resistant, halogen-free, flame retardant; PV cables certified to EN 50618 / IEC 62930; 1500VDC. - Marking, identification, and ferrules as per IEC. - Cable trays: perforated galvanized steel (min G90) with covers, bends, tees, couplers and supports. - All terminations with correct lugs, crimping tools, and heat shrink. Note
a PV string cable 1C x 10 mm² (Red & Black), min 1500VDC PV cable, UV-resistant. L.m 4,800.00 0.00 0.00
b Combiner to inverter DC cable 1C x 95 mm² (Red & Black), tinned copper where applicable. L.m 720.00 0.00 0.00
c PV bonding/earthing conductor 1C x 6 mm² G/Y, UV resistant. L.m 1,500.00 0.00 0.00
B4.2 AC Cabling:
Supply, install, testing and commissioning of complete single, multi-core copper AC cables Power 0.6/1kV, including all necessary cleats, supports, brackets, glands, etc. All of which shall be according to the specifications, drawings, codes of practice and highest prevailing engineering standards, for the following: Note
a 4Cx150sqmm - CU/XLPE /PVC + E=70sqmm. L.m 480.00 0.00 0.00
b 4Cx300sqmm - CU/XLPE /PVC + E=150sqmm. L.m 100.00 0.00 0.00
B4.3 Cable Tray:
Supply, install, testing and commissionining of complete galvanized steel cable trays (Galvanization degree=90G), Heat treated and covered with a layer of powder coating, with thikness no less than 1.5mm2, including all supports, brackets, angles, UPVC pipes, hangers, bends, tees, reducers, couplers, fixing materials and all accessories, complete in accordance with the drawings, codes of practice and highest prevailing engineering standards, specifications, approved shop drawings, for the following: Note
a Cable tray (10cm wide min height 5cm) with cover. L.m 320.00 0.00 0.00
b Cable tray (20cm wide min height 5cm) with cover. L.m 320.00 0.00 0.00
c Cable Lader (30cm wide) with cover. L.m 80.00 0.00 0.00
d Cable tray (30cm wide min height 5cm) with cover. L.m 180.00 0.00 0.00
e Cable tray (40cm wide min height 5cm) with cover. L.m 135.00 0.00 0.00
f Cable tray (50cm wide min height 5cm) with cover. L.m 70.00 0.00 0.00
g Cable tray (60cm wide min height 5cm) with cover. L.m 50.00 0.00 0.00
h Cable tray (70cm wide min height 5cm) with cover. L.m 40.00 0.00 0.00
B4.4 UNDER GROUND TRENCH:
Supply, install, test, and commission UPVC minimum PN6 for Electrical cable trench with cross section trench size of the required depth and the required width with all required fittings (Y's, T's, elbows, etc.) including shoring and shuttering works (If Required). The work includes making the required modifications, excavation, concrete chiseling, and backfilling and performing all required works to complete the work as shown on the drawing, works include all necessary related demolishing and excavation works, materials, and equipment through unclassified surfaces (soil, pavement, reinforced concrete, rocks, etc.) to the required depth, supporting the trench sides, bedding, laying pipes, connecting to the manholes, hydraulic test according to the specifications and drawings, backfilling using clean sand with watering, compaction after approval of the engineer, retiling or repaving to render surfaces to match existing, repairing any damage arising out of excavation work, removing and disposal of debris and waste material to the approved location (dumpsite), and doing all it takes and needs to finish the work according to standards, drawings, specifications, and engineer instructions. The price includes all required fittings and fixation hardware. Also, Supply and install protection tiles as a safety warning over the power cable as well as warning tape over the power cable protection tiles. The pipe should be bedded and covered with at least 15 cm of clean sand around, the top and bottom of the pipe. The used sand for backfilling the trench will be in layers not exceeding 20 cm, with compaction not less than 98 %, up to the design leveling according to the engineer's instructions, drawings, and technical specifications, and approval of employer representative, as the following: Note
a (100Wx80D) cm, and (4×6 Inch) UPVC Pipe. L.m 10.00 0.00 0.00
b (80Wx80D) cm, and (3×6 Inch) UPVC Pipe. L.m 20.00 0.00 0.00
c (60Wx80D) cm, and (3×4 Inch) UPVC Pipe. L.m 5.00 0.00 0.00
B4.5 INSPECTION MANHOLES:
Supply of materials, tools and manpower to construct Manholes, totally water and air tight with Required size. The walls of the solid concrete blocks 20x20x40cm built above plain concrete class (C20) 15 cm thick and bed of the manhole shall be of at least 15 cm thick plain concrete class (C20), marker tape, The work included plastering, painting of exposed underground surfaces with two coats of Cold bituminous paint (outside, inside), and supply and apply PVC/ductile iron cover with frame minimum class B125. Work items rate include the costs of all necessary related demolishing and excavation works, materials, and equipment through unclassified surfaces (soil, pavement, reinforced concrete, rocks, etc.) to a sufficient depth, disposal of all demolished and removed materials from the site to a dump site approved by the local authorities, backfilling with approved selected filling material, spreading, and compacting in layers not exceeding 150mm thick using mechanical compactors to B.S 95% compaction. Also, repair surfaces to match the pre-demolished existing condition. the dimension manhole from insides All as per the Employer’s Representative instructions, and doing all it takes and needs to finish the work according to standards, drawings, specifications, and approval of employer representative.as the following: Note
a Manholes 100x100cm and 80 cm depth including Heavy Duty Ductile Iron Sealed Solid Top Manhole Cover with frame minimum class D400. No 3.00 0.00 0.00
b Manholes 80x80cm and 80 cm depth including Heavy Duty Ductile Iron Sealed Solid Top Manhole Cover with frame minimum class D400. No 2.00 0.00 0.00
c Manholes 60x60cm and 80 cm depth including Heavy Duty Ductile Iron Sealed Solid Top Manhole Cover with frame minimum class D250. No 1.00 0.00 0.00
B5 Lighting System.
B5.1 INSTALLATION OF OUTDOOR LIGHTING FIXTURE.
Installation, connection, testing and commissioning of existing / client-supplied outdoor LED lighting fixture at an already established electrical point. The price shall include the supply and installation of a suitable galvanized steel mounting arm/pole with a length of approximately 2–3 meters, including the required reinforced concrete foundation/base, anchor bolts, supports, brackets, fixing materials, electrical connection accessories, and all other materials and works necessary for proper installation, fixing and connection. The works shall be carried out in accordance with the approved drawings, specifications, applicable standards, good engineering practice, and the instructions and directions of the Supervising Engineer. The lighting fixture and the established electrical point are excluded from the Contractor’s supply scope. Note
a TYPE: LED6 – Installation, connection, testing and commissioning of the existing LED6 outdoor lighting fixture, including supply and installation of the required 2–3 m mounting arm/pole, concrete foundation and all necessary fixing, supporting and connection accessories, complete as specified and directed by the Supervising Engineer. No 3.00 0.00 0.00
b TYPE: LED7 – Installation, connection, testing and commissioning of the existing LED7 outdoor lighting fixture, including supply and installation of the required 2–3 m mounting arm/pole, concrete foundation and all necessary fixing, supporting and connection accessories, complete as specified and directed by the Supervising Engineer. No 16.00 0.00 0.00
B6 Earthing System:
a ### EARTHING AND BONDING SYSTEM – CONNECTION, TESTING AND REMEDIAL WORKS Supply, installation, connection, testing and commissioning of the complete earthing and bonding system for PV arrays, inverters, BESS containers and all associated metallic parts, **utilizing the existing earthing pits/electrodes already executed at site**. The scope shall include, but not be limited to: * Supply and installation of all required copper earthing conductors/cables of appropriate sizes. * Connection of the PV arrays, inverters, BESS containers, electrical equipment and all exposed metallic parts to the existing earthing system. * Supply and installation of all required bonding conductors, cable lugs, clamps, couplers, connectors, test links, joints, fixing accessories, identification and protection materials. * Exothermic welding or approved mechanical clamps shall be used as applicable and in accordance with the approved specifications. * Inspection, cleaning, tightening, re-termination and rectification of the existing earthing connections where required. * Testing of the existing earthing pits/electrodes and the complete interconnected earthing system to verify continuity and earth resistance. The required earth resistance shall be **not more than 5 Ohms, or lower where required by the Employer, project specifications or applicable standards**. Where the measured earth resistance does not meet the specified value, **the Contractor shall carry out all necessary remedial and improvement works at no additional cost**, including the installation of **additional earth electrodes/pits, additional conductors, interconnections, approved earth-enhancement materials, or any other measures required** to achieve the specified earth resistance and provide a safe, complete and fully functional earthing system. Earth resistance testing shall be carried out using a **calibrated earth resistance tester in the presence of the UNOPS Representative / Supervising Engineer**, and complete test results and reports shall be submitted for approval. All works shall comply with **IEC 60364-5-54, BS 7671**, approved drawings, project specifications, applicable standards, manufacturer's recommendations, good engineering practice and the instructions of the Supervising Engineer. **Note:** The **existing earthing pits/electrodes and their previously completed excavation/construction works are excluded from the Contractor's scope**. However, the item price shall include all materials and works required for connection to the existing earthing pits, testing, bonding, rectification and improvement of the system, **including the provision and installation of any additional earthing pits/electrodes deemed necessary to achieve the specified earth resistance**, complete with all required excavation, backfilling, connections and accessories. **The Contractor shall be deemed to have included in the item price everything necessary to deliver a complete, tested, compliant and fully operational earthing and bonding system.** Sys 1.00 0.00 0.00
B7 Lightning Protection System.
Supply, install, testing and commissioning of complete lightning Protection System, including air termination network, down conductors, test points, earthing pits, all related accessories. All of which shall be according to the technical specifications, drawings, codes of practice and highest prevailing engineering standards. Note
a 3x25mm Copper tape, with saddles/clamps. L.m 2,107.00 0.00 0.00
b 1x70sqmm Copper Conductor, with saddles/clamps. L.m 400.00 0.00 0.00
c Air terminal units, including 1.6 m copper rode with multipoint, sadle. The item include also, a galvanized mast with 2", 2mm thickness and (x)m length, Fixed By 3x8mm Guy Wire, or any other approved method. The contractor must submit studies to determine the appropriate length (x) so that no shadows are cast on the panels throughout the year. No 50.00 0.00 0.00
d Earth pits including earth rodes, clamps and all related accessories. The resistance to earth of the lightning protection system measured at any point, should not exceed 10 ohms which should be tested in presence of the Employer’s representative by calibrated earth tester. No 3.00 0.00 0.00
C. Mechanical BoQs.
Ref. Description Unit QTY Rate USD Amount USD
C PLUMBING AND SOLAR-PANEL CLEANING SYSTEMS
This section shall be read in conjunction with the General Notes, Pricing Preambles, approved drawings, technical specifications, Conditions of Contract, Special Conditions of Contract, and all other relevant documents. The Bidder shall visit the site and verify existing conditions, access, interfaces, routes, and constraints before pricing. Note
COMMON REQUIREMENTS: 1. Rates shall include supply, installation, testing, commissioning, materials, valves, fittings, accessories, fasteners, supports, controls, wiring, approved interfaces, insulation, cladding, protective coatings, independent equipment canopies and bases, documentation, training, and all incidental work required for a complete operational installation. 2. The Bidder shall submit with the bid a manufacturer-generated computerized selection for each booster-pump group and for the complete two-machine pressure-washer group at the scheduled duty points. During project execution, complete technical submittals, calculations, certified curves, drawings, control logic, and compliance schedules shall be submitted for the Engineer's written approval. No pump or pressure-washer equipment shall be procured or delivered before approval. 3. Final routing and installation dimensions shall be coordinated through approved shop drawings and verified on site. BOQ quantities shall not be altered except by an authorized instruction. 4. Provide the required low-level dry-contact control interface from the existing tank to the applicable booster-pump and pressure-washer controllers where indicated. 5. All outdoor equipment, panels, supports, fixings, coatings, and exposed materials shall be suitable for rooftop installation in Aden's coastal and corrosive environment. Note
C1 PLUMBING AND DOMESTIC COLD-WATER BOOSTER SYSTEMS
C1.1 PPR SDR 7.4 Cold-Water Pipework
Supply, install, test, flush, disinfect, and commission PN16 PPR cold-water pipework, SDR 7.4, complying with ISO 15874 and DIN 8077/8078, from the approved existing connection through the booster-pump groups to the connections shown on the drawings. Include all fittings, reducers, unions, isolation and check valves, flexible connectors, sleeves, identification, hangers, brackets, clamps, anchors, fasteners, cutting/chasing and making good, pressure testing, and all accessories required for a complete installation. Pipe sizes are as follows: Note
a PPR pipe, OD 90 mm L.m 12.00 0.00 0.00
b PPR pipe, OD 63 mm L.m 12.00 0.00 0.00
c PPR pipe, OD 32 mm L.m 12.00 0.00 0.00
C1.2 Thermal Insulation for Cold-Water Pipework
Supply and install minimum 13 mm thick closed-cell elastomeric insulation to all exposed cold-water pipework, including continuous vapour-sealed joints, fittings, valves, adhesives, tapes, termination details, and accessories. The completed insulation shall be weather-protected by the specified cladding and shall match the existing installation where connected. Note
a Insulation for OD 90 mm pipe L.m 12.00 0.00 0.00
b Insulation for OD 63 mm pipe L.m 12.00 0.00 0.00
c Insulation for OD 32 mm pipe L.m 12.00 0.00 0.00
C1.3 Aluminium Protective Cladding
Supply and install site-fabricated aluminium protective cladding, minimum 0.6 mm thick, over the thermal insulation, complete with weatherproof laps, formed fittings, bands, compatible fasteners, sealed penetrations, end closures, and all accessories. Finish and workmanship shall match the existing cladding and shall be suitable for exposed coastal rooftop service. Note
a Cladding for OD 90 mm pipe L.m 12.00 0.00 0.00
b Cladding for OD 63 mm pipe L.m 12.00 0.00 0.00
c Cladding for OD 32 mm pipe L.m 12.00 0.00 0.00
C1.4 Duplex Domestic-Water Booster-Pump Groups
Supply, install, test, and commission each complete packaged booster-pump group comprising two vertical multistage pumps arranged one duty and one standby, each pump capable of the full scheduled duty; TEFC motors, minimum IP55 and suitable for 50 °C ambient outdoor coastal service; individual VFDs; dedicated stainless-steel outdoor control panel, minimum IP66; 100 L stainless-steel pressure vessel; stainless-steel suction and discharge headers; isolation and check valves; flexible connectors; pressure gauges and pressure switches; common base frame; anti-vibration mounts; power/control terminations, earthing, alarms, dry-run and motor/electrical protection; and the required low-level dry-contact interlock from the existing tank where applicable. Provide an independent naturally ventilated all-metal coastal-duty canopy and reinforced-concrete equipment base 100–150 mm high for each separately located group, with anchors, drainage protection, access doors, maintenance clearances, and all accessories. Complete selection, factory testing, site testing, control logic, commissioning, training, spares, and handover shall comply with the approved technical specification. Note
a Duplex booster-pump group: 86.6 gpm at 18 m head Set 1.00 0.00 0.00
b Duplex booster-pump group: 47.1 gpm at 18 m head Set 1.00 0.00 0.00
C2 GROUPED PRESSURE-WASHER MACHINES AND COMMON ACCESSORIES
Supply, install, test, and commission one complete grouped pressure-washer system comprising two professional heavy-duty stationary pressure-washer machines arranged for simultaneous use by one or two operators. Each machine shall include a low-speed four-pole air-cooled motor; crankshaft pump with ceramic pistons; nominal 50-micron serviceable inlet filter with replaceable/washable element and drain/flushing connection; individual filter bypass from upstream of the filter inlet valve to downstream of the filter outlet valve, with no common main bypass; inlet and discharge pressure gauges; unloader/relief device; dry-running protection; pressure cut-off; runtime counter; manual pressure/flow adjustment; corrosion-resistant base; and all pressure-rated connections. The complete group shall include the common inlet/outlet isolation and check valves shown; common-inlet PSL; one main group controller; one zone controller for each of the two terminal locations; labelled control wiring and coastal-duty containment; maximum-two-terminal operating logic; automatic staging; MANUAL/AUTO/OFF selection; run/available/fault indication; emergency stop; alarm/reset functions; phase, voltage, overload, short-circuit, dry-run, low-inlet-pressure, and existing-tank low-level interlocks; stainless-steel minimum-IP66 outdoor panels; an independent ventilated all-metal coastal-duty canopy; 100–150 mm reinforced-concrete base; anchors; access doors; drainage/waterproofing protection; testing; commissioning; training; spares; and all accessories required by the approved drawings and technical specification. Note
a Pressure-washer machine duty: adjustable operating pressure 70–150 bar and flow 450–600 L/h Set 2.00 0.0 0.0
C3 High-Pressure Piping Network, Take-Off Points, and Appurtenances
Supply, fabricate, install, support, pressure-test, flush, identify, protect, and commission the complete Schedule 80 black-steel high-pressure non-potable cleaning-water network from the grouped pressure-washer machines to 12 terminal points: eight rooftop terminals (T1–T8) and four elevated terminals (T1–T4). Include pressure-rated fittings, unions, branches, isolation valves, fixed male quick-connect adaptors, protective caps, end-of-line elbows only at rooftop T8 and elevated T4, sleeves, anchors, brackets, clamps, fasteners, supports, approved marine/coastal coating to all exposed steel and metallic accessories, and all necessary appurtenances. Terminal arrangements and allowable simultaneous operation shall comply with the approved drawings and technical specification. Pipe sizes are as follows: Note
a Schedule 80 high-pressure steel pipe, nominal 20 mm L.m 80.00 0.00 0.00
b Schedule 80 high-pressure steel pipe, nominal 25 mm L.m 120.00 0.00 0.00
C4 TERMINAL CLEANING TOOLS AND OPERATOR ACCESSORIES
Supply, install, test, and commission two complete operator tool sets for the solar-panel cleaning system. All components shall be new, professional heavy-duty items; mutually compatible with the approved pressure-washer machines, terminal quick-connectors, and each other; pressure-rated for the approved maximum working pressure; suitable for repeated outdoor use; and resistant to ultraviolet exposure, abrasion, corrosion, and Aden's coastal environment. Surfaces and bristles in contact with photovoltaic modules shall be non-abrasive and shall not damage glass, frames, coatings, sealants, or electrical components. Include approved technical submittals, compatibility certificates, operating instructions, spare seals and wear parts, witnessed sample-cleaning test, operator training, and all minor accessories required for a complete working system. Note
a Water-driven rotary cleaning brush, nominal 400 mm working width, with soft replaceable non-abrasive PV-safe bristles, corrosion-resistant body, compatible rotary drive and connection, and replaceable wear components No 2.00 0.00 0.00
b Telescopic pole/wand assembly of lightweight corrosion-resistant construction, adjustable to the approved working reach, with positive-lock sections, non-marking grip, hose guidance/support, and compatible pressure-rated connection No 2.00 0.00 0.00
c High-pressure hose assembly sized to the approved operating reach and rated for the maximum approved working pressure and temperature, with UV- and abrasion-resistant cover, factory-crimped ends, bend restrictors, strain relief, swivels, and compatible quick connections No 2.00 0.00 0.00
d Normally closed trigger spray gun/dead-man control, pressure-rated for the approved system, with safety lock, ergonomic non-slip grip, corrosion-resistant wetted components, swivel inlet, and compatible positive-lock connections No 2.00 0.00 0.00
e Quick-connect coupling and accessory kit comprising positive-lock male and female couplings, swivels, adaptors, compatible spare seals/O-rings, and protective caps required to connect the hose, trigger gun, telescopic pole, brush, and terminal points No 2.00 0.00 0.00
f Weather-protected storage rack/holder for the hose, telescopic pole, rotary brush, trigger gun, and accessories; corrosion-resistant and suitable for coastal outdoor service, complete with brackets, anchors, fasteners, restraints, and identification labels No 2.00 0.00 0.00
Bill of Quantities Summary:
NO Description. Amount USD Remarks
A Architectural and Structural BoQs. 0.00
B Electrical BoQs. 0.00
C Mechanical – Solar Cleaning BoQs. 0.00
Provision of a Hybrid Solar and Battery Energy Storage System for Aden Vaccines Warehouse Complex
Summary of the employees hired by your company
No Description Main Office Branches Total
1 Number of Male Employee 0
2 Number of Female Employee 0
Female Employees Details
No Name Position Unit
1. Please add rows as needed according to the female employees hired.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Annex 1 - Scope of Work.pdf
Bidding document • 1.30 MB
Annex 2A - Environmental and Social Management Plan (ESMP).pdf
Bidding document • 1.07 MB
Annex 2B - UNOPS Minimum Health and Safety Requirements for Contractors - EN.pdf
Bidding document • 0.62 MB
Annex 2C - GS04 PSEAH Specific Guidance for Contractors EN.pdf
Bidding document • 0.09 MB
Annex 2D - Forced Labor Declaration Form.docx
Bidding document • 0.20 MB
Annex 3 - Solar Bill of Quantities.xlsx
Bidding document • 0.14 MB
Annex 4 - BESS_Technical_Specifications.pdf
Bidding document • 1.10 MB
Annex 5 - Drawings.pdf
Bidding document • 0.03 MB
Annex 6 - Technical specifications for Goods and Comparative Data Table.docx
Bidding document • 0.22 MB
Company Employee Summary Mandatory.xlsx
Bidding document • 0.07 MB
DRAFT - Construction Contract for Small Works.pdf
Bidding document • 1.48 MB
Project Sign Board.pdf
Bidding document • 0.58 MB
Small Works RFQ Section-I Instructions to Bidders.pdf
Bidding document • 1.86 MB
Small Works_RFQ-2026-65468 - Section_II_III_IV_V.pdf
Bidding document • 0.89 MB
Small Works_RFQ-2026-65468 - Section_VI_Returnable Schedules.docx
Bidding document • 1.57 MB
Minutes for Pre-bid Meeting RFQ-2026-65468.pdf
Bidding document • 0.07 MB
Notice on UNGM.html
Notice page • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .