Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
Bid Security (EMD)
Refer Docs
Closing Date
24 Nov 2026, 23:59 (+06:30)2d left24 Nov 2026, 10:59 pm IST
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Dear Sir/Madam, The United Nations High Commissioner for Refugees (hereinafter referred to as UNHCR) is pleased to invite prospective bidders to submit a bid in accordance with the UNHCR General Conditions of Contract for Goods and Services and Technical Specifications (Annex A) as set out in this Request for Quotation (RFQ). REQUEST FOR QUOTATION: 26-HCR-MMR-SUP-RFQ-020- for the provision of Structural Works for Solar Panels installation and office renovation works within Sittwe , UNHCR office. The RFQ consists of the following: Annex A: Terms of Reference for Lot 1 and Scope of Works for Lot 2. Annex B: Technical Offer form Annex C: Financial Offer Form/ BoQs for both Lot 1 (A,B,C &D) and Lot 2 (A,B,C,D,E & F) Annex D: Vendor Registration Form Annex E: UNHCR General Condition of Contract for Goods and Services- July 2018 (To be initialed/acknowledged and submitted with Technical Offer) Annex F – Supplier Code of Conduct (To be initialed/acknowledged and submitted with Technical Offer) Annex G – Drawing/Floor Plan for both Lots (To be initialed/acknowledged and submitted with Technical Offer) We would appreciate receiving your quotation by or before 24th November 2026 – at 23:59 hrs. Myanmar Time by e-mail to Yangon Supply Unit at . If you have any questions, please do not hesitate to contact us. Thank you and best regards, Supply Unit, Sittwe
322676
26-HCR-MMR-SUP-RFQ-020
Request for quotation
Myanmar
RFQ
+06:30
20 Nov 2026
16 Nov 2026
26-HCR-MMR-SUP-RFQ-020
ANNEX C - FINANCIAL OFFER - LOT 1(A)
BILL OF QUANTITIES FOR
SOLAR CONTROLLER ROOM CONSTRUCTION
(15Ft-8 Inchesx 13Ft-7Inchesx8 Ft1Inch)
UNHCR SITTWE FIELD OFFICE
Sr. No. Particulars Unit Quantity Rate (Ks.) Amount (Ks.)
A Material Cost
1 Cement Bag 23.50 0.00 MMK
2 Sand Cft. 141.74 0.00 MMK
3 Gravel Cft. 91.88 0.00 MMK
4 Brick No. 1,259.18 0.00 MMK
5 Wire mesh Rft. 64.00 0.00 MMK
6 (4"x2"x1.2mm Thk") MS Hollow frame No. 15.26 0.00 MMK
7 (2"x2"x1.2mm Thk") MS Hollow frame No. 8.76 0.00 MMK
8 (2"x1"x1.2mm Thk") MS Hollow frame No. 4.90 0.00 MMK
9 8" Readymade eave board (teak color) Rft. 57.00 0.00 MMK
10 Screw No. 246.00 0.00 MMK
11 1" Screw No. 130.00 0.00 MMK
12 8mm Plaster Board Sheet. 13.00 0.00 MMK
13 4 Angel roofing sheet 11Ft Sheet. 18.00 0.00 MMK
14 Red oxide Gallon. 1.50 0.00 MMK
15 Emulsion paint Gallon. 3.77 0.00 MMK
16 Paint brush No. 6.00 0.00 MMK
17 Paint roller Sht. 4.00 0.00 MMK
18 Sand paper Sht. 20.00 0.00 MMK
19 Gi square mesh Sft. 21.00 0.00 MMK
20 Sliding Bolt No. 1.00 0.00 MMK
21 Butt Hinge No. 6.00 0.00 MMK
22 6" Tower Bolt No. 2.00 0.00 MMK
23 Bow Handle No. 2.00 0.00 MMK
24 Hook and eye No. 4.00 0.00 MMK
25 Exhaust fan No. 2.00 0.00 MMK
26 Welding rod and Other assessories LS MMK
Total(A) 0.00 MMK
B Worker charges
1 Steel Fixer No. 15.82 0.00 MMK
2 Manson No. 35.77 0.00 MMK
3 Worker No. 36.46 0.00 MMK
Total (B) 0.00 MMK
(1) Sub-Total (A+B) 0.00 MMK
(2) 5% of materials cost for transportation charges 0.00 MMK
Grand total (1+2) 0.00 MMK
Say Grand Total in MMK MMK
Name Of Company:
Price Validity (Days)
26-HCR-MMR-SUP-RFQ-020
ANNEX C - FINANCIAL OFFER - LOT 1(B)
BILL OF QUANTITIES FOR
CONSTRUCTION FRAMING FOR SOLAR PANEL INSTALLATION (STRUCTURE 1 - 66 Panels)
UNHCR OFFICE COMPOUND, SITTWE TOWNSHIP, RAKHINE STATE.
Bill of Quantity
Sr Particular Quantity Unit Rate - MMK Per Amount - MMK
A Material Charges
1 Cement (Good brand) 50kg 12.95 Bag Bag 0.00
2 River Sand 0.34 Sud Cuft 0.00
3 Aggregate 0.68 Sud Cuft 0.00
4 16mm @ anchor bolt (1.5' length) 72.00 No No 0.00
5 6.5mm @ stirrup bar 0.50 Coil Coil 0.00
6 18G binding wire 2.00 Viss Viss 0.00
7 3/4" Nut with washer 72.00 No No 0.00
8 12mm thick base plate (10"x10") 18.00 No No 0.00
9 Jungle wood 0.38 Ton Ton 0.00
10 5 plywood 4.00 Sht Sht 0.00
11 Nail 1.53 Viss Viss 0.00
12 4"x2" hollow section (1.4 mm thk) 21.00 No No 0.00
13 4"x2" I section (min 4mm thk) 45.00 No No 0.00
14 6"x3" I section (min 5mm thk) 13.00 No No 0.00
15 2" angle iron (2.5 ~3 mm thk) 2.00 No No 0.00
16 Welding rod 4.00 Pack Pack 0.00
17 Red Oxide (one coat) 3.88 Gal Gal 0.00
18 Enamel paint (two coat) 7.75 Gal Gal 0.00
19 Paint Brush 15.00 No No 0.00
Cost Of Materials (Total A) MMK 0.00
B Labour Charges
1 Skill Labour 54.33 No No 0.00
2 Worker 76.44 No No 0.00
Cost of Labour (Total B) MMK 0.00
(1) Total A+B MMK
(2) 5% transportation charge of materials MMK
Grand Total (1+2) MMK
Say: Grand Total (1+2) MMK
Name Of Company:
Price Validity (Days)
Emergency stair
First to second floor column
Second to fifth floor column
Ground floor col:
First floor col:
Second/third/fourth floor col:
26-HCR-MMR-SUP-RFQ-020
ANNEX C - FINANCIAL OFFER - LOT 1(C)
BILL OF QUANTITIES FOR
CONSTRUCTION FRAMING FOR SOLAR PANEL INSTALLATION (STRUCTURE 2 -30 Panels)
UNHCR OFFICE COMPOUND, SITTWE TOWNSHIP, RAKHINE STATE.
Bill of Quantity
Sr Particular Quantity Unit Rate - MMK Per Amount - MMK
A Material Charges
1 Cement (Good brand) 50kg 14.57 Bag Bag 0.00
2 River Sand 0.40 Sud Cuft 0.00
3 Aggregate 0.79 Sud Cuft 0.00
4 16mm @ anchor bolt (1.5' length) 64.00 No No 0.00
5 6.5mm @ stirrup bar 0.45 Coil Coil 0.00
6 18G binding wire 1.50 Viss Viss 0.00
7 3/4" Nut with washer 64.00 No No 0.00
8 12mm thick base plate (10"x10") 16.00 No No 0.00
9 Jungle wood 0.40 Ton Ton 0.00
10 5 plywood 4.00 Sht Sht 0.00
11 Nail 1.50 Viss Viss 0.00
12 4"x2" hollow section (1.4 mm thk) 16.00 No No 0.00
13 4"x2" I section (min 4mm thk) 39.00 No No 0.00
14 6"x3" I section (min 5mm thk) 13.50 No No 0.00
15 2" angle iron (2.5 ~3 mm thk) 1.00 No No 0.00
16 Welding rod 3.00 Pack Pack 0.00
17 Red Oxide (one coat) 3.48 Gal Gal 0.00
18 Enamel paint (two coat) 6.95 Gal Gal 0.00
19 Paint Brush 15.00 No No 0.00
Cost Of Materials (Total A) MMK 0.00
B Labour Charges
1 Skill Labour 40.09 No No 0.00
2 Worker 66.91 No No 0.00
Cost of Labour (Total B) MMK 0.00
(1) Total A+B MMK 0.00
(2) 5% transportation charge of materials MMK 0.00
Grand Total (1+2) MMK 0.00
Say: Grand Total (1+2) MMK
Name Of Company:
Price Validity (Days)
Emergency stair
First to second floor column
Second to fifth floor column
Ground floor col:
First floor col:
Second/third/fourth floor col:
26-HCR-MMR-SUP-RFQ-020
ANNEX C - FINANCIAL OFFER - LOT 1(D)
BILL OF QUANTITIES FOR
CONSTRUCTION FRAMING FOR SOLAR PANEL INSTALLATION (STRUCTURE 3 -26 Panels)
UNHCR OFFICE COMPOUND, SITTWE TOWNSHIP, RAKHINE STATE.
Bill of Quantity
Sr Particular Quantity Unit Rate - MMK Per Amount - MMK
A Material Charges
1 Cement (Good brand) 50kg 7.19 Bag Bag 0.00
2 River Sand 0.19 Sud Cuft 0.00
3 Aggregate 0.38 Sud Cuft 0.00
4 16mm @ anchor bolt (1.5' length) 40.00 No No 0.00
5 6.5mm @ stirrup bar 0.28 Coil Coil 0.00
6 18G binding wire 1.00 Viss Viss 0.00
7 3/4" Nut with washer 40.00 No No 0.00
8 12mm thick base plate (10"x10") 10.00 No No 0.00
9 Jungle wood 0.21 Ton Ton 0.00
10 5 plywood 3.00 Sht Sht 0.00
11 Nail 1.00 Viss Viss 0.00
12 4"x2" hollow section (1.4 mm thk) 15.00 No No 0.00
13 4"x2" I section (min 4mm thk) 24.00 No No 0.00
14 6"x3" I section (min 5mm thk) 8.00 No No 0.00
15 2" angle iron (2.5 ~3 mm thk) 1.00 No No 0.00
16 Welding rod (100 pcs per pack) 2.50 Pack Pack 0.00
17 Red Oxide 2.27 Gal Gal 0.00
18 Enamel paint 4.54 Gal Gal 0.00
19 Paint Brush 10.00 No No 0.00
20 1" Screw 200.00 No Gross 0.00
Cost Of Materials (Total A) MMK 0.00
B Labour Charges
1 Skill Labour 42.87 No No 0.00
2 Worker 67.66 No No 0.00
Cost of Labour (Total B) MMK 0.00
(1) Total A+B MMK 0.00
(2) 5% transportation charge of materials MMK 0.00
Grand Total (1+2) MMK 0.00
Say: Grand Total (1+2) MMK
Name Of Company:
Price Validity (Days)
Emergency stair
First to second floor column
Second to fifth floor column
Ground floor col:
First floor col:
Second/third/fourth floor col:
26-HCR-MMR-SUP-RFQ-020
ANNEX C - FINANCIAL OFFER - LOT 2 (A)
BILL OF QUANTITIES FOR
WATER TOWER PAINTING IN UNHCR OFFICE
SITTWE TOWNSHIP, RAKHINE STATE
Sr. No. Particulars Unit Quantity Updated Rate (Ks.) Updated Amount (Ks.) Remarks
A Material Cost
1 Removing old paints (Including labours +materials) Sft 1,609.12 0.00
2 Emulsion paint (Premier or Johtun) Gallon 6.92 0.00
3 Enamel paint (Nippon or UPG) Gallon 0.89 0.00
4 Wall Putty Bags 5.80 0.00
5 Sealer Liters 22.50 0.00
6 Turpentine Bottles 0.75 0.00
7 Sand paper Doz 1.44 0.00
8 Paint roller No. 5.00 0.00
9 Paint brush No. 4.00 0.00
B Worker charges
1 Skilled worker No. 13.54 0.0
2 worker No. 4.23 0.0
(1) Total (A) and (B) 0.0
(2) 5% of Materials cost for transport charges 0.0
(3) Scaffolding work as necessary
Grand Total (1+2+3) in MMK 0.00
Say: Grand total in MMK
Price Validity (Days)
26-HCR-MMR-SUP-RFQ-020
ANNEX C - FINANCIAL OFFER - LOT 2 (B)
BILL OF QUANTITIES FOR
REPAINTING UN LOGO AT CAR PARKING
SITTWE TOWNSHIP, RAKHINE STATE
Sr. No. Particulars Unit Quantity Rate (Ks.) Amount (Ks.) Remarks
A Material Cost
1 Removing old paints Sft 1,365.00 0.00
2 Enamel paint (Nippon or JOTUN) Gallons 12.00 0.00
3 Turpentine Bottles 18.00 0.00
4 Sand paper Doz 1.67 0.00
5 Paint roller No. 4.00 0.00
6 Paint brush No. 4.00 0.00
B Worker charges
1 Skilled worker No. 16.67 0.0
2 worker No. 16.67 0
(1) Total (A) and (B) 0.0
(2) 5% of Materials cost for transport charges 0.0
Grand Total (1+2) in MMK 0.00
Say: Grand total in MMK
Price Validity (Days)
26-HCR-MMR-SUP-RFQ-020
ANNEX C - FINANCIAL OFFER - LOT 2 (C)
BILL OF QUANTITIES FOR
REPAINTING UN LOGO AT UNHCR NEW OFFICE BUILDING
SITTWE TOWNSHIP, RAKHINE STATE
Sr. No. Particulars Unit Quantity Rate (Ks.) Amount (Ks.) Remarks
A Material Cost
1 Removing old paints Sft 4,950.00 0.00
2 Enamel paint (Nippon or UPG) Gallon 41.00 0.00
3 Turpentine Bottles 61.00 0.00
4 Sand paper Doz 5.50 0.00
5 Paint roller No. 14.00 0.00
6 Paint brush No. 14.00 0.00
B Worker charges
1 Skilled worker No. 56.74 0.0
2 worker No. 56.74 0
(1) Total (A) and (B) 0.0
(2) 5% of Materials cost for transport charges 0.0
Grand Total (1+2) in MMK 0.00
Say: Grand total in MMK
Price Validity (Days)
26-HCR-MMR-SUP-RFQ-020
ANNEX C - FINANCIAL OFFER - LOT 2 (D)
BILL OF QUANTITIES FOR
REPAINTING UN LOGO AT UNHCR OLD OFFICE BUILDING
SITTWE TOWNSHIP, RAKHINE STATE
Sr. No. Particulars Unit Quantity Rate (Ks.) Amount (Ks.) Remarks
A Material Cost
1 Removing old paints Sft 1,333.88 0.00
2 Scaffolding fee (Labours and Materials) LS
3 Enamel paint (Nippon or JOTUN) Gallon 14.75 0.00
4 Turpentine Bottles 22.00 0.00
5 Sand paper Doz 1.50 0.00
6 Paint roller No. 4.00 0.00
7 Paint brush No. 4.00 0
B Worker charges
1 Skilled worker No. 19.76 0.0
2 worker No. 19.76 0
(1) Total (A) and (B) 0.0
(2) 5% of Materials cost for transport charges 0.0
Grand Total (1+2) in MMK 0.00
Say: Grand total in MMK
26-HCR-MMR-SUP-RFQ-020
ANNEX C - FINANCIAL OFFER - LOT 2 (E)
BILL OF QUANTITIES FOR
GYM WALLS PAINTING IN UNHCR OFFICE
(15Ftx15Ftx9Ft)
SITTWE TOWNSHIP, RAKHINE STATE
Sr. No. Particulars Unit Quantity Rate (MMK) Amount (MMK) Remarks
A Material Cost
1 Removing old paints (Including labours +materials) Sft 1,182.00 0.00
2 Emulsion paint (Premier or Johtun) Gallon 5.90 0.00
3 Enamel paint (Nippon or UPG) Gallon 2.50 0.00
4 Wall Putty Bags 5.20 0.00
5 Sealer Liters 22.50 0.00
6 Turpentine Bottles 1.25 0.00
7 Sand paper Doz 1.26 0.00
8 Paint roller No. 4.00 0.00
9 Paint brush No. 3.00 0.00
B Worker charges
1 Skilled worker No. 13.12 0.0
2 worker No. 4.40 0.0
(1) Total (A) and (B) 0.0
(2) 5% of Materials cost for transport charges 0.0
Grand Total (1+2) in MMK 0.00
Say: Grand total in MMK
Price Validity (Days)
26-HCR-MMR-SUP-RFQ-020
ANNEX C - FINANCIAL OFFER - LOT 2 (F)
BILL OF QUANTITIES FOR
TRANSFORMER HOUSE PAINTING IN UNHCR OFFICE
(23Ft x 8Ft-9Inches x 8Ft-6Inches)
SITTWE TOWNSHIP, RAKHINE STATE
Sr. No. Particulars Unit Quantity Rate (MMK) Amount (MMK) Remarks
A Material Cost
1 Removing old paints (Including labours +materials) Sft 984.45 0.00
2 Emulsion paint (Premier or Johtun) Gallon 4.90 0.00
3 Enamel paint (Nippon or UPG) Gallon 2.25 0.00
4 Wall Putty Bags 4.47 0.00
5 Sealer Liters 22.50 0.00
6 Turpentine Bottles 1.12 0.00
7 Sand paper Doz 1.07 0.00
8 Paint roller No. 3.00 0.00
9 Paint brush No. 3.00 0.0
B Worker charges
1 Skilled worker No. 11.18 0.0
2 worker No. 4.09 0.0
(1) Total (A) and (B) 0.0
(2) 5% of Materials cost for transport charges 0.0
Grand Total (1+2) in MMK 0.00
Say: Grand total in MMK
Price Validity (Days)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Annex D_Vendor Registration Form (Commercial Suppliers).pdf
Bidding document • 0.65 MB
Annex E_General Condition of Contract for Goods and Services- July 2018.pdf
Bidding document • 0.35 MB
Annex F_UN SUPPLIER CODE OF CONDUCT.PDF
Bidding document • 0.29 MB
26-HCR-MMR-SUP-RFQ-020 - Sittwe Office Solar Structural works and Office renovation works.pdf
Bidding document • 0.99 MB
Annex A - Lot 1 - Structural Construction Works for Solar Panels Installation.pdf
Bidding document • 0.32 MB
Annex A - Lot 2 - SCOPE OF WORK_Office Painting works.pdf
Bidding document • 0.09 MB
Annex B - Technical Offer Form for both Lot 1 and Lot 2.docx
Bidding document • 0.07 MB
Annex C - BoQ_for Solar Frame Structural Works (Lot 1- A,B,C & D).xlsx
Bidding document • 0.09 MB
Annex C - BoQs for Office renovation (Lot 2 - A,B,C,D,E & F).xlsx
Bidding document • 0.11 MB
Notice on UNGM.html
Notice page • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .