Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
Bid Security (EMD)
Refer Docs
Closing Date
23 Nov 2026, 16:00 (Asia/Seoul)Due tomorrow23 Nov 2026, 12:30 pm IST
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GGGI Senegal Office is seeking proposals from eligible firms for the Techno‑economic pre‑feasibility studies and design of investment models with carbon finance for three organic waste valorization projects and methane emission reduction in the agro‑industry in Senegal PROJECT BACKGROUND: In Senegal, according to the First Biennial Transparency Report (BTR 1, 2023) published in January 2025, solid waste disposal produces 809.27 Gg CO₂e per year (62% of the sector’s emissions), while wastewater treatment and discharge account for 690.19 Gg CO₂e (37%), mainly in the form of methane. Senegal’s Nationally Determined Contribution (NDC) identifies waste management as a priority sector with high GHG reduction potential: for solid waste, the reduction target is set at 11% by 2030, and up to 65% if adequate external financing is mobilized. Senegal has been politically active, notably through with the implementation of the national biogas program and the development of a national strategy for organic waste valorization, mainly promoting biogas, among the technologies. However, few large‑scale anaerobic digestion or aerobic treatment (e.g., composting) projects have been implemented. Agro‑industrial companies lack the technical know‑how to develop such projects, and access to financing remains difficult and costly. Yet organic waste valorization represents a significant economic opportunity: energy and organic fertilizer production, reduced production costs, and creation of green jobs. To help address these challenges, GGGI is implementing in Senegal, with funding from the Global Methane Hub (GMH), the project “Catalyzing Green Growth: A Multi-Sector Strategy for Significant Methane Emissions Abatement”. The project aims to integrate methane emission reduction into Senegal’s industrial modernization program by unlocking climate and carbon finance for the agro‑industrial sector through the existing subsidy mechanism of the Bureau de Mise à Niveau (BMN). It seeks to unlock climate and carbon finance for companies by leveraging BMN’s existing grant mechanism, thereby improving access to climate financing and green investments for both public and private sectors. BMN will be positioned as a carbon market aggregator for small projects. This BMN‑led carbon market aggregator will serve as a key financial and technical intermediary, pooling emission reductions or sequestration from aggregated companies into a single volume. This consolidated volume can then be sold in bulk to large companies or on financial markets. This model will enable small and medium‑sized enterprises to access climate finance, since certification costs are too high and buyers only purchase large volumes. PROPOSED ACTIVITIES: GGGI seeks to engage a competent consulting firm (hereinafter referred to as the “Consultant”) to carry out the following major overall activities: Baseline assessment and evaluation of the mobilizable waste resource Sizing study and economic and financial analysis Carbon, environmental, and social analysis Investment models, SWOT analysis, and action plan Presentation of findings, validation, and finalization SCOPE OF WORK: Under the scope of this project the selected consulting firm (hereinafter referred as ‘Consultant’) shall complete the following key activities: Task 1: Baseline Diagnosis and Assessment of Mobilizable Waste Feedstock Develop a methodology for identifying and assessing the organic waste generated or treated by the three companies. The methodological report will be shared and validated by the project team before execution. Analyze existing data and studies to identify needs, gaps, and opportunities for improvement. Identify and quantify each waste stream, including its future evolution, distinguishing between gross, accessible, and mobilizable stocks. Waste from neighboring industries may be considered to improve financial viability. Analyze current practices in organic waste management (animal feed, land spreading, landfill disposal, composting, etc.) and assess the types and quantities involved in each practice, to avoid competition of use. Establish the calendar of waste availability throughout the year. Since the profitability of the facility is directly linked to waste availability, sufficient stock must be available for most of the year. Present in detail the transformation process of each company and diagnose its energy needs (electricity, heat, steam) and fertilizer requirements. Inventory existing infrastructure and equipment, including out‑of‑service valorization facilities, and analyze the causes of their shutdown. Calculate current methane emissions (actual and potential) according to a documented baseline scenario. The methanogenic potential of each substrate, based on reference values from international literature and considering the characteristics of the waste as observed in the field, including a sensitivity analysis. Task 2: Sizing Study and Economic and Financial Analysis Based on the analysis of operations and the needs of each company (energy, fertilizers), compare the valorization options suitable for the identified stocks (anaerobic digestion, composting, co‑digestion, etc.) and recommend the most relevant option. Using feedstock data and methane potential, size the selected facility, determine the type and model of the technology, and identify all ancillary equipment and civil works required for proper operation. All equipment will be presented and described: Pre‑treatment and waste management equipment; Production equipment; Equipment for transport and treatment of by‑products; Monitoring and control equipment; Maintenance equipment; etc. Assess the expected production of energy (biogas, electricity, heat) and/or fertilizers (digestate, compost) in each company, analyze the energy efficiency of the selected option, and propose outlets for each product. Determine investment costs (CAPEX) and operating costs (OPEX), as well as expected revenues and savings. Conduct financial analysis: projected operating account, cash flow, payback period, net present value (NPV), internal rate of return (IRR), and sensitivity analysis. The Firm will aim for a financially viable and attractive system for each company. Measure the economic impact for the company (reduction of energy bills and production costs). Assess operational and maintenance needs as well as local skills required for the sustainability of the facilities. Task 3: Carbon, Environmental and Social Analysis Estimate the potential reduction of GHG emissions (tCO₂e/year) for each project compared to the baseline scenario. Assess eligibility under carbon standards (voluntary market, Article 6 of the Paris Agreement), project additionality, monitoring, reporting, and verification (MRV) requirements for future certification. Estimate the potential for carbon credits and associated revenues (including ITMOs). Conduct preliminary environmental and social screening, including analysis of existing plans where applicable, and propose mitigation measures for the main identified risks. Identify social and environmental co‑benefits (jobs, health, odor nuisance reduction, etc.) and integrate gender and social inclusion considerations. Task 4: Investment Models, SWOT Analysis and Action Plan Conduct a SWOT analysis for each project to determine its internal strengths and weaknesses as well as external factors that may influence its successful implementation. Identify obstacles and enablers for implementation (regulatory, political, financial, technical, logistical, and awareness‑related), with a risk matrix and corresponding management plan. Propose structuring options for each project (equity, BMN subsidy, bank credit, climate and carbon finance, public‑private partnership, etc.). Develop robust and viable financial models (open and documented Excel files), integrating climate and carbon finance. Draft, for each project, an investor pitch deck (PowerPoint presentation of 10 to 15 slides) and a concise investment note (3 to 5 pages). Prepare an action plan for the implementation of the proposed technologies, including financing options and a list of potential financiers with their contact details. Task 5: Restitution, Validation and Finalization Prepare PowerPoint presentations and other explanatory materials for key stakeholders. Participate in the preparation and facilitation of workshops to present and validate the studies and financing plans. Draft the workshop report (main discussions, validated recommendations, and next steps). Integrate comments and recommendations into the final versions of the studies and investment documents. Finalize, for each project, the investment documents (pitch deck and investment note) following the workshop, for presentation to investors and financial partners. For further details on the Scope of Work, please refer to the Terms of Reference available under the published Document Set IMPORTANT TIMELINES: The tender submission deadline is 23 November 2026, 16:00 KST (Korean Standard Time) Note: If any bidder has any request for clarification on the TOR or any part of the tender documents, GGGI will be happy to clarify if the request is received on or before 7 days before the deadline (namely: if the tender submission deadline is 16:00 23 Nov KST, then the due date for submission of request for clarification is 16:00 16 Nov KST). Interested parties will be required to register their details on the GGGI e-Green Procurement Portal (https://in-tendhost.co.uk/gggi). HOW TO OBTAIN THE DOCUMENTS: Documents can be accessed via the e-Green Procurement Portal by selecting ‘View Details’ on the relevant notice and then clicking the ‘Tender Application’ button. If you are a new supplier, you will be required to register your details. If you have an existing account, you will need to login to the portal. Please refer to the guidance documents under the `Supplier Guidance` area of the portal for further information. ONLINE TENDER MANAGEMENT: Once in the Tender Management Area for the tender, there are five possible tabs: ‘Tender’, `Tender Documents`, ‘Correspondence’, ‘Clarifications’ and ‘History’. Select the 2nd tab (`Tender Documents`) where you will find useful information regarding the RFP. Scroll down to the heading ‘Tender Documents Received’ where you will be able to view / download the documents. OPTING IN & OPTING OUT: Please note that you may be required to ‘Opt In’ before you can start populating your response. The ‘Opt Out’ functionality will also be available throughout the duration of the tender process. Opting out will give you the option of declaring you no longer want to receive any further communication in relation to this tender along with the opportunity of providing comments and feedback for this decision. You can choose to ‘Opt In’ at any time during the tender process if you initially decided to ‘Opt Out’. SUBMITTING YOUR RESPONSE VIA THE PORTAL: Please note that you may be required to ‘Opt In’ to be able to submit a response through the portal. Tenderers will be required to upload any mandatory Placeholders (i.e. specified documents) within the `Tender Documents` tab. The ability to attach additional documents may also be available. Your proposal will not be submitted until you click `Submit Return`, located towards the bottom of the screen. On clicking `Submit Return`, you will receive a receipt confirming that your proposal has been submitted to GGGI. Please read Instructions on How to submit the Proposal. NOTIFICATION EMAILS: To ensure you receive email alerts and notifications from our system, please add the email domain `@in-tendorganiser.co.uk` to your Safe Senders list.
2184
100017215
RFP
Senegal
RFP
Asia/Seoul
20 Nov 2026
28 Oct 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Notice on GGGI's portal.html
Notice page • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .