Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
Bid Security (EMD)
Refer Docs
Closing Date
23 Nov 2026, 23:59 (-04:00)2d left24 Nov 2026, 9:29 am IST
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
1. The United Nations Economic and Social Commission for Asia and the Pacific (“ESCAP”) is seeking Expressions of Interest (EOI), from qualified vendors, for the Provision of the Supply and related Construction of the Centralized UPS at United Nations Conference Centre (UNCC), ESCAP premises, Bangkok, Thailand. 2. Introduction: ESCAP intends to install the new Uninterruptible Power Supply Systems (UPS) within the UN Conference Centre at Rajadamnern Nok Avenue, Bangkok, Thailand. The UPS will be one of the electricity backup sources for AV equipment and IT components, in the conference halls and meeting rooms. 3. Scope of Works: The scope of works includes three parts. Part 1 to build a room to house the UPS, Part 2 to connect the UPS to the conference halls and meeting rooms and Part 3 Maintenance for the UPS: Part 1: New UPS room a. System design, layout update and revision to meet project requirements. b. Supply and install a new UPS and relevant electrical, air-conditioning and fire protection system as per the drawings. c. Supply and construct structural, architectural and painting work for the new UPS room on the ground floor as the following: • Remove the existing exterior door and replace it with a lightweight brick wall, then apply plaster and paint finish to match the existing wall • Cut the existing concrete wall to create an opening for the installation of a new double-leaf fire-rated door and strengthen the opening by constructing a reinforced concrete structure to support the new door frame. Remove the ventilation fan, electrical outlets, and LAN conduits that obstruct the work. • Demolish interior drywalls including doors and windows and repair the existing ceiling and flooring to meet the new lightweight brick wall line. • Install new lightweight brick walls from floor level to slap soffit, then apply plaster and paint finish to match the existing wall • Remove existing T-bar ceilings and replace with new fire block gypsum board ceilings. • Remove existing floors and replace with new epoxy floors. • Make the floor transition between new UPS room and loading dock. . d. Commissioning and testing new UPS and relevant electrical, air-conditioning and fire protection systems. Part 2: Conference Halls, Meeting Rooms and Relevant Area Shown on the Drawings a. System design, layout update and revision to meet project requirements. b. Supply and install a new UPS power supply cabling and relevant distribution board. c. Commissioning and testing the new UPS system. Part 3: Maintenance Services of the UPS system a. semi-annual maintenance service or manufaturerer recommended schedule b. Ad-hoc call out support service 3.2. General Details: a. UPS Specifications: - Capacity: 250 kVA, scalable to 500 kVA - Configuration: N+1 - Type: Online Double Conversion Static Modular UPS - Energy Storage: Lithium-Ion Battery b. Air Conditioning System: - Includes both DX coil split type and chilled water coil type. c. Fire Protection System: - Equipped with fire sprinklers and CO2 fire extinguishers. d. Construction Details for the New UPS Room: - Walls: 100 mm thick lightweight brick wall, 2 hours fire-rated, from floor slab to slab soffit, with plaster, and paint finish to match to existing walls. - Doors: Steel double doors, 2 hours fire-rated, complete with frame and accessories. Please note that this Request for Expression of Interest (REOI) does not constitute a solicitation. ESCAP reserves the right to change or cancel this requirement at any stage of the REOI and/or solicitation process. Specific Requirements/Information The following are likely the mandatory requirements: a. The company must have a physical presence in Thailand and has a local office in Bangkok to provide the required services. b. The company must have a minimum of three (3) years related experience to similar nature of work in Thailand. c. The company must provide the proposed methodology of service covers the requirements in the Scope of Work including i) work method statements for installation; ii) tisk assessment for installation; iii) project execution plan; and iv) preventative maintenance plan. d. Suitability certified company and project team. **Please note that the above required documentation is NOT required at the REOI stage. However, the shortlisted companies will be required to submit documentary evidence and detailed technical information during the subsequent solicitation stage.
322051
EOIUNESCAP24892
Request for EOI
Thailand
EOI
-04:00
21 Nov 2026
10 Nov 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Notice on UNGM.html
Notice page • 0.01 MB
eoi24892.pdf
Bidding document
Tenderkart keeps no copy of these: they open on the source's own site.
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .