Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
Bid Security (EMD)
Refer Docs
Closing Date
4 Dec 2026, 06:00 (UTC)4 Dec 2026, 11:30 am IST
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender description: ITB for Construction Works for Renewable Energy Interventions for Rabaraba Station under the Milne Bay Project of Papua New Guinea ----- IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
322388
ITB/2026/65526
Invitation to bid
Papua New Guinea
INVITATION
UTC
21 Nov 2026
12 Nov 2026
United Nations Office for Project Services
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
THE GOVERNMENT OF PAPUA NEW GUINEA
PROPOSED RENEWABLE ENERGY INTERVENTIONS FOR RABARABA MILNE BAY PROJECT, PAPUA NEW GUINEA (PNG).
BILL OF QUANTITIES (BOQ)
Consists of the following:
- Pricing Notes
- Preliminaries
- TVET-Solar PV Hybrid System Installation
- TVET Generator Shed
- DDA Solar PV Hybrid System Installation
- Health Centre Solar PV Hybrid System Installation
- Health Centre Generator Shed
- LLG Office Solar PV Hybrid System Installation
- Primary School Solar PV Hybrid System Installation
- Primary School Generator Shed
- Grand Summary
NOTE: It is a MANDATORY requirement for bidders to complete and return all parts of this BOQ. Failure to complete all sections of the BOQ may result in automatic disqualification of your bid.
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED RENEWABLE ENERGY INTERVENTIONS FOR RABARABA MILNE BAY PROJECT, PAPUA NEW GUINEA (PNG).
These price notes form part of the Bills of Quantities.
1 The Permanent Works shall be measured notwithstanding any general or local custom except where otherwise specifically described or prescribed in the Contract.
2 The rates and prices in the Bill of Quantities shall, except where otherwise provided in the Contract, cover all the Contractor's obligations under the Contract and all matters and things necessary for the proper execution and maintenance of the Works.
3 The items provided in the Bill of Quantities shall be the only items against which payment shall be made, except that where additional items are required in respect of authorized additional works, payments may be made against such additional items.
4 The Contractor shall be deemed to have included in his rates entered against the items in the Bill of Quantities for all activities necessary to complete the Contract Works, including any items of Work, which, in his opinion has been omitted from the Bill of Quantities.
5 Except where otherwise detailed in the Bill of Quantities or specified, labor, including the supervision thereof, materials, Constructional Plant, Temporary Works, transport to and from the Site and in and about the Works, laboratory testing and other things of every kind required for the execution and maintenance of the Works shall not be measured and the cost thereof shall be deemed to be included in the rates and prices in the Bill of Quantities.
6 The total quantity included in the final measurement of each item shall be measured to the nearest integer relative to that item, or to one decimal place if so indicated in the Bill of Quantities.
7 The following abbreviations are used in the Bill of Quantities:
a. m² Square meter
b. mm Millimeter
c. m³ Cubic meter
f. km Kilometer
j. dia Diameter
k. Prov. Sum Provisional Sum
m. USD US dollar
p. HP Horse power
q. M.s Measured Separately
8 Where in the Bill of Quantities there is a Schedule or subsidiary bill setting out the quantities of component materials and work which comprise a unit of work measured under a single item in a Part of the Bill of Quantities, the said quantities shall be subject to measurement and valued at the rates and prices entered therein and the total thereof shall be the rate for the item.
10 Any item of work included in the Bill of Quantities for which no rate or price was specified shall be considered as included in other rates and prices in the Bill of Quantities and will not be paid for separately.
11 Definitive list of works is provided by the Bill of Quantities only and the quantities listed on the drawings and other tables are for information purposes only.
Provisional Quantities, Optional Works and Alternative Items
Provisional Quantities
12 Items in the Bill of Quantities for which the quantities are stated to be provisional shall only be executed if they are the subject of a written instruction from the Employer. The rates set out for such items shall be used for the valuation of works so ordered by the Employer in writing whether the quantities shown are used wholly or in part. If the amount of work ordered by the Employer to be executed under a Provisional Quantity item exceeds the quantity shown in the Bill of Quantities, the rate for that item set out in the Contract shall be deemed applicable to the excess.
Schedule of Rates
13 The activities covered by the Schedule of Rates are general activities of a routine nature which are similar or the same as some of the activities which shall be paid for under other items in the Bill of Quantities.
14 The Contractor shall be deemed to have drawn on his technical expertise in entering the Prices and shall have made all due allowances for conforming to relevant codes, standard practice and the Specifications.
Anomalous Rates
15 The rates entered in the Schedule of Rates will be scrutinized as follows:
Where a rate is entered for an item in the Schedule of Rates and an equivalent item is provided under the Bill of Quantities, the rate in the Schedule of Rates should match the rate in the Bills of Quantities. Where such rates do not match; the lower rate for such similar items will govern.
Where a rate is entered for an item in the Schedule of Rates and there is no equivalent item provided under the Bills of Quantities, the bidder may be requested to provide a breakdown of the constituent costs of any rate together with the constituent costs of rates for specified items within the priced Bill of Quantities and demonstrate that the rate in the Schedule of Rates is priced in a manner consistent with the rates provided in the Bill of Quantities. In the event that the bidder cannot demonstrate such consistency, at UNOPS discretion the rate in the Schedule of Rates shall be adjusted.
16 Items in the Bill of Quantities for which the quantities are stated to be provisional shall only be executed if they are the subject of a written instruction from the Employer. The rates set out for such items shall be used for the valuation of works so ordered by the Employer in writing whether the quantities shown are used wholly or in part. If the amount of work ordered by the Employer to be executed under a Provisional Quantity item exceeds the quantity shown in the Bill of Quantities, the rate for that item set out in the Contract shall be deemed applicable to the excess.
Alternative Items
17 Alternative Items will not be considered in the evaluation of the bids. However, UNOPS has the right to subsequently select the alternative item for implementation.
18 Items in the Bill of Quantities for which the quantities are stated to be provisional shall only be executed if they are the subject of a written instruction from the Employer. The rates set out for such items shall be used for the valuation of works so ordered by the Employer in writing whether the quantities shown are used wholly or in part. If the amount of work ordered by the Employer to be executed under a Provisional Quantity item exceeds the quantity shown in the Bill of Quantities, the rate for that item set out in the Contract shall be deemed applicable to the excess.
19 Payment in respect of labor employed on a day work basis shall be at the rate entered in the day work rates and no payment shall be made in respect of overtime. A work day is defined as an 8 hour working day including weekends and public holidays.
Construction Equipment
20 Payment in respect of Construction Equipment employed in the execution of the work on a day work basis, shall be at the rates entered in Day work Bill
The time for which Construction Equipment is broken down or during which it is being serviced shall not be measured, nor shall that of any labor or other Constructional Equipment which is unable to work by reason of such breakdown or servicing.
The rates for construction equipment working shall include for all operation and maintenance costs, fuel, oil, inclusive of drivers and attendants.
Plant and Materials
21 Payment in respect of plant and materials used in the execution of work on a day work basis shall be according to the rates of plant and materials entered in Bill 5, which shall include the cost of taking the plant and materials from the store or stockpile on the Site to the place where they are used.
22 No separate payment shall be made for complying with the provisions of the following Clauses of the Technical Specification except where explicitly provided in the Bill of Quantities.
23 Payment for diversion and/or modification of existing utility and road crossings of whatsoever kind shall be made under the items as set out in the Bill of Quantities for “temporary access roads” and for “temporary diversion works” as appropriate.
24 Where the unit of such work is defined as a “Sum” in the Bill of Quantities, the amount entered for that “Sum” shall be deemed to cover all components of work in order to complete the work. Components of such work, (e.g. removal of existing services, excavation, supply, laying and jointing of pipes, concrete, reinforcement, pile forming /driving, all temporary arrangements, etc.) shall not be separately measured.
25 No separate payment shall be made for the Contractor servicing any cranes and handling devices on completion of works that he has made use of during the works.
26 While determining unit rates, the Contractor shall take into consideration any site specific construction complexities and include their cost into the respective unit rates.
27 No separate payment shall be made for complying with any of the requirements of the Technical Specification with regard to the Contractor’s activities and requirements for the Site except as explicitly set out in the Bill of Quantities and where such items are provided these shall be deemed to cover all matters, costs and expenses.
The Contractor shall be deemed to have included in his rates for:
_ Organization of construction works when deriving his rates.
Temporary Works
28 Eighty percent (80%) of total lump sum price of temporary works will be paid to the Contractor upon completion of these temporary facilities, and the remaining twenty percent (20%) of the total price will be paid after handing over to the Employer of these temporary facilities.
29 Payment for temporary access roads shall be made in percentage of total required work in accordance with the progress of these works carried out by the Contractor. Payment for construction of temporary access roads shall be deemed to be included in the Contractor’s rates if not stated as an extra item in the Bill of Quantities.
30 Payment for photographs as per UNOPS requirements shall be deemed to be included in the Contractor’s rates if not stated as an extra item in the Bill of Quantities.
Control of Water
31 Payment for control of ground and surface water shall be deemed to be included in the Contractor’s rates if not stated as an extra item in the Bill of Quantities.
Materials and Workmanship
32 Items in the Bill of Quantities for which the quantities are stated to be provisional shall only be executed if they are the subject of a written instruction from the Employer. The rates set out for such items shall be used for the valuation of works so ordered by the Employer in writing whether the quantities shown are used wholly or in part. If the amount of work ordered by the Employer to be executed under a Provisional Quantity item exceeds the quantity shown in the Bill of Quantities, the rate for that item set out in the Contract shall be deemed applicable to the excess.
33 No separate payment shall be made for complying with the provisions of earthworks except where explicitly provided, and no separate payment will be made for:
Fill / Backfill made by the Contractor for any purpose or reason, for over excavation or fill and for removal of material.
Payment for drainage pipes will be included in the Bill of Quantities. The payment will include all labor, equipment, tools and other incidentals for providing the slits and stops.
34 Items in the Bill of Quantities for which the quantities are stated to be provisional shall only be executed if they are the subject of a written instruction from the Employer. The rates set out for such items shall be used for the valuation of works so ordered by the Employer in writing whether the quantities shown are used wholly or in part. If the amount of work ordered by the Employer to be executed under a Provisional Quantity item exceeds the quantity shown in the Bill of Quantities, the rate for that item set out in the Contract shall be deemed applicable to the excess.
Clearing and Grubbing
35 Clearing and Grubbing shall be measured in square meters and payment will be made at the unit rates per square meter tendered therefore in the Bill of Quantities.
Site Investigations
36 No separate payment will be made for complying with the provisions of Technical Specifications with respect to obtaining the specified standards and class of workmanship or complying with Standards ordered by the Employer shall be paid at the net cost for supply of standards plus the percentage in the space provided for the relevant item.
No separate payment shall be made for site investigations which are an integral part of the Contractor’s general activities under the Contract.
Clearance Works
37 Rates for removal of any type of existing structures and buildings (reinforced concrete, steelwork, etc.), their contents or general waste materials (including municipal waste) shall be included in the Contractor’s rates and prices except where it is expressly measured by a lump sum amount, or by volume as provided for in the Bill of Quantities.
The rate in the Bill of Quantities shall include all work necessary for the removal, transportation and safe disposal of materials in accordance with the Technical Specification.
38 Non-reinforced (plain) and reinforced concrete will each be measured for payment by cubic meter.
Precast concrete and reinforced concrete shall be measured in cubic meters except where the former is measured by number of units.
The unit rate for concrete works shall cover all costs that are necessary to obtain the concrete quality including, but not limited to the following items:
_ Delivery and storage of all materials
_ Preparation and submission of working drawings and calculations
_ all batching, mixing and transport equipment, including all required personnel and foremen
_ preparing, transporting and placing of concrete
_ finishing of surfaces
_ making and curing of test cubes, including laboratory tests;
_ curing of concrete, including materials and equipment;
_ drilling and cutting of concrete cores, including equipment and testing;
_ transportation, keeping on the site, including loading and unloading.
39 Shuttering shall be measured and paid for separately under the Bill of Quantities. No extra payment for cooling or soaking shuttering shall be made.
40 Unless otherwise stated in the Bills of Quantities no separate payment shall be made for reinforcement.
Where the item for concrete in the Bills of Quantities refers to a quantity or rate of reinforcement in the concrete, no separate measurement shall be made for reinforcement.
In such cases the concrete rates in the Bill of Quantities shall be deemed to include for reinforcement at the minimum of the density stated.
Where the Bills of Quantities provide for measurement of steel reinforcement bars, the weight shall be calculated on the basis of the relevant Technical Specification.
The rates for steel reinforcement, whether explicit or implicit, shall include all expenditures incurred in providing, cutting, bending, placing and fixing the reinforcement in its final position in the structure.
41 Finishes shall not be subject to additional payment and shall be deemed to be included in the rates for concrete.
42 Items in the Bill of Quantities for which the quantities are stated to be optional shall only be executed if they are the subject of a written instruction from the Employer.
No separate payment shall be made, for supply and testing of concrete ingredients; storage of materials; determination of mix proportions; making and testing of trial mixes; testing of concrete; control and mixing of concrete; transporting, placing and compacting concrete; finishes; construction joints (whether shown on the Drawings or not except that where a water stop is specified or ordered by the Employer to be incorporated in construction joints it shall be measured by length for each type and size required); moulds for transporting and fixing pre-cast work; precautions for concreting in unfavourable weather; curing; ascertaining requirements for reinforcement, bending, cutting and fixing reinforcement or working space for erection and handling of shuttering.
Removal of concrete structures
43 Demolition works to concrete structures shall be measured net as volume.
No separate payment shall be made for disposal of debris and waste in accordance with the Specification or for making good any damage arising from retained elements.
Precast Concrete Structures
44 Precast concrete and reinforced concrete will be measured in cubic meters or in case of pipes and manhole rings per unit or length as stated in the Bill items.
The unit rates for reinforced concrete elements must cover all costs, the following items inclusive:
_ Submission of working drawings;
_ Delivery and storage of all materials;
_ All equipment, including devices for dosing, mixing and transportation, and operating personnel;
_ Preparing, transporting and placing of the concrete;
_ Finishing of surfaces;
_ Making and curing of test cubes, including laboratory tests;
_ Curing of concrete, including material and equipment;
_ Transportation and storage of prefabricated elements at the site
The rates for precast reinforced concrete pipes and box units shall be deemed to include for supply and laying, including all joints and connections, except where the Bills of Quantities specifically provide for otherwise.
45 Placing of rubble concrete shall be measured by square meters stating the thickness.
46 Stone masonry shall be measured in square meters complete and shall include for all preparation, materials and finishing, including all pointing
47 Unless otherwise provided for in the Bill of Quantities no separate measurement shall be made for complying with the requirements of the Technical Specification, the cost of which shall be included in the rates and prices relative to the items concerned.
Where items are provided in the Bill of Quantities for painting, it shall be measured as the surface area covered for the top coat only.
Rules of measurement
48 Works are measured and classified in accordance to the rules of Standard Method of Measurement -SMM7 and therefore, any variation or disputed quantities SHALL be measured and classified accordingly for purposes of pricing. Where there is a deviation from the SMM measurement process on a BOQ item, any variation on that item will be measured and assessed in accordance to the unit and description presented in the BOQ.
EAST AND SOUTHERN AFRICA MULTI-COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED RENEWABLE ENERGY INTERVENTIONS FOR RABARABA MILNE BAY PROJECT, PAPUA NEW GUINEA (PNG).
ITEM DESCRIPTION QTY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 1 PRELIMINARIES
If no price has been stated against any item hereunder, the Contractor shall not be entitled to claim any money for such items even though he is obliged to execute the work or provide services described therein. Preliminary items priced by the Tenderer are deemed to include the cost of unpriced items. Note
The Tenderer shall read, understand and acquaint himself with the requirements in the Conditions of Contract, Instructions to Tenderers, Bidding Data, Bid Form, Appendix to Tender and Preamble notes. It is the Tenderer's responsibility to see that his price includes for complying with all the above requirements whether specifically referred to in this bills of quantities or otherwise. Note
The Tenderer is required to visit the site of the proposed work, as it is his responsibility to ascertain the conditions governing access to the site, the external working space, storage area and any other information he may find necessary before he can tender for the work. Note
Cost and expenses in connection with any other preliminary item which is not listed below, but is necessary for the due completion of works, is deemed to be included in the tender rates. Note
Mechanical plant and equipment which emits excessive noise, smoke, fumes, obnoxious gases etc., will not be allowed to be used in the Site, without the prior approval of the Employer's Representative Note
The contractor shall be responsible for any loss or damage to the works, existing structures, adjoining structures and unfixed materials. Note
The contractor shall be responsible for hoisting of all materials to any given height of the building. Note
The contractor shall ensure supply and connection of temporary water and power solely for the works and work related purposes. The contractor shall price for the associated water and price bills under items s and t. Note
Mobilization, Logistics and Transportation Services
a) Mobilization, logistics and transportation services for construction materials, work crews/key personnel, plant, and equipment not locally available at the project site. This includes logistics from manufacturers’ factories or construction hardware suppliers to the designated wharf (Alotau, Lae, Port Moresby, or any other alternative town selected by the bidder for sourcing project materials, plant, and equipment), followed by onward shipment to the contractor’s storage facility at the project site as well as demobilization after completion of work. This item also covers all associated costs, including wharf facility charges, delivery and handling equipment during loading and unloading operations, and any applicable permits and statutory fees. Bidders are required to submit a method statement along with a detailed cost breakdown for this item as part of their bid submission. 1 Item
b) Allow for setting out of works in accordance with drawings; liaise with client to establish exact boundaries and other written information given by the Employer and obtain written approval from the relevant government authorities for setting out, street and building lines before commencements of construction; Checking of any setting out or of any line or level by the Employers' Representative shall not in any way relieve the Contractor of his responsibility for the accuracy thereof. 1 Item 0.00
c) The contractor shall provide adequate space to serve as a temporary site office and general store and fit it with the required facilities for his own site management staff as well as the Employer's Representative (1Nr). 1 Item 0.00
d) Allow for the collection, loading, secure haulage over a distance of less than 10 km, and unloading of Employer-supplied equipment from the Employer’s storage to the Contractor’s dedicated warehouse. Scope covers approximately 600 solar PV panels, 30 inverters, 3 generator sets (2x7.5kVA and 1x46kVA), and associated accessories. Rate shall be fully inclusive of all necessary handling plant (cranes, forklifts), secure weatherproof transport, lashing, transit insurance, labor, and joint inventory takeover inspections. Rate should cover transport to sites for installation. 1 Item
e) Provide, operate, and maintain a dedicated, weatherproof, and climate-controlled warehouse facility for the secure storage of solar equipment (including PV modules, inverters, batteries, and balance-of-system components), inclusive of 24/7 security, racking, handling provisions and utilities for the duration of the contract. 1 Item 0.00
f) Carry out on-site physical inspection and functional electrical condition assessment of Employer-supplied equipment (approx. 600 PV panels and 30 inverters, including Selectronic 7.7 kW / 15 kW and Fronius Primo 5 kW / 8.2 kW units), fully witnessed by the Employer’s Technical Representative. Rate includes all skilled labor, calibrated test instruments, diagnostic power-up and electrical testing ($V_{oc}$, $I_{sc}$, insulation resistance), and submission of a certified joint condition assessment report 1 Item
g) Allow for hoarding the construction site (total length approximately 500m long) using iron sheets or equivalent as may be directed by the Employer's Representative. The hoarding height shall be not less than 3m high supported by timber poles with all necessary entry and exit gates to approval of the Employer's Representative. 5 Item
h) The contractor shall provide temporary toilet facilities for his workers and the Employer's Representatives within the site as directed. The same shall be maintained in proper sanitary conditions throughout the contract period. 1 Item 0.00
i) Allow for submission of daily and monthly progress reports for ALL Project Sites. The reports shall be in electronic format and include photographs where necessary. The contractor shall also be required to maintain daily records in the manner required by the Employer to indicate factual details of: 1 Item 0.00
(i) Number of workmen in different categories and Foremen. Note
(ii) Particulars of materials and goods brought to the site. Note
(iii) Particulars of machinery & equipment brought to or taken out of site. Note
(iv) Rain fall records. Note
j) Allow for all cost in connection with preparing samples for testing, making arrangements for testing of materials, goods etc., as stipulated in the Specification, obtaining test reports and submitting the same to the Employer's Representative. (This item intends to cover all expenses incurred by the contractor in connection with sampling and testing of materials, goods etc., required by the specifications, other than those provided for in the bills of quantities.) 1 Item 0.00
k) Fabricate and erect project sign board complete with lettering, mounted and supported on steel poles as per Architectural drawings, all subject to the approval of the Employer's Representative 5 Item
l) Prepare and submit Operation & Maintenance Manual for the Works to the Employer's approval. 2 Item 0.00
m) Prepare and submit "As-Built" or record drawings to the Employer's approval. 2 Item 0.00
n) Capacity Development and End-User Training on the Operation & Maintenance of the constructed facilities including the Dehydration Toilets 2 Item 0.00
Insurances, Bonds & Fees 0.00
Provision of insurance requirements for the contract over and above the Contractor's existing insurance covers, in line with the requirements outlined in ITB Section V Schedule B "Section 3.11 - Insurance Requirements"
o) Construction All Risk Insurance for Works, Plants and Materials 1 Item 0.00
p) Public Liability Insurance 1 Item 0.00
q) Worker's Compensation Insurance 1 Item 0.00
Levels and soil conditions confirmation 0.00
r) The contractor shall confirm the soil conditions through trial pits of 2m maximum depth with a minimum spacing of 15m between each pit for each structure. Maximum of 4 pits per site. The contractor shall submit details of the trial pits including photographs to the Employer for approval 1 Item 0.00
Time-Related Charges
s) Allow for running and maintenance of generators or equivalent temporary power supply source for power supply to the construction sites. Item to include fuel and other consumables 5 Item 0.00
t) Allow for temporary continuous water supply to the construction sites for the works and associated usage 5 Item 0.00
General ESS and HSSE requirements
u) The contractor shall carry out an Environmental and Social (E&S) screening exercise to assess whether the project’s activities pose any specific risks. The exercise shall be performed as per guidelines provided in the UNOPS E&S screening templates. 1 Item 0.00
v) Allow for provision of Occupational, Health, Safety (OSH) and Environmental and Social (E&S) Management system for the execution of works under the contract. The bidder should submit his comprehensive OSH, and E&S Management. 1 Item 0.00
w) Allow for full compliance with all Environmental, Social, Health, and Safety (ESHS) obligations, including strict adherence to Protection from Sexual Exploitation, Abuse, and Harassment (PSEAH) requirements and policies throughout the contract duration 1 Item 0.00
TOTAL FOR BILL NO. 1 - PRELIMINARIES - CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED RENEWABLE ENERGY INTERVENTIONS FOR RABARABA MILNE BAY PROJECT, PAPUA NEW GUINEA (PNG).
ITEM DESCRIPTION QNTY UNIT RATE (USD) AMOUNT (USD)
BILL NO.2 TVET-SOLAR PV HYBRID SYSTEM INSTALLATION
NOTE: TRADE NAMES
Where Trade Names are mentioned below, it is intended to indicate the level of quality required. The tenderer MAY supply alternatives which must be approved in writing by the Employer. Note
1 GENERAL ITEMS
a) Allow for the preparation of all Working drawings 3 Set 0.00
b) Allow for the preparation of a set of Test and Inpection Plan ( ITP) sheets for each equipment, i.e BESS, inverters, Solar PV, ATS, Distribution Board, Earthing, Megger, Circuit Breakers, Inverters, Solar PV cells and BESS. 1 Set
c) Allow for the preparation of all "As Built" drawings after testing and commissioning 3 Set 0.00
d) The Tenderer is to describe hereunder inserting any relevant clause number, any other works, obligations or items that may be referred to in the Conditions of Contract, Specification, Drawings or Data Schedule in respect of the works for which he desires to enter a separate charge( this charge is to be entered in the Amount column). If no charge is entered hereunder, rates and amounts elsewhere in the schedule of prices shall be deemed to cover all expenses for such works, obligations or items. 1 Sum 0.00
e) Allow for point to point checking, testing and commissioning of the entire electrical installation works. 1 Sum 0.00
2 SOLAR PV PANELS & MOUNTING STRUCTURE
Note: The Contractor is to provide detailed solar PV mounting shop drawings and structural details for review and approval prior to installation. The proposed mounting system shall be compatible with the existing roof construction, safely distribute loads to the supporting roof members, and be designed to resist the specified wind uplift forces.
a) Transport from site store and install solar photovoltaic (PV) modules — Phono Solar PS275P-20/U, 275 W polycrystalline, Voc=38.68V, Isc=9.17V, Vmpp=31.79V, frame anodised aluminium, IP67 MC4-compatible connectors, IEC 61215 & IEC 61730 certified. Installed to roof in 12 strings: 6×17p (Voc=657.6V) + 6×18p (Voc=696.2V). All Voc values ≤1000V DC verified. 138 Nr. 0.00
b) Supply and install complete roof mounting rail system for PV array; anodised aluminium L-foot brackets and rail profile, mid-clamps, end-clamps, module-level bonding clips, stainless steel fasteners and all necessary fixings suitable for corrugated metal roof. Wind-rated to minimum 50 m/s. Include anti-galvanic separation as required. 1 Sum 0.00
c) Supply and install anodised aluminium mounting rail profile 40×40mm, 3m lengths, including all splices, joints and accessories. 150 m 0.00
d) Supply and install panel mid-clamps, universal aluminium type rated for 275W module frame. 112 Nr. 0.00
e) Supply and install panel end-clamps, universal aluminium type. 52 Nr. 0.00
f) Supply and install roof hooks or chemical anchor bolt assemblies, stainless steel, fixed through roof corrugation crests to purlins. Include sealing washers and UV sealant. 104 Nr. 0.00
g) Supply and install module-to-rail earthing/bonding clips, stainless steel or aluminium, providing electrical continuity between module frames and mounting rails. 138 Nr. 0.00
Timber to Existing roof structure
The Contractor shall ensure duty of care to the existing timber structure/ covering while executing the works. Any damages caused to existing roof must be reinstated to the Employer's Representative's approval
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished with 2 coats polyurethane varnish on completion; all as per Construction Structural drawings
h) 75x250mm Timber truss rafters, bolted/srewed/nailed below existing timber purlins and to the top of existing timber tie beams/Truss tie - (Approximate total length 155m) 1 Item 0.00
3 DC WIRING & PROTECTION
a) Supply and install 4mm² twin-core UV-stabilised solar DC cable (red positive, black negative), TUV 2 Pfg 1169 / EN 50618, rated 1000V DC, temperature -40°C to +90°C. Run in UV-rated rigid PVC conduit Ø32mm on roof. Allow 840m single-core total (12 strings: 6×17p (Voc=657.6V) + 6×18p (Voc=696.2V)). 840 m 0.00
b) Supply and install MC4-compatible connector pairs (male + female), IP67, rated 1000V DC / 30A, crimped type. Include 58 pairs with 20% spare. 58 Pairs 0.00
c) Supply and install 20A 1000V DC string protection circuit breakers, DIN-rail mounted, 1 per DC string. 12 Nr. 0.00
d) Supply and install Type II 1000V DC surge protection devices (SPD), 40kA rated, DIN-rail mounted in Solar Power Board; 1 per string inverter. 12 Nr. 0.00
e) Supply and install DC Solar Power Board with lockable enclosure, IP65 minimum, including DIN rail, copper busbar, terminal blocks, cable glands and all accessories for DC string terminations and protection. 1 Nr. 0.00
f) Supply and install UV-rated rigid PVC conduit Ø32mm or stainless steel cable tray 50×50mm on roof for DC string cable routing, including all clips, saddles and fixings. 30 m 0.00
g) Supply and install stainless steel cable tray support brackets at 2m maximum centres on roof structure. . 16 Nr. 0.00
4 INVERTER-CHARGERS & STRING INVERTERS 0.00
a) Transport from site store and install Selectronic SP PRO SPLC1200 15kW / 48V DC inverter-charger units (Selectronic SCERT certified), wall-mounted in power room. Each unit operates independently — no Manager/Worker hierarchy. Include SP LINK commissioning software configuration. 2 Nr. 0.00
b) Supply and install Selectronic AC Coupled Interface PCA (Selectronic Part No. 005227), RS485 interface board for Fronius SCERT managed AC coupling. Install 1 per SP PRO unit. 2 Nr. 0.00
c) Transport from site store, install, test and commission Fronius Primo 8.2-1 single-phase string inverters, 8.2kW rated, Selectronic SCERT certified for managed AC coupling, 2×MPPT, 0-1000V DC input, 240V AC / 50Hz output, IP65. Configure for MG50 country code and Night Mode ON. 4 Nr. 0.00
d) Supply and install heavy-duty wall-mounting brackets and back-plates for SP PRO 15kW inverter-charger units (minimum 113kg capacity each). Include all fixings. 2 Nr. 0.00
e) Supply and install wall-mounting brackets and back-plates for Fronius Primo 8.2-1 string inverters. Include all fixings. 4 Nr. 0.00
f) Supply and install solar rapid shutdown system or emergency stop in the event of rooftop fire on the solar panels (NEA compliance) 1 Nr.
g) Supply and install solar panel string 40A 2 pole, DC isolators at the rooftop for maintenance purposes (NEA compliance) 12 Nr.
5 BATTERY ENERGY STORAGE SYSTEM (BESS) 0.00
a) Supply and install LiFePO4 (Lithium Iron Phosphate) battery modules, server-rack format, 5.12kWh / 48V DC nominal per module, with integrated Battery Management System (BMS), IEC 62133-2 and UN 38.3 certified, minimum 3,000 cycles at 80% DoD. Install in 2 racks × 10 modules each = 102.4kWh total. Total installed capacity: 102.4kWh. 20 Nr. 0.00
b) Supply and install battery rack enclosure(s), 19" steel rack or proprietary modular cabinet, UL listed or equivalent, 600mm wide. Configure in 2 racks × 10 modules each = 102.4kWh total. Include all busbars and inter-module DC cables. 2 Nr. 0.00
c) Supply and install battery DC busbar box, 200A rated, insulated copper busbar, IP31 minimum enclosure, with all terminals and cable glands. 1 Nr. 0.00
d) Supply and install 200A 2-pole DC battery circuit breakers (MCCBs), 1000V DC rated, between battery busbar and SP PRO DC terminals. 2 Nr. 0.00
e) Supply and install 150A 1000V DC 2-pole 1000V DC MCCBs at battery rack DC output, 1 per battery rack. 2 Nr. 0.00
f) Supply and install 35mm² flexible two-core DC battery cable, colour coded, with compression lugs and protection sleeves at all terminations. 12 m 0.00
6 AC WIRING, SWITCHGEAR & PROTECTION 0.00
a) Supply and install 50mm² 3-core copper conductor, XLPE insulated, SWA armoured AC power cable from grid/changeover to SP PRO Source terminal. Include brass SWA compression glands at both ends. 20 m 0.00
b) Supply and install 25mm² 3-core copper conductor, XLPE insulated, SWA armoured AC power cable for SP PRO output + solar board feed + distribution (3 runs × 40m). Include SWA glands and lugs. 120 m 0.00
c) Supply and install 25mm² 3-core PVC insulated copper cable for Fronius Primo string inverter AC output connections to Solar Power Board. 30 m 0.00
d) Supply and install 63A 2-pole miniature circuit breakers (MCBs), 10kA, DIN-rail mounted, for Selectronic SP PRO source input protection. 2 Nr. 0.00
e) Supply and install 80A 2-pole MCB, DIN-rail mounted, as main incoming breaker for Solar Power Board. 2 Nr. 0.00
f) Supply and install 100A 2-pole MCBs for Solar Power Board sub-circuits. 2 Nr. 0.00
g) Supply and install 63A 2-pole MCBs for BESS Selectronic Charger. 2 Nr.
h) Supply and install 63A 3-pole MCBs for new Client Distribution board sub-board 1 Nr.
i) Supply and install 32A 2-pole MCBs for new Client Distribution Board sub-board 1 Nr.
j) Supply and install 100A 3-pole MCBs for new Client Distribution Board sub-board 1 Nr.
k) Supply and install 100A 3-pole MCB, DIN-rail mounted, as main incoming breaker for the new Client Distribution Board. 1 Nr.
l) Supply and install 150A, 24 pole, 3 phase new Client Distribution Board. 1 Nr.
m) Supply and install 150A, 18 pole, 3 phase new Solar Power Board. 1 Nr.
n) Supply and install 100A 2-pole MCB, DIN-rail mounted, as main incoming breaker for the new Solar Power Board. 1 Nr.
o) Supply and install 40A 2-pole MCBs, Type B, 6kA, for Fronius Primo AC output protection on Solar Power Board. Total 4 No. 4 Nr. 0.00
q) Supply and install motorised 100A, 3 pole Automatic Transfer Switch (ATS) for grid and generator changeover, including mechanical and electrical interlocking, rated per system load. 1 Nr. 0.00
r) Supply and install enclosed 100A, 3 pole Manual Transfer Switch (MTS) for grid and generator changeover, including mechanical and electrical interlocking, rated per system load. 1 Nr.
s) Supply and install enclosed 100A 3 pole lockable rotary isolator for generator main supply connection, rated current per system. 1 Nr. 0.00
t) Supply and install revenue-grade digital energy meter and an enclosed 100A 3 pole main isolator switch for utility grid connection. 1 Set 0.00
u) Supply and install galvanised steel trunking 100×50mm or rigid PVC conduit Ø32/50mm for AC cable routing within power/inverter room, including all fittings. 25 m 0.00
v) Supply and install brass SWA cable glands, compression lugs, heat-shrink sleeving and cable ties for all armoured cable terminations. 1 Set 0.00
7 EARTHING, BONDING & LIGHTNING PROTECTION
a) Supply and install copper-bonded steel earth rods, 16mm diameter × 1.2m long, driven to approved depth with earth rod clamp, test links and removable pit cover. 3 Nr. 0.00
b) Supply and install 16mm² stranded copper earth conductor, green/yellow PVC insulated, connecting all earth electrodes and equipment earthing terminals to main earth bar. 40 m 0.00
c) Supply and install copper earth bar/busbar, 100A rated, wall-mounted on insulators in power room, with all terminal connections. 1 Nr. 0.00
d) Supply and install 6mm² bare stranded copper bonding conductor along all PV array mounting rails, bonding all module frames and rail sections to earth system. 60 m 0.00
e) Supply and install Type I+II combined AC surge protection device (SPD), 50kA rated,AC, DIN-rail mounted at Main Distribution Board incoming, with minimum 6mm² earth conductor to main earth bar. 1 Nr. 0.00
f) Supply, install, test and commission a complete IEC 62305 LPL III Lightning Protection System, comprising Franklin air terminals, roof supports, copper down conductors, test joints, earth ring and electrodes, inspection pits, bonding to PV structures/main earth, coordinated Type I+II AC/DC SPDs, all accessories, weatherproof making-good 1 LOT 0.00
8 POWER / BATTERY ROOM FITOUT — CIVIL & MECHANICAL
a) Allow for preparation and cleaning of inverter and battery room including surface preparation, marking out equipment positions, drilling and fixings for wall-mounted equipment. 1 Item 0.00
b) Construct concrete equipment plinths or supply and install steel frame equipment bases, minimum 100mm raised, for battery rack installation. 2 Nr. 0.00
c) Supply and install perforated galvanised steel cable ladder, 300mm wide, on wall brackets at 600mm centres within power/inverter room. 12 m 0.00
d) Supply and install wireless standalone combination optical smoke and rate-of-rise heat detector with integral 85dB sounder/strobe, 10-year sealed lithium battery, wireless interlink capability, EN 14604 / EN 50291 certified. Ceiling-mounted inside battery room. 1 Nr. 0.00
e) Supply and install wireless standalone combination smoke/heat detector — identical specification to item 7A.1. Positioned at battery room exit/escape route. Wireless interlink: simultaneous alarm with 7A.1. 1 Nr. 0.00
f) Supply and provide replacement 10-year lithium batteries for wireless detectors as per manufacturer specification, for maintenance stock. 2 Set 0.00
g) Supply, install and commission ABC dry powder fire extinguisher, 6kg minimum, EN 3 certified, wall-mounted on bracket. Suitable for Class A, B, C and electrical fires. Suitable for lithium-ion battery environments. Note: CO₂ type NOT permitted in battery rooms. 1 No. inside battery room + 1 No. at exit door. 2 Nr. 0.00
h) Supply and install 300mm diameter axial exhaust fan with thermostat control and louvred intake grille for battery room ventilation and gas dispersion. 1 Set 0.00
i) Supply and install lockable steel security door, 3mm steel sheet construction, with deadbolt lock and padlock provision. 1 Nr. 0.00
j) Supply and install LED light fittings, 20W, 240V, IP44 minimum, switched at door, within power/battery room. 1 Nr. 0.00
k) Supply and install warning and safety signs on vinyl self-adhesive labels: Electrical Hazard, Lithium-Ion Battery Hazard, No Smoking, No CO₂ Extinguisher. Minimum 200×150mm each. 1 Set 0.00
l) Supply and install high-performance calcium silicate boards to internal faces of walls and ceilings (Approximate Area of 96sm) in Battery and Inverter Storage Rooms to achieve the required Fire Resistance Level (FRL) in strict accordance with the manufacturer's specifications and PNG National Building Code requirements. Rate shall include for all fixing to timber or metal studs/furring channels (measured separately); Flushed joints, skimming, taping, and sanding ready for painting;Sealing of all joint perimeters with approved fire-retardant mastic/sealant. 1 Item 0.00
9 TESTING, COMMISSIONING & DOCUMENTATION
a) Allow for complete system commissioning of SP PRO inverter-charger(s) and Fronius Primo string inverter(s) using Selectronic SP LINK software (v9.1 or later). Include: Site Configuration Wizard, RS485/Solar Net communications verification, DNO Editor setup on Fronius Master, SCERT coupling ratio check, ATS changeover testing, fire detection test 2 Day 0.00
b) Allow for Fronius Datamanager 2.0 monitoring portal setup (Fronius Solar.web), including WLAN/LAN connection, system entry (PV[Wp], array details) and provision of login credentials and system name to Employer. 1 Item 0.00
c) Allow for battery capacity test and BMS commissioning: full charge-discharge cycle, BMS cell balancing verification and SOC calibration. 1 Item 0.00
d) Allow for ATS and generator changeover testing: simulate grid failure, verify generator start and load transfer time, test manual override. 1 Item 0.00
e) Allow for complete electrical installation testing and certification including: insulation resistance test (all DC strings at 500V DC), polarity verification, DC open-circuit voltage measurement per string, AC insulation resistance and continuity tests, earth electrode resistance measurement (≤5Ω), per IEE/BS 7671. 1 Item 0.00
f) Supply three (3) hard copies and one (1) digital copy of as-built drawings and commissioning report including: updated SLD, string layout, cable schedule, SP LINK configuration file backup, all test results with measured values. 1 Item 0.00
g) Allow for half-day operation and maintenance (O&M) training for client's site personnel covering: SP PRO daily operation, Fronius monitoring, battery health checks, fire safety, emergency procedures and routine maintenance schedule. 0.5 Day 0.00
10 GENERATOR INSTALATION WORKS 0.00
a) Standby 46kVA Generator connection works — supply materials and tools, install and connect standby generator, ATS connection, generator main isolator, fuel system to the generator supplied by the Employer. 1 Item 0.00
b) Transport from site store, install, test and commission standby 15kW, 3 phase standby generator 1 Nr.
11 RETROFITTING WORKS 0.00
Supply, deliver and install the following materials: The contractor should ensure that storage is properly done on site while awaiting installation
a) Aluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets 10 Nr. 0.00
b) 3mm thick sheet 4 Nr. 0.00
c) 150x75mm Hardwood Timber 42 m 0.00
d) 75x50mm Hardwood Timber 42 m 0.00
TOTAL FOR TVET- ELECTRICAL INSTALLATION CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED RENEWABLE ENERGY INTERVENTIONS FOR RABARABA MILNE BAY PROJECT, PAPUA NEW GUINEA (PNG).
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO.3 TVET-GENERATOR SHED
All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS
a) Clear the site of all shrubs, bushes, small trees and debris; remove from site as directed [Approximate area: 63 m2 for Building footprint and 50% allowance] 1 Item 0.00
Oversite excavations
b) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Building footprint only] 43 m2 0.00
c) Excavate in soft material for foundation trenches; 0-1.50m deep 19 m3 0.00
d) Excavate in soft material for column bases; 0-1.50m deep 24 m3 0.00
e) Return, fill in and ram selected excavated material around foundations 31 m3 0.00
Disposal of Surplus spoil
f) Load and cart away surplus excavated material from site to an approved dumping site 12 m3 0.00
Selected filling
g) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep 33 m2 0.00
h) 50mm Thick granular/gravel blinding to surfaces of hardcore; as per structural drawing's specifications 33 m2 0.00
Anti-termite treatment
i) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to granular/gravel surfaces 33 m2 0.00
TOTAL FOR SITE PREPARATION, EXCAVATIONS & EARTHWORKS CARRIED TO BILL SUMMARY 0.00
2) CONCRETE WORKS
Lean concrete class C16/20 (mix 1:2:4)
a) 50mm Thick blinding under strip foundation 11 m2 0.00
b) 50mm Thick blinding under column bases 14 m2 0.00
c) 50mm Thick blinding under ground floor slab 33 m2 0.00
Insitu concrete class C20/25, vibrated and reinforced as described, in:-
d) Foundation strip 2 m3 0.00
e) Column bases 3 m3 0.00
f) Stub columns 1 m3 0.00
g) Ground Beams 1 m3 0.00
h) Ground floor slab [100mm thick ], finished smooth 2.5 m3 0.00
i) Generator and fuel tank plinths [250mm thick ], finished smooth 2.5 m3 0.00
j) Ring Beam & Columns above ground floor slab 0.5 m3 0.00
Damp proof membrane
k) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) 33 m2 0.00
TOTAL FOR CONCRETE WORKS CARRIED TO BILL SUMMARY 0.00
3) STEEL REINFORCEMENT (PROVISIONAL)
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 8mm Diameter bars 247 kg 0.00
b) 12mm Diameter bars 368 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
c) Fabric mesh reinforcement to ground floor bed 33 m2 0.00
d) Ditto: 2 layers to generator plinth and fuel tank plinths 10 m2 0.00
TOTAL FOR STEEL REINFORCEMENT CARRIED TO BILL SUMMARY 0.00
4) SHUTTERING & FORMWORK
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 7 m² 0.00
b) Vertical sides of column bases 11 m² 0.00
c) Vertical sides of stub columns 13 m² 0.00
d) Edges of ground beams 6 m² 0.00
e) Edges of the ground floor slab, 100mm girth 23 m 0.00
f) Edges of the generator and fuel tank plinth, 150mm girth 19 m 0.00
g) Vertical sides of columns above ground floor slab 5 m² 0.00
h) Soffites and sides of ring beam 2 m² 0.00
TOTAL FOR SHUTTERING & FORMWORK CARRIED TO BILL SUMMARY 0.00
5) JOINERY & TIMBER WORKS
1. Rate for Timber sections shall include all necessary drilling of holes, bolting, cleats and other necessary connections that are not separately itemized for pricing Note
2. The Contractor shall provide shop drawings for approval. Once approved, the drawings shall be strictly adhered to during the fabrication and installation process. Note
3. The Contractor shall provide documentation verifying treatment type, retention levels, and compliance. Note
I Timber framework
Columns, rafters etc.
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished with 2 coats polyurethane varnish on completion; all as per Structural drawings
a) 100 x 60 x 10mm Thick base plate with 4no. 14mm dia pre-drilled holes to receive 12mm dia J bolts: fixed to stub column bases (stub column bases measured separately) 8 Nr 0.00
b) 2/10mm Stiffener plate welded to base plates as per details (Plates measured separately) 8 Nr 0.00
c) 150x50mm Timber Column, encased in concrete column(m.s), secured with a threaded end or steel plate anchored in the timber column 23 m 0.00
d) 75x100mm Timber bracings bolted/srewed/nailed to timber columns (m.s) 20 m 0.00
e) 75x100mm Timber stiffeners bolted/screwed/nailed to timber columns (m.s) 20 m 0.00
f) 75x100mm Timber tie beams bolted/srewed/nailed to top of timber columns (m.s) 22 m 0.00
g) 50x150mm Timber truss rafters, bolted/srewed/nailed to top of timber tie beams/Truss tie (m.s) 47 m 0.00
h) 50x100mm Timber truss internal members, bolted/srewed/nailed to timber rafters/ truss tie (m.s) 42 m 0.00
i) 50x150mm Timber truss tie beams bolted/srewed/nailed to top of timber columns (m.s) 35 m 0.00
j) 50x50mm Timber purlins fixed to rafters (m.s) 63 m 0.00
Softwood timber
k) 250x20mm Thick One-side wrot fascia and barge board 28 m 0.00
II Timber doors
The following in timber doors as per the details provided
Door Frames, architraves and beads
a) Ex 150x50mm hardwood frame rebated 11 m 0.00
Supply and fix the following timber door comprising; Hardwoord timber frame all around, diagonal timber strips both ways, timber wood panel at the middle to hold the lock: refer to architectural drawings for further details. All to Employer's approval
b) Double leaf door size 1800x1800mm high 2 Nr 0.00
Supply and fix the following ironmongery with screws to match
c) Heavy duty natural aluminium hinges approved from samples 12 Nr 0.00
d) 12mm diameter slide bolt,300mm long with hasp and staple 2 Nr 0.00
Painting and Decorating
Aluminum wood primer
e) Back of wood frames over 100mm but not exceeding 200mm girth 11 m 0.00
Prepare and apply clear matt varnish to timber doors
f) Ditto over 100mm not exceeding 200mm girth 11 m 0.00
g) General surfaces of doors 13 m2 0.00
TOTAL FOR JOINERY & TIMBER WORKS CARRIED TO BILL SUMMARY 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide for the change over panel wall 3 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 26 m2 0.00
c) 200mm walling for change over panels 7 m2 0.00
d) 200mm walling Thick bund walling 5 m2 0.00
e) 150mm walling Thick bund walling around the generator and fuel tank plinths 5 m2 0.00
Expansion Joints
f) 12mm Flexcell or equal and approved expansion 1 m2 0.00
g) 25 x 25mm approved joint sealer 10 m 0.00
Precast Concrete units [PCC] class 25/20: Vibrated; reinforced for handling: fair faced finish on all exposed faces: bedded, jointed and pointed in Cement mortar (1:3)
h) 250mm wide x 50mm thick Coping, twice weathered and throated 11 m 0.00
i) Supply and fix 1500mm high galvanized heavy duty chain-link nailed,screwed/bolted to timber supports (Measured separately) 16 m 0.00
TOTAL FOR BLOCKWORK CARRIED TO BILL SUMMARY 0.00
7) ROOF COVERING & RAINWATER GOODS
a) Supply and FixAluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets or approved equivalent; fixed to timber purlins (m.s) using manufacturer's proprietary bolts 45 m2 0.00
Rainwater goods
Supply and install the following sheerline colorbond rain water goods
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Employer's approval
b) Supply and install sheerline colorbond gutter fixed to fascia (m.s) with and including spring clips at 1200mm centres [Rate to include gutter stop ends]. The gutter to have a micro-mesh leaf guards 13 m 0.00
c) Extra over downpipe; for gutter outlet 4 Nr 0.00
d) 75 mm Diameter sheer line colorbond rainwater down pipe; holder bats at 1500mm (maximum) centers including all fittings 12 m 0.00
e) Extra over ditto for swan neck 1200mm projection. 4 Nr 0.00
f) Ditto for shoe. 4 Nr 0.00
g) Extra over gutter for stopped ends. 4 Nr 0.00
TOTAL FOR ROOF COVERING & RAINWATER GOODS CARRIED TO BILL SUMMARY 0.00
Note: Contractor to provide all samples for approval before incorporation into the final works.
15mm Cement and sand (1:3) render on block wall or concrete work to:-
a) Bund wall around the building including the edges of floor slab 16 m2 0.00
b) Bund wall around the generator and fuel tank plinths 9 m2 0.00
c) Coping 4 m2 0.00
d) Change over panel wall 19 m2 0.00
Sand surfaces and fill uneven surfaces with stucco filler paste; Prepare and apply two undercoats of plastic emulsion paint and two finishing coats external quality paint as "Permaplast" manufactured by Crown paints or other equal and approved:-
e) All the plastered walls 48 m2 0.00
TOTAL FOR FINISHES CARRIED TO BILL SUMMARY 0.00
TVET-GENERATOR SHED
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS 0.00
2) CONCRETE WORKS 0.00
3) STEEL REINFORCEMENT (PROVISIONAL) 0.00
4) SHUTTERING & FORMWORK 0.00
5) JOINERY & TIMBER WORKS 0.00
6) BLOCKWORK 0.00
7) ROOF COVERING & RAINWATER GOODS 0.00
8) FINISHES 0.00
TOTAL FOR BILL NO. 3- TVET GENERATOR SHED- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED RENEWABLE ENERGY INTERVENTIONS FOR RABARABA MILNE BAY PROJECT, PAPUA NEW GUINEA (PNG).
ITEM DESCRIPTION QNTY UNIT RATE (USD) AMOUNT (USD)
BILL NO.4 DDA-SOLAR PV HYBRID SYSTEM INSTALLATION
NOTE: TRADE NAMES
Where Trade Names are mentioned below, it is intended to indicate the level of quality required. The tenderer MAY supply alternatives which must be approved in writing by the Employer. Note
1 GENERAL ITEMS
a) Allow for the preparation of all Working drawings 3 Set 0.00
b) Allow for the preparation of a set of Test and Inpection Plan ( ITP) sheets for each equipment, i.e BESS, inverters, Solar PV, ATS, Distribution Board, Earthing, Megger, Circuit Breakers, Inverters, Solar PV cells and BESS. 1 Set
c) Allow for the preparation of all "As Built" drawings after testing and commissioning 3 Set 0.00
d) The Tenderer is to describe hereunder inserting any relevant clause number, any other works, obligations or items that may be referred to in the Conditions of Contract, Specification, Drawings or Data Schedule in respect of the works for which he desires to enter a separate charge( this charge is to be entered in the Amount column). If no charge is entered hereunder, rates and amounts elsewhere in the schedule of prices shall be deemed to cover all expenses for such works, obligations or items. 1 Sum 0.00
e) Allow for point to point checking, testing and commissioning of the entire electrical installation works 1 Sum 0.00
2 SOLAR PV PANELS & MOUNTING STRUCTURE
Note: The Contractor is to provide detailed solar PV mounting shop drawings and structural details for review and approval prior to installation. The proposed mounting system shall be compatible with the existing roof construction, safely distribute loads to the supporting roof members, and be designed to resist the specified wind uplift forces.
a) Transport from site store and install solar photovoltaic (PV) modules — Phono Solar PS275P-20/U, 275 W polycrystalline, Voc=38.68V, Isc=9.17V, Vmpp=31.79V, frame anodised aluminium, IP67 MC4-compatible connectors, IEC 61215 & IEC 61730 certified. Installed to roof in 18 strings: 1×8p, 2×11p, 7×12p, 4×13p, 2×14p, 2×15p (max Voc=580.2V). All Voc values ≤1000V DC verified. 224 Nr. 0.00
b) Supply and install complete roof mounting rail system for PV array; anodised aluminium L-foot brackets and rail profile, mid-clamps, end-clamps, module-level bonding clips, stainless steel fasteners and all necessary fixings suitable for corrugated metal roof. Wind-rated to minimum 50 m/s. Include anti-galvanic separation as required. 1 Sum 0.00
c) Supply and install anodised aluminium mounting rail profile 40×40mm, 3m lengths, including all splices, joints and accessories. 240 m 0.00
d) Supply and install panel mid-clamps, universal aluminium type rated for 275W module frame. 178 Nr. 0.00
e) Supply and install panel end-clamps, universal aluminium type. 80 Nr. 0.00
f) Supply and install roof hooks or chemical anchor bolt assemblies, stainless steel, fixed through roof corrugation crests to purlins. Include sealing washers and UV sealant. 168 Nr. 0.00
g) Supply and install module-to-rail earthing/bonding clips, stainless steel or aluminium, providing electrical continuity between module frames and mounting rails. 224 Nr. 0.00
3 DC WIRING & PROTECTION
a) Supply and install 4mm² twin-core UV-stabilised solar DC cable (red positive, black negative), TUV 2 Pfg 1169 / EN 50618, rated 1000V DC, temperature -40°C to +90°C. Run in UV-rated rigid PVC conduit Ø32mm on roof. Allow 720m single-core total (18 strings: 1×8p, 2×11p, 7×12p, 4×13p, 2×14p, 2×15p (max Voc=580.2V)). 720 m 0.00
b) Supply and install MC4-compatible connector pairs (male + female), IP67, rated 1000V DC / 30A, crimped type. Include 86 pairs with 20% spare. 86 Pairs 0.00
c) Supply and install 20A 1000V DC string protection circuit breakers, DIN-rail mounted, 1 per DC string. 18 Nr. 0.00
d) Supply and install Type II 1000V DC surge protection devices (SPD), 40kA rated, DIN-rail mounted in Solar Power Board; 1 per string inverter. 18 Nr. 0.00
e) Supply and install DC Solar Power Board with lockable enclosure, IP65 minimum, including DIN rail, copper busbar, terminal blocks, cable glands and all accessories for DC string terminations and protection. 1 Nr. 0.00
f) Supply and install UV-rated rigid PVC conduit Ø32mm or stainelss steel cable tray 50×50mm on roof for DC string cable routing, including all clips, saddles and fixings. 15 m 0.00
g) Supply and install stainless steel cable tray support brackets at 2m maximum centres on roof structure. 10 Nr. 0.00
4 INVERTER-CHARGERS & STRING INVERTERS 0.00
a) Supply, transport to site, store and install Selectronic SP PRO SPLC1200 15kW / 48V DC inverter-charger units (Selectronic SCERT certified), wall-mounted in power room. Each unit operates independently — no Manager/Worker hierarchy. Include SP LINK commissioning software configuration. 3 Nr. 0.00
b) Deliver and install Selectronic AC Coupled Interface PCA (Selectronic Part No. 005227), RS485 interface board for Fronius SCERT managed AC coupling. Install 1 per SP PRO unit. 3 Nr. 0.00
c) Transport from site store install Fronius Primo 8.2-1 single-phase string inverters, 8.2kW rated, Selectronic SCERT certified for managed AC coupling, 2×MPPT, 0-1000V DC input, 240V AC / 50Hz output, IP65. Configure for MG50 country code and Night Mode ON. 6 Nr. 0.00
d) Supply and install heavy-duty wall-mounting brackets and back-plates for SP PRO 15kW inverter-charger units (minimum 35kg capacity each). Include all fixings. 3 Nr. 0.00
e) Supply and install wall-mounting brackets and back-plates for Fronius Primo 8.2-1 string inverters. Include all fixings. 6 Nr. 0.00
f) Supply and install solar rapid shutdown system or emergency stop in the event of rooftop fire on the solar panels (NEA compliance) 1 Nr.
g) Supply and install solar panel string 40A 2 pole isolators at the rooftop for maintenance purposes (NEA compliance) 18 Nr.
5 BATTERY ENERGY STORAGE SYSTEM (BESS) 0.00
a) Supply and install LiFePO4 (Lithium Iron Phosphate) battery modules, server-rack format, 5.12kWh / 48V DC nominal per module, with integrated Battery Management System (BMS), IEC 62133-2 and UN 38.3 certified, minimum 3,000 cycles at 80% DoD. Install in 3 racks × 10 modules each = 153.6kWh total. Total installed capacity: 153.6kWh. 30 Nr. 0.00
b) Supply and install battery rack enclosure(s), 19" steel rack or proprietary modular cabinet, UL listed or equivalent, 600mm wide. Configure in 3 racks × 10 modules each = 153.6kWh total. Include all busbars and inter-module DC cables. 3 Nr. 0.00
c) Supply and install battery DC busbar box, 200A rated, insulated copper busbar, IP31 minimum enclosure, with all terminals and cable glands. 1 Nr. 0.00
d) Supply and install 200A 2-pole DC battery circuit breakers (MCCBs), 1000V DC rated, between battery busbar and SP PRO DC terminals. 3 Nr. 0.00
e) Supply and install 150A 1000V DC 2-pole 1000V DC MCCBs at battery rack DC output, 1 per battery rack. 3 Nr. 0.00
f) Supply and install 35mm² flexible two-core DC battery cable, colour coded, with compression lugs and protection sleeves at all terminations. 18 m 0.00
6 AC WIRING, SWITCHGEAR & PROTECTION 0.00
a) Supply and install 75mm² 3-core copper conductor, XLPE insulated, SWA armoured AC power cable from grid/changeover to SP PRO Source terminal. Include brass SWA compression glands at both ends. 20 m 0.00
b) Supply and install 50mm² 3-core copper conductor, XLPE insulated, SWA armoured AC power cable for solar board feed + distribution (2 runs × 20m). Include SWA glands and lugs. 40 m 0.00
c) Supply and install 50mm² 3-core PVC insulated copper cable for Fronius Primo string inverter AC output connections to Solar Power Board. 45 m 0.00
d) Supply and install 40A 2-pole miniature circuit breakers (MCBs), 10kA, DIN-rail mounted, for SP PRO source input protection. 3 Nr. 0.00
e) Supply and install 80A 3P MCB, DIN-rail mounted, as main incoming breaker for Solar Power Board. 2 Nr. 0.00
f) Supply and install 63A 1P 1-pole MCBs for Solar Power Board sub-circuits. 2 Nr. 0.00
g) Supply and install 63A 3-pole MCBs for new Client Distribution Board sub-board (Post Office). 1 Nr.
Supply and install 100A 3-pole MCBs for new Client Distribution Board sub-board (DDA Office & Treasury/Fisheries ). 2 Nr.
h) Supply and install 100A 3-pole MCB, DIN-rail mounted, as main incoming breaker for the new Client Distribution Board. 1 Nr.
i) Supply and install 150A, 24 pole, 3 phase new Client Distribution Board. 1 Nr.
j) Supply and install 150A, 18 pole, 3 phase new Solar Power Board. 1 Nr.
k) Supply and install 63A 2-pole MCBs for Solar Power Board sub-circuits. 2 Nr.
l) Supply and install 40A 2-pole MCBs for Solar Power Board sub-circuits. 3 Nr.
m) Supply and install 40A 2-pole MCBs, Type B, 6kA, for Fronius Primo AC output protection on Solar Power Board. 3 Nr. 0.00
p) Supply and install enclosed motorised 100A rated, 3 pole Automatic Transfer Switch (ATS) for grid and generator changeover, including mechanical and electrical interlocking, rated per system load. 1 Nr. 0.00
q) Supply and install lockable rotary isolator for generator main supply connection, rated current per system. 1 Nr. 0.00
r) Supply and install enclosed revenue-grade digital energy meter and 100A rated, 3 pole main isolator switch for utility grid connection. 1 Set 0.00
s) Supply and install galvanised steel trunking 100×50mm or rigid PVC conduit Ø32/50mm for AC cable routing within power/inverter room, including all fittings. 25 m 0.00
t) Supply and install brass SWA cable glands, compression lugs, heat-shrink sleeving and cable ties for all armoured cable terminations. 1 Set 0.00
7 EARTHING, BONDING & LIGHTNING PROTECTION
a) Supply and install copper-bonded steel earth rods, 16mm diameter × 1.2m long, driven to approved depth with earth rod clamps, test links and removable pit cover. 4 Nr. 0.00
b) Supply and install 16mm² stranded copper earth conductor, green/yellow PVC insulated, connecting all earth electrodes and equipment earthing terminals to main earth bar. 55 m 0.00
c) Supply and install copper earth bar/busbar, 100A rated, wall-mounted on insulators in power room, with all terminal connections. 1 Nr. 0.00
d) Supply and install 6mm² bare stranded copper bonding conductor along all PV array mounting rails, bonding all module frames and rail sections to earth system. 90 m 0.00
e) Supply and install Type I+II combined AC surge protection device (SPD), 50kA rated,AC, DIN-rail mounted at Main Distribution Board incoming, with minimum 6mm² earth conductor to main earth bar. 1 Nr. 0.00
f) Supply and install a complete IEC 62305 LPL III Lightning Protection System, comprising Franklin air terminals, roof supports, copper down conductors, test joints, earth ring and electrodes, inspection pits, bonding to PV structures/main earth, coordinated Type I+II AC/DC SPDs, all accessories, weatherproof making-good 1 LOT 0.00
g) Supply and install a complete IEC 62305 LPL III Lightning Protection System, comprising Franklin air terminals, roof supports, copper down conductors, test joints, earth ring and electrodes, inspection pits, bonding to PV structures/main earth, coordinated Type I+II AC/DC SPDs, all accessories, weatherproof making-good 1 LOT 0.00
8 POWER / BATTERY ROOM FITOUT — CIVIL & MECHANICAL
a) Allow for preparation and cleaning of inverter and battery room including surface preparation, marking out equipment positions, drilling and fixings for wall-mounted equipment. 1 Item 0.00
b) Construct concrete equipment plinths or supply and install steel frame equipment bases, minimum 100mm raised, for battery rack installation. Total 3 No. 3 Nr. 0.00
c) Supply and install perforated galvanised steel cable ladder, 300mm wide, on wall brackets at 600mm centres within power/inverter room. 16 m 0.00
d) Supply and install wireless standalone combination optical smoke and rate-of-rise heat detector with integral 85dB sounder/strobe, 10-year sealed lithium battery, wireless interlink capability, EN 14604 / EN 50291 certified. Ceiling-mounted inside battery room. 1 Nr. 0.00
e) Supply and install wireless standalone combination smoke/heat detector — identical specification to item 7A.1. Positioned at battery room exit/escape route. Wireless interlink: simultaneous alarm with 7A.1. 1 Nr. 0.00
f) Supply and provide replacement 10-year lithium batteries for wireless detectors as per manufacturer specification, for maintenance stock. 2 Set 0.00
g) Supply, install and commission ABC dry powder fire extinguisher, 6kg minimum, EN 3 certified, wall-mounted on bracket. Suitable for Class A, B, C and electrical fires. Suitable for lithium-ion battery environments. Note: CO₂ type NOT permitted in battery rooms. 1 No. inside battery room + 1 No. at exit door. 2 Nr. 0.00
h) Supply and install 300mm diameter axial exhaust fan with thermostat control and louvred intake grille for battery room ventilation and gas dispersion. 1 Set 0.00
i) Supply and install lockable steel security door, 3mm steel sheet construction, with deadbolt lock and padlock provision. 1 Nr. 0.00
j) Supply and install. LED light fittings, 20W, 240V, IP44 minimum, switched at door, within power/battery room. 1 Nr. 0.00
k) Supply and install warning and safety signs on vinyl self-adhesive labels: Electrical Hazard, Lithium-Ion Battery Hazard, No Smoking, No CO₂ Extinguisher. Minimum 200×150mm each. 1 Set 0.00
l) Supply and install high-performance calcium silicate boards to internal faces of walls and ceilings (Approximate Area of 128sm) in Battery and Inverter Storage Rooms to achieve the required Fire Resistance Level (FRL) in strict accordance with the manufacturer's specifications and PNG National Building Code requirements. Rate shall include for all fixing to timber or metal studs/furring channels (measured separately); Flushed joints, skimming, taping, and sanding ready for painting;Sealing of all joint perimeters with approved fire-retardant mastic/sealant. 1 Item 0.00
9 TESTING, COMMISSIONING & DOCUMENTATION
a) Allow for complete system commissioning of SP PRO inverter-charger(s) and Fronius Primo string inverter(s) using Selectronic SP LINK software (v9.1 or later). Include: Site Configuration Wizard, RS485/Solar Net communications verification, DNO Editor setup on Fronius Master, SCERT coupling ratio check, ATS changeover testing, fire detection test. 3 Day 0.00
b) Allow for Fronius Datamanager 2.0 monitoring portal setup (Fronius Solar.web), including WLAN/LAN connection, system entry (PV[Wp], array details) and provision of login credentials and system name to Employer. 1 Item 0.00
c) Allow for battery capacity test and BMS commissioning: full charge-discharge cycle, BMS cell balancing verification and SOC calibration. 1 Item 0.00
d) Allow for ATS and generator changeover testing: simulate grid failure, verify generator start and load transfer time, test manual override. 1 Item 0.00
e) Allow for complete electrical installation testing and certification including: insulation resistance test (all DC strings at 500V DC), polarity verification, DC open-circuit voltage measurement per string, AC insulation resistance and continuity tests, earth electrode resistance measurement (≤5Ω), per IEE/BS 7671. 1 Item 0.00
f) Supply three (3) hard copies and one (1) digital copy of as-built drawings and commissioning report including: updated SLD, string layout, cable schedule, SP LINK configuration file backup, all test results with measured values. 1 Item 0.00
g) Allow for half-day operation and maintenance (O&M) training for client's site personnel covering: SP PRO daily operation, Fronius monitoring, battery health checks, fire safety, emergency procedures and routine maintenance schedule. 0.5 Day 0.00
10 RETROFITTING WORKS 0.00
Supply, deliver and install the following materials: The contractor should ensure that storage is properly done on site while awaiting installation
a) Aluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets 10 Nr. 0.00
b) 3mm thick sheet 4 Nr. 0.00
c) 100x50mm Hardwood Timber 60 m 0.00
TOTAL FOR DDA-SOLAR PV HYBRID SYSTEM INSTALLATION CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED RENEWABLE ENERGY INTERVENTIONS FOR RABARABA MILNE BAY PROJECT, PAPUA NEW GUINEA (PNG).
ITEM DESCRIPTION QNTY UNIT RATE (USD) AMOUNT (USD)
BILL NO.5 HEALTH CENTRE-SOLAR PV HYBRID SYSTEM INSTALLATION
NOTE: TRADE NAMES
Where Trade Names are mentioned below, it is intended to indicate the level of quality required. The tenderer MAY supply alternatives which must be approved in writing by the Employer. Note
1 GENERAL ITEMS
a) Allow for the preparation of all Working drawings 3 Set 0.00
b) Allow for the preparation of a set of Test and deliver Plan ( ITP) sheets for each equipment, i.e BESS, inverters, Solar PV, ATS, Distribution Board, Earthing, Megger, Circuit Breakers, Inverters, Solar PV cells and BESS. 1 Set
c) Allow for the preparation of all "As Built" drawings after testing and commissioning 3 Set 0.00
d) The Tenderer is to describe hereunder inserting any relevant clause number, any other works, obligations or items that may be referred to in the Conditions of Contract, Specification, Drawings or Data Schedule in respect of the works for which he desires to enter a separate charge( this charge is to be entered in the Amount column). If no charge is entered hereunder, rates and amounts elsewhere in the schedule of prices shall be deemed to cover all expenses for such works, obligations or items. 1 Sum 0.00
e) Allow for point to point checking, testing and commissioning of the entire electrical installation works 1 Sum 0.00
2 SOLAR PV PANELS & MOUNTING STRUCTURE
Note: The Contractor is to provide detailed solar PV mounting shop drawings and structural details for review and approval prior to installation. The proposed mounting system shall be compatible with the existing roof construction, safely distribute loads to the supporting roof members, and be designed to resist the specified wind uplift forces.
a) Transport from site store and install solar photovoltaic (PV) modules — Phono Solar PS275P-20/U, 275 W polycrystalline, Voc=38.68V, Isc=9.17V, Vmpp=31.79V, frame anodised aluminium, IP67 MC4-compatible connectors, IEC 61215 & IEC 61730 certified. Installed to roof in 8 strings × 11 panels each (Voc=425.5V ≤1000V DC ✓). All Voc values ≤1000V DC verified. 88 Nr. 0.00
b) Supply and install complete roof mounting rail system for PV array; anodised aluminium L-foot brackets and rail profile, mid-clamps, end-clamps, module-level bonding clips, stainless steel fasteners and all necessary fixings suitable for corrugated metal roof. Wind-rated to minimum 50 m/s. Include anti-galvanic separation as required. 1 Sum 0.00
c) Supply and install anodised aluminium mounting rail profile 40×40mm, 3m lengths, including all splices, joints and accessories. 100 m 0.00
d) Supply and install panel mid-clamps, universal aluminium type rated for 275W module frame. 70 Nr. 0.00
e) Supply and install panel end-clamps, universal aluminium type. 34 Nr. 0.00
f) Supply and install roof hooks or chemical anchor bolt assemblies, stainless steel, fixed through roof corrugation crests to purlins. Include sealing washers and UV sealant. 68 Nr. 0.00
g) Supply and install module-to-rail earthing/bonding clips, stainless steel or aluminium, providing electrical continuity between module frames and mounting rails. 88 Nr. 0.00
3 DC WIRING & PROTECTION
a) Supply and install 4mm² twin-core UV-stabilised solar DC cable (red positive, black negative), TUV 2 Pfg 1169 / EN 50618, rated 1000V DC, temperature -40°C to +90°C. Run in UV-rated rigid PVC conduit Ø32mm on roof. Allow 400m single-core total (8 strings × 11 panels each (Voc=425.5V ≤1000V DC ✓)). 400 m 0.00
b) Supply and install MC4-compatible connector pairs (male + female), IP67, rated 1000V DC / 30A, crimped type. 38 Pairs 0.00
c) Supply and install 20A 1000V DC string protection circuit breakers, DIN-rail mounted, 1 per DC string. 8 Nr. 0.00
d) Supply and install Type II 1000V DC surge protection devices (SPD), 40kA rated, DIN-rail mounted in Solar Power Board; 1 per string inverter. 6 Nr. 0.00
e) Supply and install DC Solar Power Board lockable enclosure, IP65 minimum, including DIN rail, copper busbar, terminal blocks, cable glands and all accessories for DC string terminations and protection. 1 Nr. 0.00
f) Supply and install UV-rated rigid PVC conduit Ø32mm or stainless steel cable tray 50×50mm on roof for DC string cable routing, including all clips, saddles and fixings. 20 m 0.00
g) Supply and install stainless steel cable tray support brackets at 2m maximum centres on roof structure. 12 Nr. 0.00
4 INVERTER-CHARGERS & STRING INVERTERS 0.00
a) Transport from site store and install Selectronic SP PRO SPMC482 7.7kW / 48V DC inverter-charger units (Selectronic SCERT certified), wall-mounted in power room. Each unit operates independently — no Manager/Worker hierarchy. Include SP LINK commissioning software configuration. 2 Nr. 0.00
b) Supply and install Selectronic AC Coupled Interface PCA (Selectronic Part No. 005227), RS485 interface board for Fronius SCERT managed AC coupling. Install 1 per SP PRO unit. 2 Nr. 0.00
c) Transport from site store and install Fronius Primo 8.2-1 single-phase string inverters, 8.2kW rated, Selectronic SCERT certified for managed AC coupling, 2×MPPT, 0-1000V DC input, 240V AC / 50Hz output, IP65. Configure for MG50 country code and Night Mode ON. 2 Nr. 0.00
d) Supply and install heavy-duty wall-mounting brackets and back-plates for SP PRO 7.7kW inverter-charger units (minimum 35kg capacity each). Include all fixings. 2 Nr. 0.00
e) Supply and install wall-mounting brackets and back-plates for Fronius Primo 8.2-1 string inverters. Include all fixings. 2 Nr. 0.00
f) Supply and install solar rapid shutdown system or emergency stop in the event of rooftop fire on the solar panels (NEA compliance) 1 Nr.
g) Supply and install solar panel string 32A 2 pole isolators at the rooftop for maintenance purposes (NEA compliance) 6 Nr.
5 BATTERY ENERGY STORAGE SYSTEM (BESS) 0.00
a) Supply and install LiFePO4 (Lithium Iron Phosphate) battery modules, server-rack format, 5.12kWh / 48V DC nominal per module, with integrated Battery Management System (BMS), IEC 62133-2 and UN 38.3 certified, minimum 3,000 cycles at 80% DoD. Install in 1 rack × 10 modules = 51.2kWh total. Total installed capacity: 51.2kWh. 10 Nr. 0.00
b) Supply and install battery rack enclosure(s), 19" steel rack or proprietary modular cabinet, UL listed or equivalent, 600mm wide. Configure in 1 rack × 10 modules = 51.2kWh total. Include all busbars and inter-module DC cables. 1 Nr. 0.00
c) Supply and install battery DC busbar box, 250A rated, insulated copper busbar, IP31 minimum enclosure, with all terminals and cable glands. 1 Nr. 0.00
d) Supply and install 150A 2-pole DC battery circuit breakers (MCCBs), 1000V DC rated, between battery busbar and SP PRO DC terminals. 2 Nr. 0.00
e) Supply and install 100A 1000V DC 2-pole 1000V DC MCCBs at battery rack DC output, 1 per battery rack. 1 Nr. 0.00
f) Supply and install 35mm² flexible two-core DC battery cable, colour coded, with compression lugs and protection sleeves at all terminations. 6 m 0.00
6 AC WIRING, SWITCHGEAR & PROTECTION 0.00
a) Supply and install 25mm² 3-core copper conductor, XLPE insulated, SWA armoured AC power cable from grid/changeover to SP PRO Source terminal. Include brass SWA compression glands at both ends. 15 m 0.00
b) Supply and install 10mm² 3-core copper conductor, XLPE insulated, SWA armoured AC power cable for SP PRO output + distribution (2 runs × 15m). Include SWA glands and lugs. 30 m 0.00
c) Supply and install 10mm² 4-core PVC insulated copper cable for Fronius Primo string inverter AC output connections to Solar Power Board. 15 m 0.00
d) Supply and install 32A 2-pole miniature circuit breakers (MCBs), 10kA, DIN-rail mounted, for SP PRO source input protection. 2 Nr. 0.00
e) Supply and install 63A 2P 2-pole MCB, DIN-rail mounted, as main incoming breaker for Solar Power Board. 1 Nr. 0.00
f) Supply and install 40A 2P 2-pole MCBs for Solar Power Board sub-circuits. 2 Nr. 0.00
g) Supply and install 32A 2-pole MCBs, Type B, 6kA, for Fronius Primo AC output protection on Solar Power Board. 2 Nr. 0.00
h) Supply and install 100A, 3-pole MCB, DIN-rail mounted, as main incoming breaker for Client Distribution Panel main incoming, rated per site load schedule. 1 Nr. 0.00
i) Supply and install 100A enclosed motorised Automatic Transfer Switch (ATS) for grid and generator changeover, including mechanical and electrical interlocking, rated per system load. 1 Nr. 0.00
j) Supply and install enclosed 100A Manual Transfer Switch (ATS) for generator and solar PV changeover, including mechanical and electrical interlocking, rated per system load. 1 Nr.
k) Supply and install enclosed lockable rotary isolator for generator main supply connection, rated current per system. 1 Nr. 0.00
l) Supply and install revenue-grade digital energy meter and enclosed main isolator switch for utility grid connection. 1 Set 0.00
m) Supply and install brass SWA cable glands, compression lugs, heat-shrink sleeving and cable ties for all armoured cable terminations. 25 m 0.00
n) Supply and install 63A 3P 3-pole MCBs for new Client Distribution Board sub-board within the Ward building. 2 Nr. 0.00
o) Supply and install 32A 1P 2-pole MCBs for new Client Distribution Board sub-board (supply water pump ). 1 Nr.
p) Supply and install 150A, 24 pole, 3 phase new Client Distribution Board. 1 Nr.
q) Supply and install 100A, 18 pole, 3 phase new Solar Power Board. 1 Nr.
7 EARTHING, BONDING & LIGHTNING PROTECTION
a) Supply and install copper-bonded steel earth rods, 16mm diameter × 1.2m long, driven to approved depth with earth rod clamps and test links and removable pit cover. 3 Nr. 0.00
b) Supply and install 16mm² stranded copper earth conductor, green/yellow PVC insulated, connecting all earth electrodes and equipment earthing terminals to main earth bar. 35 m 0.00
c) Supply and install copper earth bar/busbar, 100A rated, wall-mounted on insulators in power room, with all terminal connections. 1 Nr. 0.00
d) Supply and install 6mm² bare stranded copper bonding conductor along all PV array mounting rails, bonding all module frames and rail sections to earth system. 50 m 0.00
e) Supply and install Type I+II combined AC surge protection device (SPD), 50kA rated,AC, DIN-rail mounted at Main Distribution Board incoming, with minimum 6mm² earth conductor to main earth bar. 1 Nr. 0.00
Supply and install a complete IEC 62305 LPL III Lightning Protection System, comprising Franklin air terminals, roof supports, copper down conductors, test joints, earth ring and electrodes, inspection pits, bonding to PV structures/main earth, coordinated Type I+II AC/DC SPDs, all accessories, weatherproof making-good 1 LOT -
8 POWER / BATTERY ROOM FITOUT — CIVIL & MECHANICAL
a) Allow for preparation and cleaning of inverter and battery room including surface preparation, marking out equipment positions, drilling and fixings for wall-mounted equipment. 1 Item 0.00
b) Construct concrete equipment plinths or supply and install steel frame equipment bases, minimum 100mm raised, for battery rack installation. 1 Nr. 0.00
c) Supply and install perforated galvanised steel cable ladder, 300mm wide, on wall brackets at 600mm centres within power/inverter room. 10 m 0.00
d) Supply and install wireless standalone combination optical smoke and rate-of-rise heat detector with integral 85dB sounder/strobe, 10-year sealed lithium battery, wireless interlink capability, EN 14604 / EN 50291 certified. Ceiling-mounted inside battery room. 1 Nr. 0.00
e) Supply and install wireless standalone combination smoke/heat detector — identical specification to item 7A.1. Positioned at battery room exit/escape route. Wireless interlink: simultaneous alarm with 7A.1. 1 Nr. 0.00
f) Supply and provide replacement 10-year lithium batteries for wireless detectors as per manufacturer specification, for maintenance stock. 2 Set 0.00
g) Supply and install ABC dry powder fire extinguisher, 6kg minimum, EN 3 certified, wall-mounted on bracket. Suitable for Class A, B, C and electrical fires. Suitable for lithium-ion battery environments. Note: CO₂ type NOT permitted in battery rooms. 1 No. inside battery room + 1 No. at exit door. 2 Nr. 0.00
h) Supply and install 300mm diameter axial exhaust fan with thermostat control and louvred intake grille for battery room ventilation and gas dispersion. 1 Set 0.00
i) Supply and install lockable steel security door, 3mm steel sheet construction, with deadbolt lock and padlock provision. 1 Nr. 0.00
j) Supply and install 2 No. LED light fittings, 20W, 240V, IP44 minimum, switched at door, within power/battery room. 1 Set 0.00
k) Supply and install warning and safety signs on vinyl self-adhesive labels: Electrical Hazard, Lithium-Ion Battery Hazard, No Smoking, No CO₂ Extinguisher. Minimum 200×150mm each. 1 Set 0.00
l) Supply and install high-performance calcium silicate boards to internal faces of walls and ceilings (Approximate Area of 58sm) in Battery and Inverter Storage Rooms to achieve the required Fire Resistance Level (FRL) in strict accordance with the manufacturer's specifications and PNG National Building Code requirements. Rate shall include for all fixing to timber or metal studs/furring channels (measured separately); Flushed joints, skimming, taping, and sanding ready for painting;Sealing of all joint perimeters with approved fire-retardant mastic/sealant. 1 Item 0.00
9 TESTING, COMMISSIONING & DOCUMENTATION
a) Allow for complete system commissioning of SP PRO inverter-charger(s) and Fronius Primo string inverter(s) using Selectronic SP LINK software (v9.1 or later). Include: Site Configuration Wizard, RS485/Solar Net communications verification, DNO Editor setup on Fronius Master, SCERT coupling ratio check, ATS changeover testing, fire detection test. 3 Day 0.00
b) Allow for Fronius Datamanager 2.0 monitoring portal setup (Fronius Solar.web), including WLAN/LAN connection, system entry (PV[Wp], array details) and provision of login credentials and system name to Employer 1 Item 0.00
c) Allow for battery capacity test and BMS commissioning: full charge-discharge cycle, BMS cell balancing verification and SOC calibration. 1 Item 0.00
d) Allow for ATS and generator changeover testing: simulate grid failure, verify generator start and load transfer time, test manual override. 1 Item 0.00
e) Allow for complete electrical installation testing and certification including: insulation resistance test (all DC strings at 500V DC), polarity verification, DC open-circuit voltage measurement per string, AC insulation resistance and continuity tests, earth electrode resistance measurement (≤5Ω), per IEE/BS 7671. 1 Item 0.00
f) Supply three (3) hard copies and one (1) digital copy of as-built drawings and commissioning report including: updated SLD, string layout, cable schedule, SP LINK configuration file backup, all test results with measured values. 1 Item 0.00
g) Allow for half-day operation and maintenance (O&M) training for client's site personnel covering: SP PRO daily operation, Fronius monitoring, battery health checks, fire safety, emergency procedures and routine maintenance schedule. 0.5 Day 0.00
10 GENERATOR INSTALLATION WORKS 0.00
a) Standby 7.5 kVA Generator connection works — supply materials and tools, install and connect standby generator, ATS connection, generator main isolator, fuel system to the generator supplied by the Employer. 1 Item 0.00
b) Transport from site store and install the standby 7.5kW, 1 phase standby generator 1 Nr.
11 RETROFITTING WORKS 0.00
Supply, deliver and install the following materials: The contractor should ensure that storage is properly done on site while awaiting installation
a) Aluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets 10 Nr. 0.00
b) 3mm thick sheet 6 Nr. 0.00
c) 100x50mm Hardwood Timber 60 m 0.00
TOTAL FOR HEALTH CENTRE-SOLAR PV HYBRID SYSTEM INSTALLATION CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED RENEWABLE ENERGY INTERVENTIONS FOR RABARABA MILNE BAY PROJECT, PAPUA NEW GUINEA (PNG).
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO.6 HEALTH CENTRE-GENERATOR SHED
All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS
a) Clear the site of all shrubs, bushes, small trees and debris; remove from site as directed [Approximate area: 63 m2 for Building footprint and 50% allowance] 1 Item 0.00
Oversite excavations
b) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Building footprint only] 43 m2 0.00
c) Excavate in soft material for foundation trenches; 0-1.50m deep 19 m3 0.00
d) Excavate in soft material for column bases; 0-1.50m deep 24 m3 0.00
e) Return, fill in and ram selected excavated material around foundations 31 m3 0.00
Disposal of Surplus spoil
f) Load and cart away surplus excavated material from site to an approved dumping site 12 m3 0.00
Selected filling
g) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep 33 m2 0.00
h) 50mm Thick granular/gravel blinding to surfaces of hardcore; as per structural drawing's specifications 33 m2 0.00
Anti-termite treatment
i) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to granular/gravel surfaces 33 m2 0.00
TOTAL FOR SITE PREPARATION, EXCAVATIONS & EARTHWORKS CARRIED TO BILL SUMMARY 0.00
2) CONCRETE WORKS
Lean concrete class C16/20 (mix 1:2:4)
a) 50mm Thick blinding under strip foundation 11 m2 0.00
b) 50mm Thick blinding under column bases 14 m2 0.00
c) 50mm Thick blinding under ground floor slab 33 m2 0.00
Insitu concrete class C20/25, vibrated and reinforced as described, in:-
d) Foundation strip 2 m3 0.00
e) Column bases 3 m3 0.00
f) Stub columns 1 m3 0.00
g) Ground Beams 1 m3 0.00
h) Ground floor slab [100mm thick ], finished smooth 2.5 m3 0.00
i) Generator and fuel tank plinths [250mm thick ], finished smooth 2.5 m3 0.00
j) Ring Beam & Columns above ground floor slab 0.5 m3 0.00
Damp proof membrane
k) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) 33 m2 0.00
TOTAL FOR CONCRETE WORKS CARRIED TO BILL SUMMARY 0.00
3) STEEL REINFORCEMENT (PROVISIONAL)
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 8mm Diameter bars 247 kg 0.00
b) 12mm Diameter bars 368 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
c) Fabric mesh reinforcement to ground floor bed 33 m2 0.00
d) Ditto: 2 layers to generator plinth and fuel tank plinths 10 m2 0.00
TOTAL FOR STEEL REINFORCEMENT CARRIED TO BILL SUMMARY 0.00
4) SHUTTERING & FORMWORK
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 7 m² 0.00
b) Vertical sides of column bases 11 m² 0.00
c) Vertical sides of stub columns 13 m² 0.00
d) Edges of ground beams 6 m² 0.00
e) Edges of the ground floor slab, 100mm girth 23 m 0.00
f) Edges of the generator and fuel tank plinth, 150mm girth 19 m 0.00
g) Vertical sides of columns above ground floor slab 5 m² 0.00
h) Soffites and sides of ring beam 2 m² 0.00
TOTAL FOR SHUTTERING & FORMWORK CARRIED TO BILL SUMMARY 0.00
5) JOINERY & TIMBER WORKS
1. Rate for Timber sections shall include all necessary drilling of holes, bolting, cleats and other necessary connections that are not separately itemized for pricing Note
2. The Contractor shall provide shop drawings for approval. Once approved, the drawings shall be strictly adhered to during the fabrication and installation process. Note
3. The Contractor shall provide documentation verifying treatment type, retention levels, and compliance. Note
I Timber framework
Columns, rafters etc.
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
Supply and fix the following; bolted/screwed connections, including hoisting and fixing into place; priming surface with wood primer before erection; finished with 2 coats polyurethane varnish on completion; all as per Structural Drawings
a) 100 x 60 x 10mm Thick base plate with 4no. 14mm dia pre-drilled holes to receive 12mm dia J bolts: fixed to stub column bases (stub column bases measured separately) 8 Nr 0.00
b) 2/10mm Stiffener plate welded to base plates as per details (Plates measured separately) 8 Nr 0.00
c) 150x50mm Timber Column, encased in concrete column(m.s), secured with a threaded end or steel plate anchored in the timber column 23 m 0.00
d) 75x100mm Timber bracings bolted/srewed/nailed to timber columns (m.s) 20 m 0.00
e) 75x100mm Timber stiffeners bolted/screwed/nailed to timber columns (m.s) 20 m 0.00
f) 75x100mm Timber tie beams bolted/srewed/nailed to top of timber columns (m.s) 22 m 0.00
g) 50x150mm Timber truss rafters, bolted/srewed/nailed to top of timber tie beams/Truss tie (m.s) 47 m 0.00
h) 50x100mm Timber truss internal members, bolted/srewed/nailed to timber rafters/ truss tie (m.s) 42 m 0.00
i) 50x150mm Timber truss tie beams bolted/srewed/nailed to top of timber columns (m.s) 35 m 0.00
j) 50x50mm Timber purlins fixed to rafters (m.s) 63 m 0.00
Softwood timber
k) 250x20mm Thick One-side wrot fascia and barge board 28 m 0.00
II Timber doors
The following in timber doors as per the details provided
Door Frames, architraves and beads
a) Ex 150x50mm hardwood frame rebated 11 m 0.00
Supply and fix the following timber door comprising; Hardwoord timber frame all around, diagonal timber strips both ways, timber wood panel at the middle to hold the lock: refer to architectural drawings for further details. All to Employer's Representative approval
b) Double leaf door size 1800x1800mm high 2 Nr 0.00
Supply and fix the following ironmongery with screws to match
c) Heavy duty natural aluminium hinges approved from samples 12 Nr 0.00
d) 12mm diameter slide bolt,300mm long with hasp and staple 2 Nr 0.00
Painting and Decorating
Aluminum wood primer
e) Back of wood frames over 100mm but not exceeding 200mm girth 11 m 0.00
Prepare and apply clear matt varnish to timber doors
f) Ditto over 100mm not exceeding 200mm girth 11 m 0.00
g) General surfaces of doors 13 m2 0.00
TOTAL FOR JOINERY & TIMBER WORKS CARRIED TO BILL SUMMARY 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide for the change over panel wall 3 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 26 m2 0.00
c) 200mm walling for change over panels 7 m2 0.00
d) 200mm walling Thick bund walling 5 m2 0.00
e) 150mm walling Thick bund walling around the generator and fuel tank plinths 5 m2 0.00
Expansion Joints
f) 12mm Flexcell or equal and approved expansion 1 m2 0.00
g) 25 x 25mm approved joint sealer 10 m 0.00
Precast Concrete units [PCC] class 25/20: Vibrated; reinforced for handling: fair faced finish on all exposed faces: bedded, jointed and pointed in Cement mortar (1:3)
h) 250mm wide x 50mm thick Coping, twice weathered and throated 11 m 0.00
i) Supply and fix 1500mm high galvanized heavy duty chain-link nailed,screwed/bolted to timber supports (Measured separately) 16 m 0.00
TOTAL FOR BLOCKWORK CARRIED TO BILL SUMMARY 0.00
7) ROOF COVERING & RAINWATER GOODS
a) Supply and FixAluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets or approved equivalent; fixed to timber purlins (m.s) using manufacturer's proprietary bolts 45 m2 0.00
Rainwater goods
Supply and install the following sheerline colorbond rain water goods
Rate to be inclusive of matching color accessories, cast angles, silicone sealants, rivets all to manufacturers specifications and to Employer's Representative approval
b) Supply and install sheerline colorbond gutter fixed to fascia (m.s) with and including spring clips at 1200mm centres [Rate to include gutter stop ends]. The gutter to have a micro-mesh leaf guards 13 m 0.00
c) Extra over downpipe; for gutter outlet 4 Nr 0.00
d) 75 mm Diameter sheer line colorbond rainwater down pipe; holder bats at 1500mm (maximum) centers including all fittings 12 m 0.00
e) Extra over ditto for swan neck 1200mm projection. 4 Nr 0.00
f) Ditto for shoe. 4 Nr 0.00
g) Extra over gutter for stopped ends. 4 Nr 0.00
TOTAL FOR ROOF COVERING & RAINWATER GOODS CARRIED TO BILL SUMMARY 0.00
Note: Contractor to provide all samples for approval before incorporation into the final works.
15mm Cement and sand (1:3) render on block wall or concrete work to:-
a) Bund wall around the building including the edges of floor slab 16 m2 0.00
b) Bund wall around the generator and fuel tank plinths 9 m2 0.00
c) Coping 4 m2 0.00
d) Change over panel wall 19 m2 0.00
Sand surfaces and fill uneven surfaces with stucco filler paste; Prepare and apply two undercoats of plastic emulsion paint and two finishing coats external quality paint as "Permaplast" manufactured by Crown paints or other equal and approved:-
e) All the plastered walls 48 m2 0.00
TOTAL FOR FINISHES CARRIED TO BILL SUMMARY 0.00
HEALTH CENTRE-GENERATOR SHED
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS 0.00
2) CONCRETE WORKS 0.00
3) STEEL REINFORCEMENT (PROVISIONAL) 0.00
4) SHUTTERING & FORMWORK 0.00
5) JOINERY & TIMBER WORKS 0.00
6) BLOCKWORK 0.00
7) ROOF COVERING & RAINWATER GOODS 0.00
8) FINISHES 0.00
TOTAL FOR BILL NO. 6- HEALTH CENTRE GENERATOR SHED- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED RENEWABLE ENERGY INTERVENTIONS FOR RABARABA MILNE BAY PROJECT, PAPUA NEW GUINEA (PNG).
ITEM DESCRIPTION QNTY UNIT RATE (USD) AMOUNT (USD)
BILL NO.7 LLG OFFICE-SOLAR PV HYBRID SYSTEM INSTALLATION
NOTE: TRADE NAMES
Where Trade Names are mentioned below, it is intended to indicate the level of quality required. The tenderer MAY supply alternatives which must be approved in writing by the Employer Note
1 GENERAL ITEMS
a) Allow for the preparation of all Working drawings 3 Set 0.00
b) Allow for the preparation of a set of Test and Inpection Plan ( ITP) sheets for each equipment, i.e BESS, inverters, Solar PV, ATS, Distribution Board, Earthing, Megger, Circuit Breakers, Inverters, Solar PV cells and BESS. 1 Set
c) Allow for the preparation of all "As Built" drawings after testing and commissioning 3 Set 0.00
d) The Tenderer is to describe hereunder inserting any relevant clause number, any other works, obligations or items that may be referred to in the Conditions of Contract, Specification, Drawings or Data Schedule in respect of the works for which he desires to enter a separate charge( this charge is to be entered in the Amount column). If no charge is entered hereunder, rates and amounts elsewhere in the schedule of prices shall be deemed to cover all expenses for such works, obligations or items. 1 Sum 0.00
d) Allow for point to point checking, testing and commissioning of the entire electrical installation works 1 Sum 0.00
2 SOLAR PV PANELS & MOUNTING STRUCTURE
Note: The Contractor is to provide detailed solar PV mounting shop drawings and structural details for review and approval prior to installation. The proposed mounting system shall be compatible with the existing roof construction, safely distribute loads to the supporting roof members, and be designed to resist the specified wind uplift forces.
a) Transport from site store and install solar photovoltaic (PV) modules — Phono Solar PS275P-20/U, 275 W polycrystalline, Voc=38.68V, Isc=9.17V, Vmpp=31.79V, frame anodised aluminium, IP67 MC4-compatible connectors, IEC 61215 & IEC 61730 certified. Installed to roof in 4 strings × 11 panels each (Voc=425.5V ≤1000V DC ✓). All Voc values ≤1000V DC verified. 44 Nr. 0.00
b) Supply and install complete roof mounting rail system for PV array; anodised aluminium L-foot brackets and rail profile, mid-clamps, end-clamps, module-level bonding clips, stainless steel fasteners and all necessary fixings suitable for corrugated metal roof. Wind-rated to minimum 50 m/s. Include anti-galvanic separation as required. 1 Sum 0.00
c) Supply and install anodised aluminium mounting rail profile 40×40mm, 3m lengths, including all splices, joints and accessories. 55 m 0.00
d) Supply and install panel mid-clamps, universal aluminium type rated for 275W module frame. 36 Nr. 0.00
e) Supply and install panel end-clamps, universal aluminium type. 18 Nr. 0.00
f) Supply and install roof hooks or chemical anchor bolt assemblies, stainless steel, fixed through roof corrugation crests to purlins. Include sealing washers and UV sealant. 36 Nr. 0.00
g) Supply and install module-to-rail earthing/bonding clips, stainless steel or aluminium, providing electrical continuity between module frames and mounting rails. 44 Nr. 0.00
3 DC WIRING & PROTECTION
a) Supply and install 4mm² twin-core UV-stabilised solar DC cable (red positive, black negative), TUV 2 Pfg 1169 / EN 50618, rated 1000V DC, temperature -40°C to +90°C. Run in UV-rated rigid PVC conduit Ø32mm on roof. Allow 160m single-core total (4 strings × 11 panels each (Voc=425.5V ≤1000V DC ✓)). 160 m 0.00
b) Supply and install MC4-compatible connector pairs (male + female), IP67, rated 1000V DC / 30A, crimped type. Include 20 pairs with 20% spare. 20 Pairs 0.00
c) Supply and install 20A 1000V DC string protection circuit breakers, DIN-rail mounted, 1 per DC string. 4 Nr. 0.00
d) Supply and install Type II 1000V DC surge protection devices (SPD), 40kA rated, DIN-rail mounted in Solar Power Board; 1 per string inverter. 1 Nr. 0.00
e) Supply and install DC Solar Power Board lockable enclosure, IP65 minimum, including DIN rail, copper busbar, terminal blocks, cable glands and all accessories for DC string terminations and protection. 1 Nr. 0.00
f) Supply and install UV-rated rigid PVC conduit Ø32mm or stainless steel cable tray 50×50mm on roof for DC string cable routing, including all clips, saddles and fixings. Allow 15m. 15 m 0.00
g) Supply and install stainless steel cable tray support brackets at 2m maximum centres on roof structure. 10 Nr. 0.00
4 INVERTER-CHARGERS & STRING INVERTERS 0.00
a) Transport from site store and install Selectronic SP PRO SPMC482 7.7kW / 48V DC inverter-charger units (Selectronic SCERT certified), wall-mounted in power room. Each unit operates independently — no Manager/Worker hierarchy. Include SP LINK commissioning software configuration. 1 Nr. 0.00
b) Supply and install Selectronic AC Coupled Interface PCA (Selectronic Part No. 005227), RS485 interface board for Fronius SCERT managed AC coupling. Install 1 per SP PRO unit. 1 Nr. 0.00
c) Transport from site store and install Fronius Primo 8.2-1 single-phase string inverters, 8.2kW rated, Selectronic SCERT certified for managed AC coupling, 2×MPPT, 0-1000V DC input, 240V AC / 50Hz output, IP65. Configure for MG50 country code and Night Mode ON. 1 Nr. 0.00
d) Supply and install heavy-duty wall-mounting brackets and back-plates for SP PRO 7.7kW inverter-charger units (minimum 35kg capacity each). Include all fixings. 1 Nr. 0.00
e) Supply and install wall-mounting brackets and back-plates for Fronius Primo 8.2-1 string inverters. Include all fixings. 1 Nr. 0.00
f) Supply and install solar rapid shutdown system or emergency stop in the event of rooftop fire on the solar panels (NEA compliance) 1 Nr.
g) Supply and install solar panel string 32A 2 pole isolators at the rooftop for maintenance purposes (NEA compliance) 3 Nr.
5 BATTERY ENERGY STORAGE SYSTEM (BESS) 0.00
a) Supply and install LiFePO4 (Lithium Iron Phosphate) battery modules, server-rack format, 5.12kWh / 48V DC nominal per module, with integrated Battery Management System (BMS), IEC 62133-2 and UN 38.3 certified, minimum 3,000 cycles at 80% DoD. Install in 1 rack × 6 modules = 30.72kWh total. Total installed capacity: 30.72kWh. 6 Nr. 0.00
b) Supply and install battery rack enclosure(s), 19" steel rack or proprietary modular cabinet, UL listed or equivalent, 600mm wide. Configure in 1 rack × 6 modules = 30.72kWh total. Include all busbars and inter-module DC cables. 1 Nr. 0.00
c) Supply and install battery DC busbar box, 200A rated, insulated copper busbar, IP31 minimum enclosure, with all terminals and cable glands. 1 Nr. 0.00
d) Supply and install 125A 2-pole DC battery circuit breakers (MCCBs), 1000V DC rated, between battery busbar and SP PRO DC terminals. Total 1 No. 1 Nr. 0.00
e) Supply and install 100A 1000V DC 2-pole 1000V DC MCCBs at battery rack DC output, 1 per battery rack. 1 Nr. 0.00
f) Supply and install 35mm² flexible two-core DC battery cable, colour coded, with compression lugs and protection sleeves at all terminations. 6 m 0.00
6 AC WIRING, SWITCHGEAR & PROTECTION 0.00
a) Supply and install 16mm² 2-core copper conductor, XLPE insulated, SWA armoured AC power cable from grid/changeover to SP PRO Source terminal. Include brass SWA compression glands at both ends. 12 m 0.00
b) Supply and install 6mm² 2-core copper conductor, XLPE insulated, SWA armoured AC power cable for SP PRO output to distribution panel (12m). Include SWA glands and lugs. 12 m 0.00
c) Supply and install 6mm² 2-core PVC insulated copper cable for Fronius Primo string inverter AC output connections to Solar Power Board. Allow 8m total. 8 m 0.00
d) Supply and install 40A 2-pole miniature circuit breakers (MCBs), 10kA, DIN-rail mounted, for SP PRO source input protection. 1 Nr. 0.00
e) Supply and install 40A 2-pole MCB, DIN-rail mounted, as main incoming breaker for Solar Power Board. 1 Nr. 0.00
f) Supply and install 40A 2-pole MCBs for Solar Power Board sub-circuits. 1 Nr. 0.00
g) Supply and install 40A 2-pole MCBs, Type B, 6kA, for Fronius Primo AC output protection on Solar Power Board. 1 Nr. 0.00
h) Supply and install 63A 2-pole MCB, DIN-rail mounted, as main for Client Distribution Panel main incoming, rated per site load schedule. 1 Nr. 0.00
i) Supply and install enclosed motorised Automatic Transfer Switch (ATS) for grid and generator changeover, including mechanical and electrical interlocking, rated per system load. 1 Nr. 0.00
g) Supply and install enclosed lockable rotary isolator for generator main supply connection, rated current per system. 1 Nr. 0.00
j) Supply and install revenue-grade digital energy meter and an enclosed main isolator switch for utility grid connection. 1 Set 0.00
g) Supply and install galvanised steel trunking 100×50mm or rigid PVC conduit Ø32/50mm for AC cable routing within power/inverter room, including all fittings. 25 m 0.00
l) Supply and install brass SWA cable glands, compression lugs, heat-shrink sleeving and cable ties for all armoured cable terminations. 1 Set 0.00
m) Supply and install 16A 2-pole MCBs for new Client Distribution Board sub-board (power points) 2 Nr.
n) Supply and install 10A 2-pole MCBs for new Client Distribution Board sub-board (lighting ). 1 Nr.
o) Supply and install 63A, 9 pole, 1 phase new Client Distribution Board. 1 Nr.
p) Supply and install 63A, 9 pole, 1 phase new Solar Power Board. 1 Nr.
7 EARTHING, BONDING & LIGHTNING PROTECTION
a) Supply and install copper-bonded steel earth rods, 16mm diameter × 1.2m long, driven to approved depth with earth rod clamps and test links and removable pit cover. 2 Nr. 0.00
b) Supply and install 6mm² 2-core copper conductor, XLPE insulated, SWA armoured AC power cable for SP PRO output to distribution panel (12m). Include SWA glands and lugs. 25 m 0.00
c) Supply and install copper earth bar/busbar, 100A rated, wall-mounted on insulators in power room, with all terminal connections. 1 Nr. 0.00
d) Supply and install 6mm² bare stranded copper bonding conductor along all PV array mounting rails, bonding all module frames and rail sections to earth system. 30 m 0.00
e) Supply and install Type I+II combined AC surge protection device (SPD), 50kA rated, 240V AC, DIN-rail mounted at Main Distribution Board incoming, with minimum 6mm² earth conductor to main earth bar. 1 Nr. 0.00
f) Supply, install, test and commission a complete IEC 62305 LPL III Lightning Protection System, comprising Franklin air terminals, roof supports, copper down conductors, test joints, earth ring and electrodes, inspection pits, bonding to PV structures/main earth, coordinated Type I+II AC/DC SPDs, all accessories, weatherproof making-good 1 LOT -
8 POWER / BATTERY ROOM FITOUT — CIVIL & MECHANICAL
a) Allow for preparation and cleaning of inverter and battery room including surface preparation, marking out equipment positions, drilling and fixings for wall-mounted equipment. 1 Item 0.00
b) Construct concrete equipment plinths or supply and install steel frame equipment bases, minimum 100mm raised, for battery rack installation. 1 Nr. 0.00
c) Supply and install perforated galvanised steel cable ladder, 300mm wide, on wall brackets at 600mm centres within power/inverter room. 8 m 0.00
d) Supply and install wireless standalone combination optical smoke and rate-of-rise heat detector with integral 85dB sounder/strobe, 10-year sealed lithium battery, wireless interlink capability, EN 14604 / EN 50291 certified. Ceiling-mounted inside battery room. 1 Nr. 0.00
e) Supply and install wireless standalone combination smoke/heat detector — identical specification to item 7A.1. Positioned at battery room exit/escape route. Wireless interlink: simultaneous alarm with 7A.1. 1 Nr. 0.00
f) Supply and provide replacement 10-year lithium batteries for wireless detectors as per manufacturer specification, for maintenance stock. 2 Set 0.00
g) Supply, install and commission ABC dry powder fire extinguisher, 6kg minimum, EN 3 certified, wall-mounted on bracket. Suitable for Class A, B, C and electrical fires. Suitable for lithium-ion battery environments. Note: CO₂ type NOT permitted in battery rooms. 1 No. inside battery room + 1 No. at exit door. 2 Nr. 0.00
h) Supply and install 300mm diameter axial exhaust fan with thermostat control and louvred intake grille for battery room ventilation and gas dispersion. 1 Set 0.00
i) Supply and install lockable steel security door, 3mm steel sheet construction, with deadbolt lock and padlock provision. 1 Nr. 0.00
j) Supply and install 2 No. LED light fittings, 20W, 240V, IP44 minimum, switched at door, within power/battery room. 1 Nr. 0.00
k) Supply and install warning and safety signs on vinyl self-adhesive labels: Electrical Hazard, Lithium-Ion Battery Hazard, No Smoking, No CO₂ Extinguisher. Minimum 200×150mm each. 1 Set 0.00
l) Supply and install high-performance calcium silicate boards to internal faces of walls and ceilings (Approximate Area of 60sm) in Battery and Inverter Storage Rooms to achieve the required Fire Resistance Level (FRL) in strict accordance with the manufacturer's specifications and PNG National Building Code requirements. Rate shall include for all fixing to timber or metal studs/furring channels (measured separately); Flushed joints, skimming, taping, and sanding ready for painting;Sealing of all joint perimeters with approved fire-retardant mastic/sealant. 1 Item 0.00
9 TESTING, COMMISSIONING & DOCUMENTATION
a) Allow for complete system commissioning of SP PRO inverter-charger(s) and Fronius Primo string inverter(s) using Selectronic SP LINK software (v9.1 or later). Include: Site Configuration Wizard, RS485/Solar Net communications verification, DNO Editor setup on Fronius Master, SCERT coupling ratio check, ATS changeover testing, fire detection test. 1 Day 0.00
b) Allow for Fronius Datamanager 2.0 monitoring portal setup (Fronius Solar.web), including WLAN/LAN connection, system entry (PV[Wp], array details) and provision of login credentials and system name to Employer 1 Item 0.00
c) Allow for battery capacity test and BMS commissioning: full charge-discharge cycle, BMS cell balancing verification and SOC calibration. 1 Item 0.00
d) Allow for ATS and generator changeover testing: simulate grid failure, verify generator start and load transfer time, test manual override. 1 Item 0.00
e) Allow for complete electrical installation testing and certification including: insulation resistance test (all DC strings at 500V DC), polarity verification, DC open-circuit voltage measurement per string, AC insulation resistance and continuity tests, earth electrode resistance measurement (≤5Ω), per IEE/BS 7671. 1 Item 0.00
f) Supply three (3) hard copies and one (1) digital copy of as-built drawings and commissioning report including: updated SLD, string layout, cable schedule, SP LINK configuration file backup, all test results with measured values. 1 Item 0.00
g) Allow for half-day operation and maintenance (O&M) training for client's site personnel covering: SP PRO daily operation, Fronius monitoring, battery health checks, fire safety, emergency procedures and routine maintenance schedule. 0.5 Day 0.00
10 RETROFITTING WORKS 0.00
Supply, deliver and install the following materials: The contractor should ensure that storage is properly done on site while awaiting installation
a) Aluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets 10 Nr. 0.00
b) 3mm thick sheet 4 Nr. 0.00
c) 150x75mm Hardwood Timber 36 m 0.00
d) 75x50mm Hardwood Timber 36 m 0.00
TOTAL FOR LLG OFFICE-SOLAR PV HYBRID SYSTEM INSTALLATION CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED RENEWABLE ENERGY INTERVENTIONS FOR RABARABA MILNE BAY PROJECT, PAPUA NEW GUINEA (PNG).
ITEM DESCRIPTION QNTY UNIT RATE (USD) AMOUNT (USD)
BILL NO.8 PRIMARY SCHOOL-SOLAR PV HYBRID SYSTEM INSTALLATION
NOTE: TRADE NAMES
Where Trade Names are mentioned below, it is intended to indicate the level of quality required. The tenderer MAY supply alternatives which must be approved in writing by the Employer Note
1 GENERAL ITEMS
a) Allow for the preparation of all Working drawings 3 Set 0.00
b) Allow for the preparation of a set of Test and Inpection Plan ( ITP) sheets for each equipment, i.e BESS, inverters, Solar PV, ATS, Distribution Board, Earthing, Megger, Circuit Breakers, Inverters, Solar PV cells and BESS. 1 Set
c) Allow for the preparation of all "As Built" drawings after testing and commissioning 3 Set 0.00
d) The Tenderer is to describe hereunder inserting any relevant clause number, any other works, obligations or items that may be referred to in the Conditions of Contract, Specification, Drawings or Data Schedule in respect of the works for which he desires to enter a separate charge( this charge is to be entered in the Amount column). If no charge is entered hereunder, rates and amounts elsewhere in the schedule of prices shall be deemed to cover all expenses for such works, obligations or items. 1 Sum 0.00
e) Allow for testing and commissioning of the entire electrical installation works 1 Sum 0.00
2 SOLAR PV PANELS & MOUNTING STRUCTURE
Note: The Contractor is to provide detailed solar PV mounting shop drawings and structural details for review and approval prior to installation. The proposed mounting system shall be compatible with the existing roof construction, safely distribute loads to the supporting roof members, and be designed to resist the specified wind uplift forces.
a) Transport from site store, install, test and commission solar photovoltaic (PV) modules — Phono Solar PS275P-20/U, 275 W polycrystalline, Voc=38.68V, Isc=9.17V, Vmpp=31.79V, frame anodised aluminium, IP67 MC4-compatible connectors, IEC 61215 & IEC 61730 certified. Installed to roof in 4 strings × 11 panels each (Voc=425.5V ≤1000V DC ✓). All Voc values ≤1000V DC verified. 44 Nr. 0.00
b) Supply and install MC4-compatible connector pairs (male + female), IP67, rated 1000V DC / 30A, crimped type. Include 20 pairs with 20% spare. 20 Sum 0.00
c) Supply and install 20A 1000V DC string protection circuit breakers, DIN-rail mounted, 1 per DC string. 4 m 0.00
d) Supply and install Type II 1000V DC surge protection devices (SPD), 40kA rated, DIN-rail mounted in Solar Power Board; 1 per string inverter. 1 Nr. 0.00
e) Supply and install DC Solar Power Board enclosure, IP65 minimum, including DIN rail, copper busbar, terminal blocks, cable glands and all accessories for DC string terminations and protection. 1 Nr. 0.00
f) Supply and install UV-rated rigid PVC conduit Ø32mm or galvanised steel cable tray 50×50mm on roof for DC string cable routing, including all clips, saddles and fixings. 15 Nr. 0.00
g) Supply and install galvanised steel cable tray support brackets at 2m maximum centres on roof structure. 10 Nr. 0.00
3 DC WIRING & PROTECTION
a) Supply and install 4mm² twin-core UV-stabilised solar DC cable (red positive, black negative), TUV 2 Pfg 1169 / EN 50618, rated 1000V DC, temperature -40°C to +90°C. Run in UV-rated rigid PVC conduit Ø32mm on roof. Allow 160m single-core total (4 strings × 11 panels each (Voc=425.5V ≤1000V DC ✓)). 160 m 0.00
b) Supply and install MC4-compatible connector pairs (male + female), IP67, rated 1000V DC / 30A, crimped type. Include 20 pairs with 20% spare. 20 Pairs 0.00
c) Supply and install 20A 1000V DC string protection circuit breakers, DIN-rail mounted, 1 per DC string. 4 Nr. 0.00
d) Supply and install Type II 1000V DC surge protection devices (SPD), 40kA rated, DIN-rail mounted in Solar Power Board; 1 per string inverter. 1 Nr. 0.00
e) Supply and install DC Solar Power Board lockable enclosure, IP65 minimum, including DIN rail, copper busbar, terminal blocks, cable glands and all accessories for DC string terminations and protection. 1 Nr. 0.00
f) Supply and install UV-rated rigid PVC conduit Ø32mm or stainless steel cable tray 50×50mm on roof for DC string cable routing, including all clips, saddles and fixings. 15 m 0.00
g) Supply and install stainless steel cable tray support brackets at 2m maximum centres on roof structure. 10 Nr. 0.00
4 INVERTER-CHARGERS & STRING INVERTERS 0.00
a) Transport from site store, install, test and commission Selectronic SP PRO SPMC482 7.7kW / 48V DC inverter-charger units (Selectronic SCERT certified), wall-mounted in power room. Each unit operates independently — no Manager/Worker hierarchy. Include SP LINK commissioning software configuration. 1 Nr. 0.00
b) Supply and install Selectronic AC Coupled Interface PCA (Selectronic Part No. 005227), RS485 interface board for Fronius SCERT managed AC coupling. Install 1 per SP PRO unit. Total 1 No. 1 Nr. 0.00
c) Transport from site store, install, test and commission Fronius Primo 8.2-1 single-phase string inverters, 8.2kW rated, Selectronic SCERT certified for managed AC coupling, 2×MPPT, 0-1000V DC input, 240V AC / 50Hz output, IP65. Configure for MG50 country code and Night Mode ON. 1 Nr. 0.00
d) Supply and install heavy-duty wall-mounting brackets and back-plates for SP PRO 7.7kW inverter-charger units (minimum 35kg capacity each). Include all fixings. 1 Nr. 0.00
e) Supply and install wall-mounting brackets and back-plates for Fronius Primo 8.2-1 string inverters. Include all fixings. Total 1 No. 1 Nr. 0.00
g) Supply and install solar rapid shutdown system or emergency stop in the event of rooftop fire on the solar panels (NEA compliance) 1 Nr.
h) Supply and install solar panel string 32A 2 pole isolators at the rooftop for maintenance purposes (NEA compliance) 3 Nr.
5 BATTERY ENERGY STORAGE SYSTEM (BESS) 0.00
a) Supply, install and commission LiFePO4 (Lithium Iron Phosphate) battery modules, server-rack format, 5.12kWh / 48V DC nominal per module, with integrated Battery Management System (BMS), IEC 62133-2 and UN 38.3 certified, minimum 3,000 cycles at 80% DoD. Install in 1 rack × 6 modules = 30.72kWh total. Total installed capacity: 30.72kWh. 6 Nr. 0.00
b) Supply and install battery rack enclosure(s), 19" steel rack or proprietary modular cabinet, UL listed or equivalent, 600mm wide. Configure in 1 rack × 6 modules = 30.72kWh total. Include all busbars and inter-module DC cables. 1 Nr. 0.00
c) Supply and install battery DC busbar box, 200A rated, insulated copper busbar, IP31 minimum enclosure, with all terminals and cable glands. 1 Nr. 0.00
d) Supply and install 125A 2-pole DC battery circuit breakers (MCCBs), 1000V DC rated, between battery busbar and SP PRO DC terminals. 1 Nr. 0.00
e) Supply and install 100A 1000V DC 2-pole 1000V DC MCCBs at battery rack DC output, 1 per battery rack. 1 Nr. 0.00
f) Supply and install 35mm² flexible two-core DC battery cable, colour coded, with compression lugs and protection sleeves at all terminations. 6 m 0.00
6 AC WIRING, SWITCHGEAR & PROTECTION 0.00
a) Supply and install 16mm² 2-core copper conductor, XLPE insulated, SWA armoured AC power cable from grid/changeover to SP PRO Source terminal. Include brass SWA compression glands at both ends. 12 m 0.00
b) Supply and install 6mm² 2-core copper conductor, XLPE insulated, SWA armoured AC power cable for SP PRO output to distribution panel (12m). Include SWA glands and lugs. 12 m 0.00
c) Supply and install 6mm² 2-core PVC insulated copper cable for Fronius Primo string inverter AC output connections to Solar Power Board. 8 m 0.00
d) Supply and install 40A 2-pole miniature circuit breakers (MCBs), 10kA, DIN-rail mounted, for SP PRO source input protection. 1 Nr. 0.00
e) Supply and install 40A 2-pole MCB, DIN-rail mounted, as main incoming breaker for Solar Power Board. 1 Nr. 0.00
f) Supply and install 40A 2-pole MCBs for Solar Power Board sub-circuits. 1 Nr. 0.00
g) Supply and install 40A 2-pole MCBs, Type B, 6kA, for Fronius Primo AC output protection on Solar Power Board. 1 Nr. 0.00
h) Supply and install 40A 2-pole MCB, DIN-rail mounted, as main for Client Distribution Panel main incoming, rated per site load schedule. 1 Nr. 0.00
i) Supply and install an enclosed motorised Automatic Transfer Switch (ATS) for grid and generator changeover, including mechanical and electrical interlocking, rated per system load. 1 Nr. 0.00
g) Supply and install an enclosed lockable rotary isolator for generator main supply connection, rated current per system. 1 Nr. 0.00
j) Supply and install revenue-grade digital energy meter and an enclosed main isolator switch for utility grid connection. 1 Set 0.00
g) Supply and install galvanised steel trunking 100×50mm or rigid PVC conduit Ø32/50mm for AC cable routing within power/inverter room, including all fittings. 25 m 0.00
l) Supply and install brass SWA cable glands, compression lugs, heat-shrink sleeving and cable ties for all armoured cable terminations. 1 Set 0.00
m) Supply and install 16A 2-pole MCBs for new Client Distribution Board sub-board (inverter room power points) 1 Nr.
n) Supply and install 16A 2-pole MCBs for new Client Distribution Board sub-board (classroom power points) 1 Nr.
o) Supply and install 10A 2-pole MCBs for new Client Distribution Board sub-board (outdoor lighting). 1 Nr.
p) Supply and install 10A 2-pole MCBs for new Client Distribution Board sub-board (classroom lighting). 1 Nr.
q) Supply and install 63A, 12 pole, 1 phase new Client Distribution Board. 1 Nr.
r) Supply and install 63A, 9 pole, 1 phase new Solar Power Board. 1 Nr.
7 EARTHING, BONDING & LIGHTNING PROTECTION
a) Supply and install copper-bonded steel earth rods, 16mm diameter × 1.2m long, driven to approved depth with earth rod clamps and test links and removable pit cover. 2 Nr. 0.00
b) Supply and install 16mm² stranded copper earth conductor, green/yellow PVC insulated, connecting all earth electrodes and equipment earthing terminals to main earth bar. 25 m 0.00
c) Supply and install copper earth bar/busbar, 100A rated, wall-mounted on insulators in power room, with all terminal connections. 1 Nr. 0.00
d) Supply and install 6mm² bare stranded copper bonding conductor along all PV array mounting rails, bonding all module frames and rail sections to earth system. 30 m 0.00
e) Supply and install Type I+II combined AC surge protection device (SPD), 50kA rated, 240V AC, DIN-rail mounted at Main Distribution Board incoming, with minimum 6mm² earth conductor to main earth bar. 1 Nr. 0.00
f) Supply, install, test and commission a complete IEC 62305 LPL III Lightning Protection System, comprising Franklin air terminals, roof supports, copper down conductors, test joints, earth ring and electrodes, inspection pits, bonding to PV structures/main earth, coordinated Type I+II AC/DC SPDs, all accessories, weatherproof making-good 1 LOT -
8 POWER / BATTERY ROOM FITOUT — CIVIL & MECHANICAL
a) Allow for preparation and cleaning of inverter and battery room including surface preparation, marking out equipment positions, drilling and fixings for wall-mounted equipment. 1 Item 0.00
b) Construct concrete equipment plinths or supply and install steel frame equipment bases, minimum 100mm raised, for battery rack installation. 1 Nr. 0.00
c) Supply and install perforated galvanised steel cable ladder, 300mm wide, on wall brackets at 600mm centres within power/inverter room. 8 m 0.00
d) Supply and install wireless standalone combination optical smoke and rate-of-rise heat detector with integral 85dB sounder/strobe, 10-year sealed lithium battery, wireless interlink capability, EN 14604 / EN 50291 certified. Ceiling-mounted inside battery room. 1 Nr. 0.00
e) Supply and install wireless standalone combination smoke/heat detector — identical specification to item 7A.1. Positioned at battery room exit/escape route. Wireless interlink: simultaneous alarm with 7A.1. 1 Nr. 0.00
f) Supply and provide replacement 10-year lithium batteries for wireless detectors as per manufacturer specification, for maintenance stock. 2 Set 0.00
g) Supply, install and commission ABC dry powder fire extinguisher, 6kg minimum, EN 3 certified, wall-mounted on bracket. Suitable for Class A, B, C and electrical fires. Suitable for lithium-ion battery environments. Note: CO₂ type NOT permitted in battery rooms. 1 No. inside battery room + 1 No. at exit door. 2 Nr. 0.00
h) Supply and install 300mm diameter axial exhaust fan with thermostat control and louvred intake grille for battery room ventilation and gas dispersion. 1 Set 0.00
i) Supply and install lockable steel security door, 3mm steel sheet construction, with deadbolt lock and padlock provision. 1 Nr. 0.00
j) Supply and install 2 No. LED light fittings, 20W, 240V, IP44 minimum, switched at door, within power/battery room. 1 Nr. 0.00
k) Supply and install warning and safety signs on vinyl self-adhesive labels: Electrical Hazard, Lithium-Ion Battery Hazard, No Smoking, No CO₂ Extinguisher. Minimum 200×150mm each. 1 Set 0.00
l) Supply and install high-performance calcium silicate boards to internal faces of walls and ceilings (Approximate Area of 76sm) in Battery and Inverter Storage Rooms to achieve the required Fire Resistance Level (FRL) in strict accordance with the manufacturer's specifications and PNG National Building Code requirements. Rate shall include for all fixing to timber or metal studs/furring channels (measured separately); Flushed joints, skimming, taping, and sanding ready for painting;Sealing of all joint perimeters with approved fire-retardant mastic/sealant. 1 Item 0.00
9 TESTING, COMMISSIONING & DOCUMENTATION
a) Allow for complete system commissioning of SP PRO inverter-charger(s) and Fronius Primo string inverter(s) using Selectronic SP LINK software (v9.1 or later). Include: Site Configuration Wizard, RS485/Solar Net communications verification, DNO Editor setup on Fronius Master, SCERT coupling ratio check, ATS changeover testing, fire detection test. 1 Day 0.00
b) Allow for Fronius Datamanager 2.0 monitoring portal setup (Fronius Solar.web), including WLAN/LAN connection, system entry (PV[Wp], array details) and provision of login credentials and system name to Employer 1 Item 0.00
c) Allow for battery capacity test and BMS commissioning: full charge-discharge cycle, BMS cell balancing verification and SOC calibration. 1 Item 0.00
d) Allow for ATS and generator changeover testing: simulate grid failure, verify generator start and load transfer time, test manual override. 1 Item 0.00
e) Allow for complete electrical installation testing and certification including: insulation resistance test (all DC strings at 500V DC), polarity verification, DC open-circuit voltage measurement per string, AC insulation resistance and continuity tests, earth electrode resistance measurement (≤5Ω), per IEE/BS 7671. 1 Item 0.00
f) Supply three (3) hard copies and one (1) digital copy of as-built drawings and commissioning report including: updated SLD, string layout, cable schedule, SP LINK configuration file backup, all test results with measured values. 1 Item 0.00
g) Allow for half-day operation and maintenance (O&M) training for client's site personnel covering: SP PRO daily operation, Fronius monitoring, battery health checks, fire safety, emergency procedures and routine maintenance schedule. 0.5 Day 0.00
10 GENERATOR INSTALlATION WORKS 0.00
a) Standby 7.5 kVA Generator connection works — supply materials and tools, install and connect standby generator, ATS connection, generator main isolator, fuel system to the generator supplied by the Employer. 1 Item 0.00
b) Transport from site store, install, test and commission standby 7.5kW, 1 phase standby generator 1 Nr.
11 RETROFITTING WORKS 0.00
Supply, deliver and install the following materials: The contractor should ensure that storage is properly done on site while awaiting installation
a) Aluminium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets 10 Nr. 0.00
b) 3mm thick sheet 4 Nr. 0.00
c) 100x50mm Hardwood Timber 36 m 0.00
TOTAL FOR PRIMARY SCHOOL-SOLAR PV HYBRID SYSTEM INSTALLATION CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED RENEWABLE ENERGY INTERVENTIONS FOR RABARABA MILNE BAY PROJECT, PAPUA NEW GUINEA (PNG).
ITEM DESCRIPTION QUANTITY UNIT RATE (USD) AMOUNT (USD)
BILL NO.9 PRIMARY SCHOOL-GENERATOR SHED
All excavations are measured net. The rate shall include: any working space that the contractor may deem necessary, allowance for maintaining & supporting sides of excavations, cutting to slope, stokepilling and keeping excavations free from all fallen materials, mud and water by pumping, bailing or otherwise Note
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS
a) Clear the site of all shrubs, bushes, small trees and debris; remove from site as directed [Approximate area: 63 m2 for Building footprint and 50% allowance] 1 Item 0.00
Oversite excavations
b) Excavate to remove top vegetable soil, average 200mm deep, load and cart away from site as directed [Building footprint only] 43 m2 0.00
c) Excavate in soft material for foundation trenches; 0-1.50m deep 19 m3 0.00
d) Excavate in soft material for column bases; 0-1.50m deep 24 m3 0.00
e) Return, fill in and ram selected excavated material around foundations 31 m3 0.00
Disposal of Surplus spoil
f) Load and cart away surplus excavated material from site to an approved dumping site 12 m3 0.00
Selected filling
g) 300mm Thick hardcore filling, well watered and compacted in layers not exceeding 100mm deep 33 m2 0.00
h) 50mm Thick granular/gravel blinding to surfaces of hardcore; as per structural specifications 33 m2 0.00
Anti-termite treatment
i) Chemical anti-termite treatment as "Premise 200 SC" or other equal and approved executed complete by an approved specialist under a ten (10) year guarantee to granular/gravel surfaces 33 m2 0.00
TOTAL FOR SITE PREPARATION, EXCAVATIONS & EARTHWORKS CARRIED TO BILL SUMMARY 0.00
2) CONCRETE WORKS
Lean concrete class C16/20 (mix 1:2:4)
a) 50mm Thick blinding under strip foundation 11 m2 0.00
b) 50mm Thick blinding under column bases 14 m2 0.00
c) 50mm Thick blinding under ground floor slab 33 m2 0.00
Insitu concrete class C20/25, vibrated and reinforced as described, in:-
d) Foundation strip 2 m3 0.00
e) Column bases 3 m3 0.00
f) Stub columns 1 m3 0.00
g) Ground Beams 1 m3 0.00
h) Ground floor slab [100mm thick ], finished smooth 2.5 m3 0.00
i) Generator and fuel tank plinths [250mm thick ], finished smooth 2.5 m3 0.00
j) Ring Beam & Columns above ground floor slab 0.5 m3 0.00
Damp proof membrane
k) 1000 Gauge polythene or other equal and approved damp proof membrane laid under surface bed with 300mm side and end laps (measured net- allow for laps) 33 m2 0.00
TOTAL FOR CONCRETE WORKS CARRIED TO BILL SUMMARY 0.00
3) STEEL REINFORCEMENT (PROVISIONAL)
High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
a) 8mm Diameter bars 247 kg 0.00
b) 12mm Diameter bars 368 kg 0.00
BRC A142 Mesh reinforcement ; B.S. 4483 weighing 2.22 kgs per square meter including bends, tying wire and spacing blocks
c) Fabric mesh reinforcement to ground floor bed 33 m2 0.00
d) Ditto: 2 layers to generator plinth and fuel tank plinths 10 m2 0.00
TOTAL FOR STEEL REINFORCEMENT CARRIED TO BILL SUMMARY 0.00
4) SHUTTERING & FORMWORK
Sawn Formwork, including all necessary propping; to:
a) Edges of strip foundation [200mm girth] 7 m² 0.00
b) Vertical sides of column bases 11 m² 0.00
c) Vertical sides of stub columns 13 m² 0.00
d) Edges of ground beams 6 m² 0.00
e) Edges of the ground floor slab, 100mm girth 23 m 0.00
f) Edges of the generator and fuel tank plinth, 150mm girth 19 m 0.00
g) Vertical sides of columns above ground floor slab 5 m² 0.00
h) Soffites and sides of ring beam 2 m² 0.00
TOTAL FOR SHUTTERING & FORMWORK CARRIED TO BILL SUMMARY 0.00
5) JOINERY & TIMBER WORKS
1. Rate for Timber sections shall include all necessary drilling of holes, bolting, cleats and other necessary connections that are not separately itemized for pricing Note
2. The Contractor shall provide shop drawings for approval. Once approved, the drawings shall be strictly adhered to during the fabrication and installation process. Note
3. The Contractor shall provide documentation verifying treatment type, retention levels, and compliance. Note
I Timber framework
Columns, rafters etc.
"Kwila (Intsia bijuga)" grade F27 or other approved hardwood; well seasoned to AS 2082—2000 and treated against termites and moisture ingress with approved wood preservative; including all jointing and connections (packing piece, bolts etc.) as necessary; in stairs
50mm Thick granular/gravel blinding to surfaces of hardcore; as per structural specifications
a) 100 x 60 x 10mm Thick base plate with 4no. 14mm dia pre-drilled holes to receive 12mm dia J bolts: fixed to stub column bases (stub column bases measured separately) 8 Nr 0.00
b) 2/10mm Stiffener plate welded to base plates as per details (Plates measured separately) 8 Nr 0.00
c) 150x50mm Timber Column, encased in concrete column(m.s), secured with a threaded end or steel plate anchored in the timber column 23 m 0.00
d) 75x100mm Timber bracings bolted/srewed/nailed to timber columns (m.s) 20 m 0.00
e) 75x100mm Timber stiffeners bolted/screwed/nailed to timber columns (m.s) 20 m 0.00
f) 75x100mm Timber tie beams bolted/srewed/nailed to top of timber columns (m.s) 22 m 0.00
g) 50x150mm Timber truss rafters, bolted/srewed/nailed to top of timber tie beams/Truss tie (m.s) 47 m 0.00
h) 50x100mm Timber truss internal members, bolted/srewed/nailed to timber rafters/ truss tie (m.s) 42 m 0.00
i) 50x150mm Timber truss tie beams bolted/srewed/nailed to top of timber columns (m.s) 35 m 0.00
j) 50x50mm Timber purlins fixed to rafters (m.s) 63 m 0.00
Softwood timber
k) 250x20mm Thick One-side wrot fascia and barge board 28 m 0.00
II Timber doors
The following in timber doors as per the details provided
Door Frames, architraves and beads
a) Ex 150x50mm hardwood frame rebated 11 m 0.00
50mm Thick granular/gravel blinding to surfaces of hardcore; as per structural specifications
b) Double leaf door size 1800x1800mm high 2 Nr 0.00
Supply and fix the following ironmongery with screws to match
c) Heavy duty natural aluminium hinges approved from samples 12 Nr 0.00
d) 12mm diameter slide bolt,300mm long with hasp and staple 2 Nr 0.00
Painting and Decorating
Aluminum wood primer
e) Back of wood frames over 100mm but not exceeding 200mm girth 11 m 0.00
Prepare and apply clear matt varnish to timber doors
f) Ditto over 100mm not exceeding 200mm girth 11 m 0.00
g) General surfaces of doors 13 m2 0.00
TOTAL FOR JOINERY & TIMBER WORKS CARRIED TO BILL SUMMARY 0.00
Damp proof course
Three- ply bituminous felt damp proof course bedded in cement and sand (1:4) mortar (measured net allow for 300mm laps):- 0.00
a) 200mm wide for the change over panel wall 3 m 0.00
Concrete block walling (minimum comprehensive strength of not less than 7N/mm2); bedded, jointed and pointed in cement sand (1:3) mortar; reinforced with hoop iron after every alternate course.
b) 200mm Thick foundation walls 26 m2 0.00
c) 200mm walling for change over panels 7 m2 0.00
d) 200mm walling Thick bund walling 5 m2 0.00
e) 150mm walling Thick bund walling around the generator and fuel tank plinths 5 m2 0.00
Expansion Joints
f) 12mm Flexcell or equal and approved expansion 1 m2 0.00
g) 25 x 25mm approved joint sealer 10 m 0.00
Precast Concrete units [PCC] class 25/20: Vibrated; reinforced for handling: fair faced finish on all exposed faces: bedded, jointed and pointed in Cement mortar (1:3)
h) 250mm wide x 50mm thick Coping, twice weathered and throated 11 m 0.00
i) Supply and fix 1500mm high galvanized heavy duty chain-link nailed,screwed/bolted to timber supports (Measured separately) 16 m 0.00
TOTAL FOR BLOCKWORK CARRIED TO BILL SUMMARY 0.00
7) ROOF COVERING & RAINWATER GOODS
a) Supply and FixAlumniunium Zinc/Galvanized iron (AZ/GI) Trimdeck Zincalume roofing sheets or approved equivalent; fixed to timber purlins (m.s) using manufacturer's proprietary bolts 45 m2 0.00
Rainwater goods
Supply and install the following sheerline colorbond rain water goods
50mm Thick granular/gravel blinding to surfaces of hardcore; as per structural specifications
b) Supply and install sheerline colorbond gutter fixed to fascia (m.s) with and including spring clips at 1200mm centres [Rate to include gutter stop ends]. The gutter to have a micro-mesh leaf guards 13 m 0.00
c) Extra over downpipe; for gutter outlet 4 Nr 0.00
d) 75 mm Diameter sheer line colorbond rainwater down pipe; holder bats at 1500mm (maximum) centers including all fittings 12 m 0.00
e) Extra over ditto for swan neck 1200mm projection. 4 Nr 0.00
f) Ditto for shoe. 4 Nr 0.00
g) Extra over gutter for stopped ends. 4 Nr 0.00
TOTAL FOR ROOF COVERING & RAINWATER GOODS CARRIED TO BILL SUMMARY 0.00
Note: Contractor to provide all samples for approval before incorporation into the final works.
15mm Cement and sand (1:3) render on block wall or concrete work to:-
a) Bund wall around the building including the edges of floor slab 16 m2 0.00
b) Bund wall around the generator and fuel tank plinths 9 m2 0.00
c) Coping 4 m2 0.00
d) Change over panel wall 19 m2 0.00
Sand surfaces and fill uneven surfaces with stucco filler paste; Prepare and apply two undercoats of plastic emulsion paint and two finishing coats external quality paint as "Permaplast" manufactured by Crown paints or other equal and approved:-
e) All the plastered walls 48 m2 0.00
TOTAL FOR FINISHES CARRIED TO BILL SUMMARY 0.00
PRIMARY SCHOOL-GENERATOR SHED
1) SITE PREPARATION, EXCAVATIONS & EARTHWORKS 0.00
2) CONCRETE WORKS 0.00
3) STEEL REINFORCEMENT (PROVISIONAL) 0.00
4) SHUTTERING & FORMWORK 0.00
5) JOINERY & TIMBER WORKS 0.00
6) BLOCKWORK 0.00
7) ROOF COVERING & RAINWATER GOODS 0.00
8) FINISHES 0.00
TOTAL FOR BILL NO. 9- PRIMARY SCHOOL GENERATOR SHED- CARRIED TO GRAND SUMMARY 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED RENEWABLE ENERGY INTERVENTIONS FOR RABARABA MILNE BAY PROJECT, PAPUA NEW GUINEA (PNG).
ITEM DESCRIPTION QTY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 10 DAY WORKS
Any Daywork ordered shall be executed at the following rates: Note
Labour: The Prime Cost to which *___________ per centum shall be added Per cent
Materials: The Prime Cost (delivered to Site) to which *___________per centum shall be added Per Cent
Plant: The Net Hire Charge to which *______________centum shall be added Per Cent
These percentage additions shall cover all insurances, use of small tools and non-mechanical plant, sharpening tools, water, supervision, watching, power and lighting, establishment and overhead charges. Note
Dayworks will be allowed only where specifically ordered by the Employer in writing. Note
Dayworks will be allowed only where specifically ordered by the Employer in writing. Note
Time engaged in the actual works only will be allowed. Idle time will not be allowed. Note
All rates in this Day work Schedule shall be fixed for the duration of the Contract Note
Any other labour / material plant and equipment category employed but not included below shall be priced at rates analogous to those rates included under the relevant categories. Note
Only a nominal quantity is inserted against each item for computation purposes only. Note
The following labour rates are to be applied for the days worked and are to be all inclusive Note
A day shall mean an 8 hour day. Note
Gangers and trade chargehands when working with their gangs shall be paid for at the below rates for labourers and the applicable craftsman respectively Note
The said rates are to include, inter alia, for all supervision, importation of labour including transport, travelling time, fares, subsistence and lodging allowances, operation of incentive schemes and costs of overtime working, guaranteed time, sick pay and any other disbursements arising from the employment of labour, for the use and repair of all non-mechanical tools (including paint brushes), sharpening of tools and use of standing scaffolding and other Contractor's Equipment and for overheads and profit of the Contractor. Note
The Tenderer shall state the rates required for labour per day irrespective of public holidays, week-ends, etc., required for work ordered to be executed as Day works or Extra Work. Note
The said rates are to be based on the rates of wages and other emoluments and expenses, including holiday credits (if any), and insurances, payable by the Contractor. Note
a Mason 10 day 0.00
b Carpenter / Joiner 10 day 0.00
c Pipe Layer / Fitter / Plumber 10 day 0.00
d Mechanics 10 day 0.00
e Welder 10 day 0.00
f Electrician 10 day 0.00
g Bar Bender 10 day 0.00
h Skilled Labourer (other catageries) 10 day 0.00
j Unskilled Labourer 10 day 0.00
TOTAL FOR LABOUR CARRIED TO DAY WORK BILL SUMMARY 0.00
The rates for the below listed materials are to be used for Day Work or Extra Work at the site of the works Note
The rates shall cover all the expenses such as loading, delivery to site, unloading, storing and protecting, profit and overheads less all trade discounts, rebates and allowances and all cash discounts. Note
a Ordinary Portland cement 50 kg 10 bag 0.00
b Aggregates for concrete as per specification. 10 m³ 0.00
c Burnt clay bricks, standard size 100 nr 0.00
d Solid concrete blocks, standard size 100 nr 0.00
e Local foundation stones, 9"x9" 100 nr 0.00
f Formwork with sawn timber 50 m² 0.00
g Formwork with plywood 50 m² 0.00
h Concrete grade 25 if ready mixed / 1:1.5:3-20mm - if site mixed. 5 m³ 0.00
i Y-8 Reinforcement bars 1 Kg 0.00
j Y-12 Reinforcement bars 1 Kg 0.00
k Y-16 Reinforcement bars 1 Kg 0.00
l 300x300x10mm non-slip ceramic floor tiles 1 m² 0.00
m 150x150x6mm white glazed ceramic wall tiles 1 m² 0.00
n Heavy duty Manhole Cover size 600x600mm 1 nr 0.00
o 150x50mm Hardwood Timber 1 m 0.00
p 100x50mm Hardwood Timber 1 m 0.00
q 150x150mm Hardwood Timber 1 m 0.00
r GI Sheets (0.9x3m) - 24 gauge 1 nr 0.00
s GI Sheets (0.9x3m) - 26 gauge 1 nr 0.00
t GI Sheets (0.9x3m) - 28 gauge 1 nr 0.00
u 150mm diameter PVC gutters 1 m 0.00
v First Grade Plastic Emulsion Paint 1 Litre 0.00
w First Grade Super Gloss Oil Paint 1 Litre 0.00
x 625x595mm stainless steel squat pan water closet 1 nr 0.00
y European type ceramic water closet 1 nr 0.00
z 75x 50x 4mm thick RHS (6m length) 1 nr 0.00
a1 75x75x3mm thick steel angles (6m length) 1 nr 0.00
b1 Water pump, 1HP 1 nr 0.00
c1 1 cubic meter plastic water tank 1 nr 0.00
d1 2 cubic meters plastic water tank 1 nr 0.00
TOTAL FOR MATERIALS CARRIED TO DAY WORK BILL SUMMARY 0.00
10C PLANT AND EQUIPMENT
The following rates for plant and equipment are to be applied to the days worked and use of such plant/equipment in good working condition . Note
A day shall mean an 8 hour day. Note
The rates are to include all operational and maintenance costs, fuel, oil, grease, transport to and from site and other consumables, operator and attendants wages, supervision, overheads and profit. Note
Only for the time which the plant / equipment was been actually employed upon the work shall be paid for and the rates shall include for idle time, travelling time and overtime. Note
All items of plant and equipment shall be priced. Note
a Pumping set - 3 kW 2 day 0.00
b Concrete mixer - 0.5 m³ 2 day 0.00
c Poker Vibrator Plant including 25,32, 50mm poker 2 day 0.00
d Motor Lorry - 5 ton 2 day 0.00
e Tipper truck - 8 ton 2 day 0.00
f Plate compactor / Vibrator - 2 Tonne 2 day 0.00
g Excavator, crawler mounted - 0.7 m³ 2 day 0.00
h Loader and backhoe, wheel mounted - 1.4 m³ 2 day 0.00
i Portable diesel generator - 5 kVA 2 day 0.00
j Portable Air Compressor including rock breakers & hammers - 175 cfm 2 day 0.00
k Water Bowser - 6000 Ltr 2 day 0.00
TOTAL FOR PLANT AND EQUIPMENT CARRIED TO DAY WORK BILL SUMMARY 0.00
DAY WORK BILL SUMMARY
10A LABOUR 0.00
10B MATERIALS 0.00
10C PLANT AND EQUIPMENT 0.00
TOTAL FOR DAY WORKS (THIS TOTAL SHALL NOT BE CARRIED TO THE GRAND SUMMARY) 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
ITEM DESCRIPTION QTY UNIT RATE (USD) AMOUNT (USD)
BILL NO. 11 SCHEDULE OF RATES - GENERAL (NOTE: IT IS MANDATORY FOR BIDDERS TO COMPLETE THIS SECTION)
Note: The rates provided in this section will ONLY be used to value variation items whose rates are not provided in the measured work bills.
a Cutting, clearing and dumping away all shrubs, debris and unnecessary materials. 10 m2 0.00
b Cutting of trees not exceeding 450mm girth including removing from site as directed 5 nr 0.00
c Cutting of trees exceeding 450mm but not exceeding 600mm girth ditto 5 nr 0.00
d Cutting of trees exceeding 600mm but not exceeding 900mm girth ditto 5 nr 0.00
e Cutting of trees exceeding 900mm but not exceeding 1200mm girth ditto 5 nr 0.00
f Cutting of trees exceeding 1200mm girth ditto 5 nr 0.00
g Removing stumps of trees not exceeding 600mm girth and carting away debris 5 nr 0.00
h Removing stumps of trees exceeding 600mm but not exceeding 1200mm girth ditto 5 nr 0.00
i Removing stumps of trees exceeding 1200mm girth ditto 5 nr 0.00
j Excavate the unconsolidated top soil to an average depth of 150mm 5 m2 0.00
k Cutting of surface rock outcrops and removing debris from site 5 m2 0.00
l Backfill to make up levels 10 m3 0.00
2 FOUNDATION EXCAVATION 0.00
a Excavate on normal soil to a depth of 1500mm from ground level 10 m3 0.00
b Excavate on normal soil to a depth of 3000mm from ground level 10 m3 0.00
c Extra-over for excavating in rock class I 10 m3 0.00
d Extra-over for excavating in rock class II 10 m3 0.00
e Extra-over for excavating in clay soil 10 m3 0.00
f Extra-over for excavating in hard material 10 m3 0.00
3 FOUNDATION WALLING 0.00
a 400mm thick rubble stone foundation walling bedded and jointed in cement and sand (1:3)mortar 10 m2 0.00
b 200mm thick natural stone foundation walling bedded and jointed in cement and sand (1:3)mortar 10 m2 0.00
4 CONCRETE WORK 0.00
a Provide all materials and cast insitu plain concrete class 15/20 (1:3:6) blinding under foundation 10 m3 0.00
b Provide all materials and cast insitu plain concrete class 20/20 (1:2:4); vibrated 10 m3 0.00
c Provide all materials and cast insitu plain concrete class 25/20 (1:11/2:3); vibrated 10 m3 0.00
Sawn formwork to insitu concrete as described:- 0.00
d To sides of ring beams 10 m2 0.00
e To soffits of suspended slabs 10 m2 0.00
f To sides of columns 10 m2 0.00
Extra over formwork for:- 0.00
g Fair face finish 10 m2 0.00
a Provide materials and construct 100mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course 10 m2 0.00
b Provide materials and construct 150mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course 10 m2 0.00
c Provide materials and construct 200mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course 10 m2 0.00
d Provide materials and construct 200mm thick hollow concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course 10 m2 0.00
6 ELECTRICAL SUPPLY INSTALLATIONS 0.00
Rate for supply, transport to site and store on site only 0.00
a Inverter-Model: Selectronic SP Pro 15kW -Single-Phase 1 Nr 0.00
b Inverter-Model: Selectronic SP Pro 7.7kW -Single-Phase 1 Nr 0.00
c Fronius Snap back Primo 8.2 kW- Single-Phase 1 Nr 0.00
d Phono Solar PS275P-20/U, 275 W polycrystalline 4 Nr
7 RETROFITTING WORKS 0.00
a Removal and replacement of defective timber members, including the strengthening and reinforcement of weakened members, as required. 36 m
b Removal and replacement of defective roof sheeting, including sealing or filling of gaps and openings in the existing roof covering, as necessary. 10 Nr
TOTAL FOR SCHEDULE OF RATES BILL (NOTE: THIS TOTAL SHALL NOT BE CARRIED TO GRAND SUMMARY) 0.00
EAST AND SOUTHERN AFRICA MULTI COUNTRY OFFICE
BILLS OF QUANTITIES
PROPOSED RENEWABLE ENERGY INTERVENTIONS FOR RABARABA MILNE BAY PROJECT, PAPUA NEW GUINEA (PNG).
ITEM DESCRIPTION AMOUNT (USD)
Bill No. 01 PRELIMINARIES 0.00
Bill No. 02 TVET-SOLAR PV HYBRID SYSTEM INSTALLATION 0.00
Bill No. 03 TVET-GENERATOR SHED 0.00
Bill No. 04 DDA-SOLAR PV HYBRID SYSTEM INSTALLATION 0.00
Bill No. 05 HEALTH CENTRE-SOLAR PV HYBRID SYSTEM INSTALLATION 0.00
Bill No. 06 HEALTH CENTRE-GENERATOR SHED 0.00
Bill No. 07 LLG OFFICE-SOLAR PV HYBRID SYSTEM INSTALLATION 0.00
Bill No. 08 PRIMARY SCHOOL-SOLAR PV HYBRID SYSTEM INSTALLATION 0.00
Bill No. 09 PRIMARY SCHOOL-GENERATOR SHED 0.00
TOTAL PRICE [A] 0.00
LESS DISCOUNT (IF ANY) [B] -
TOTAL PRICE (POST DISCOUNT) [C = A - B] -
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Annex 1_Drawings.pdf
Bidding document • 0.04 MB
Annex 2-Technical Specifications.pdf
Bidding document • 0.04 MB
Annex 3_Rabaraba Renewable Energy__BOQ.xlsx
Bidding document • 0.41 MB
Annex 4-Quality Management Plan.zip
Bidding document • 2.58 MB
Annex 5-Health and Safety Management Plan (HSMP).zip
Bidding document • 1.43 MB
Annex 6-Social and Environmental Management Plan (SEMP).zip
Bidding document • 0.46 MB
Annex 7-Gender Action Plan (GAP).pdf
Bidding document • 0.05 MB
Annex 8-Prevention of Sexual Exploitation, Abuse and Harassment.zip
Bidding document • 4.08 MB
Annex 9-Sustainability Plan.zip
Bidding document • 0.09 MB
Small Works - 6 Solicitation - ITB 04 Sections II, III, IV, V _Rabaraba Solar PV_ITB_2026_65526.docx
Bidding document • 9.15 MB
Small_Works_ITB_Section_I_Instructions to Bidders.pdf
Bidding document • 2.15 MB
Small_Works_ITB_Section_VI_Returnable Schedules ITB_2026_65526.docx
Bidding document • 0.58 MB
Notice on UNGM.html
Notice page • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .