Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
Bid Security (EMD)
Refer Docs
Closing Date
26 Nov 2026, 09:00 (UTC)4d left26 Nov 2026, 2:30 pm IST
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender description: [Supply, installation, testing and commissioning of a complete 100 kVA transformer substation for Summer Land Pumping Station in Haritan, Aleppo Governorate] ----- IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
322367
RFQ/2026/65340
Request for quotation
Syria
RFQ
UTC
21 Nov 2026
12 Nov 2026
The rates and prices in the Bill of Quantities shall be deemed to include full compensation for all obligations necessary to complete the execution, testing, commissioning and handover of the Works in accordance with the Contract Documents, whether or not expressly referred to in this Estimate. All equipment, materials and accessories supplied below, together with the installation works, shall be complete with all related accessories, as specified in the Specifications and shown on the Drawings, and to the satisfaction of the Engineer.
Supply and installation of a 100 kVA oil-immersed (oil-insulated and oil-cooled) transformer (20/0.38) kV, complete with all required protections, in accordance with the Technical Specifications and the standards approved by the Electrical Utility.
Supply and installation of a steel tower supporting the transformer (Utility standard model 11.5m / 25,000 N, actual fabricated length 12.755m); tower strength 25,000 N, approximate tower weight 600 kg, in accordance with the Technical Specifications and the model approved by the Electrical Utility.
Supply and execution of the reinforced concrete foundation for the steel tower dimensions (3.0 m x 3.0 m x 2.1 m), f'c = 25 MPa for Concrete, a minimum yield stress Grade 60/fy = 420 MPa for steel reinforcement, and a minimum yield stress of 235 MPA or equal for the four plates under each leg of the pole (0.15mx0.15mx0.02m), and in accordance with the Technical Specifications and the standards approved by the Electrical Utility.
Cast-in-place plain blinding concrete for the transformer pole footing using moderate sulphate resistant cement to ASTM C150, Type II, 14 MPa on cylinder, complete including all necessary formwork and accessories, as shown on the drawings and to the satisfaction of the Engineer.
Supply and installation of a three-phase OUTDOOR-type medium-voltage switch for 20/24 kV medium-voltage networks, in accordance with the Technical Specifications and the standards approved by the Electrical Utility.
Supply and installation of an IP65 - low-voltage distribution board comprising a main MCCB 200A circuit breaker, copper busbars and three outgoing feeders with a voltmeter and ammeters, in accordance with the Technical Specifications and the standards approved by the Electrical Utility.
Supply and installation of an IP55 - 60 kVAR power factor correction panel, operating automatically in six stages, each stage comprising a capacitor of a specified rating (20-15-15-5-2.5-2.5), together with the contactors and a set of high rupturing capacity (HRC) fuses with a discharge resistor.
Supply and installation of the earthing network for the transformer support tower together with the earthing of the low-voltage board, in accordance with the Technical Specifications and the standards approved by the Electrical Utility.
Supply and installation of an aluminium connection cable, type NAYY 4 × 120 mm², between the transformer and the low-voltage distribution board, including all necessary accessories and aluminium-to-copper bimetallic compression cable lugs at both ends, suitable for the cable cross-section and equipment terminals, complete with proper crimping, connection, insulation and termination works, in accordance with the approved specifications and requirements of the Electrical Utility.
Supply and installation of an aluminium connection cable, type NAYY 4 × 95 mm², between the low-voltage distribution board and the power factor correction panel, including all necessary accessories and aluminium-to-copper bimetallic compression cable lugs at both ends, suitable for the cable cross-section and equipment terminals, complete with proper crimping, connection, insulation and termination works, in accordance with the approved specifications and requirements of the Electrical Utility.
Supply and installation of 6A outdoor medium-voltage fuses, in accordance with the standards approved by the Electrical Utility.
Supply and installation of medium-voltage fuse bases, in accordance with the standards approved by the Electrical Utility.
Supply and installation of medium-voltage lightning arresters with their fixings, in accordance with the standards approved by the Electrical Utility.
Supply and installation of a steel cross-arm for the branch connection (220 cm x 10 cm).
Supply and installation of a tension insulator string.
Supply and installation of ACSR aluminium-steel overhead conductors, 70 mm² cross-section, in accordance with the Technical Specifications and the standards approved by the Electrical Utility.
Supply and installation of a three-phase electricity meter for a 100 kVA transformer substation, in accordance with the specifications approved by the Electrical Utility.
Equipment / Area
General documentation
General documentation
General documentation
100 kVA transformer
100 kVA transformer
100 kVA transformer
100 kVA transformer
100 kVA transformer
100 kVA transformer
100 kVA transformer
100 kVA transformer
100 kVA transformer
100 kVA transformer
100 kVA transformer
100 kVA transformer
Transformer support tower
Transformer support tower
Transformer support tower
20 kV outdoor switch-disconnector
20 kV outdoor switch-disconnector
20 kV outdoor switch-disconnector
20 kV outdoor switch-disconnector
20 kV outdoor switch-disconnector
20 kV outdoor switch-disconnector
LV distribution board
LV distribution board
LV distribution board
LV distribution board
LV distribution board
LV distribution board
LV distribution board
LV distribution board
60 kVAR PFC panel
60 kVAR PFC panel
60 kVAR PFC panel
60 kVAR PFC panel
60 kVAR PFC panel
60 kVAR PFC panel
60 kVAR PFC panel
Earthing system
Earthing system
Associated LV equipment
Associated LV equipment
Associated MV equipment
Associated MV equipment/ metering
Utility / commissioning interface
Utility / commissioning interface
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
1-Executive Summary -Aleppo - WP1..pdf
Bidding document • 0.38 MB
2- Bill of Quantities -Aleppo - WP1..xlsx
Bidding document • 0.05 MB
3- Technical Specifications.pdf
Bidding document • 0.42 MB
4- Drawing.pdf
Bidding document • 1.13 MB
Minimum Health and Safety Requirements for Contractors..pdf
Bidding document • 0.75 MB
Small_Works_RFQ_Section_I_InstructionstoBidders.pdf
Bidding document • 2.15 MB
Small_Works_RFQ_Section_II_III_IV_V WP1-Aleppo- 100 KVA Transformer..docx
Bidding document • 0.30 MB
Small_Works_RFQ_Section_VI_ReturnableSchedules WP1-Aleppo- 100 KVA Transformer..docx
Bidding document • 0.57 MB
WP1_Technical_Compliance_and_Comparative_Data_Schedule- WP1-Aleppo- 100 KVA Transformer..xlsx
Bidding document • 0.02 MB
Notice on UNGM.html
Notice page • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .