Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Amendment #5
The following amendment is hereby issued under Revision 5 for RFP/2026/64531:1. Alignment of Terms of Reference (TORs) with eSourcing CriteriaPlease note that the Terms of Reference (TORs) documents for the Lot 1 and Lot 2 has been updated to align its Eligibility, Formal, and Qualification criteria with the exact text already reflected in the eSourcing portal tabs.No Substantive Changes: There are no changes to the Scope of Work, technical requirements, deadlines, or any other fields.Easy Reference: All text updates within the revised TOR document have been highlighted in yellow for bidders ease of reference.
Clarification
Question 6: How are studies, designs and calculation sets counted?Reference: Lot 1—Criteria 1.1, 1.2 and 2.2–2.4.Please clarify whether quantities refer to contracts, facilities or technical packages, and whether one project may support several criteria. Given the limited comparable local assignments, would UNOPS consider reducing the minimum quantities where strong specialist capability is demonstrated?Answer 6: Quantities refer to completed studies, designs, and technical packages as explicitly defined under the technical assessment criteria (e.g., completed geological investigations or full sets of drawings). Distinct studies, designs, or calculations carried out within a single project will be counted separately. The minimum quantities specified under each criterion remain unchanged. Question 7: What qualifies under drainage and treatment calculations?Reference: Lot 1—Criteria 2.3 and 2.4.Please confirm whether surface water drainage designs qualify under Criterion 2.3, and whether structural stability and treatment-process mass balance calculations may be demonstrated through separate assignments and specialists under Criterion 2.4.Answer 7: Regarding Criterion 2.3 (Drainage Systems): Surface water drainage designs qualify under Criterion 2.3 provided they are integral components of waste management infrastructure (such as stormwater management around waste processing pads, leachate collection networks, drainage canals, and environmental control systems for waste facilities). General municipal road drainage or unrelated building drainage will not be considered.Regarding Criterion 2.4 (Calculations): Yes, structural stability calculations and treatment-process mass balance calculations (for waste treatment, leachate treatment, or compost production) are recognized under Criterion 2.4. However, each qualifying submission must be presented as a comprehensive and complete set of calculations (Report on Calculations and Justifications) linked to a qualifying project. While multidisciplinary specialists may contribute to these designs, the corporate submission must meet the required threshold of complete calculation packages as specified in the evaluation criteria.While multidisciplinary specialists may contribute to these designs, Criterion 2.4 strictly evaluates the firm's/institution's corporate design track record. Experience or calculations performed by individual specialists under previous employers count toward Section 3 of Table 6 (Strength of Team / Institution) and cannot be substituted for the firm's required corporate calculation sets. Question 8: Can the turnover requirement be clarified and reviewed?Reference: Lot 1—Criterion 3.3.Does USD 500,000 refer to total consultancy turnover or similar services, and over which financial period? Can JV members’ turnover be combined? Would UNOPS consider a lower threshold or average annual turnover proportionate to the assignment?Answer 8: The USD 500,000 requirement refers to the minimum annual turnover (annual volume of work performed) in at least one of the last five years. Turnover from multiple years cannot be combined to meet this threshold. Question 9. Are all individual minimum requirements mandatory?Reference: Both lots—TOR Assessment Matrices and Minimum Qualification Annex.Please confirm whether missing an individual minimum results in rejection despite achieving the overall pass mark of 70. Please also clarify the scoring method and which document takes precedence where requirements differ.Answer 9: Not meeting the minimum requirement of a criteria under table 6- partner assessment matrix will result in zero marks for that particular criteria, however will not be considered as a reason for rejection of the proposal. Bidders must meet the minimum cumulative points of 70 marks for technical criteria to be qualified for further evaluation with a financial proposal. Please refer to the Particular tab in the e-sourcing for further information.Question 10.1: Can comparable projects and aggregated lengths qualify for Lot 2?Reference: Lot 2—Criteria 1.1–1.3 and 2.2–2.4.Please confirm whether relevant road, survey, drainage, culvert, bridge and retaining structure experience from wider infrastructure projects is acceptable. Answer 10.1: Relevant road, survey, drainage, culvert and bridge experience from wider infrastructure projects are acceptable, provided it meets the specific scope and measurement parameters outlined in the Lot 2 TOR and criteria. Question 10.2: Can the required lengths be aggregated across assignments, and can comparable drainage or conveyance studies qualify for the discharge route criterion? Answer 10.2: Please refer to Table 6 and the notes under the ToR for Lot 2.
Clarification
Question 1: Can related consultancy experience satisfy the 10-year requirement?Reference: Lots 1 and 2—Eligibility Criteria.Our firm has over 10 years of civil and structural consultancy experience. Given the limited availability of local firms with extensive sanitary landfill experience, would UNOPS accept this experience supported by qualified landfill and environmental specialists? Answer 1: Yes. Related consultancy experience is acceptable. The offeror or at least one member of a joint venture must have been in continuous business offering similar services for more than 10 years. An Sub-contractor experience will not be considered. This has been reflected in the qualification criteria of the updated ToR, not under eligibility. General civil and structural engineering consultancy experience outside the scope of solid waste management does not satisfy the 10-year requirement. Only experience specifically in the design, construction, or management of sanitary landfills or closely related waste infrastructure projects (such as transfer stations, composting facilities, or water/leachate treatment plants,drainage and/or gas collection systems ), construction of bunds, retaining walls, soil bioengineering structures will be considered. The inclusion of specialists with relevant experience will not be considered as minimum previous experience requested for the offeror. Question 2: What will be accepted as “similar projects”?Reference: Lot 1—Criteria 1.1, 1.2 and 2.2.Our firm has extensive experience in managing geotechnical investigations, earthworks, slope stability, retaining structures, bunds, ground improvement, drainage, water-retaining structures, treatment tanks and coordinated multidisciplinary designs. Please confirm whether these components of building, industrial and infrastructure projects qualify, including work for private clients and government institutions.Answer 2: Experience specifically in the design, construction, or management of sanitary landfills or closely related waste infrastructure projects (such as transfer stations, composting facilities, or water/leachate treatment plants, drainage and/or gascollection systems), construction of bunds, retaining walls, soil bioengineering structures will qualify.General building, industrial, and infrastructure projects will not qualify. Even those involving earthworks, slope stability, retaining structures, drainage, or treatment tanks as sub-components of a main project do not qualify as "similar projects”. Question 3: Can previous personal experience with UNOPS be recognised?Reference: Lot 1—Relevant Experience and Strength of Team / Institution.Our Managing Director was involved in Ampara solid waste handling facility during his work with UNOPS-PIDU, with designs prepared by the in-house team. Please confirm whether this may be credited as his personal professional experience, subject to evidence of his responsibilities.Answer 3: Yes. Individual professional experience can be credited toward the evaluation of key personnel (such as Project Managers and experts) provided that proper supporting evidence and documentation of responsibilities are submitted with the CV. Question 4: Can specialist expert and subcontractor experience be considered?Reference: Lots 1 and 2—Eligibility and Technical Assessment Criteria.Please clarify whether the exclusion of subcontractor experience applies only to the 10-year eligibility requirement or also to technical scoring. Considering the limited local specialist experience, would UNOPS recognise committed specialists’ relevant assignments, including experience gained with previous employers?Answer 4: Subcontractor experience will not be considered toward the firm's 10-year eligibility requirement.Exclusion of subcontractor experience is applicable for both eligibility as well as for technical scoring. The experience through Joint ventures will count.Relevant experience gained by key specialists with previous employers is considered when evaluating key personnel experience. Question 5: Can JV or consortium members collectively meet the experience requirements?Reference: Lots 1 and 2—Technical Assessment Criteria.Please confirm whether members may collectively demonstrate the required specialist studies, designs and calculations according to their assigned responsibilities, and identify any requirements each member must meet individually.Answer 5: Joint venture, consortium, or association members can collectively meet the technical experience requirements, subject to the following conditions:Each member must meet formal and eligibility criterion #1.The lead partner must meet formal and eligibility criteria #3 and #5.All members combined must meet all technical criteria.At least one member must meet formal and eligibility criterion #4 and qualification criteria #1, #2, and #3.
Amendment #4
Dear All,The following amendments are hereby issued under Revision 4 for RFP/2026/64531:1. Issuance of Revision 4 Amendments (Qualification, Technical, and JV Requirements) Please note that detailed revisions have been made to the Terms of Reference (TORs), and eSourcing tabs, specifically regarding qualification criteria, technical criteria, and Joint Venture (JV) submission requirements.A separate document detailing all specific updates and amendments under Revision 4 has been uploaded under the Documents section of the eSourcing portal. All prospective bidders are strongly advised to carefully review this document in full prior to preparing and submitting their proposals to ensure complete compliance.2. Extension of Bid Submission Deadline To provide suppliers with sufficient time to review the updated requirements and finalize their submissions, the bid submission deadline has been extended by 10 days from 16 November 2026 to 26 Novemberr 2026 at 18:00 UTC.3. Deadline for ClarificationsThe deadline for clarifications has been further revised to 23 November 2026 at 18:00 UTC
Amendment #3
Dear All,The following amendments are hereby issued:1. Extension of Bid Submission DeadlineThe bid submission deadline has been further revised to 16 November 2026 at 18:00 UTC.2. Deadline for ClarificationsThe deadline for clarifications has been further revised to 12 November 2026 at 18:00 UTC.
Clarification
Lot 2 / Question 1: Who is responsible for permissions, consents and environmental acceptance for alternative discharge routes?Reference: Lot 2 TOR—Scope of Work, Output 1: Examination of a Feasible Discharge Route for Treated Leachate. Please clarify whether UNOPS will facilitate access permissions, landowner consents and acceptance by the Central Environmental Authority, or whether these are the consultant’s responsibility. Please also confirm who will bear any associated fees.Lot 2 / Answer 1: Leachate Discharge Route Proposal: The consultant/bidder is responsible for identifying, examining, and proposing a suitable alternative discharge route for treated leachate, along with providing all supporting technical data, assessment reports, and documentation.Regulatory Approvals & Statutory Consents: Obtaining formal approval and environmental acceptance from the Central Environmental Authority (CEA), as well as access permissions and landowner consents, is not the consultant's/bidder's direct responsibility. These regulatory approvals and stakeholder consultations will be facilitated and handled by the Employer / Client / UNOPS.Lot 2 / Question 2: Will the Project Manager position be evaluated?Reference: Lot 2—Minimum Qualification Requirements, TOR and Returnable Schedule. The evaluation criteria do not specify marks for the Project Manager position, although it is included in the Returnable Schedule. Kindly confirm whether this position will be evaluated and, if so, specify the applicable criteria and marks.Lot 2 / Answer 2: Yes, the Project Manager position will be evaluated on a Pass/Fail basis. However, no specific marks have been allocated to this position in the evaluation matrix.Nevertheless, the service provider is responsible for allocating the necessary human resources to ensure the effective delivery of the specified scope of work, even if certain positions are not explicitly identified in the solicitation document.
Clarification
Lot 1 / Question 1: Will the Project Manager position be evaluated?Reference: Lot 1—Minimum Qualification Requirements, TOR and Returnable Schedule.The evaluation criteria do not specify marks for the Project Manager position, although it is included in the Returnable Schedule. Kindly confirm whether this position will be evaluated and, if so, specify the applicable criteria and marks.Lot 1 / Answer 1: Yes, the Project Manager position will be evaluated on a Pass/Fail basis. However, no specific marks have been allocated to this position in the evaluation matrix.Nevertheless, the service provider is responsible for allocating the necessary human resources to ensure the effective delivery of the specified scope of work, even if certain positions are not explicitly identified in the solicitation document.Lot 1 / Question 2: What are the locations and investigation requirements for the 12 geological investigation points?Lot 1 / Answer 2: Please be advised that although eight investigation locations within the landfill area and four locations outside the landfill area have been indicated, the final locations and number of investigation points will be subject to prevailing site conditions. Bidders are not required to use the exact same investigation points. The service provider may determine the appropriate locations and increase the number of investigation points based on site-specific conditions and technical requirements. However, reducing the proposed number of investigation points is not advisable. Accordingly, bidders are required to propose appropriate investigation methodologies and identify the necessary data requirements, taking into consideration the site conditions and the overall objectives of the investigation.Lot 1 / Question 3: What are the locations and requirements for the hydrogeological investigations?Reference: Lot 1 TOR—Table 1, Engineering Study: Hydrogeological Investigation, specifying investigations upstream, downstream and at 10 other locations. Please provide the locations/coordinates of these investigation points. Please also confirm the investigation methods, depths, groundwater-testing parameters and monitoring frequency, including whether new boreholes, piezometers or pumping tests are required.Lot 1 / Answer 3: Please be advised that although upstream and downstream locations, together with ten additional locations (a total of twelve investigation locations), have been indicated, the final locations and number of investigation points will be subject to prevailing site conditions. Accordingly, bidders are required to propose appropriate investigation methodologies and identify the necessary data requirements, taking into consideration the site-specific conditions and the overall objectives of the investigation.Lot 1 / Question 4: What arrangements and costs should be included for the two training sessions?Reference: Lot 1 TOR—Scope of Work, requiring two training sessions on modelling and landfill design for technical staff in the Northern and Uva Provinces after design completion and approval. Please confirm the location, duration, delivery mode and expected participant numbers for each session. Please also clarify whether the consultant must bear the costs of the venue, equipment, training materials, refreshments, participant travel and accommodation.Lot 1 / Answer 4: The training programme will focus on landfill design and operations, with the primary participants being technical staff from local authorities, including engineers, technical officers, public health inspectors, and supervisors.The service provider shall be responsible for covering all costs associated with organizing and delivering the training programme, including venue arrangements, training materials, equipment, and refreshments. The training is expected to be conducted within the Badulla district. The service provider will not be required to cover participants' travel and accommodation expenses, as these will be the responsibility of the respective local authorities.Lot 1 / Question 5: What physical meetings and site visits are expected during the 16-week review period?Reference: Lot 1 TOR—Management and Reporting; Table 1, Design Review & Approvals; Table 5, Work Programme. Please confirm the expected number, locations and duration of physical review meetings and additional site visits, including which experts must attend. Please also clarify whether virtual attendance is acceptable, to enable accurate travel and accommodation costing.Lot 1 / Answer 5: The design review meetings are expected to be conducted virtually; therefore, physical attendance is not mandatory. However, the experts and technical staff involved in the design process must be available to participate in the review meetings and provide the necessary technical clarifications and responses throughout the design review process. Bidders should take these requirements into consideration when preparing and proposing their financial offers.Lot 1 / Question 6: What staffing and services are required for the 24/7 help desk?Reference: Lot 1 TOR—Management and Reporting, requiring a dedicated help desk accessible 24 hours a day, seven days a week, via telephone and email. Please clarify whether separately dedicated personnel are required or whether telephone and email support from the project team is acceptable. Please also confirm the scope of support, response times, and operating period for staffing and cost estimation.Lot 1 / Answer 6: The personnel involved in the design process shall be available to participate in virtual meetings and provide the necessary technical clarifications, as required. Virtual meetings and email correspondence shall be the primary modes of communication, while telephone conversations may be used as an optional means of communication.The scope of support and clarifications shall be limited to the documents submitted by the service provider and the solicitation document issued by UNOPS. The service provider shall ensure that all queries and requests for clarification are addressed within 48 hours of receipt. The service period shall commence on the date of contract signing and continue until the expiry of the contract. The service provider shall bear all costs associated with fulfilling these requirements throughout the contract period.
Clarification
Question: "Returnable Schedules - 0.13 Proposal, No Proposal Confirmation", however, we are unable to find a placeholder under the tender for submission through portal. Please advise. Answer: Please note that submission of Returnable Schedules 0.13 and 0.14 is not mandatory. Bidders are not required to upload these schedules through the portal.
Amendment #2
Dear All,The following amendments are hereby issued:1. Please note the following correction to the RFP description: Correction: The paragraph referring to "IT infrastructure and cable routing for thirty hospitals (MOH project)" was included by mistake and has been removed completely.2. Extension of Bid Submission DeadlineThe bid submission deadline has been revised to 04 November 2026 at 18:00 UTC.
Amendment #1
Dear All,The following amendments are hereby issued:1. Extension of Bid Submission DeadlineThe bid submission deadline has been revised to 02 November 2026 at 11:30 UTC.2. Second Site Inspection – Badulla DistrictUpon request, UNOPS will arrange a second site inspection in the Badulla District on or before 26 October 2026.Offerors willing to participate in the site inspection are kindly requested to notify UNOPS by email no later than 26 October 2026, COB, using the following email addresses:[email protected]@unops.orgThe date and time of the site inspection will be communicated directly to the requesting offerors in due course.Please note that this will be the final site inspection that can be arranged for this procurement due to time constraints. No further site visits will be accommodated.Thank you.
Clarification
Question: With reference to Section II – Qualification Criteria and the previous clarifications concerning participation by international and Sri Lankan firms in a Joint Venture, please confirm whether the minimum technical experience requirements for Lots 1 and 2 may be satisfied cumulatively by the JV partners.Answer: Please be advised that Lot 1 and Lot 2 are treated as two separate lots, and sector-specific experience is strictly required for each. The minimum technical experience requirements cannot be satisfied cumulatively.
Clarification
Question: With reference to Section II – Qualification Criteria and the previous clarifications concerning participation by international and Sri Lankan firms in a Joint Venture, please confirm whether the minimum technical experience requirements for Lots 1 and 2 may be satisfied cumulatively by the JV partners.Answer: Please be advised that Lot 1 and Lot 2 are treated as two separate lots, and sector-specific experience is strictly required for each. The minimum technical experience requirements cannot be satisfied cumulatively.
Clarification
Question: Could you confirm whether an international service provider with relevant design experience may participate in this Project in a JV with a Sri Lankan service provider with relevant design experience, even if the international service provider itself has no previous experience working with local partners in Sri Lanka? Could you confirm whether an international service provider with relevant design experience may participate in this Project in a JV with a Sri Lankan service provider with relevant design experience, even if the international service provider itself has no previous experience working with local partners in Sri Lanka? Could you confirm whether an international service provider with relevant design experience may participate in this Project in a JV with a Sri Lankan service provider with relevant design experience, even if the international service provider itself has no previous experience working with local partners in Sri Lanka?Answer: Yes. An international service provider with relevant construction design experience may participate in the Project in a joint venture (JV) with a Sri Lankan service provider that also has relevant construction design experience. The international service provider is not required to have previous experience working with local partners in Sri Lanka, provided that both parties meet the eligibility and experience requirements specified in the solicitation document.2026-10-06 05:27 UTC
Clarification
Question: Could you confirm whether an international service provider with relevant design experience may participate in this Project in a JV with a Sri Lankan service provider with relevant design experience, even if the international service provider itself has no previous experience working with local partners in Sri Lanka? Could you confirm whether an international service provider with relevant design experience may participate in this Project in a JV with a Sri Lankan service provider with relevant design experience, even if the international service provider itself has no previous experience working with local partners in Sri Lanka? Could you confirm whether an international service provider with relevant design experience may participate in this Project in a JV with a Sri Lankan service provider with relevant design experience, even if the international service provider itself has no previous experience working with local partners in Sri Lanka?Answer: Yes. An international service provider with relevant construction design experience may participate in the Project in a joint venture (JV) with a Sri Lankan service provider that also has relevant construction design experience. The international service provider is not required to have previous experience working with local partners in Sri Lanka, provided that both parties meet the eligibility and experience requirements specified in the solicitation document.
Clarification
Question:With reference to the requirement for “Experience working with local partners in Sri Lanka – minimum two (2) legal contracts” for Lots 1 and 2, please confirm whether, in the case of a Joint Venture between an international firm and a Sri Lankan firm, this requirement may be fulfilled by the Sri Lankan JV partner.In other words, can an international firm with no previous contracts in Sri Lanka participate if its Sri Lankan JV partner can demonstrate the required two legal contracts with local partners in Sri Lanka?Answer:The international service provider must have demonstrated experience in construction design. Similarly, the Sri Lankan service provider intending to enter into a Joint Venture (JV) must also have demonstrated experience in construction design.Both the international and Sri Lankan JV partners are required to meet this requirement. If either party does not have relevant construction design experience, the proposed JV will not be eligible.
Clarification
Question: With reference to the requirement for “Experience working with local partners in Sri Lanka – minimum two (2) legal contracts” for Lots 1 and 2, please confirm whether, in the case of a Joint Venture between an international firm and a Sri Lankan firm, this requirement may be fulfilled by the Sri Lankan JV partner.In other words, can an international firm with no previous contracts in Sri Lanka participate if its Sri Lankan JV partner can demonstrate the required two legal contracts with local partners in Sri Lanka?Requested by: Salvatore Bellizzi ([email protected])Requested on: 2026-10-02Answer: The international service provider must have demonstrated experience in construction design. Similarly, the Sri Lankan service provider intending to enter into a Joint Venture (JV) must also have demonstrated experience in construction design.Both the international and Sri Lankan JV partners are required to meet this requirement. If either party does not have relevant construction design experience, the proposed JV will not be eligible.
Clarification
Dear Sir/Madam,Question :Due to the National Day holiday in China from October 1 to 8, we would like to kindly request an extension of the bid closing date to November 19. Additionally, we would greatly appreciate it if the on-site inspection scheduled for October 6 could be postponed to October 20. We look forward to your approval.Answer ;Due to an urgent design requirement, we will not extend the tender deadline at this stage. Please kindly adhere to the timeline specified in the tender document.
Clarification
Dear Team,Due to an urgent design requirement, we will not extend the tender deadline at this stage. Please kindly adhere to the timeline specified in the tender document.Thank you very much for your cooperation and understanding.With best regards,Sivakumaran
Clarification
Dear Team,Due to an urgent design requirement, we will not extend the tender deadline at this stage. Please kindly adhere to the timeline specified in the tender document.Thank you very much for your cooperation and understanding.With best regards,Sivakumaran
Tender Value
Refer Docs
Bid Security (EMD)
Refer Docs
Closing Date
26 Nov 2026, 18:00 (UTC)4d left26 Nov 2026, 11:30 pm IST
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
This RFP refers to procurement of Consultancy Services for Provision of Design Service for Sanitary Landfill and Access Road in Badulla District, Sri Lanka (2 lots). The United Nations Office for Project Services’ (UNOPS) mission is to serve people in need by expanding the ability of the United Nations, governments and other partners to manage projects, infrastructure and procurement in a sustainable and efficient manner. Within these three core areas of expertise, UNOPS provides its partners with advisory, implementation and transactional services, with projects ranging from building schools, hospitals, administrative offices etc to procuring goods and services and training local personnel. UNOPS works closely with governments and communities to ensure increased economic, social and environmental sustainability for the projects we support, with a focus on developing national capacity. UNOPS, with funding support from KOICA, is seeking a qualified service provider to undertake detailed engineering studies, geological investigations, and comprehensive facility designs for new and modified composting plants, Material Recovery Facilities (MRFs), and associated infrastructure across the Badulla and Vavuniya districts, aiming to establish sustainable solid waste management and circular economy practices in the Uva and Northern Provinces of Sri Lanka. The requirement is divided into two separate lots and proposals are being invited for individual contracts (lots) or for combination of contracts (lots). Offerors are allowed to submit one proposal, either for a single lot or for both lots. Proposal must cover 100% of the services specified for each offered lot. IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
315426
RFP/2026/64531
Request for proposal
Sri Lanka
RFP
UTC
21 Nov 2026
23 Sept 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Annex - Minimum Qualification ( Lot 1 & 2 ) .pdf
Bidding document • 0.07 MB
Annexes - Lot 01 & Lot 02.pdf
Bidding document • 0.08 MB
Lot 01 - RFP_Section_VI_Returnable Schedules_Schedule 4.1.A & 4.1.B .docx
Bidding document • 1.41 MB
Lot 02 - RFP_Section_VI_Returnable Schedules_Schedule 4.1.A & 4.1.B .docx
Bidding document • 1.41 MB
RFP _ Section I - Instructions to Offerors.pdf
Bidding document • 2.34 MB
RFP _ Section II, III, IV, V .docx
Bidding document • 0.34 MB
RFP _ Section VI - Returnable Schedules.docx
Bidding document • 0.61 MB
RFP_Annex_01_Design Planning Manual.pdf
Bidding document • 4.60 MB
RFP_Annex_02_CAD Drawing Guideline.pdf
Bidding document • 1.50 MB
RFP_Annex_03_UNOPS Occupational Health _ Safety and Social _ Environmental Management_Policy.pdf
Bidding document • 0.12 MB
RFP_Annex_04_Template_NDA.pdf
Bidding document • 0.15 MB
RFP_Annex_05_UNOPS_eSourcing_Vendor Guide_EN.pdf
Bidding document • 6.51 MB
Rev 4_ List of Amendments.pdf
Bidding document • 0.22 MB
Lot 02-TOR Technical study and Road design_Revision 2.pdf
Bidding document • 0.29 MB
Lot 01-TOR Landfill design_Revision 2.pdf
Bidding document • 1.44 MB
Notice on UNGM.html
Notice page • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .