Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Clarification
Question: Dear Sir/Madam,We are interested in participating in the tender; therefore, we kindly request you to extend the closing date.Dear Bidder, Thank you for your interest in this tender. Answer: Unfortunately, we are unable to extend the bid submission deadline because of project timelines. The deadline remains unchanged.Best regards,Procurement UnitUNOPS Sudan Office
Clarification
Dear Bidder, Thank you for your interest in this tender. Question: Dear UNOPS Procurement Team,Approach Engineering Co. Ltd. confirms its interest in participating in the above-referenced tender.We kindly request an extension of the bid submission deadline, to allow sufficient time to thoroughly review the tender documents, obtain supplier quotations, and prepare a comprehensive and competitive bid.We would appreciate your consideration and confirmation of the requested extension.Answer: Unfortunately, we are unable to extend the bid submission deadline because of project timelines. The deadline remains unchanged.Best regards,Procurement UnitUNOPS Sudan Office
Amendment #1
Dear Bidders,Thank you to all bidders who participated in the pre-bid meeting.Please note that the tender has been amended to include the Pre-Bid Meeting presentation and Meeting Summary Document, which have been uploaded to the system for reference, particularly for bidders who were unable to attend.Bidders are requested to review the uploaded documents and take them into consideration when preparing their submissions.All the bestProcurement UnitUNOPS Sudan Office.
Clarification
Dear Bidders,Thank you for your interest in this tender.Please find below bidder questions and UNOPS clarifications:Q1. Are international contractors eligible to bid directly, or is a locally registered Sudanese partner required?International firms may bid directly, either alone or in a joint venture or consortium, provided they meet the eligibility requirements in Section I: Instructions to Bidders, Article 4 [Bidder Eligibility]. Each bidder, and each joint venture member, must submit:a valid Business Licence;a Company Registration Certificate;an Engineering Practice Certificate, where applicable (Criterion 1.4).Q2. Can bidders bid for individual lots? Is subcontracting of structural steel works permitted?Lots: Bidders may bid for one, several or all lots. Financial and technical capacity will be assessed against the number of lots bid for (Criteria 3.3 and 3.5). A bidder bidding for more than one lot must:meet the minimum annual turnover for each lot (see Q4);propose separate key personnel for each lot (Criterion 4.10);show fully independent teams and technical and financial resources for each lot.UNOPS reserves the right not to award any lot or lots to a bidder.Subcontracting: Permitted. Subcontracted works may not exceed 30% of the Contract Price without UNOPS's prior written approval. For each proposed subcontractor, the bid must include:the subcontractor's name and profile;the scope and estimated value of the subcontracted works;evidence of its technical capability, experience and resources.The bidder remains fully responsible for all subcontracted work (Criterion 4.7).Q3. What are the approximate structural steel quantities and building areas for each lot?Quantities, building areas and specifications are in the Bill of Quantities and drawings for each lot available in e-Sourcing. Bidders should rely only on the solicitation documents and any published amendments.Q4. What are the minimum turnover, experience, financial and registration requirements?These are set out in full in the solicitation documents. In summary:In business: at least 2 years (3.2).Annual turnover: at least USD 300,000 in any 2 of the last 5 years, for each lot bid for. Joint venture members may combine to meet this (3.3).Liquidity / working capital: either a ratio of current assets to current liabilities of at least 1 in any 2 years of 2021–2025, or access to credit or other financial means of at least USD 300,000. Joint venture members may combine to meet this (3.1).Experience: at least 2 completion certificates for building construction contracts of at least USD 300,000 each, completed as prime contractor in the last 5 years (3.4).Key personnel per lot: Project Manager / Team Leader, Site Manager, Site/General Foreman and HSSE Officer (4.10).Minimum equipment per lot: as listed in Schedule 4.7 (4.11).Programme: a preliminary programme and method statement showing completion within 120 calendar days (4.4 and 4.8).Registration: see Q1 and Eligibility CriteriaQ5. Are site visits mandatory, and what arrangements apply?Site visits are not mandatory. Bidders are responsible for informing themselves of site conditions. Any site visit is at the bidder's own cost and risk.Best Regards,Procurement Unit UNOPS Sudan Office.
Tender Value
Refer Docs
Bid Security (EMD)
Refer Docs
Closing Date
26 Nov 2026, 10:00 (UTC)4d left26 Nov 2026, 3:30 pm IST
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender description: Construction of Crop Storage Facilities in Kassala, Gedaref, and Red Sea States, Sudan (5 Lots) – EFSR Project: Lot 1: Construction of Crop Storage Facility – New Halfa (Kassala State) Lot 2: Construction of Crop Storage Facility – Gala El Nahal (Gedaref State) Lot 3: Construction of Crop Storage Facility – East Galabat / Doka (Gedaref State) Lot 4: Construction of Crop Storage Facility – West Galabat / Kassab (Gedaref State) Lot 5: Construction of Crop Storage Facility – Tokar (Red Sea State) ----- The United Nations Office for Project Services (hereinafter referred to as UNOPS) is pleased to invite competent Bidders/Contractors to submit their respective competitive bids for the Construction of Crop Storage Facilities in Kassala, Gedaref, and Red Sea States, Sudan (5 Lots) – EFSR Project. in accordance with the UNOPS General Conditions of Contract. ----- IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
321994
ITB/2026/65470
Invitation to bid
Sudan
INVITATION
UTC
21 Nov 2026
10 Nov 2026
United Nations Office for Project Services
Horn of Africa Multi-Country Office
CROPS STORAGE MODEL DESIGN
ENHANCING FOOD SECURITY AND RESILIENCE OF RURAL COMMUNITIES (EFSR) IN SUDAN
UNPRICED BILL OF QUANTITIES (BOQ)
NOTE: It is a MANDATORY requirement for bidders to complete and return this section
Failure to complete all sections of the BOQ may result in automatic disqualification of your bid.
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
Bill No. 01 General Requirements and Provision 0.00
Bill No. 02 Crops Storage Main Building 0.00
Bill No. 03 MECHANICAL INSTALLATION 0.00
Bill No. 04 ELECTRICAL INSTALLATION 0.00
SUB-TOTAL 1 0.00
LESS DISCOUNT (IF ANY)
GRAND TOTAL 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QTY UNIT RATE (KES) AMOUNT (KES)
BILL NO. 1 PRELIMINARIES
All the Bidders are requested to refer "Pricing Preamble and notes below" and works items of this Bills of Quantities shall be priced to fulfill the requirements there-in. Also see that no page or items are missing prior to pricing of this bill of quantities.
A list of typical general items are given below. However, the Bidder is requested to price only those items that may affect this Contract. Note
The Bidder is advised to visit the site of the proposed work, as it is his responsibility to ascertain the conditions governing access to the site, and external working space, storage area etc. Note
If no price has been stated against any item hereunder, the Contractor shall not be entitled to claim any money for such items even though he is obliged to execute the work or provide services described therein. Preliminary items priced by the Tenderer are deemed to include the cost of unpriced items. Note
The Bidder is advised to refer to the General Notes, Pricing Preambles, Drawings, Specifications, Conditions of Contract, Particular Conditions of Contract and other relevant documents prior to pricing of the following items. Note
The bidder is required to visit the site of the proposed work, as it is his responsibility to ascertain the conditions governing access to the site, the external working space, storage area and any other information he may find necessary before he can tender for the work. Note
Cost and expenses in connection with any other preliminary item which is not listed below, but is necessary for the due completion of works, is deemed to be included in the tender rates. Note
Mechanical plant and equipment which emits excessive noise, smoke, fumes, obnoxious gases etc., will not be allowed to be used in the Site, without the prior approval of the Engineer. Note
The contractor shall be responsible for any loss or damage to the works, existing structures, adjoining structures and unfixed materials. Note
The contractor shall try to locate the new units in a way to avoid cutting trees. If it is really needed to cut down any number of trees, allow for planting same number of trees – Contractor has to take care about watering and maintenance of plants for about 3 months or until completion of the contract. (Fill schedule of late) Note
The contractor shall be responsible for providing necessary lighting, watchmen, and other suitable security measures during construction until handing over. Note
The contractor will be required throughout the contract to maintain and keep from obstructing the existing way. Note
The Contractor shall be responsible for the provision of all materials, scaffolding, tools, plant, transport and workmen required for the works except in so far as may be stated otherwise herein and he shall allow for the provision of the foregoing except for such items specifically and only required for the use of nominated Sub-Contractors as described herein. Note
All such plant, tools and scaffolding shall comply with all regulations whether general or local in force throughout the period of the contract and shall be altered or adapted during the contract, as may be necessary to comply with any amendments in or additions to such regulations. Note
Contractor shall provide helmets, gloves, safety masks, dusk masks, eye goggles, boots etc. for the workmen. Note
Contractor shall provide safety boards, signs and safety ribbons Note
Contractor shall take special care for safety of the patients, staff and public during transportation of materials and implementation of the contract. Note
Plant, Material & Work Practices
No work in any trade shall be carried out in such a manner as to cause any damage and nuisance to adjacent owners or the public. Note
Mechanical plant and equipment which emits excessive noise, water, smoke, fumes, or obnoxious liquids, gases etc., will not be allowed to be used on the site. If the use of such machinery becomes necessary, the Contractor is expected to obtain prior approval. Note
The Engineer has the discretion as to when he deems it necessary for the Contractor to take precautions, maintain or repair any such plant and equipment or order their removal from the site. Note
Contractor shall provide specimens, samples and sample panels of material and testing of materials as appropriate and as directed by Engineer. Note
HORN of AFRICA MULTI-COUNTRY OFFICE (HAMCO): Sudan Office
BILL OF QUANTITIES
ITEM DESCRIPTION UNIT QTY UNIT RATE AMOUNT
1 General Requirements and Provision
a Fabricate supply and erect Project Sign boards as per the drawings No 1 0.00
b Mobilization, Establishing contractor's camps, supply equipment ,personnel, Lab, accommodation and construction plant on the site, L.S 1 0.00
c Demobilization, removal of site establishments of the contractor's organization, camps and reinstating the site to the existed conditions L.S 1 0.00
d As Built Drawings L.S 1 0.00
Total Sub-section Sum Carried to Summary
2 Site Clearance and Organization
a Clearing and removal of bushes, trees and debris and site surfacing M2 245 0.00
b Fencing and protection of site , site security and entrance control L.S 45 0.00
Total Sub-section Sum Carried to Summary
GRAND TOTAL 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QUANTITY UNIT RATE AMOUNT
BILL NO.3 Crops Storage Main Building
A SUBSTRUCTURE AND EARTHWORK
a) Excavation on land of any nature in order to obtain project levels, including loading and transport of surplus material to the dump, eventual bracing, pumping of the tributary water to the excavation, regularization of the bottom of the box and replacement of land whenever necessary, all executed in order to obtain the levels indicated in the design. 155 m3 0.00
b) Excavations of Raft Footing for Water tank & pump room to the depths of not less than 2.0 m as per the drawings or as directed by the Engineer 92 m3 0.00
c) Excavations of square Isolated Footing foundations to the depths of not less than 2.5 m as per the drawings or as directed by the Engineer 355 m3 0.00
d) Excavate and removal of soft material for ramps, landscaping and outside fence 72 m3 0.00
c) Return, fill in and ram selected excavated material around foundations trenches 239 m3 0.00
3 Disposal of Surplus spoils
d) Load and cart away surplus material from site to an approved dumping site 116 m3 0.00
4 Selected filling
e) Backfilling Beneath the Foundations compacted in layers not exceeding 150mm deep and well watered 71 m3 0.00
f) Ditto; Under water tank & pump room 46 m3 0.00
g) Backfilling inside the walls till the tileing elevation with a selected materilas in a compacted in layers not exceeding 150mm deep and well watered 1350 m3 0.00 150
h) Backfilling of filter materials of notless than 150 mm beanecth internal tiling and the external landscaping and entrance ramps as per the drwaings or as directed by the Engineer 900 m3 0.00
i Backfilling for landscaping and entrance ramps with a selected materilas in a compacted in layers not exceeding 150mm deep and well watered as per the drwaings or as directed by the Engineer 150 m3 0.00
4 Concrete work
The contractor should provide for approval the concrete mix design and the aggregates, cement and sand wihich will be used in the construction works.The minimum cement conetent will be 350 Kg of cement per cubic meter
Rates shall include the price of steel reinforcement, formwork, mixing, placing, curing and removal of formwork for all concrete and for all threading fillets etc. The rates shall include the sampling and testing at an approved labortary . All exposed concrete surfaces in columns, beams, slabs etc. must be fair face and of first class standard.
First class shuttering must be used and it must be approved by the Engineer before the reinforcement is placed in position and before the concrete is casted.
Plastered surfaces are to be roughened to receive plaster cement and should be used for all types of concrete
Plain concrete class 15 (mix 1:3:6)
a) 100mm Thick surface blinding under strip footings 142 m2 0.00
b) Ditto; under external & internal tiles 1500 m2 0.00
c) Ditto; for latines seats and slabs 25 m2 0.00
d) Ditto; for water tank & pump room 46 m2 0.00
Insitu concrete class 30, vibrated and reinforced as described, in:-
d) Isolated Footings 86 m3 0.00
e) Raft footing for water tank & pump room 28 m3 0.00
f) Short Columns 19.5 m3 0.00
g) Grade Beam 35 m3 0.00
h) G.B. for Latrines slabs and walls 30 m3 0.00
i) Latrines Strip footing 12 m3 0.00
Foundation walling
Masonry stone walls bedded , jointed in cement and sand (1:3) mortar and reinforced with hoop irons at every alternate course
i) 200mm thick beaneath Grade Beam and ramps sides 200 mL 0.00
i) 12 mm thick cement : sand (1:3) plaster to plinth 160 m2 0.00
j) Three coats of bituminous paint to foundations, columns stubs, grade beam, plinths surfaces. 450 m2 0.00
TOTAL FOR SUBSTRUCTURES AND SITE EARTHWORK CARRIED TO SUMMARY 0.00
B STRUCTURAL FRAME & ROOF
1) Reinforced Concrete
Insitu concrete class 30 , vibrated and reinforced as described, High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
The contractor should provide for approval the concrete mix design and the aggregates, cement and sand wihich will be used in the construction works.The minimum cement conetent will be 350 Kg of cement per cubic meter. where there is an exposure to the sea water and chemical attack, the Contrator should provide the sulphte resistance cement and apply / isoltate the concrete properly form the chemical attack using membrane and painting reagents
Rates shall include the price of steel reinforcement, formwork, mixing, placing, curing and removal of formwork for all concrete and for all threading fillets etc. The rates shall include the sampling and testing at an approved labortary . All exposed concrete surfaces in columns, beams, slabs etc. must be fair face and of first class standard.
First class shuttering must be used and it must be approved by the Engineer before the reinforcement is placed in position and before the concrete is casted.
a) Intermediate tie beams ( top level +3.00m) 16 m3 0.00
b) Top beams ( top level +5.20m) 10.5 m3 0.00
c) R.C. Ground Floor Columns 27 m3 0.00
d) R.C. walls for water tank & pump room 12.5 m3 0.00
e) R.C. cover slab for water tank & pump room 6.25 m3 0.00
2 Steel Roofing Frame & Sheet
Contractor to allow for hoisting and all angle brackets or gusset plates bolts, cleats, fish tailing lugs, drilling holes and the likes for fixing members to position as per the details;
The following in trusses and/or independent members
Frame structure including rafters, cross bracing, fasteners,struts and purlins complete with bolts and nut, fillet weld together.The contractor shall obtain the roof structure manfacturer drawings and spsecifications before importing or delivering to site to be reveiwed and approved by the Engineer .
a) Fabricate, erect and fix in position steel columns of IPE 500 , including surface preparation, anti-corrosion primer, and two coats of enamel finish paint. 26.4 M.L 0.00
b) Fabricate, erect and fix in position roof framing shall consist of primary beams of IPE 400 ( Rafter ) as per the drawings. 323.4 M.L 0.00
c) Fabricate, erect and fix in position roof framing shall consist of Secondary beams of IPE 330 as per the drawings. 100 M.L 0.00
d) Fabricate, erect and fix in position roof framing shall consist of Purlins section (SHS100*4) as per the drawings. 1,644.80 M.L 0.00
e) Fabricate, erect and fix in position Double Rod Bracing ∅32mm as per the drawings. 342 M.L 0.00
f) Supply and install galvanized steel roofing sheets ( thick. 50mm) as specified placed in and to steel frame including fasteners and all fittings in accordance with the drawings, manufacturer's instructions and Engineer directions. 1,562.50 m2 0.00
TOTAL FOR STRUCTURAL FRAME & ROOF CARRIED TO SUMMARY 0.00
First Class Bricks: Type (Fire faced brick) Uniform size (e.g., ~242x115x70mm), sharp edges, free from cracks, good crushing strength , low water absorption (<12-20%), made from good brick earth.
Three- ply bituminous felt damp proof course bedded in cement and sand (1:3) mortar (measured net allow for 300mm laps):-
a) 200mm wide between grade beam and bottom of the brick wall 180 mL 0.00
1) External Walling
200mm Thick walling , Supply material and construct first calss masonry burnet brick walls bedded and jointed in cement and sand (1:3) mortar
a) for Main Building 800 m2 0.00
b) Ditto for landscaping and gates, fence 36 m2 0.00
c) Ditto for latrines 60 m2 0.00
2) Internal Partition offices Walling 60 m2 0.00
d) For gurd rooms and entrances 30 m2 0.00
TOTAL FOR WALLING CARRIED TO SUMMARY 0.00
D DOORS and WINDOWS
Note: All doors shall be supplied and installed in accordance with the provided details and schedule. The installation shall include all necessary design features to ensure proper sealing and protection against insects, rodents, dust, and moisture, including but not limited to rubber or brush seals, tight-fitting frames, and metal thresholds. All ironmongery not measured separately shall be deemed included in the rates for the corresponding doors..
Mild steel caged door made out of cold rolled steel sections thoroughly cleaned and phosphatized to resist corrosion before receiving Two coats of grey rust inhibiting primer
Door external frame grouted below finished floor and fixed to walls: All iron mongery and lugs fixed to manufacturer's specifications
a Entrance Sliding Door (5.0 x 4.0m ) : Supply and install high-quality metal door 2.5 - 3 mm for vehicle entry with enhanced security features, including heavy-duty steel construction, durable locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint, and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 2 Nr 0.00
b Supply and install high-quality Singl steel door ( 900x220mm high ) including locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint, and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 4 Nr 0.00
c Supply and install high-quality Singl steel door for Latrine ( 700x220mm high ) including locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint ,and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 4 Nr 0.00
d Fence Gate (4.0 x 1.8m ) : Supply and install high-quality metal door 2.5 - 3 mm for vehicle entry with enhanced security features, including heavy-duty steel construction, durable locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint, and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 1 Nr 0.00
TOTAL FOR DOORS CARRIED TO SUMMARY 0.00
a Supply and install a high-quality steel window (3000 × 1000 mm high) comprising three upward-opening glass panels, each fitted with external steel mesh. The window shall include locking mechanisms, hinges, handles, anti-rust treatment, and three layers of chemical-resistant paint, along with all necessary accessories to ensure strength, durability, and safety, in accordance with the specifications, drawings, and the Engineer’s instructions. 30 Nr 0.00
b Supply and install ( 1000x1200mm high ) Double glazed aluminum for Security Room, 2-panel hinged window including 6mm toughwood glass out skin and 7.5mm laminated glass inner skin, metal insect mesh. (Weight of section not less 1.6kg/m.l, and width of external section 100 mm) 2 Nr 0.00
c Supply and install ( 800x400mm high ) Double glazed aluminum for latrines, 2-panel hinged window including 6mm toughwood glass out skin and 7.5mm laminated glass inner skin, metal insect mesh. (Weight of section not less 1.6kg/m.l, and width of external section 100 mm) 4 Nr 0.00
TOTAL FOR WINDOWS CARRIED TO SUMMARY 0.00
Ceiling Finishes
1 Roof Isolation
a) Supply, roof tempreturs isolation sheets and install , with pproper fixing wires and glue under the corrugated roof sheets as per drwaings , spcifications or as directed by the Engineer 1500 m2 0.00
2 Anti-Rust and chemacal attack paints
Prepare and apply undercoat and two finishing coats of gloss oil paint; and anti-rust paints
b) beneath and on the top of the corrougated roof sheets 3000 m2 0.00
2) Floor finishes
a Supply and apply epoxy coating of floor with skirting (100 mm) and joints. Samples shall be approved by site Engineer prior to procurement. 1500 M2 0.00
b Supply and fix 600x600x8.5 thick ceramic floor tiles tiles layed over white cement slurry over cement sand screed to overll thickness of 100mm include skirting 8cm high. Samples shall be approved by site Engineer prior to procurement. 16 M2 0.00
c Supply and fix300x300x8.5 thick non-slip ceramic tiles for latrines over waterproofing adhesive layed over white cement slurry over cement sand screed . Samples shall be approved by site Engineer prior to procurement. 24 M2 0.00
d Supply and fix a floor pallet made from durable, untreated hardwood or pest-resistant softwood, measuring 1.2 x 0.8m with a minimum dynamic load capacity of 1,500 kg, featuring top deck boards spaced no more than 4 cm apart, and elevated 10 to 15 cm above the floor 1200 M2
a Supply and apply 5 cm thickness concrete tiles with textured surface and stamped on two layers of selected material 25 cm for each around premisses of main building pattern as per drawings 500 M2 0.00
3) Wall Finishes (Plastering)
Clean, well-graded sand; Portland cement; clean potable water; bonding agent or hardening walls, consistent mix. apply the mixture in a multi-step process involving surface preparation, applying coats of plaster, leveling, and proper curing. This process ensures a strong bond, a flat surface, and prevents cracking.
Internal Walls: 12mm thick cement sand plaster, with steel trowelled finish, as described to:-
a) Wall surfaces internally of main building 1000 m2 0.00
b) Wall surfaces internally of latrines 60 m2 0.00
External Walls: 15mm Cement and sand (1:3) render on block wall or concrete work to:-
Fill uneven surfaces with stucco filler to approval including sanding of all uneven surfaces; apply two undercoats emulsion paint and two finishing coats of first quality Silk Vinyl emulsion paint to match the existing ;-
c) Wall surfaces externally of main building 1000 m2 0.00
d) Wall surfaces externally of latrines 60 0.00
Wall Finishes (Painting)
Fill uneven surfaces with stucco filler to approval including sanding of all uneven surfaces; apply two undercoats emulsion paint and two finishing coats of first quality Silk Vinyl emulsion paints
a) Wall surfaces internally of main building 1000 m2 0.00
b) Wall surfaces internally of latrines 60 m2 0.00
c) Wall surfaces externally of main building 1000 m2 0.00
d) Wall surfaces externally of latrines 60 m2 0.00
Fence chain Link and posts
a Fabrication: GI Chain Link Mesh 50x50mm mesh size, 3mm or 4mm diameter). Height: Generally 2.0 meters above ground level. Posts: Main posts (60.3mm O.D.) and line posts, spaced 3m apart. Structure: 'Y' shaped arms (450mm) for 3-6 rows of barbed wire. Finish: Galvanized (ASTM-A392-81) or PVC coated. Foundation: Concrete base ( 1:4:8 mix) for posts. 320 mL 0.00
TOTAL FOR FINISHES CARRIED TO SUMMARY 0.00
ITEM DESCRIPTION
A SUBSTRUCTURES 0.00
B STRUCTURAL FRAME & ROOF 0.00
D DOORS & WINDOWS 0.00
TOTAL TO SUMMARY 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QUANTITY UNIT RATE AMOUNT
A MECHANICAL INSTALLATION
1 PORTABLE FIRE FIGHTING EQUIPMENT
CO2 Fire Extinguishers
a) 6 kg Carbon Dioxide Steel Stored pressure gas fire extinguishers conforming to BS EN 3 complete with:- - charge and fixing bracket - pictorial instructions - colour coding to BS 7863 - discharge horn and hose. - pressure indicator -Complete with all required identification signage as specified in Technical Specification 3 Nr. 0.00
b) 5 kg ABC type fire extinguishers conforming to BS EN 3 complete with:- - charge and fixing bracket - pictorial instructions - colour coding to BS 7863 -Complete with all required identification signage as specified in Technical Specification 14 Nr. 0.00
2 FIXED FIRE FIGHTING EQUIPMENT 0.00
a) Supply install, test and commission GRP reservoir cylindrical ground water storage tank of nominal capacity 25000 litres; as per provided drawing to be located within a shade to be made as a makeshift shade for fire pump and fire water reservoir as 'TOPTANK' on 300mm high plinth support to structural Engineer’s detail complete with cover. The tank is to be complete with the following ; a) 50mm diameter overflow b) 32mm diameter washouts with gate valve c) 80mm diameter outlet with gate valve (2No.) d) 40mm diameter inlet with high pressure float valve e) Tank connectors for all incoming & outgoing pipes 1 Nr. 0.00
b Supply, install and test and commission a modular skid mounted 22.7m³/hr. @ 80m head; main electric fire pump; (centrifugal with an electric motor capable of working 100% flow at rated pressure, 150% flow at ≥65% rated pressure); a diesel engine driven standby firepump of the same capacity including fuel tank of a minimum capacity of 8 hrs continous running ; and a 3m3/hr capacity electric jockey pump at the rated head of 80m; mounted on a modular skid including all the accessories, signage,manometers, relef valves; test valves; and interconnecting pipes and fittings ; to be installed on a 200mm RC foundation to be built within the fire pump shade ; to the structural and architectural details; to be compliant to NFPA standards. 1 Nr. 0.00
c Supply and install galvanized steel schedule 40 pipes to external fire water distribution system as where shown on the drawing. Complete with all the necessary fittings, support and accessories. DN[mm] = 65mm 20 m 0.00
d Supply, install, test, and commission a wall-mounted, lockable fire hose cabinet , designed for fire fighting purposes in compliance with relevant standards (e.g., EN 671-1 for hose systems .The cabinet shall include all necessary fittings and accessories for full functionality & complete with all required identification signage as specified in Technical Specification Section. Material: Mild steel with anti-corrosion red powder-coated finish, minimum 1.2 mm thickness, suitable for indoor/outdoor use with weather-resistant properties (IP54 or better). Dimensions: Approximately 700 mm (H) × 600 mm (W) × 250 mm (D), or as required to accommodate all components. Door: Hinged, lockable with a break-glass key access system, fitted with a clear tempered glass or acrylic panel for visibility. Mounting: Wall-mounted with corrosion-resistant brackets and fixings, securely anchored to the structure as per manufacturer’s recommendations and structural drawings. Fire hose Type: Synthetic rubber-lined fire hose, compliant with EN 671-1 or equivalent, suitable for Class A, B, and C fires. Length: 30 meters, coiled on a swinging hose reel for easy deployment. Diameter: 38 mm (1.5 inch) nominal, with brass or aluminum nozzle (jet/spray type, adjustable). Couplings: Instantaneous couplings, corrosion-resistant, compatible with local fire fighting standards. Accessories: Nozzle Holder: Integrated holder for the hose nozzle, ensuring secure storage.,Signage: Clear, durable fire equipment signage (minimum 200 mm × 200 mm) in compliance with fire safety regulations, indicating the location and contents of the cabinet.Inlet Valve: Bronze gate valve (PN16, minimum DN25), suitable for connection to the fire water supply system, compliant with BS EN 12201 or equivalent. 3 Nr. 0.00
e Construct rectangular manhole out of 250mm thick double brick walls,internal dimension 600mm x 600mm x 600mm (average depth),internally plastered with three coats of cement/sand mix ratio1:3 ,on a base of precast R.C slab of size ,1300mm x 1300mm x100mm , including benching and bottom channeling with mass concrete.Slab shall be reinforced with dia.8mm reinforcement bar c/c 130mm bothways. Provide 150mm thick granular materials beneath the slab,on a compacted earth . Manhole shall have precast R.C cover slab, each,size, 740mm x 740mm x 100mmreinforced with diameter 8mm steel barc/c140mm bothways,including diameter 14mm steel ring handle with supporter bar all in accordance with the given detail drawings .Unit price shall include excavation of the pitto a depth of 800mm (average) and cart away of the excavated soil. 7 Nr. 0.00
f Supply, lay, test, and commission a High-Density Polyethylene (HDPE) PN16 fire main pipeline , including all necessary fittings, as per the provided detail drawings . The work shall ensure a reliable, leak-free system compliant with site requirements. Pipe: Material: High-Density Polyethylene (HDPE), PE100 grade virgin material, Pressure Rating: PN16 (16 bar nominal pressure).Sizes: As specified in the detail drawings (DN80) Type: HDPE compression fittings, electrofusion fittings, or butt-fusion fittings.Standards: Compliant with BS EN 12201-3 or equivalent, Includes elbows, tees, reducers, couplers, end caps, and transition fittings where ever necessaey (to connect with valves or other materials). Valves: Type: PN16 gate valves, ball valves, or check valves where they are necessary.Material: Bronze, brass, or ductile iron with HDPE-compatible ends (flanged or spigot).Standards: Compliant with BS EN 1074-2 or equivalent. Other Accessories:Thrust blocks, anchor blocks, and supports to prevent pipe movement.Warning tape or marker tiles above buried pipes for identification during future excavations. All materials shall be new, free from defects, and certified for potable water use by relevant standards (WRAS, NSF/ANSI 61). Installation: Site Preparation: Excavate trenches to the depths and widths specified in the detail drawings, ensuring proper alignment and gradient (minimum 1:100 unless otherwise specified). Prepare trench beds with sand or fine granular material (minimum 100 mm thickness) to provide uniform support and prevent pipe damage. Remove rocks, debris, or sharp objects from the trench to protect the pipe. Pipe Laying: Lay HDPE pipes along the alignments shown in the detail drawings, ensuring continuous support and proper gradient for drainage where required. Join pipes using butt-fusion, electrofusion, or compression fittings, as specified, following manufacturer’s guidelines and BS EN 12201-5 procedures. Ensure joints are leak-proof and capable of withstanding PN16 pressure.Install fittings, valves, and accessories (e.g., air valves, washouts). Backfilling: Backfill trenches with compacted sand or fine granular material (minimum 300 mm above the pipe) to protect the pipe, followed by native soil or as specified. Compact backfill in layers (maximum 150 mm per layer) to prevent settlement, as per ASTM D698 or equivalent. Place warning tape or marker tiles 300 mm above the pipe for future identification. Thrust Restraint: Install concrete thrust blocks or anchor blocks at bends, tees, and valves to resist hydraulic thrust. Ensure thrust blocks are cast against undisturbed soil and cured adequately. Testing: Pressure Testing: Conduct a hydrostatic pressure test on the completed pipeline as per BS EN 805 or equivalent. Test pressure: 1.5 × PN16 = 24 bar, maintained for a minimum of 2 hours (or as specified). Monitor for leaks, pressure drops, or deformations, and repair any defects before proceeding. Leakage Testing: Perform a leakage test to ensure the system meets allowable leakage rates (as per BS EN 805 or local standards). Record test results, including pressure, duration, and any observed issues. Alignment and Gradient Check: Verify pipe alignment and gradient using surveying equipment. 0.00
Size Ø = DN80 101 m 0.00
Size Ø = DN 65 30 m 0.00
3 MECHANICAL VENTILATION & AIRCONDITIONING 0.00
a) Supply and install a 600mm throuat diameter wind powered turbine ventillator ; spaced in accordance with the drawings; flushing detail designs in accordance with manufacturer's recommendation and to the engineers approval ; to acheive a lasting ; weather proof joint. 14 Nr. 0.00
b) Supply, installation and test and commissioning of 5 kW cooling capacity split-type air conditioner (Inverter type) for Administration Office, complete with indoor unit (Hi-wall mounted), outdoor condensing unit, wireless remote control with timer and temperature settings, washable easy-access air filters, refrigerant charge (R-410A or equivalent), all interconnecting refrigerant piping (copper tubing with insulation), condensate drain piping and connections, wall mounting brackets,signage and hardware, vibration isolation pads for outdoor unit, electrical supply cable and connections, commissioning and testing. The unit price shall include refrigerant piping and respective insulation - closed-cell elastomeric foam, 13mm thickness, condensate piping and all supporting structure. Set 1
c) Ditto No b) but for Security Office + Bed Quarter Set 1
d) Supply, installation and test and commissioning of wall-mounted or window-mounted axial exhaust fan for Utilities Room, complete with airflow capacity ≥ 320 m³/h (approx. 190 CFM), direct drive motor thermally protected, 220-240V / 50 Hz single-phase power supply, corrosion-resistant construction, integral gravity backdraft damper, bird/insect screen on exterior discharge, weatherproof louver or hood for exterior discharge, manual on/off switch inside room, all mounting brackets, fasteners, signage and hardware, electrical supply cable and connections, door undercut (15-25mm) for makeup air, commissioning and testing Set 1
4 GENERAL ITEMS/ SUMMARY 0.00
a) Test & commission all systems as per approved working drawings, specifications and bills of quantities to the satisfaction of the Engineer. Testing and commissioning shall be to Chartered Institution of Building Services Engineer Commissioning Codes 1 Sum 0.00
b) Prepare and submit working and record (as-installed) drawings to easily readable scale, A1 or A0 paper size format as follows; i) general arrangement drawings of all equipment, plant etc. ii) routes - types and sizes and arrangement of all pipework iii) wiring(electrical & control) details iv) any other details as per specifications Drawings are to be submitted in soft copy (AutoCAD format) & hard copy to the client, the Architect and the Engineer. All drawings shall be submitted to the satisfaction of the Engineer. 1 Sum 0.00
c) Prepare & submit draft and three final copies of operation & instruction manuals to Engineer's approval 1 Sum 0.00
TOTAL FOR MECHANICAL INSTALLATION CARRIED TO GRAND SUMMARY 0.00
B SANITARY , DRAINAGE AND WATER
NOTE: TRADE NAMES
Where Trade Names are mentioned below, it is intended to indicate the level of quality required. The tenderer MAY supply alternatives which must be approved in writing by the Engineer/Architect.
This BOQ shall be read in conjunction with mechanical technical specifications general and particular method of measurements, the mechanical drawings except where otherwise indicated. The unit price for all items in all sections shall include for supplying, installation and commissioning unless otherwise specially mentioned.
Contractor must check site condition including all installed first fix, sleeves structural opening in concrete works, any modifications or alternations would be considered included in contractor price or priced in this item contractor shall not be entitled for any extra cost for opening in structural walls or slabs.
1 SITE WATER SUPPLY PIPING SYSTEM
a PPR Piping System (DN 25) – Supply, install, test, and commission PPR pipe DN 25 mm (1 inch), PN20 rating, including all fittings (elbows, tees, couplings), heat fusion joints, wall/floor penetrations, pipe supports at 1.2 m intervals, and hydraulic pressure test to 4 bar for 1 hour. Complete from GRP tank outlet to elevated tank inlet. the standard requirement at the expense of the contractor. lm 20.00 0.00
b Elevated Water Tank (500 Liters) – Supply, install, and commission one food-grade polyethylene elevated water tank, nominal capacity 500 liters, conforming to ISO 4422. Include galvanized steel support frame anchored to wall/column, float valve or level sensor (adjustable high/low setpoints), overflow pipe (DN 25) with screen, drain plug, lockable lid, outlet strainer (1 mm mesh), and DN 20 gate valve for isolation. Mounting height: 2 m above handwashing faucet. № 1.00 0.00
c Transfer Pump set(dual pump) (GRP to EWT) – Supply, install, test, and commission one centrifugal electric transfer pump, minimum flow 20 L/min, minimum total dynamic head 4 m, motor rating 0.135 hp (100 W), 230 V / 50 Hz / single-phase. Include built-in thermal overload protector, isolation valve, non-return valve on discharge, suction strainer, corrosion-resistant casing (bronze/stainless steel/engineered plastic), and dry-run protection. № 1.00 0.00
d Level Sensor and Control Panel – Supply, install, and commission one automatic pump control system comprising: ultrasonic or float switch level sensor (IP68, dry contact output, adjustable high/low setpoints) installed in elevated tank; and control panel (IP54) with magnetic contactor with overload protection, Hand-Off-Auto selector switch, indicator lights (Power ON, Pump Running, High Level, Low Level). Complete with all interconnecting wiring conforming to IEC 60364. Set 1.00 0.00
TOTAL FOR SITE WATER SUPPLY PIPING SYSTEM CARRIED TO GRAND SUMMARY 0.00
2 WASTE WATER DRAINAGE SYSTEMS
The rates for drainage ditches shall include full compensation for excavation, disposal of excavated material, preparation of subgrade, supply and placement of concrete (minimum 25 MPa compressive strength at 28 days) or masonry as specified, forming of trapezoidal or rectangular cross-section, installation of galvanized steel gratings where shown, construction of catch pits with debris screens, joint sealing, curing, and finishing to achieve Manning’s roughness coefficient n = 0.017 for concrete ditches and n = 0.025 for masonry ditches. The rate shall also include all formwork, reinforcement where required, and any necessary erosion protection measures at outlets. The unit rate is per linear meter of completed ditch of the cross-sectional dimensions indicated. No separate payment shall be made for excavation, backfill, or disposal.
a Pit Latrine Ventilation Pipe (DN 100) – Supply, install, and commission one uPVC ventilation pipe, DN 100 mm (4 inch), conforming to ISO 1452-1, including: pipe extending from 300 mm above pit floor to 1.0 m above highest roof peak, solvent welded joints, galvanized brackets at 2 m maximum intervals, weatherproof cowl (turbo vent or 180° bend with bird screen), stainless steel insect mesh (12 mm aperture) at top, and fly-proof mesh (2 mm aperture) at pit entry. № 2.00 0.00
b Handwashing Station (Standard) – Supply, install, and commission one handwashing station comprising: concrete basin (Type 304, 400×300×150 mm), eight (8)(four (4) on each side) lever-operated chrome-plated brass tap, two liquid soap dispenser (500 mL), supply piping PPR and uPVC drainage piping to soak away pit. set 1.00 0.00
c Soak Pit – Supply, excavate, construct, and commission one soak pit for handwashing station drainage, including excavation, stone/gravel filling, perforated pipe inlet, geotextile fabric lining, and covered top with inspection port. Dimensions as per standard design. set 1.00 0.00
d Waste Water Septictank Supply and apply a complete waterproofing system, Waste Water Septictank to pit latrine structure including brick protection wall as follows: (1) Surface preparation: clean, dry, and prime concrete pit walls; (2) Waterproofing coating: apply bituminous emulsion or acrylic waterproof coating (minimum 2 coats) to external concrete pit walls from base to 500 mm above ground level, conforming to ASTM D1227; (3) Cementitious top seal: apply cementitious crystalline waterproofing slurry (minimum 3 mm thickness) to top 500 mm of pit lining (interior and exterior surfaces); (4) Joint sealant: apply flexible polyurethane sealant at all construction joints and pipe penetrations; (5) Brick protection wall: construct half-brick thick (115 mm) masonry wall against external waterproofed surface from pit base to 500 mm above ground level using common burnt clay bricks (minimum class 7.5 MPa) laid in cement mortar (1:4 mix) to act as sacrificial protective layer preventing backfill damage to waterproof membrane; (6) Damp Proof Course (DPC): install 300 mm wide polyethylene DPC membrane between brick protection wall and backfill material at top 500 mm zone; (7) Backfill interface: backfill shall be placed carefully against brick wall, not directly against waterproofing. Unit rate includes all materials, labor, application, brick wall construction, testing, and commissioning for a complete watertight installation. Conforms to manufacturer's specifications and BS 8102.Please note that the waterproofing system shall be applied only after the concrete pit has cured for a minimum of 7 days. All surfaces shall be clean, dry, and free from dust, oil, or loose material before application. The contractor shall conduct a water spray test after completion to verify no water ingress occurs at the top sealed zone. Any leaks detected shall be repaired at no additional cost. m2 50.00 0.00
e Rainwater Downpipe DN 100 (Market Block) – Supply, install, test, and commission one uPVC rainwater downpipe, DN 100 mm nominal diameter, conforming to ISO 1452-1 or AS/NZS 1260, minimum wall thickness 2.5 mm. Include stainless steel leaf guard (5 mm mesh) at roof inlet, galvanized pipe brackets (vertical spacing 1.8 m maximum, horizontal spacing 1.0 m maximum), UV-reflective light-colored oil paint coating (white/light grey) conforming to ISO 4892-2 on all exposed sections, and discharge splash block at base. Complete from roof outlet to ditch/splash block. ml 110.00 0.00
f Rainwater Downpipe DN 80 (Toilet Block) – Supply, install, test, and commission one uPVC rainwater downpipe, DN 80 mm nominal diameter, conforming to ISO 1452-1 or AS/NZS 1260, minimum wall thickness 2.0 mm. Include stainless steel leaf guard (5 mm mesh) at roof inlet, galvanized pipe brackets (vertical spacing 1.8 m maximum, horizontal spacing 1.0 m maximum), UV-reflective light-colored oil paint coating (white/light grey) conforming to ISO 4892-2 on all exposed sections, and discharge splash block at base. Complete from roof outlet to ditch/splash block. ml 10.00 0.00
g Rainwater Downpipe DN 80 (Guard House) – Supply, install, test, and commission one uPVC rainwater downpipe, DN 80 mm nominal diameter, conforming to ISO 1452-1 or AS/NZS 1260, minimum wall thickness 2.0 mm. Include stainless steel leaf guard (5 mm mesh) at roof inlet, galvanized pipe brackets (vertical spacing 1.8 m maximum, horizontal spacing 1.0 m maximum), UV-reflective light-colored oil paint coating (white/light grey) conforming to ISO 4892-2 on all exposed sections, and discharge splash block at base. Complete from roof outlet to ditch/splash block. ml 10.00 0.00
h Drainage Ditch – Supply, excavate, construct, and commission reinforced concrete drainage ditch, rectangular cross-section, with different internal dimensions, concrete grade minimum 25 MPa, smooth finish achieving Manning’s n = 0.017, including excavation to required depth, disposal of surplus material, formwork, reinforcement, joints (with waterstop where ), and curing.. Provide a minimum slope of 1% or follow the natural ground slope which ever is greater ml 90.00 0.00
i SIZE[mmXmm] = 450 X 300 ml 220.00 0.00
j SIZE[mmXmm] = 350 X 250 ml 280.00 0.00
k Catch Pit with Debris Screen(manhole) – Supply, excavate, construct, and commission one catch pit at ditch junctions or before discharge points, including reinforced concrete construction, minimum 600×600×900 mm deep, heavy duty removable cast iron grating cover, stainless steel debris screen (12 mm mesh), inlet and outlet connections to adjoining ditches, and concrete base. № 5.00 0.00
l Heavy duty cast iron or galvanized steel or concrete Ditch Cover (Pedestrian Crossing) – Supply and install one heavy duty cast iron or concrete cover for the ditch at pedestrian and vehicle crossing, including frame and cover, designed for pedestrian loading (minimum 5 kN/m²), hot-dip galvanised finish(if galvanized used), sized to match the ditch opening. № 4.00 0.00
m Supply and install uPVC DN 160 mm PN10 pipe conforming to ISO 1452-1 / EN 1452-2 inside the open ditch from roof downpipes to the underground RC rainwater harvesting tank, including all necessary fittings (bends, couplings, tees), galvanized steel supports or concrete anchor blocks at maximum 3.0 m spacing, one non-return valve (check valve) at tank inlet, one sediment trap with 5 mm stainless steel debris screen upstream of tank, and UV-protective coating (ISO 4892-2) for all exposed sections. Installation shall maintain minimum 0.5% gravity gradient. Jointing shall be by solvent cement welding or rubber ring push-fit sockets per manufacturer's specifications. Testing shall be by 24-hour water flow test with no visible leakage or ponding. Unit rate includes all materials, labor, testing, and commissioning but excludes ditch constructio lm 55.00 0.00
n Piping system for underground RC tank: overflow (uPVC DN 100 PN10), rainwater inlet (uPVC DN 160 PN10), washout (uPVC DN 100 PN10 with isolating valve and extended operating rod), including all fittings, supports, watertight tank connections, testing, and commissioning. Conforms to ISO 1452-1 / EN 1452-2. set 1.00 0.00
o Water Harvest Tank Ditto item No 2.d but for the under ground rain water harvest tank (5 x 5 x 2 [m]) m2 95.00 0.00
p Allow for Testing and commissioning of the entire plumbing installation by a Chartered Mechanical Engineer and obtaining a Test Certificate (3rd party testing to approval of the Engineer) including all off-site and factory testing; inspections to demonstrate compliance with relevant standards, operating the completed installation and submitting all relevant test records and authority approval. LS 1 0.00
q All sanitary fittings supplied shall be provided with a minimum 5 year warranty, issued jointly and severally by the local supplier and the manufacturer. LS 1 0.00
r Allow for preparation of Operationa and Maintenance Manual including site users training for the O & M Maual of all plumbing and mechanical appliances. LS 1 0.00
s Supply and installation of Dry Latrine Squatting Pan – Ordinary Type Heavy-duty vitreous china or FRP pan, no water seal, shallow profile with anti-splash lip, drop hole min. 180mm. Includes fixing to concrete slab. No water supply connection. № 2
t Supply and installation of Dry Latrine Squatting Pan – PWD Type Accessible design for persons with disabilities. Heavy-duty FRP or china with raised footrests, pan rim height ≤200mm from floor. Includes stainless steel grab bars (wall-mounted, vertical & horizontal). Drop hole min. 200mm. No water supply connection. № 1
u Supply and installation of Shower Water Drain Intake to Pit Floor-mounted grating (stainless steel/HD plastic, min. 150mm diameter) with debris trap. Includes vertical drop pipe (PVC, 75mm min. diameter) from floor through pit cover slab into pit void. No trap, no water seal. No connection to pressurized water supply. № 1
TOTAL FOR WASTE WATER DRAINAGE SYSTEMS CARRIED TO GRAND SUMMARY 0.00
ITEM DESCRIPTION
A MECHANICAL INSTALLATION 0.00
B SITE WATER SUPPLY PIPING SYSTEM 0.00
C WASTE WATER DRAINAGE SYSTEMS 0.00
TOTAL TO SUMMARY 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
BILL NO.4 ELECTRICAL INSTALLATION
4 ELECTRICAL INSTALLATIONS
The Bill of Quantities, Specifications, Drawings and all other Contract documents are complementary to each other. It is the responsibility of the Contractor to check the locations and quantities of the materials and equipment to be executed in accordance with the drawings. The unit rate of the materials and equipment shall be based on the Specification, all components as required and specified under each item concerned in the Specifications, Drawings, and all other Contract documents.
5.1.1 Low Voltage Switchboard
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Normal / Standby Switchboards:
5.1.1 18 way TP/N - flush mounted distribution board DB 'S.CST.0 (E )' complete with 4X63A TP/N MCB main incomer and all MCB , as shown on schematic wiring Un 1
5.1.2 63A Load transfer switch (L.T.S), as shown on schematic wiring Un 1
5.1.3 18 way TP/N - flush mounted distribution board DB 'S.CST.1 (E )' complete with 4X40A TP/N MCB main incomer and all MCB , as shown on schematic wiring Un 1
5.1.4 12 way TP/N - flush mounted distribution board DB 'S.PR.0 (E )' IP65 complete with 4X20A TP/N MCB main incomer and all MCB , as shown on schematic wiring Un 1
5.1.5 4P-25 A (IP65) - flush mounted Fire PumpPump Isolator complete with all accessories , as shown on drawings Un 1
5.1.6 2P-10 A (IP65) - flush mounted Domestic Pump Isolator complete with allaccessories , as shown on drawings Un 1
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories including conduits and manholes as specified in schedules of equipment, detailed drawings and specs:
LV Distribution Cables including burid PVC ducting and all accessories as indicated in the drawings
5.2.1 - 4X16+16 Emm² Cu/ XLPE/ PVC (plain annealed stranded copper conductors, connecting Load transfer switch to switchboard to S.CST.0 ml 1
5.2.2 - 4X4+4 Emm² Cu/ XLPE/ SWA/PVC (plain annealed stranded copper conductors , connecting PR.0 to S.CST.0 ml 19
5.2.3 - 4X10+10Emm² Cu/ XLPE/ SWA/PVC connecting switchboardS.CST.1 to S.CST.0 ml 25
5.2.4 - Fire rated inside metallic conduit 4X4+4 Emm² Cu/ XLPE/ SWA/LSZH (plain annealed stranded copper conductors wrapped in mica glass fire-barrier tape, cross-linked polyethylene (XLPE) insulation, galvanized steel wire armor (SWA), and a low smoke zero halogen (LSZH/LSHF) outer sheath)connecting switchboardS.Fire pump to S.CST.0 ml 20
5.2.5 - 2X1.5+1.5 Emm² Cu/ XLPE/ SWA/PVC (plain annealed stranded copper conductors , connecting Domestic pump to PR.0 ml 8
Supply and installation of class SN8 conduit in accordance with the conditions defined in the in written pieces, specification, drawings and 100 mm diameter regid conduit buried in the ground
5.2.6.1 - PEAD Ø 110 mm for grid connection ml 5
5.2.6.2 - PEAD Ø 110 mm for lLV cables connecting panels S.ST.1 , Fire Pump, and S.PR.0 connection ml 55
5.2.7.1 - Low Voltage manhole chambers, with internal measures of 1000 x 1000 x 1000 (W*L*H), with RC cover thickness not less than 100 mm, as per drawing details Un 8
5.2.7.2 - Fire alarm cable manhole chambers, with internal measures of 1000 x 1000 x 1000 (W*L*H), with RC cover thickness not less than 100 mm, as per drawing details Un 4
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Indoor Lighting:
5.3.1 Luminaire fix to the ceiling (Downlight) LED 80W, IP65( L1) Un 98
5.3.2 Luminaire fix to the ceiling (Downlight) LED 30W, IP44(L2) Un 4
5.3.3 Luminaire fix to the ceiling LED15W, IP44 (L3) Un 12
5.3.4 Luminaire fix to the ceiling LED30W, IP44 (L4) Un 2
5.3.5 Luminaire fix to the ceiling LED30W, IP65 (L4) Un 3
5.3.6 POLE MOUNTED 2 Days SOLAR SYSTEM LIGHTING FIXTURE WITH 80W LED IP66/1K07. COMPLETE WITH SOLAR PANEL BATTERIES e,t,c AND 10 M HOT-DIP GALVANIZED STEEL WITH THICKNESS NOT LESS THAN 4MM FIXED ON CONCRET BASE Type L9 Un 16
5.3.7 Luminaire fix to the wall 2 Days Solar SystemLIGHTING FIXTURE WITH 80W LED IP66/1K07. COMPLETE WITH SOLAR PANEL BATTERIES e,t,c (L11) Un 5
Lighting Switches
5.3.8 - One way switch, recessed mounting Un 4
5.3.9 - Double pole switch, recessed mounting Un 6
5.3.10 Three pole switch, recessed mounting Un 8
5.3.11 Three pole switch, recessed mounting(IP65) Un 1
5.3.12 - Two Way Double pole switch, recessed mounting Un 2
LIGHTING Outlet
Supplying, installing, connecting and testing lighting outlets including conduit, conduitor fittings, boxes,wiring, cabling, earthing, accessories and all necessary works and materials required for complete installation back to panel boards as specified and as indicated on the drawings for the following items :
5.3.13 copper wire Cu/ XLPE/ PVC(2x1.5+1.5E sqmm) Cu/ XLPE/ PVC in 20mm minimum pvc conduit No. 71
5.3.14 copper wire Cu/ XLPE/ PVC(2x2.5+2.5E sqmm) in 20mm minimum pvc conduit No. 48
5.3.15 copper wire Cu/ XLPE/ PVC(2x1.5+1.5E sqmm) in 20mm minimum pvc conduit for emergency and safety lighting No. 23
Emergency / Safety Lighting
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Indoor Lighting:
5.3.16 - S1 - maintained (60min Autonomy) Un 19
5.3.17 - Maintained type Exit signe(3 Hours) Un 4
5.4 General Purpose Power Socket
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Double Flush and Surface Mounting Devices - Normal/Standby Supply:
5.4.1 - Flush Mounting Earthed Socket (BS546 ) - with cover 16A IP44 Un 16
5.4.2 - Flush Mounting Earthed Socket (BS546) - 16A Un 8
5.4.3 - Flush Mounting Earthed Socket (BS Type) - with cover 16A IP65 Un 2
Supplying, installing, connecting and testing electric outlets Including conduit or three compartment perimeter trunking which shall be designed to provide a solution to the segregation and access of power, data and communication cable trunk, r trunk accessories, conduit or trunk accessories, cabling, boxes terminations, earthing and all necessary ancillary works and materials required for complete installation as specified and as indicated on the drawings for the following items :
5.4.4 Sockets outlet ,240V by copper wire 3X2.5 mm2 Cu/ XLPE/ PVC in 20 mm pvc conduit. No. 26
5.4.5 Ditto but outlet by copper wires 3X1.5 mm2 Cu/ XLPE/ PVC in 20 mm pvc conduit Ceiling Fans No. 2
5.4.6 Ditto but outlet by copper wires 3X4 mm2 Cu/ XLPE/ PVC in 20 mm pvc conduit for Air conditioners No. 2
5.4.7 Ditto but outlet by copper wires 3X1.5 mm2 for Tools room exhaust fan Cu/ XLPE/ PVC in 20 mm pvc conduit No. 1
5.4.8 Power Outlets with fire rated cables(2X1.5mm² Cu/ XLPE/ LSZH , in galvanized steel coduit for fir alarm panel and repeater No. 2
5.5 Earthing System
5.5.1 Supplying, installing connecting and testing a complete protective earthing system including earthing pits, earthing electrodes, equalizer bars, earth continuity conductor, earthing conductor to switchboards, diesel generator set and transformers and all low voltage systems ...etc complete with all accessories, fixings, brackets test links, suspensions, drilling and cutting to form a complete installation as specified and as indicated on the earthing schematic drawings (Note: In the end It should be guaranteed, the achievement of a protective earth value less than a 1 Ohm (Regime TN-S)) LS 1
5.6 Lightening Protection Systeme
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
5.6.1 - Interseption rod installed on pole NO 6
5.6.2 - Detail C - Mechanical connector (connection to source earth) NO 12
5.6.3 - Main Earthing Terminal NO 12
5.6.4 - Source earth with 20mm Diameter made of copper NO 12
5.6.5 - Downward conductor 50 mm2 bar copper with connection terminal +Manhole / 400x400x500mm - ml 450
5.7 Fire Detection System
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories include 24 hours operation batteries as specified in schedules of equipment, detailed drawings and specs. All components of the fire alarm system shall be fire resistant (conduits, pullboxes…)
5.7.1 - Self contained , 4 loops Fire control panel, addressable pcs 1
5.7.2 - control panel, repeator pcs 1
Fire Detection Devices:
5.7.3 - Manual break glass points with protective cover pcs 5
5.7.4 - Optical smoke detector including detector base pcs 53
5.7.5 - Evacuation speaker pcs 7
5.7.6 Ditto but Water Proof pcs 2
5.7.7 Visual Alarm pcs 5
5.7.8 Ditto but Water Proof pcs 4
Electrical fire rated cables:
Enclosed in a recessed or surface mettalic conduiting include , all needed fire rated accessories :
5.7.9 - JE-H(st)H minimum 2x2x1mm² (The size to be determn according to system design), connecting repeator to control panel ml 448
5.7.10 - JE-H(st)H minimum 2x2x1mm² (The size to be determn according to system design), connecting Detectors to control panel and repeator ml 164
5.8 - Engineering, System Programming, including System Testing, Commissioning and Training. L.S 1
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
\ DESCRIPTION QUANTITY UNIT RATE AMOUNT
BILL NO.5 SCHEDULE OF RATES - GENERAL (NOTE: IT IS MANDATORY FOR BIDDERS TO COMPLETE THIS SECTION)
Note: The rates provided in this section will ONLY be used to value variation items whose rates are not provided in the measured work bills.
a Site Clearance m2 0.00
b Cutting, clearing and dumping away all shrubs, debris and unnecessary materials. m2 0.00
c Cutting of trees not exceeding 450mm girth including removing from site as directed nr 0.00
d Cutting of trees exceeding 450mm but not exceeding 600mm girth ditto nr 0.00
e Cutting of trees exceeding 600mm but not exceeding 900mm girth ditto nr 0.00
f Cutting of trees exceeding 900mm but not exceeding 1200mm girth ditto nr 0.00
g Cutting of trees exceeding 1200mm girth ditto nr 0.00
h Removing stumps of trees not exceeding 600mm girth and carting away debris nr 0.00
j Removing stumps of trees exceeding 600mm but not exceeding 1200mm girth ditto nr 0.00
k Removing stumps of trees exceeding 1200mm girth ditto nr 0.00
l Excavate the unconsolidated top soil to an average depth of 150mm m2 0.00
m Cutting of surface rock outcrops and removing debris from site m2 0.00
n Backfill to make up levels m3 0.00
p "Premise 200CC" insecticide treatment to surfaces of excavations applied as per manufacturer's instruction with a 10 year guarantee m2 0.00
q "Gladiator TC"(organophosphates chlorpyrifos)-covers 8SM per litre m2 0.00
r "Termidor" anti-termite with a coverage of 20m2 per litre m2 0.00
2 FOUNDATION EXCAVATION 0.00
a Excavate on normal soil to a depth of 1500mm from ground level m3 0.00
b Excavate on normal soil to a depth of 3000mm from ground level m3 0.00
c Excavate on normal soil to a depth of 4500mm from ground level m3 0.00
d Extra-over for excavating in rock class I m3 0.00
e Extra-over for excavating in rock class II m3 0.00
f Extra-over for excavating in rock class III m3 0.00
g Extra-over for excavating in clay soil m3 0.00
3 FOUNDATION WALLING 0.00
a 400mm thick rubble stone foundation walling bedded and jointed in cement and sand (1:3)mortar m2 0.00
b 200mm thick natural stone foundation walling bedded and jointed in cement and sand (1:3)mortar m2 0.00
4 CONCRETE WORK 0.00
a Provide all materials and cast insitu plain concrete class 15/20 (1:3:6) blinding under foundation m3 0.00
b Provide all materials and cast insitu plain concrete class 20/20 (1:2:4); vibrated m3 0.00
c Provide all materials and cast insitu plain concrete class 25/20 (1:11/2:3); vibrated m3 0.00
Sawn formwork to insitu concrete as described:- 0.00
d To sides of ring beams m2 0.00
e To soffits of suspended slabs m2 0.00
f To sides of columns m2 0.00
Extra over formwork for:- 0.00
g Fair face finish m2 0.00
a Provide materials and construct 100mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
b Provide materials and construct 150mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
c Provide materials and construct 200mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
d Provide materials and construct 400mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with two strips of hoop iron after every four courses m2 0.00
e Provide materials and construct 200mm thick hollow concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
f Provide materials and construct 100mm thick machine cut stone walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
g Provide materials and construct 150mm thick machine cut stone walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
h Provide materials and construct 200mm thick machine cut stone walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
6 ROOF CONSTRUCTION, COVERING AND RAIN WATER GOODS 0.00
a Supply and fix gauge 26 IT5 roofing sheets m2 0.00
b Approved concrete roofing tiles on 50x25mm soft wood battens at 200 centres m2 0.00
c Galvanized iron plain sheet 26 gauge m2 0.00
Approved pressure impregnated and treated hardwood steel 0.00
d 150x50mm section Steel members m 0.00
e 100x50mm section Steel members m 0.00
f 75x50mm section Steel members m 0.00
g 50x50mm section -Steel members m 0.00
h Provide and fix fascia board 250x25mm section fixed to the beams m 0.00
Approved pressure impregnated and treated softwood steel 0.00
j 150x50mm section Steel members m 0.00
k 100x50mm section Steel members m 0.00
l 75x50mm section Steel members m 0.00
n Provide and fix fascia board 250x25mm section fixed to the beams m 0.00
p Provide and fix 150x150mm box gutter fixed to fascia board with/and including brackets at rafter center and two coat of oil paint. The slopes to be considered according to the drawings m 0.00
q Supply and fix premanufactured 150x100mm PVC rain water gutter fixed to fascia board with mild steel brackets at 1200mm centres m 0.00
r Approve concrete roofing tiles on 50x25mm soft wood battens at 200 centres m2 0.00
7 WALL FINISHES 0.00
a Plaster with 18mm thick mortar on walls and beams, both inside and outside: Walls to be cured at least for one week after 24 hours of plastering. Contractor to allow for scaffolding and all necessary tools in his rate m2 0.00
b Plaster with 12mm thick mortar on walls and beams, both inside and outside: Walls to be cured at least for one week after 24 hours of plastering. Contractor to allow for scaffolding and all necessary tools in his rate m2 0.00
c Supply and apply two coats of white wash on all plastered surfaces with uniforms colours. Contractor to allow for scaffolding and all necessary tools in his rate m2 0.00
d Supply and fix ceramic wall tiles size 200x150x6mm thick m2 0.00
8 FLOOR FINISHES 0.00
Cement and sand screed 0.00
a 25mm thick insitu cement and sand (1:3) screeded beds, with steel trowelled finish , on concrete m2 0.00
Ceramic floor tiles 0.00
b Supply and fix ceramic floor tiles m2 0.00
c 100mm high ceramic tiles skirting m 0.00
Concrete Tiles 0.00
d Provide and install 50x50x5cm precast concrete tiles around the building 1m width as shown in the drawings m2 0.00
Epoxy paint 0.00
e Supply and apply epoxy industrial floor paint to all cement finished floors m2 0.00
Granolithic paving 0.00
f 38 mm thick (24mm cement and sand backing & 15mm thick granolithic layer) m2 0.00
g 20 x 100 mm Skirting m 0.00
Terrazzo Paving 0.00
h 38 mm thick (24mm cement and sand backing & 15mm thick terrazzo layer) m2 0.00
j 20 x 100 mm Skirting m 0.00
Plastic dividing strips. 0.00
k 32 x 3 mm thick plastic dividing strips. m 0.00
l Aluminum ditto m 0.00
m 25 mm wide non slip carborundum m 0.00
Precast Paving slabs
n) 600x600x50mm thick precast concrete paving slabs (standard) jointed in cement and sand mortar and laid on 50mm thick sand bed (Sample of paving slab to be provided by the Contractor for approval by the site Engineer). m2 0.00
Precast interlocking Paving slabs
o) Precast interlocking concrete paving slabs (standard) jointed in cement and sand mortar and laid on 50mm thick sand bed (m.s) (Sample of paving slab to be provided by the Contractor for approval by the site Engineer). m2 0.00
9 CEILING FINISHES 0.00
Acoustic Ceiling 0.00
a Tiles system suspended ceilings; 600 x 600 x 15 mm thick fissured mineral fibre tiles; jointed as per the manufacturer's instructions including suspending on 14 gauge pre-straightened galvanized annealed iron wire hungers at 2100 mm centers; rate to include steel brandering m2 0.00
Gypsum Board Ceiling 0.00
b Supply of materials and installation of gypsum board ceiling complete with steel brandering m2 0.00
Chipboard Ceiling 0.00
c 12mm thick chipboard ceiling fixed to and including 50x50mm cypress branderings at 600mm c/c both ways, with clout headed nails and set out in symmetrical panels with 'V' joints m2 0.00
Plywood Ceiling 0.00
d 8mm thick plywood ceiling (8'x4') boards on and including 50 x 50 mm softwood brandering m2 0.00
e Ex 75x50mm softwood molded steel cornice m 0.00
10 PAINTING 0.00
Prepare and apply three coats plastic emulsion paint to:- 0.00
a Plastered surfaces m2 0.00
Prepare and apply two coats gloss oil paint to:- 0.00
b Plastered surfaces m2 0.00
Aluminum primer or other equal and approved wood primer before fixing: - 0.00
c Backs of frame, board, etc over 100mm but not exceeding 200mm girth m 0.00
Prepare and apply three coats polyurethane clear matt varnish on woodwork internally 0.00
d General surfaces of flush doors and frames m2 0.00
Prepare and apply three coats permaplast weather proof paint to:- 0.00
e Walling and concrete ; external m2 0.00
a Mild steel grill door overall size 900x2100mm high made out of 40x80x4mm thick RHS framing, two equal door leafs each made out of 40x40x6mm mild steel plate frames, 12mm solid square bars welded to frame at equal 150mm centres at 450 angle both ways; including fixing frame to walling/concrete and complete with heavy duty hinges Nr. 0.00
b Supply and fix 30" mahogany veneered steel flush door size 900x2100mm high with hardwood lipping all round Nr. 0.00
c Door size 800x2100mm high Nr. 0.00
Wrot mahogany 0.00
Framed frames and framings 0.00
d 150 x 50 mm; 2 No. labours; plugged door frame m 0.00
e 50 x 15 mm architrave m 0.00
f 15x15mm quadrant beading m 0.00
Iron mongery 0.00
g Supply and fix three lever mortise lock complete with set lever handle furniture - fixed to steel doors Nr. 0.00
h 100mm steel butt hinges prs 0.00
j 900x100mm high standard Aluminum kicking plate Nr 0.00
k Four lever mortise lock complete with set lever handle furniture - fixed to steel doors Nr. 0.00
12 WINDOWS 0.00
Aluminum Windows 0.00
a Supply and fix 1500x1000mm high bronze anodized aluminium windows as per the specifications, with aluminium woven mesh fly screen in aluminium frame, and all necessary hardware and accessories. Nr 0.00
Steel Grill Windows 0.00
b Supply and fix steel grill window size 1500x1000mm high made out of 40x40x4mm SHS framing; 12mm solid square bars welded to frame at equal 150mm centers at 450 angles including fixing to approval Nr 0.00
Steel Casement Windows 0.00
c Supply and fix steel casement windows size 1200x1200mm in standard 'T' sections complete with closers, hinges, stays and all other necessary iron mongery Nr 0.00
d Supply and fix steel casement windows size 600x600mm in standard 'T' sections complete with closers, hinges, stays and all other necessary iron mongery Nr 0.00
e 5mm thick clear sheet glass and glazing to aluminium frames m2 0.00
f 5mm thick obscured sheet glass and glazing to aluminium frames m2 0.00
Adjustable Aluminum Louvre frames 0.00
g 8No. 100 mm blades (per set of blade ) Nr 0.00
h Ditto for 150 mm ( per set of blade ) Nr 0.00
Curtain fittings 0.00
j 35 mm diameter chrome plated curtain rod m 0.00
Pelmet boxes in wrot cypress 0.00
k End stops nr 0.00
l 150 X 25 mm pelmet top m 0.00
m 100 x 25 mm pelmet fascia m 0.00
Window Sills 0.00
n 500mm x 100mm precast concrete window sill pointed in cement and sand (1:3) mortar m 0.00
Window Blinds 0.00
p Supply and install vertical blinds to windows m2 0.00
Window Stay 0.00
q Supply and fixing of brass window stays approved from samples Nr 0.00
Window Handles 0.00
r Supply and fixing of brass window handles approved from samples Nr 0.00
13 DEMOLITION 0.00
a Demolition of single-storey masonry block/building including breaking the ground slab and the foundation , cleaning the site and making good the site for new construction, sort out arising materials as directed and removing all debris from site m2 0.00
b Demolition of multi-storey masonry block/building including breaking the ground slab and the foundation , cleaning the site and making good the site for new construction, sort out arising materials as directed and removing all debris from site m2 0.00
c Demolition of parts masonry wall, including any concrete beams and columns, make good the affected surfaces, sort out arising materials as directed and removing all debris from site m2 0.00
d Hack out the existing floor finish including the skirting and prepare floor surfaces to receive new floor; remove all debris from site m2 0.00
e Hack out the existing wall plaster in and prepare surfaces to receive new wall plaster m2 0.00
f Hack out the existing wall paint and prepare surfaces to receive new wall paint m2 0.00
g Remove existing doors and windows(various sizes) including frames and all iron mongery, cost of setting aside re-usable material as directed, removing debris from site and making good all affected surfaces Nr. 0.00
h Carefully remove all complete toilet fittings, prepare the affected surfaces to receive new fittings. Nr. 0.00
i Carefully remove all complete sinks fittings, prepare the affected surfaces to receive new fittings. Nr. 0.00
j Carefully remove all existing roof covering, repair the affected roof structures to receive new roof covering,; remove all debris from site as directed by site engineer m2 0.00
13 WATER AND SANITATION 0.00
Supply and fix the following sanitary appliances complete with all the connections to services, waste, jointing to supply overflows and plugging and screwing to the floors. Where trade names are mensioned below, the reference is intended to be as a guide to the type of fitting. 0.00
Water Closet 0.00
a 600x500mm deep Anti Vandal stainless steel squat type WC pan cast in concrete floor slab; complete with cistern and all necessary accessories Nr 0.00
b White European toilet complete with trap, cistern and all necessary accessories Nr 0.00
Wash hand basin (WHB) 0.00
c Ceramic Wash Hand basin complete with pedestal and all necessary accessories Nr 0.00
Urinal Bowl 0.00
d Wall hung ceramic urinal complete with all accessories and fixtures Nr 0.00
e Anti-vandal type stainless steel mirror Nr 0.00
Shower panel 0.00
f Shower panel to detail constructed in one piece grade 304stainless steel with all exposed surfaces polished to a satin finish; complete with an anti vandal spray head Nr. 0.00
Dhobi sinks 0.00
g Supply materials and construct concrete dhobi sink overall size 900x550mm wide Nr. 0.00
j Approved anti- vandal water tap Nr 0.00
k Supply and installation of a steel grease trap with a flow rate of 30GPM complete with accessories Nr 0.00
l Supply and install PVC water tanks with a capacity of 2 m3 complete with all fittings Nr 0.00
m Supply and install fibre glass tanks with a capacity of 5 m3 complete with all fittings Nr 0.00
n Install 10,000m3 Bulk Water Storage Fibre Glass tank complete with accessories Nr 0.00
Supply and install G.I. Class "B" Pipes complete with Fittings
p 32mm Diameter Pipe Lm 0.00
q 25mm ditto Lm 0.00
r 20mm ditto Lm 0.00
s 15mm ditto Lm 0.00
Supply and install PN 20 PPRC conforming to the current European standards for PPR installations and to the Engineer's approval, pipes jointing shall be by polyfusion or use of electric coupling.
Rates must allow for all Metal/plastic threaded adaptors where required for the connection of sanitary fixtures, valves. sockets, sliding and fixed joints, support raceways, isolating sheaths, elastic materials, expansion arm and bends, crossovers etc.
t 50mm dia pipe Lm 0.00
u 32mm dia pipe Lm 0.00
v 25mm ditto Lm 0.00
PPR to GI Adoption pieces
w 32mm diameter high pressure approved pattern brass rising stem full way gate valve with wheel head and jointing to tubing as 'PEGLAR' or approved equivalent. Nr. 0.00
x 12mm diameter 300mm long Copper tubing bent as required including jointing to GMS pipe and fitting. Nr. 0.00
Supply and install uPVC soil system to BS4660 and BS4515and muPVC waste systems to BS 5255withscrewed and socketed joints to BS 21. solvent welded joints shall be as per the system's manufacturer's written instruction. Tenderer must allow in their pipe work prices for all the couplings, connectors, joints etc as required in the running lengths of the pipe work and also where necessary for fixing clips, holder bats plugged and screwed.
y 100mm diameter grey heavy duty high pressure pipes Lm 0.00
z 50mm diameter waste pipes ditto Lm 0.00
a1 Supplying materials and construction of Inspection Chamber (IC) 600x600mm using solid concrete blocks for walls and casting concrete for the manhole base with thickness not less than 150mm; including cement plastering for inside walls. Nr 0.00
b1 Provide a rate for emptying of septic tank and disposal of waste m3 0.00
14 ELECTRICAL SUPPLY , CONDITIONING AND FIRE FIGHTING INSTALLATIONS
Supply, fix and install wires 1.5mm for lighting and 2.5mm for sockets, distribution panel boards with necessary circuit breakers, testing and earthing boards, cables, sockets, switches, fans, and lighting fixtures as specified in the drawings. All the price of the below items must include the materials and installations cost
a Main Distribution Panel Board of 150 AMP. Nr 0.00
b Twin sockets (13amp) Nr 0.00
c Single socket (13amp) Nr 0.00
d Switched Spur Outlet 13A c/w neon indicator lamp for Water Heaters Nr 0.00
e switches one gang (5amp) one way Nr 0.00
f switches one way (5amp) two gang Nr 0.00
g switches one way (5amp) three gang Nr 0.00
h Fluorescent lamps 40w 4 feet (Twin Unit) Nr 0.00
j Fluorescent lamps 40w 4 feet (Twin Unit) c/w Emergency Maintained Fluorescent fitting. Nr 0.00
k Fluorescent lamps 40w 4 feet (Single Unit) 'Splash Proof Fitting' Nr 0.00
l Fluorescent lamps 40w 4 feet (Single Unit) 'Splash Proof' c/w Emergency Maintained Fluorescent fitting. Nr 0.00
m Watertight IP65 Double 'D' Light Fitting Nr 0.00
n 3 speed box fan with 20 inch blades Nr 0.00
p Fire Escape Illuminated Fire Exit (Running Man) Sign to BS 5499 Nr 0.00
q Smoke Detector - Battery Operated 85dB Sounder with Test Button to BS 5839 Nr 0.00
r Battery Operated heat detector Nr 0.00
s Intercom code outlet points Nr 0.00
t Internet points Nr 0.00
Supply and install Air Conditioning A/C split unit, with complete installation and fittings
u 9000 BTU Nr 0.00
v 12000 BTU Nr 0.00
w 18000 BTU Nr 0.00
x 24000 BTU Nr 0.00
y Supply and installation of a 50KVA generator including all necessary wiring and builder's work Nr 0.00
z Ditto but Supply and installation of a 30KVA generator Nr 0.00
a1 Ditto but Supply and installation of a 20KVA generator Nr 0.00
b1 Ditto but Supply and installation of a 10KVA generator Nr 0.00
c1 Supply and installation of 150mm diameter extractor fan complete with humidity stat Nr 0.00
Fire Horse Reel
d1 Supply and installation of 1"x30m fire horse reel complete with disk ,waterway ,swing arm ,nozzle ,one meter inlet hose ,valve and all other necessary accessories Nr 0.00
Supply and erect pre-cast concrete Fencing Posts-Cranked
a 100x100mm Nr 0.00
b 100x125mm Nr 0.00
c 125x125mm Nr 0.00
d 125x150mm Nr 0.00
Chain Link Fencing
e Supply and install 2400mm high x 14 gauge chain link fencing on and including 100x125 cranked precast concrete fencing posts on concrete bases m 0.00
f Supply and install 12 1/2 Gauge x 4 strands galvanized barbed wire nailed to steel or concrete posts (Measured Separately) m 0.00
Supply and install 12 1/2 Gauge galvanized steel razor wire complete with 1000mm high 50x50x6mm thick angle iron posts at 1500mm centers; bottom part of posts built in concrete block walling
g 300mm diameter (stretched) m 0.00
h 450mm diameter (stretched) m 0.00
j 600mm diameter (stretched) m 0.00
k Supply materials and construct boom gate overall 10950mm long comprising of 350mm diameter mild steel pipe 1400 mm high filled with mass concrete , embedded on the ground with concrete and painted with reflective white and yellow paint; 50mm diameter mild steel pipe painted with reflective white paint; 950x950x950mm steel box filled with lightweight concrete and painted with white reflective paint: All to the details provided and the Site Engineer's instructions nr 0.00
16 WATER PROOFING
a Supply and lay approved single layer bituminous waterproofing membrane on sealer coat and hot laid with melted oxidized bitumen by specialist, tucking into grooves including forming grooves in block work or concrete, all in accordance with the manufacturer's specifications (10 years guarantee to be given, measured net) m2 0.00
b Supply materials and apply two part acrylic modified cementitious coating mixed with cement screed laid to fall to manufacturer's specifications m2 0.00
16 steel BOARDS & PARTITIONS
Supply and fix the following:-
25 mm thick block board
a Plain m2 0.00
b Veneered one side with mahogany m2 0.00
c Veneered BOTH sides with mahogany m2 0.00
d 3mm thick sheet m2 0.00
12 mm thick celotex soft board
e Sheets m2 0.00
f 3mm thick mahogany m2 0.00
Chip boards 8' X 4'
g 9 mm thick Plain Chip board m2 0.00
h 12 mm thick ditto m2 0.00
Gypsum boards 8' X 4'
j 9 mm thick m2 0.00
k 12 mm thick m2 0.00
l 12 mm thick m2 0.00
m 18 mm thick m2 0.00
Styrofoam boards 4' X 4'
n 25mm thick size 1200x1200 m2 0.00
p 12.5mm thick size 1200x1200mm m2 0.00
25 mm wrot T & G boarding
q Fabricated from 100 X 25 mm prime grade cypress m2 0.00
r Ditto in cedar Ditto. m2 0.00
Polystyrene Thermal Insulation Boards
s Supply and install 2500x600x100mm thick interlocking polystyrene thermal insulation boards with compressive strength of 250-300kpa and a density of 30kg/m2 : Thermal conductivity to be 0.029 W/mK. The insulation boards should be installed as per the manufacturer's instructions and the Project Engineer's approval m2 0.00
The works shall consist of furnishing materials, construction,installation, and completion as directed by site engineer.
a Cordinate to construct and test a round water fountain, comprised of an external fountain of 5.6m diameter,40cm high and an inside circular of 2.6m diameter 60cm high . Concrete tilling works,stone works and electromechanical works and equipment are included in their respective items. price to include all items including cleaning. Sum 0.00
b Supply and install, spread and make good a minimum of 30cm agricultural soil in designated areas m2 0.00
c Supply and plant trees. Price includes digging a minimum of 1.5m deep holes for each tree for the following:
i) Plam tree , medjoul type not less than 2m high in good condition Nr 0.00
ii) Ditto but pensian trees Nr 0.00
iii) Ditto but vecus trees Nr 0.00
iv) Supply and plant washintonian trees Nr 0.00
v) Ditto but Lavnedar 3 year old Nr 0.00
vi Ditto but Rose 1 year old Nr 0.00
vii Ditto but cuctus 6 month year old Nr 0.00
viii) Cypress tree , not less than 0.5m high in good condition Nr 0.00
ix) Reasonable general rate for any other trees not included here but commonly use in human habitation areas, not less than 0.5m high in good condition Nr 0.00
d Supply and install Arturo turf grass. Price to include leveling of the agricultural soil and fertilizers and all necessary works to complete the job according to the prevailing weather condition. m2 0.00
e Allow for shifting of existing cover plants / live fence/flowers . The rate has to take care about watering and maintenance of plants for about 3 months or until completion of the contract. m2 0.00
f Allow for shifting of existing small trees at the location of proposed units. – The rate has to take care about watering and maintenance of plants for about 3 months or until completion of the contract Nr 0.00
TOTAL FOR SCHEDULE OF RATES BILL (NOTE: THIS TOTAL WILL NOT BE CARRIED TO GRAND SUMMARY) 0.00
United Nations Office for Project Services
Horn of Africa Multi-Country Office
CROPS STORAGE MODEL DESIGN
ENHANCING FOOD SECURITY AND RESILIENCE OF RURAL COMMUNITIES (EFSR) IN SUDAN
UNPRICED BILL OF QUANTITIES (BOQ)
NOTE: It is a MANDATORY requirement for bidders to complete and return this section
Failure to complete all sections of the BOQ may result in automatic disqualification of your bid.
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
Bill No. 01 General Requirements and Provision 0.00
Bill No. 02 Crops Storage Main Building 0.00
Bill No. 03 MECHANICAL INSTALLATION 0.00
Bill No. 04 ELECTRICAL INSTALLATION 0.00
SUB-TOTAL 1 0.00
LESS DISCOUNT (IF ANY)
GRAND TOTAL 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QTY UNIT RATE (KES) AMOUNT (KES)
BILL NO. 1 PRELIMINARIES
All the Bidders are requested to refer "Pricing Preamble and notes below" and works items of this Bills of Quantities shall be priced to fulfill the requirements there-in. Also see that no page or items are missing prior to pricing of this bill of quantities.
A list of typical general items are given below. However, the Bidder is requested to price only those items that may affect this Contract. Note
The Bidder is advised to visit the site of the proposed work, as it is his responsibility to ascertain the conditions governing access to the site, and external working space, storage area etc. Note
If no price has been stated against any item hereunder, the Contractor shall not be entitled to claim any money for such items even though he is obliged to execute the work or provide services described therein. Preliminary items priced by the Tenderer are deemed to include the cost of unpriced items. Note
The Bidder is advised to refer to the General Notes, Pricing Preambles, Drawings, Specifications, Conditions of Contract, Particular Conditions of Contract and other relevant documents prior to pricing of the following items. Note
The bidder is required to visit the site of the proposed work, as it is his responsibility to ascertain the conditions governing access to the site, the external working space, storage area and any other information he may find necessary before he can tender for the work. Note
Cost and expenses in connection with any other preliminary item which is not listed below, but is necessary for the due completion of works, is deemed to be included in the tender rates. Note
Mechanical plant and equipment which emits excessive noise, smoke, fumes, obnoxious gases etc., will not be allowed to be used in the Site, without the prior approval of the Engineer. Note
The contractor shall be responsible for any loss or damage to the works, existing structures, adjoining structures and unfixed materials. Note
The contractor shall try to locate the new units in a way to avoid cutting trees. If it is really needed to cut down any number of trees, allow for planting same number of trees – Contractor has to take care about watering and maintenance of plants for about 3 months or until completion of the contract. (Fill schedule of late) Note
The contractor shall be responsible for providing necessary lighting, watchmen, and other suitable security measures during construction until handing over. Note
The contractor will be required throughout the contract to maintain and keep from obstructing the existing way. Note
The Contractor shall be responsible for the provision of all materials, scaffolding, tools, plant, transport and workmen required for the works except in so far as may be stated otherwise herein and he shall allow for the provision of the foregoing except for such items specifically and only required for the use of nominated Sub-Contractors as described herein. Note
All such plant, tools and scaffolding shall comply with all regulations whether general or local in force throughout the period of the contract and shall be altered or adapted during the contract, as may be necessary to comply with any amendments in or additions to such regulations. Note
Contractor shall provide helmets, gloves, safety masks, dusk masks, eye goggles, boots etc. for the workmen. Note
Contractor shall provide safety boards, signs and safety ribbons Note
Contractor shall take special care for safety of the patients, staff and public during transportation of materials and implementation of the contract. Note
Plant, Material & Work Practices
No work in any trade shall be carried out in such a manner as to cause any damage and nuisance to adjacent owners or the public. Note
Mechanical plant and equipment which emits excessive noise, water, smoke, fumes, or obnoxious liquids, gases etc., will not be allowed to be used on the site. If the use of such machinery becomes necessary, the Contractor is expected to obtain prior approval. Note
The Engineer has the discretion as to when he deems it necessary for the Contractor to take precautions, maintain or repair any such plant and equipment or order their removal from the site. Note
Contractor shall provide specimens, samples and sample panels of material and testing of materials as appropriate and as directed by Engineer. Note
HORN of AFRICA MULTI-COUNTRY OFFICE (HAMCO): Sudan Office
BILL OF QUANTITIES
ITEM DESCRIPTION UNIT QTY UNIT RATE AMOUNT
1 General Requirements and Provision
a Fabricate supply and erect Project Sign boards as per the drawings No 1 0.00
b Mobilization, Establishing contractor's camps, supply equipment ,personnel, Lab, accommodation and construction plant on the site, L.S 1 0.00
c Demobilization, removal of site establishments of the contractor's organization, camps and reinstating the site to the existed conditions L.S 1 0.00
d As Built Drawings L.S 1 0.00
Total Sub-section Sum Carried to Summary
2 Site Clearance and Organization
a Clearing and removal of bushes, trees and debris and site surfacing M2 245 0.00
b Fencing and protection of site , site security and entrance control L.S 45 0.00
Total Sub-section Sum Carried to Summary
GRAND TOTAL 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QUANTITY UNIT RATE AMOUNT
BILL NO.3 Crops Storage Main Building
A SUBSTRUCTURE AND EARTHWORK
a) Excavation on land of any nature in order to obtain project levels, including loading and transport of surplus material to the dump, eventual bracing, pumping of the tributary water to the excavation, regularization of the bottom of the box and replacement of land whenever necessary, all executed in order to obtain the levels indicated in the design. 155 m3 0.00
b) Excavations of Raft Footing for Water tank & pump room to the depths of not less than 2.0 m as per the drawings or as directed by the Engineer 92 m3 0.00
c) Excavations of square Isolated Footing foundations to the depths of not less than 2.5 m as per the drawings or as directed by the Engineer 355 m3 0.00
d) Excavate and removal of soft material for ramps, landscaping and outside fence 72 m3 0.00
c) Return, fill in and ram selected excavated material around foundations trenches 239 m3 0.00
3 Disposal of Surplus spoils
d) Load and cart away surplus material from site to an approved dumping site 116 m3 0.00
4 Selected filling
e) Backfilling Beneath the Foundations compacted in layers not exceeding 150mm deep and well watered 71 m3 0.00
f) Ditto; Under water tank & pump room 46 m3 0.00
g) Backfilling inside the walls till the tileing elevation with a selected materilas in a compacted in layers not exceeding 150mm deep and well watered 1350 m3 0.00 150
h) Backfilling of filter materials of notless than 150 mm beanecth internal tiling and the external landscaping and entrance ramps as per the drwaings or as directed by the Engineer 900 m3 0.00
i Backfilling for landscaping and entrance ramps with a selected materilas in a compacted in layers not exceeding 150mm deep and well watered as per the drwaings or as directed by the Engineer 150 m3 0.00
4 Concrete work
The contractor should provide for approval the concrete mix design and the aggregates, cement and sand wihich will be used in the construction works.The minimum cement conetent will be 350 Kg of cement per cubic meter
Rates shall include the price of steel reinforcement, formwork, mixing, placing, curing and removal of formwork for all concrete and for all threading fillets etc. The rates shall include the sampling and testing at an approved labortary . All exposed concrete surfaces in columns, beams, slabs etc. must be fair face and of first class standard.
First class shuttering must be used and it must be approved by the Engineer before the reinforcement is placed in position and before the concrete is casted.
Plastered surfaces are to be roughened to receive plaster cement and should be used for all types of concrete
Plain concrete class 15 (mix 1:3:6)
a) 100mm Thick surface blinding under strip footings 142 m2 0.00
b) Ditto; under external & internal tiles 1500 m2 0.00
c) Ditto; for latines seats and slabs 25 m2 0.00
d) Ditto; for water tank & pump room 46 m2 0.00
Insitu concrete class 30, vibrated and reinforced as described, in:-
d) Isolated Footings 86 m3 0.00
e) Raft footing for water tank & pump room 28 m3 0.00
f) Short Columns 19.5 m3 0.00
g) Grade Beam 35 m3 0.00
h) G.B. for Latrines slabs and walls 30 m3 0.00
i) Latrines Strip footing 12 m3 0.00
Foundation walling
Masonry stone walls bedded , jointed in cement and sand (1:3) mortar and reinforced with hoop irons at every alternate course
i) 200mm thick beaneath Grade Beam and ramps sides 200 mL 0.00
i) 12 mm thick cement : sand (1:3) plaster to plinth 160 m2 0.00
j) Three coats of bituminous paint to foundations, columns stubs, grade beam, plinths surfaces. 450 m2 0.00
TOTAL FOR SUBSTRUCTURES AND SITE EARTHWORK CARRIED TO SUMMARY 0.00
B STRUCTURAL FRAME & ROOF
1) Reinforced Concrete
Insitu concrete class 30 , vibrated and reinforced as described, High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
The contractor should provide for approval the concrete mix design and the aggregates, cement and sand wihich will be used in the construction works.The minimum cement conetent will be 350 Kg of cement per cubic meter. where there is an exposure to the sea water and chemical attack, the Contrator should provide the sulphte resistance cement and apply / isoltate the concrete properly form the chemical attack using membrane and painting reagents
Rates shall include the price of steel reinforcement, formwork, mixing, placing, curing and removal of formwork for all concrete and for all threading fillets etc. The rates shall include the sampling and testing at an approved labortary . All exposed concrete surfaces in columns, beams, slabs etc. must be fair face and of first class standard.
First class shuttering must be used and it must be approved by the Engineer before the reinforcement is placed in position and before the concrete is casted.
a) Intermediate tie beams ( top level +3.00m) 16 m3 0.00
b) Top beams ( top level +5.20m) 10.5 m3 0.00
c) R.C. Ground Floor Columns 27 m3 0.00
d) R.C. walls for water tank & pump room 12.5 m3 0.00
e) R.C. cover slab for water tank & pump room 6.25 m3 0.00
2 Steel Roofing Frame & Sheet
Contractor to allow for hoisting and all angle brackets or gusset plates bolts, cleats, fish tailing lugs, drilling holes and the likes for fixing members to position as per the details;
The following in trusses and/or independent members
Frame structure including rafters, cross bracing, fasteners,struts and purlins complete with bolts and nut, fillet weld together.The contractor shall obtain the roof structure manfacturer drawings and spsecifications before importing or delivering to site to be reveiwed and approved by the Engineer .
a) Fabricate, erect and fix in position steel columns of IPE 500 , including surface preparation, anti-corrosion primer, and two coats of enamel finish paint. 26.4 M.L 0.00
b) Fabricate, erect and fix in position roof framing shall consist of primary beams of IPE 400 ( Rafter ) as per the drawings. 323.4 M.L 0.00
c) Fabricate, erect and fix in position roof framing shall consist of Secondary beams of IPE 330 as per the drawings. 100 M.L 0.00
d) Fabricate, erect and fix in position roof framing shall consist of Purlins section (SHS100*4) as per the drawings. 1,644.80 M.L 0.00
e) Fabricate, erect and fix in position Double Rod Bracing ∅32mm as per the drawings. 342 M.L 0.00
f) Supply and install galvanized steel roofing sheets ( thick. 50mm) as specified placed in and to steel frame including fasteners and all fittings in accordance with the drawings, manufacturer's instructions and Engineer directions. 1,562.50 m2 0.00
TOTAL FOR STRUCTURAL FRAME & ROOF CARRIED TO SUMMARY 0.00
First Class Bricks: Type (Fire faced brick) Uniform size (e.g., ~242x115x70mm), sharp edges, free from cracks, good crushing strength , low water absorption (<12-20%), made from good brick earth.
Three- ply bituminous felt damp proof course bedded in cement and sand (1:3) mortar (measured net allow for 300mm laps):-
a) 200mm wide between grade beam and bottom of the brick wall 180 mL 0.00
1) External Walling
200mm Thick walling , Supply material and construct first calss masonry burnet brick walls bedded and jointed in cement and sand (1:3) mortar
a) for Main Building 800 m2 0.00
b) Ditto for landscaping and gates, fence 36 m2 0.00
c) Ditto for latrines 60 m2 0.00
2) Internal Partition offices Walling 60 m2 0.00
d) For gurd rooms and entrances 30 m2 0.00
TOTAL FOR WALLING CARRIED TO SUMMARY 0.00
D DOORS and WINDOWS
Note: All doors shall be supplied and installed in accordance with the provided details and schedule. The installation shall include all necessary design features to ensure proper sealing and protection against insects, rodents, dust, and moisture, including but not limited to rubber or brush seals, tight-fitting frames, and metal thresholds. All ironmongery not measured separately shall be deemed included in the rates for the corresponding doors..
Mild steel caged door made out of cold rolled steel sections thoroughly cleaned and phosphatized to resist corrosion before receiving Two coats of grey rust inhibiting primer
Door external frame grouted below finished floor and fixed to walls: All iron mongery and lugs fixed to manufacturer's specifications
a Entrance Sliding Door (5.0 x 4.0m ) : Supply and install high-quality metal door 2.5 - 3 mm for vehicle entry with enhanced security features, including heavy-duty steel construction, durable locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint, and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 2 Nr 0.00
b Supply and install high-quality Singl steel door ( 900x220mm high ) including locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint, and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 4 Nr 0.00
c Supply and install high-quality Singl steel door for Latrine ( 700x220mm high ) including locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint ,and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 4 Nr 0.00
d Fence Gate (4.0 x 1.8m ) : Supply and install high-quality metal door 2.5 - 3 mm for vehicle entry with enhanced security features, including heavy-duty steel construction, durable locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint, and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 1 Nr 0.00
TOTAL FOR DOORS CARRIED TO SUMMARY 0.00
a Supply and install a high-quality steel window (3000 × 1000 mm high) comprising three upward-opening glass panels, each fitted with external steel mesh. The window shall include locking mechanisms, hinges, handles, anti-rust treatment, and three layers of chemical-resistant paint, along with all necessary accessories to ensure strength, durability, and safety, in accordance with the specifications, drawings, and the Engineer’s instructions. 30 Nr 0.00
b Supply and install ( 1000x1200mm high ) Double glazed aluminum for Security Room, 2-panel hinged window including 6mm toughwood glass out skin and 7.5mm laminated glass inner skin, metal insect mesh. (Weight of section not less 1.6kg/m.l, and width of external section 100 mm) 2 Nr 0.00
c Supply and install ( 800x400mm high ) Double glazed aluminum for latrines, 2-panel hinged window including 6mm toughwood glass out skin and 7.5mm laminated glass inner skin, metal insect mesh. (Weight of section not less 1.6kg/m.l, and width of external section 100 mm) 4 Nr 0.00
TOTAL FOR WINDOWS CARRIED TO SUMMARY 0.00
Ceiling Finishes
1 Roof Isolation
a) Supply, roof tempreturs isolation sheets and install , with pproper fixing wires and glue under the corrugated roof sheets as per drwaings , spcifications or as directed by the Engineer 1500 m2 0.00
2 Anti-Rust and chemacal attack paints
Prepare and apply undercoat and two finishing coats of gloss oil paint; and anti-rust paints
b) beneath and on the top of the corrougated roof sheets 3000 m2 0.00
2) Floor finishes
a Supply and apply epoxy coating of floor with skirting (100 mm) and joints. Samples shall be approved by site Engineer prior to procurement. 1500 M2 0.00
b Supply and fix 600x600x8.5 thick ceramic floor tiles tiles layed over white cement slurry over cement sand screed to overll thickness of 100mm include skirting 8cm high. Samples shall be approved by site Engineer prior to procurement. 16 M2 0.00
c Supply and fix300x300x8.5 thick non-slip ceramic tiles for latrines over waterproofing adhesive layed over white cement slurry over cement sand screed . Samples shall be approved by site Engineer prior to procurement. 24 M2 0.00
d Supply and fix a floor pallet made from durable, untreated hardwood or pest-resistant softwood, measuring 1.2 x 0.8m with a minimum dynamic load capacity of 1,500 kg, featuring top deck boards spaced no more than 4 cm apart, and elevated 10 to 15 cm above the floor 1200 M2
a Supply and apply 5 cm thickness concrete tiles with textured surface and stamped on two layers of selected material 25 cm for each around premisses of main building pattern as per drawings 500 M2 0.00
3) Wall Finishes (Plastering)
Clean, well-graded sand; Portland cement; clean potable water; bonding agent or hardening walls, consistent mix. apply the mixture in a multi-step process involving surface preparation, applying coats of plaster, leveling, and proper curing. This process ensures a strong bond, a flat surface, and prevents cracking.
Internal Walls: 12mm thick cement sand plaster, with steel trowelled finish, as described to:-
a) Wall surfaces internally of main building 1000 m2 0.00
b) Wall surfaces internally of latrines 60 m2 0.00
External Walls: 15mm Cement and sand (1:3) render on block wall or concrete work to:-
Fill uneven surfaces with stucco filler to approval including sanding of all uneven surfaces; apply two undercoats emulsion paint and two finishing coats of first quality Silk Vinyl emulsion paint to match the existing ;-
c) Wall surfaces externally of main building 1000 m2 0.00
d) Wall surfaces externally of latrines 60 0.00
Wall Finishes (Painting)
Fill uneven surfaces with stucco filler to approval including sanding of all uneven surfaces; apply two undercoats emulsion paint and two finishing coats of first quality Silk Vinyl emulsion paints
a) Wall surfaces internally of main building 1000 m2 0.00
b) Wall surfaces internally of latrines 60 m2 0.00
c) Wall surfaces externally of main building 1000 m2 0.00
d) Wall surfaces externally of latrines 60 m2 0.00
Fence chain Link and posts
a Fabrication: GI Chain Link Mesh 50x50mm mesh size, 3mm or 4mm diameter). Height: Generally 2.0 meters above ground level. Posts: Main posts (60.3mm O.D.) and line posts, spaced 3m apart. Structure: 'Y' shaped arms (450mm) for 3-6 rows of barbed wire. Finish: Galvanized (ASTM-A392-81) or PVC coated. Foundation: Concrete base ( 1:4:8 mix) for posts. 320 mL 0.00
TOTAL FOR FINISHES CARRIED TO SUMMARY 0.00
ITEM DESCRIPTION
A SUBSTRUCTURES 0.00
B STRUCTURAL FRAME & ROOF 0.00
D DOORS & WINDOWS 0.00
TOTAL TO SUMMARY 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QUANTITY UNIT RATE AMOUNT
A MECHANICAL INSTALLATION
1 PORTABLE FIRE FIGHTING EQUIPMENT
CO2 Fire Extinguishers
a) 6 kg Carbon Dioxide Steel Stored pressure gas fire extinguishers conforming to BS EN 3 complete with:- - charge and fixing bracket - pictorial instructions - colour coding to BS 7863 - discharge horn and hose. - pressure indicator -Complete with all required identification signage as specified in Technical Specification 3 Nr. 0.00
b) 5 kg ABC type fire extinguishers conforming to BS EN 3 complete with:- - charge and fixing bracket - pictorial instructions - colour coding to BS 7863 -Complete with all required identification signage as specified in Technical Specification 14 Nr. 0.00
2 FIXED FIRE FIGHTING EQUIPMENT 0.00
a) Supply install, test and commission GRP reservoir cylindrical ground water storage tank of nominal capacity 25000 litres; as per provided drawing to be located within a shade to be made as a makeshift shade for fire pump and fire water reservoir as 'TOPTANK' on 300mm high plinth support to structural Engineer’s detail complete with cover. The tank is to be complete with the following ; a) 50mm diameter overflow b) 32mm diameter washouts with gate valve c) 80mm diameter outlet with gate valve (2No.) d) 40mm diameter inlet with high pressure float valve e) Tank connectors for all incoming & outgoing pipes 1 Nr. 0.00
b Supply, install and test and commission a modular skid mounted 22.7m³/hr. @ 80m head; main electric fire pump; (centrifugal with an electric motor capable of working 100% flow at rated pressure, 150% flow at ≥65% rated pressure); a diesel engine driven standby firepump of the same capacity including fuel tank of a minimum capacity of 8 hrs continous running ; and a 3m3/hr capacity electric jockey pump at the rated head of 80m; mounted on a modular skid including all the accessories, signage,manometers, relef valves; test valves; and interconnecting pipes and fittings ; to be installed on a 200mm RC foundation to be built within the fire pump shade ; to the structural and architectural details; to be compliant to NFPA standards. 1 Nr. 0.00
c Supply and install galvanized steel schedule 40 pipes to external fire water distribution system as where shown on the drawing. Complete with all the necessary fittings, support and accessories. DN[mm] = 65mm 20 m 0.00
d Supply, install, test, and commission a wall-mounted, lockable fire hose cabinet , designed for fire fighting purposes in compliance with relevant standards (e.g., EN 671-1 for hose systems .The cabinet shall include all necessary fittings and accessories for full functionality & complete with all required identification signage as specified in Technical Specification Section. Material: Mild steel with anti-corrosion red powder-coated finish, minimum 1.2 mm thickness, suitable for indoor/outdoor use with weather-resistant properties (IP54 or better). Dimensions: Approximately 700 mm (H) × 600 mm (W) × 250 mm (D), or as required to accommodate all components. Door: Hinged, lockable with a break-glass key access system, fitted with a clear tempered glass or acrylic panel for visibility. Mounting: Wall-mounted with corrosion-resistant brackets and fixings, securely anchored to the structure as per manufacturer’s recommendations and structural drawings. Fire hose Type: Synthetic rubber-lined fire hose, compliant with EN 671-1 or equivalent, suitable for Class A, B, and C fires. Length: 30 meters, coiled on a swinging hose reel for easy deployment. Diameter: 38 mm (1.5 inch) nominal, with brass or aluminum nozzle (jet/spray type, adjustable). Couplings: Instantaneous couplings, corrosion-resistant, compatible with local fire fighting standards. Accessories: Nozzle Holder: Integrated holder for the hose nozzle, ensuring secure storage.,Signage: Clear, durable fire equipment signage (minimum 200 mm × 200 mm) in compliance with fire safety regulations, indicating the location and contents of the cabinet.Inlet Valve: Bronze gate valve (PN16, minimum DN25), suitable for connection to the fire water supply system, compliant with BS EN 12201 or equivalent. 3 Nr. 0.00
e Construct rectangular manhole out of 250mm thick double brick walls,internal dimension 600mm x 600mm x 600mm (average depth),internally plastered with three coats of cement/sand mix ratio1:3 ,on a base of precast R.C slab of size ,1300mm x 1300mm x100mm , including benching and bottom channeling with mass concrete.Slab shall be reinforced with dia.8mm reinforcement bar c/c 130mm bothways. Provide 150mm thick granular materials beneath the slab,on a compacted earth . Manhole shall have precast R.C cover slab, each,size, 740mm x 740mm x 100mmreinforced with diameter 8mm steel barc/c140mm bothways,including diameter 14mm steel ring handle with supporter bar all in accordance with the given detail drawings .Unit price shall include excavation of the pitto a depth of 800mm (average) and cart away of the excavated soil. 7 Nr. 0.00
f Supply, lay, test, and commission a High-Density Polyethylene (HDPE) PN16 fire main pipeline , including all necessary fittings, as per the provided detail drawings . The work shall ensure a reliable, leak-free system compliant with site requirements. Pipe: Material: High-Density Polyethylene (HDPE), PE100 grade virgin material, Pressure Rating: PN16 (16 bar nominal pressure).Sizes: As specified in the detail drawings (DN80) Type: HDPE compression fittings, electrofusion fittings, or butt-fusion fittings.Standards: Compliant with BS EN 12201-3 or equivalent, Includes elbows, tees, reducers, couplers, end caps, and transition fittings where ever necessaey (to connect with valves or other materials). Valves: Type: PN16 gate valves, ball valves, or check valves where they are necessary.Material: Bronze, brass, or ductile iron with HDPE-compatible ends (flanged or spigot).Standards: Compliant with BS EN 1074-2 or equivalent. Other Accessories:Thrust blocks, anchor blocks, and supports to prevent pipe movement.Warning tape or marker tiles above buried pipes for identification during future excavations. All materials shall be new, free from defects, and certified for potable water use by relevant standards (WRAS, NSF/ANSI 61). Installation: Site Preparation: Excavate trenches to the depths and widths specified in the detail drawings, ensuring proper alignment and gradient (minimum 1:100 unless otherwise specified). Prepare trench beds with sand or fine granular material (minimum 100 mm thickness) to provide uniform support and prevent pipe damage. Remove rocks, debris, or sharp objects from the trench to protect the pipe. Pipe Laying: Lay HDPE pipes along the alignments shown in the detail drawings, ensuring continuous support and proper gradient for drainage where required. Join pipes using butt-fusion, electrofusion, or compression fittings, as specified, following manufacturer’s guidelines and BS EN 12201-5 procedures. Ensure joints are leak-proof and capable of withstanding PN16 pressure.Install fittings, valves, and accessories (e.g., air valves, washouts). Backfilling: Backfill trenches with compacted sand or fine granular material (minimum 300 mm above the pipe) to protect the pipe, followed by native soil or as specified. Compact backfill in layers (maximum 150 mm per layer) to prevent settlement, as per ASTM D698 or equivalent. Place warning tape or marker tiles 300 mm above the pipe for future identification. Thrust Restraint: Install concrete thrust blocks or anchor blocks at bends, tees, and valves to resist hydraulic thrust. Ensure thrust blocks are cast against undisturbed soil and cured adequately. Testing: Pressure Testing: Conduct a hydrostatic pressure test on the completed pipeline as per BS EN 805 or equivalent. Test pressure: 1.5 × PN16 = 24 bar, maintained for a minimum of 2 hours (or as specified). Monitor for leaks, pressure drops, or deformations, and repair any defects before proceeding. Leakage Testing: Perform a leakage test to ensure the system meets allowable leakage rates (as per BS EN 805 or local standards). Record test results, including pressure, duration, and any observed issues. Alignment and Gradient Check: Verify pipe alignment and gradient using surveying equipment. 0.00
Size Ø = DN80 101 m 0.00
Size Ø = DN 65 30 m 0.00
3 MECHANICAL VENTILATION & AIRCONDITIONING 0.00
a) Supply and install a 600mm throuat diameter wind powered turbine ventillator ; spaced in accordance with the drawings; flushing detail designs in accordance with manufacturer's recommendation and to the engineers approval ; to acheive a lasting ; weather proof joint. 14 Nr. 0.00
b) Supply, installation and test and commissioning of 5 kW cooling capacity split-type air conditioner (Inverter type) for Administration Office, complete with indoor unit (Hi-wall mounted), outdoor condensing unit, wireless remote control with timer and temperature settings, washable easy-access air filters, refrigerant charge (R-410A or equivalent), all interconnecting refrigerant piping (copper tubing with insulation), condensate drain piping and connections, wall mounting brackets,signage and hardware, vibration isolation pads for outdoor unit, electrical supply cable and connections, commissioning and testing. The unit price shall include refrigerant piping and respective insulation - closed-cell elastomeric foam, 13mm thickness, condensate piping and all supporting structure. Set 1
c) Ditto No b) but for Security Office + Bed Quarter Set 1
d) Supply, installation and test and commissioning of wall-mounted or window-mounted axial exhaust fan for Utilities Room, complete with airflow capacity ≥ 320 m³/h (approx. 190 CFM), direct drive motor thermally protected, 220-240V / 50 Hz single-phase power supply, corrosion-resistant construction, integral gravity backdraft damper, bird/insect screen on exterior discharge, weatherproof louver or hood for exterior discharge, manual on/off switch inside room, all mounting brackets, fasteners, signage and hardware, electrical supply cable and connections, door undercut (15-25mm) for makeup air, commissioning and testing Set 1
4 GENERAL ITEMS/ SUMMARY 0.00
a) Test & commission all systems as per approved working drawings, specifications and bills of quantities to the satisfaction of the Engineer. Testing and commissioning shall be to Chartered Institution of Building Services Engineer Commissioning Codes 1 Sum 0.00
b) Prepare and submit working and record (as-installed) drawings to easily readable scale, A1 or A0 paper size format as follows; i) general arrangement drawings of all equipment, plant etc. ii) routes - types and sizes and arrangement of all pipework iii) wiring(electrical & control) details iv) any other details as per specifications Drawings are to be submitted in soft copy (AutoCAD format) & hard copy to the client, the Architect and the Engineer. All drawings shall be submitted to the satisfaction of the Engineer. 1 Sum 0.00
c) Prepare & submit draft and three final copies of operation & instruction manuals to Engineer's approval 1 Sum 0.00
TOTAL FOR MECHANICAL INSTALLATION CARRIED TO GRAND SUMMARY 0.00
B SANITARY , DRAINAGE AND WATER
NOTE: TRADE NAMES
Where Trade Names are mentioned below, it is intended to indicate the level of quality required. The tenderer MAY supply alternatives which must be approved in writing by the Engineer/Architect.
This BOQ shall be read in conjunction with mechanical technical specifications general and particular method of measurements, the mechanical drawings except where otherwise indicated. The unit price for all items in all sections shall include for supplying, installation and commissioning unless otherwise specially mentioned.
Contractor must check site condition including all installed first fix, sleeves structural opening in concrete works, any modifications or alternations would be considered included in contractor price or priced in this item contractor shall not be entitled for any extra cost for opening in structural walls or slabs.
1 SITE WATER SUPPLY PIPING SYSTEM
a PPR Piping System (DN 25) – Supply, install, test, and commission PPR pipe DN 25 mm (1 inch), PN20 rating, including all fittings (elbows, tees, couplings), heat fusion joints, wall/floor penetrations, pipe supports at 1.2 m intervals, and hydraulic pressure test to 4 bar for 1 hour. Complete from GRP tank outlet to elevated tank inlet. the standard requirement at the expense of the contractor. lm 20.00 0.00
b Elevated Water Tank (500 Liters) – Supply, install, and commission one food-grade polyethylene elevated water tank, nominal capacity 500 liters, conforming to ISO 4422. Include galvanized steel support frame anchored to wall/column, float valve or level sensor (adjustable high/low setpoints), overflow pipe (DN 25) with screen, drain plug, lockable lid, outlet strainer (1 mm mesh), and DN 20 gate valve for isolation. Mounting height: 2 m above handwashing faucet. № 1.00 0.00
c Transfer Pump set(dual pump) (GRP to EWT) – Supply, install, test, and commission one centrifugal electric transfer pump, minimum flow 20 L/min, minimum total dynamic head 4 m, motor rating 0.135 hp (100 W), 230 V / 50 Hz / single-phase. Include built-in thermal overload protector, isolation valve, non-return valve on discharge, suction strainer, corrosion-resistant casing (bronze/stainless steel/engineered plastic), and dry-run protection. № 1.00 0.00
d Level Sensor and Control Panel – Supply, install, and commission one automatic pump control system comprising: ultrasonic or float switch level sensor (IP68, dry contact output, adjustable high/low setpoints) installed in elevated tank; and control panel (IP54) with magnetic contactor with overload protection, Hand-Off-Auto selector switch, indicator lights (Power ON, Pump Running, High Level, Low Level). Complete with all interconnecting wiring conforming to IEC 60364. Set 1.00 0.00
TOTAL FOR SITE WATER SUPPLY PIPING SYSTEM CARRIED TO GRAND SUMMARY 0.00
2 WASTE WATER DRAINAGE SYSTEMS
The rates for drainage ditches shall include full compensation for excavation, disposal of excavated material, preparation of subgrade, supply and placement of concrete (minimum 25 MPa compressive strength at 28 days) or masonry as specified, forming of trapezoidal or rectangular cross-section, installation of galvanized steel gratings where shown, construction of catch pits with debris screens, joint sealing, curing, and finishing to achieve Manning’s roughness coefficient n = 0.017 for concrete ditches and n = 0.025 for masonry ditches. The rate shall also include all formwork, reinforcement where required, and any necessary erosion protection measures at outlets. The unit rate is per linear meter of completed ditch of the cross-sectional dimensions indicated. No separate payment shall be made for excavation, backfill, or disposal.
a Pit Latrine Ventilation Pipe (DN 100) – Supply, install, and commission one uPVC ventilation pipe, DN 100 mm (4 inch), conforming to ISO 1452-1, including: pipe extending from 300 mm above pit floor to 1.0 m above highest roof peak, solvent welded joints, galvanized brackets at 2 m maximum intervals, weatherproof cowl (turbo vent or 180° bend with bird screen), stainless steel insect mesh (12 mm aperture) at top, and fly-proof mesh (2 mm aperture) at pit entry. № 2.00 0.00
b Handwashing Station (Standard) – Supply, install, and commission one handwashing station comprising: concrete basin (Type 304, 400×300×150 mm), eight (8)(four (4) on each side) lever-operated chrome-plated brass tap, two liquid soap dispenser (500 mL), supply piping PPR and uPVC drainage piping to soak away pit. set 1.00 0.00
c Soak Pit – Supply, excavate, construct, and commission one soak pit for handwashing station drainage, including excavation, stone/gravel filling, perforated pipe inlet, geotextile fabric lining, and covered top with inspection port. Dimensions as per standard design. set 1.00 0.00
d Waste Water Septictank Supply and apply a complete waterproofing system, Waste Water Septictank to pit latrine structure including brick protection wall as follows: (1) Surface preparation: clean, dry, and prime concrete pit walls; (2) Waterproofing coating: apply bituminous emulsion or acrylic waterproof coating (minimum 2 coats) to external concrete pit walls from base to 500 mm above ground level, conforming to ASTM D1227; (3) Cementitious top seal: apply cementitious crystalline waterproofing slurry (minimum 3 mm thickness) to top 500 mm of pit lining (interior and exterior surfaces); (4) Joint sealant: apply flexible polyurethane sealant at all construction joints and pipe penetrations; (5) Brick protection wall: construct half-brick thick (115 mm) masonry wall against external waterproofed surface from pit base to 500 mm above ground level using common burnt clay bricks (minimum class 7.5 MPa) laid in cement mortar (1:4 mix) to act as sacrificial protective layer preventing backfill damage to waterproof membrane; (6) Damp Proof Course (DPC): install 300 mm wide polyethylene DPC membrane between brick protection wall and backfill material at top 500 mm zone; (7) Backfill interface: backfill shall be placed carefully against brick wall, not directly against waterproofing. Unit rate includes all materials, labor, application, brick wall construction, testing, and commissioning for a complete watertight installation. Conforms to manufacturer's specifications and BS 8102.Please note that the waterproofing system shall be applied only after the concrete pit has cured for a minimum of 7 days. All surfaces shall be clean, dry, and free from dust, oil, or loose material before application. The contractor shall conduct a water spray test after completion to verify no water ingress occurs at the top sealed zone. Any leaks detected shall be repaired at no additional cost. m2 50.00 0.00
e Rainwater Downpipe DN 100 (Market Block) – Supply, install, test, and commission one uPVC rainwater downpipe, DN 100 mm nominal diameter, conforming to ISO 1452-1 or AS/NZS 1260, minimum wall thickness 2.5 mm. Include stainless steel leaf guard (5 mm mesh) at roof inlet, galvanized pipe brackets (vertical spacing 1.8 m maximum, horizontal spacing 1.0 m maximum), UV-reflective light-colored oil paint coating (white/light grey) conforming to ISO 4892-2 on all exposed sections, and discharge splash block at base. Complete from roof outlet to ditch/splash block. ml 110.00 0.00
f Rainwater Downpipe DN 80 (Toilet Block) – Supply, install, test, and commission one uPVC rainwater downpipe, DN 80 mm nominal diameter, conforming to ISO 1452-1 or AS/NZS 1260, minimum wall thickness 2.0 mm. Include stainless steel leaf guard (5 mm mesh) at roof inlet, galvanized pipe brackets (vertical spacing 1.8 m maximum, horizontal spacing 1.0 m maximum), UV-reflective light-colored oil paint coating (white/light grey) conforming to ISO 4892-2 on all exposed sections, and discharge splash block at base. Complete from roof outlet to ditch/splash block. ml 10.00 0.00
g Rainwater Downpipe DN 80 (Guard House) – Supply, install, test, and commission one uPVC rainwater downpipe, DN 80 mm nominal diameter, conforming to ISO 1452-1 or AS/NZS 1260, minimum wall thickness 2.0 mm. Include stainless steel leaf guard (5 mm mesh) at roof inlet, galvanized pipe brackets (vertical spacing 1.8 m maximum, horizontal spacing 1.0 m maximum), UV-reflective light-colored oil paint coating (white/light grey) conforming to ISO 4892-2 on all exposed sections, and discharge splash block at base. Complete from roof outlet to ditch/splash block. ml 10.00 0.00
h Drainage Ditch – Supply, excavate, construct, and commission reinforced concrete drainage ditch, rectangular cross-section, with different internal dimensions, concrete grade minimum 25 MPa, smooth finish achieving Manning’s n = 0.017, including excavation to required depth, disposal of surplus material, formwork, reinforcement, joints (with waterstop where ), and curing.. Provide a minimum slope of 1% or follow the natural ground slope which ever is greater ml 90.00 0.00
i SIZE[mmXmm] = 450 X 300 ml 220.00 0.00
j SIZE[mmXmm] = 350 X 250 ml 280.00 0.00
k Catch Pit with Debris Screen(manhole) – Supply, excavate, construct, and commission one catch pit at ditch junctions or before discharge points, including reinforced concrete construction, minimum 600×600×900 mm deep, heavy duty removable cast iron grating cover, stainless steel debris screen (12 mm mesh), inlet and outlet connections to adjoining ditches, and concrete base. № 5.00 0.00
l Heavy duty cast iron or galvanized steel or concrete Ditch Cover (Pedestrian Crossing) – Supply and install one heavy duty cast iron or concrete cover for the ditch at pedestrian and vehicle crossing, including frame and cover, designed for pedestrian loading (minimum 5 kN/m²), hot-dip galvanised finish(if galvanized used), sized to match the ditch opening. № 4.00 0.00
m Supply and install uPVC DN 160 mm PN10 pipe conforming to ISO 1452-1 / EN 1452-2 inside the open ditch from roof downpipes to the underground RC rainwater harvesting tank, including all necessary fittings (bends, couplings, tees), galvanized steel supports or concrete anchor blocks at maximum 3.0 m spacing, one non-return valve (check valve) at tank inlet, one sediment trap with 5 mm stainless steel debris screen upstream of tank, and UV-protective coating (ISO 4892-2) for all exposed sections. Installation shall maintain minimum 0.5% gravity gradient. Jointing shall be by solvent cement welding or rubber ring push-fit sockets per manufacturer's specifications. Testing shall be by 24-hour water flow test with no visible leakage or ponding. Unit rate includes all materials, labor, testing, and commissioning but excludes ditch constructio lm 55.00 0.00
n Piping system for underground RC tank: overflow (uPVC DN 100 PN10), rainwater inlet (uPVC DN 160 PN10), washout (uPVC DN 100 PN10 with isolating valve and extended operating rod), including all fittings, supports, watertight tank connections, testing, and commissioning. Conforms to ISO 1452-1 / EN 1452-2. set 1.00 0.00
o Water Harvest Tank Ditto item No 2.d but for the under ground rain water harvest tank (5 x 5 x 2 [m]) m2 95.00 0.00
p Allow for Testing and commissioning of the entire plumbing installation by a Chartered Mechanical Engineer and obtaining a Test Certificate (3rd party testing to approval of the Engineer) including all off-site and factory testing; inspections to demonstrate compliance with relevant standards, operating the completed installation and submitting all relevant test records and authority approval. LS 1 0.00
q All sanitary fittings supplied shall be provided with a minimum 5 year warranty, issued jointly and severally by the local supplier and the manufacturer. LS 1 0.00
r Allow for preparation of Operationa and Maintenance Manual including site users training for the O & M Maual of all plumbing and mechanical appliances. LS 1 0.00
s Supply and installation of Dry Latrine Squatting Pan – Ordinary Type Heavy-duty vitreous china or FRP pan, no water seal, shallow profile with anti-splash lip, drop hole min. 180mm. Includes fixing to concrete slab. No water supply connection. № 2
t Supply and installation of Dry Latrine Squatting Pan – PWD Type Accessible design for persons with disabilities. Heavy-duty FRP or china with raised footrests, pan rim height ≤200mm from floor. Includes stainless steel grab bars (wall-mounted, vertical & horizontal). Drop hole min. 200mm. No water supply connection. № 1
u Supply and installation of Shower Water Drain Intake to Pit Floor-mounted grating (stainless steel/HD plastic, min. 150mm diameter) with debris trap. Includes vertical drop pipe (PVC, 75mm min. diameter) from floor through pit cover slab into pit void. No trap, no water seal. No connection to pressurized water supply. № 1
TOTAL FOR WASTE WATER DRAINAGE SYSTEMS CARRIED TO GRAND SUMMARY 0.00
ITEM DESCRIPTION
A MECHANICAL INSTALLATION 0.00
B SITE WATER SUPPLY PIPING SYSTEM 0.00
C WASTE WATER DRAINAGE SYSTEMS 0.00
TOTAL TO SUMMARY 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
BILL NO.4 ELECTRICAL INSTALLATION
4 ELECTRICAL INSTALLATIONS
The Bill of Quantities, Specifications, Drawings and all other Contract documents are complementary to each other. It is the responsibility of the Contractor to check the locations and quantities of the materials and equipment to be executed in accordance with the drawings. The unit rate of the materials and equipment shall be based on the Specification, all components as required and specified under each item concerned in the Specifications, Drawings, and all other Contract documents.
5.1.1 Low Voltage Switchboard
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Normal / Standby Switchboards:
5.1.1 18 way TP/N - flush mounted distribution board DB 'S.CST.0 (E )' complete with 4X63A TP/N MCB main incomer and all MCB , as shown on schematic wiring Un 1
5.1.2 63A Load transfer switch (L.T.S), as shown on schematic wiring Un 1
5.1.3 18 way TP/N - flush mounted distribution board DB 'S.CST.1 (E )' complete with 4X40A TP/N MCB main incomer and all MCB , as shown on schematic wiring Un 1
5.1.4 12 way TP/N - flush mounted distribution board DB 'S.PR.0 (E )' IP65 complete with 4X20A TP/N MCB main incomer and all MCB , as shown on schematic wiring Un 1
5.1.5 4P-25 A (IP65) - flush mounted Fire PumpPump Isolator complete with all accessories , as shown on drawings Un 1
5.1.6 2P-10 A (IP65) - flush mounted Domestic Pump Isolator complete with allaccessories , as shown on drawings Un 1
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories including conduits and manholes as specified in schedules of equipment, detailed drawings and specs:
LV Distribution Cables including burid PVC ducting and all accessories as indicated in the drawings
5.2.1 - 4X16+16 Emm² Cu/ XLPE/ PVC (plain annealed stranded copper conductors, connecting Load transfer switch to switchboard to S.CST.0 ml 1
5.2.2 - 4X4+4 Emm² Cu/ XLPE/ SWA/PVC (plain annealed stranded copper conductors , connecting PR.0 to S.CST.0 ml 19
5.2.3 - 4X10+10Emm² Cu/ XLPE/ SWA/PVC connecting switchboardS.CST.1 to S.CST.0 ml 25
5.2.4 - Fire rated inside metallic conduit 4X4+4 Emm² Cu/ XLPE/ SWA/LSZH (plain annealed stranded copper conductors wrapped in mica glass fire-barrier tape, cross-linked polyethylene (XLPE) insulation, galvanized steel wire armor (SWA), and a low smoke zero halogen (LSZH/LSHF) outer sheath)connecting switchboardS.Fire pump to S.CST.0 ml 20
5.2.5 - 2X1.5+1.5 Emm² Cu/ XLPE/ SWA/PVC (plain annealed stranded copper conductors , connecting Domestic pump to PR.0 ml 8
Supply and installation of class SN8 conduit in accordance with the conditions defined in the in written pieces, specification, drawings and 100 mm diameter regid conduit buried in the ground
5.2.6.1 - PEAD Ø 110 mm for grid connection ml 5
5.2.6.2 - PEAD Ø 110 mm for lLV cables connecting panels S.ST.1 , Fire Pump, and S.PR.0 connection ml 55
5.2.7.1 - Low Voltage manhole chambers, with internal measures of 1000 x 1000 x 1000 (W*L*H), with RC cover thickness not less than 100 mm, as per drawing details Un 8
5.2.7.2 - Fire alarm cable manhole chambers, with internal measures of 1000 x 1000 x 1000 (W*L*H), with RC cover thickness not less than 100 mm, as per drawing details Un 4
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Indoor Lighting:
5.3.1 Luminaire fix to the ceiling (Downlight) LED 80W, IP65( L1) Un 98
5.3.2 Luminaire fix to the ceiling (Downlight) LED 30W, IP44(L2) Un 4
5.3.3 Luminaire fix to the ceiling LED15W, IP44 (L3) Un 12
5.3.4 Luminaire fix to the ceiling LED30W, IP44 (L4) Un 2
5.3.5 Luminaire fix to the ceiling LED30W, IP65 (L4) Un 3
5.3.6 POLE MOUNTED 2 Days SOLAR SYSTEM LIGHTING FIXTURE WITH 80W LED IP66/1K07. COMPLETE WITH SOLAR PANEL BATTERIES e,t,c AND 10 M HOT-DIP GALVANIZED STEEL WITH THICKNESS NOT LESS THAN 4MM FIXED ON CONCRET BASE Type L9 Un 16
5.3.7 Luminaire fix to the wall 2 Days Solar SystemLIGHTING FIXTURE WITH 80W LED IP66/1K07. COMPLETE WITH SOLAR PANEL BATTERIES e,t,c (L11) Un 5
Lighting Switches
5.3.8 - One way switch, recessed mounting Un 4
5.3.9 - Double pole switch, recessed mounting Un 6
5.3.10 Three pole switch, recessed mounting Un 8
5.3.11 Three pole switch, recessed mounting(IP65) Un 1
5.3.12 - Two Way Double pole switch, recessed mounting Un 2
LIGHTING Outlet
Supplying, installing, connecting and testing lighting outlets including conduit, conduitor fittings, boxes,wiring, cabling, earthing, accessories and all necessary works and materials required for complete installation back to panel boards as specified and as indicated on the drawings for the following items :
5.3.13 copper wire Cu/ XLPE/ PVC(2x1.5+1.5E sqmm) Cu/ XLPE/ PVC in 20mm minimum pvc conduit No. 71
5.3.14 copper wire Cu/ XLPE/ PVC(2x2.5+2.5E sqmm) in 20mm minimum pvc conduit No. 48
5.3.15 copper wire Cu/ XLPE/ PVC(2x1.5+1.5E sqmm) in 20mm minimum pvc conduit for emergency and safety lighting No. 23
Emergency / Safety Lighting
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Indoor Lighting:
5.3.16 - S1 - maintained (60min Autonomy) Un 19
5.3.17 - Maintained type Exit signe(3 Hours) Un 4
5.4 General Purpose Power Socket
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Double Flush and Surface Mounting Devices - Normal/Standby Supply:
5.4.1 - Flush Mounting Earthed Socket (BS546 ) - with cover 16A IP44 Un 16
5.4.2 - Flush Mounting Earthed Socket (BS546) - 16A Un 8
5.4.3 - Flush Mounting Earthed Socket (BS Type) - with cover 16A IP65 Un 2
Supplying, installing, connecting and testing electric outlets Including conduit or three compartment perimeter trunking which shall be designed to provide a solution to the segregation and access of power, data and communication cable trunk, r trunk accessories, conduit or trunk accessories, cabling, boxes terminations, earthing and all necessary ancillary works and materials required for complete installation as specified and as indicated on the drawings for the following items :
5.4.4 Sockets outlet ,240V by copper wire 3X2.5 mm2 Cu/ XLPE/ PVC in 20 mm pvc conduit. No. 26
5.4.5 Ditto but outlet by copper wires 3X1.5 mm2 Cu/ XLPE/ PVC in 20 mm pvc conduit Ceiling Fans No. 2
5.4.6 Ditto but outlet by copper wires 3X4 mm2 Cu/ XLPE/ PVC in 20 mm pvc conduit for Air conditioners No. 2
5.4.7 Ditto but outlet by copper wires 3X1.5 mm2 for Tools room exhaust fan Cu/ XLPE/ PVC in 20 mm pvc conduit No. 1
5.4.8 Power Outlets with fire rated cables(2X1.5mm² Cu/ XLPE/ LSZH , in galvanized steel coduit for fir alarm panel and repeater No. 2
5.5 Earthing System
5.5.1 Supplying, installing connecting and testing a complete protective earthing system including earthing pits, earthing electrodes, equalizer bars, earth continuity conductor, earthing conductor to switchboards, diesel generator set and transformers and all low voltage systems ...etc complete with all accessories, fixings, brackets test links, suspensions, drilling and cutting to form a complete installation as specified and as indicated on the earthing schematic drawings (Note: In the end It should be guaranteed, the achievement of a protective earth value less than a 1 Ohm (Regime TN-S)) LS 1
5.6 Lightening Protection Systeme
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
5.6.1 - Interseption rod installed on pole NO 6
5.6.2 - Detail C - Mechanical connector (connection to source earth) NO 12
5.6.3 - Main Earthing Terminal NO 12
5.6.4 - Source earth with 20mm Diameter made of copper NO 12
5.6.5 - Downward conductor 50 mm2 bar copper with connection terminal +Manhole / 400x400x500mm - ml 450
5.7 Fire Detection System
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories include 24 hours operation batteries as specified in schedules of equipment, detailed drawings and specs. All components of the fire alarm system shall be fire resistant (conduits, pullboxes…)
5.7.1 - Self contained , 4 loops Fire control panel, addressable pcs 1
5.7.2 - control panel, repeator pcs 1
Fire Detection Devices:
5.7.3 - Manual break glass points with protective cover pcs 5
5.7.4 - Optical smoke detector including detector base pcs 53
5.7.5 - Evacuation speaker pcs 7
5.7.6 Ditto but Water Proof pcs 2
5.7.7 Visual Alarm pcs 5
5.7.8 Ditto but Water Proof pcs 4
Electrical fire rated cables:
Enclosed in a recessed or surface mettalic conduiting include , all needed fire rated accessories :
5.7.9 - JE-H(st)H minimum 2x2x1mm² (The size to be determn according to system design), connecting repeator to control panel ml 448
5.7.10 - JE-H(st)H minimum 2x2x1mm² (The size to be determn according to system design), connecting Detectors to control panel and repeator ml 164
5.8 - Engineering, System Programming, including System Testing, Commissioning and Training. L.S 1
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
\ DESCRIPTION QUANTITY UNIT RATE AMOUNT
BILL NO.5 SCHEDULE OF RATES - GENERAL (NOTE: IT IS MANDATORY FOR BIDDERS TO COMPLETE THIS SECTION)
Note: The rates provided in this section will ONLY be used to value variation items whose rates are not provided in the measured work bills.
a Site Clearance m2 0.00
b Cutting, clearing and dumping away all shrubs, debris and unnecessary materials. m2 0.00
c Cutting of trees not exceeding 450mm girth including removing from site as directed nr 0.00
d Cutting of trees exceeding 450mm but not exceeding 600mm girth ditto nr 0.00
e Cutting of trees exceeding 600mm but not exceeding 900mm girth ditto nr 0.00
f Cutting of trees exceeding 900mm but not exceeding 1200mm girth ditto nr 0.00
g Cutting of trees exceeding 1200mm girth ditto nr 0.00
h Removing stumps of trees not exceeding 600mm girth and carting away debris nr 0.00
j Removing stumps of trees exceeding 600mm but not exceeding 1200mm girth ditto nr 0.00
k Removing stumps of trees exceeding 1200mm girth ditto nr 0.00
l Excavate the unconsolidated top soil to an average depth of 150mm m2 0.00
m Cutting of surface rock outcrops and removing debris from site m2 0.00
n Backfill to make up levels m3 0.00
p "Premise 200CC" insecticide treatment to surfaces of excavations applied as per manufacturer's instruction with a 10 year guarantee m2 0.00
q "Gladiator TC"(organophosphates chlorpyrifos)-covers 8SM per litre m2 0.00
r "Termidor" anti-termite with a coverage of 20m2 per litre m2 0.00
2 FOUNDATION EXCAVATION 0.00
a Excavate on normal soil to a depth of 1500mm from ground level m3 0.00
b Excavate on normal soil to a depth of 3000mm from ground level m3 0.00
c Excavate on normal soil to a depth of 4500mm from ground level m3 0.00
d Extra-over for excavating in rock class I m3 0.00
e Extra-over for excavating in rock class II m3 0.00
f Extra-over for excavating in rock class III m3 0.00
g Extra-over for excavating in clay soil m3 0.00
3 FOUNDATION WALLING 0.00
a 400mm thick rubble stone foundation walling bedded and jointed in cement and sand (1:3)mortar m2 0.00
b 200mm thick natural stone foundation walling bedded and jointed in cement and sand (1:3)mortar m2 0.00
4 CONCRETE WORK 0.00
a Provide all materials and cast insitu plain concrete class 15/20 (1:3:6) blinding under foundation m3 0.00
b Provide all materials and cast insitu plain concrete class 20/20 (1:2:4); vibrated m3 0.00
c Provide all materials and cast insitu plain concrete class 25/20 (1:11/2:3); vibrated m3 0.00
Sawn formwork to insitu concrete as described:- 0.00
d To sides of ring beams m2 0.00
e To soffits of suspended slabs m2 0.00
f To sides of columns m2 0.00
Extra over formwork for:- 0.00
g Fair face finish m2 0.00
a Provide materials and construct 100mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
b Provide materials and construct 150mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
c Provide materials and construct 200mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
d Provide materials and construct 400mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with two strips of hoop iron after every four courses m2 0.00
e Provide materials and construct 200mm thick hollow concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
f Provide materials and construct 100mm thick machine cut stone walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
g Provide materials and construct 150mm thick machine cut stone walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
h Provide materials and construct 200mm thick machine cut stone walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
6 ROOF CONSTRUCTION, COVERING AND RAIN WATER GOODS 0.00
a Supply and fix gauge 26 IT5 roofing sheets m2 0.00
b Approved concrete roofing tiles on 50x25mm soft wood battens at 200 centres m2 0.00
c Galvanized iron plain sheet 26 gauge m2 0.00
Approved pressure impregnated and treated hardwood steel 0.00
d 150x50mm section Steel members m 0.00
e 100x50mm section Steel members m 0.00
f 75x50mm section Steel members m 0.00
g 50x50mm section -Steel members m 0.00
h Provide and fix fascia board 250x25mm section fixed to the beams m 0.00
Approved pressure impregnated and treated softwood steel 0.00
j 150x50mm section Steel members m 0.00
k 100x50mm section Steel members m 0.00
l 75x50mm section Steel members m 0.00
n Provide and fix fascia board 250x25mm section fixed to the beams m 0.00
p Provide and fix 150x150mm box gutter fixed to fascia board with/and including brackets at rafter center and two coat of oil paint. The slopes to be considered according to the drawings m 0.00
q Supply and fix premanufactured 150x100mm PVC rain water gutter fixed to fascia board with mild steel brackets at 1200mm centres m 0.00
r Approve concrete roofing tiles on 50x25mm soft wood battens at 200 centres m2 0.00
7 WALL FINISHES 0.00
a Plaster with 18mm thick mortar on walls and beams, both inside and outside: Walls to be cured at least for one week after 24 hours of plastering. Contractor to allow for scaffolding and all necessary tools in his rate m2 0.00
b Plaster with 12mm thick mortar on walls and beams, both inside and outside: Walls to be cured at least for one week after 24 hours of plastering. Contractor to allow for scaffolding and all necessary tools in his rate m2 0.00
c Supply and apply two coats of white wash on all plastered surfaces with uniforms colours. Contractor to allow for scaffolding and all necessary tools in his rate m2 0.00
d Supply and fix ceramic wall tiles size 200x150x6mm thick m2 0.00
8 FLOOR FINISHES 0.00
Cement and sand screed 0.00
a 25mm thick insitu cement and sand (1:3) screeded beds, with steel trowelled finish , on concrete m2 0.00
Ceramic floor tiles 0.00
b Supply and fix ceramic floor tiles m2 0.00
c 100mm high ceramic tiles skirting m 0.00
Concrete Tiles 0.00
d Provide and install 50x50x5cm precast concrete tiles around the building 1m width as shown in the drawings m2 0.00
Epoxy paint 0.00
e Supply and apply epoxy industrial floor paint to all cement finished floors m2 0.00
Granolithic paving 0.00
f 38 mm thick (24mm cement and sand backing & 15mm thick granolithic layer) m2 0.00
g 20 x 100 mm Skirting m 0.00
Terrazzo Paving 0.00
h 38 mm thick (24mm cement and sand backing & 15mm thick terrazzo layer) m2 0.00
j 20 x 100 mm Skirting m 0.00
Plastic dividing strips. 0.00
k 32 x 3 mm thick plastic dividing strips. m 0.00
l Aluminum ditto m 0.00
m 25 mm wide non slip carborundum m 0.00
Precast Paving slabs
n) 600x600x50mm thick precast concrete paving slabs (standard) jointed in cement and sand mortar and laid on 50mm thick sand bed (Sample of paving slab to be provided by the Contractor for approval by the site Engineer). m2 0.00
Precast interlocking Paving slabs
o) Precast interlocking concrete paving slabs (standard) jointed in cement and sand mortar and laid on 50mm thick sand bed (m.s) (Sample of paving slab to be provided by the Contractor for approval by the site Engineer). m2 0.00
9 CEILING FINISHES 0.00
Acoustic Ceiling 0.00
a Tiles system suspended ceilings; 600 x 600 x 15 mm thick fissured mineral fibre tiles; jointed as per the manufacturer's instructions including suspending on 14 gauge pre-straightened galvanized annealed iron wire hungers at 2100 mm centers; rate to include steel brandering m2 0.00
Gypsum Board Ceiling 0.00
b Supply of materials and installation of gypsum board ceiling complete with steel brandering m2 0.00
Chipboard Ceiling 0.00
c 12mm thick chipboard ceiling fixed to and including 50x50mm cypress branderings at 600mm c/c both ways, with clout headed nails and set out in symmetrical panels with 'V' joints m2 0.00
Plywood Ceiling 0.00
d 8mm thick plywood ceiling (8'x4') boards on and including 50 x 50 mm softwood brandering m2 0.00
e Ex 75x50mm softwood molded steel cornice m 0.00
10 PAINTING 0.00
Prepare and apply three coats plastic emulsion paint to:- 0.00
a Plastered surfaces m2 0.00
Prepare and apply two coats gloss oil paint to:- 0.00
b Plastered surfaces m2 0.00
Aluminum primer or other equal and approved wood primer before fixing: - 0.00
c Backs of frame, board, etc over 100mm but not exceeding 200mm girth m 0.00
Prepare and apply three coats polyurethane clear matt varnish on woodwork internally 0.00
d General surfaces of flush doors and frames m2 0.00
Prepare and apply three coats permaplast weather proof paint to:- 0.00
e Walling and concrete ; external m2 0.00
a Mild steel grill door overall size 900x2100mm high made out of 40x80x4mm thick RHS framing, two equal door leafs each made out of 40x40x6mm mild steel plate frames, 12mm solid square bars welded to frame at equal 150mm centres at 450 angle both ways; including fixing frame to walling/concrete and complete with heavy duty hinges Nr. 0.00
b Supply and fix 30" mahogany veneered steel flush door size 900x2100mm high with hardwood lipping all round Nr. 0.00
c Door size 800x2100mm high Nr. 0.00
Wrot mahogany 0.00
Framed frames and framings 0.00
d 150 x 50 mm; 2 No. labours; plugged door frame m 0.00
e 50 x 15 mm architrave m 0.00
f 15x15mm quadrant beading m 0.00
Iron mongery 0.00
g Supply and fix three lever mortise lock complete with set lever handle furniture - fixed to steel doors Nr. 0.00
h 100mm steel butt hinges prs 0.00
j 900x100mm high standard Aluminum kicking plate Nr 0.00
k Four lever mortise lock complete with set lever handle furniture - fixed to steel doors Nr. 0.00
12 WINDOWS 0.00
Aluminum Windows 0.00
a Supply and fix 1500x1000mm high bronze anodized aluminium windows as per the specifications, with aluminium woven mesh fly screen in aluminium frame, and all necessary hardware and accessories. Nr 0.00
Steel Grill Windows 0.00
b Supply and fix steel grill window size 1500x1000mm high made out of 40x40x4mm SHS framing; 12mm solid square bars welded to frame at equal 150mm centers at 450 angles including fixing to approval Nr 0.00
Steel Casement Windows 0.00
c Supply and fix steel casement windows size 1200x1200mm in standard 'T' sections complete with closers, hinges, stays and all other necessary iron mongery Nr 0.00
d Supply and fix steel casement windows size 600x600mm in standard 'T' sections complete with closers, hinges, stays and all other necessary iron mongery Nr 0.00
e 5mm thick clear sheet glass and glazing to aluminium frames m2 0.00
f 5mm thick obscured sheet glass and glazing to aluminium frames m2 0.00
Adjustable Aluminum Louvre frames 0.00
g 8No. 100 mm blades (per set of blade ) Nr 0.00
h Ditto for 150 mm ( per set of blade ) Nr 0.00
Curtain fittings 0.00
j 35 mm diameter chrome plated curtain rod m 0.00
Pelmet boxes in wrot cypress 0.00
k End stops nr 0.00
l 150 X 25 mm pelmet top m 0.00
m 100 x 25 mm pelmet fascia m 0.00
Window Sills 0.00
n 500mm x 100mm precast concrete window sill pointed in cement and sand (1:3) mortar m 0.00
Window Blinds 0.00
p Supply and install vertical blinds to windows m2 0.00
Window Stay 0.00
q Supply and fixing of brass window stays approved from samples Nr 0.00
Window Handles 0.00
r Supply and fixing of brass window handles approved from samples Nr 0.00
13 DEMOLITION 0.00
a Demolition of single-storey masonry block/building including breaking the ground slab and the foundation , cleaning the site and making good the site for new construction, sort out arising materials as directed and removing all debris from site m2 0.00
b Demolition of multi-storey masonry block/building including breaking the ground slab and the foundation , cleaning the site and making good the site for new construction, sort out arising materials as directed and removing all debris from site m2 0.00
c Demolition of parts masonry wall, including any concrete beams and columns, make good the affected surfaces, sort out arising materials as directed and removing all debris from site m2 0.00
d Hack out the existing floor finish including the skirting and prepare floor surfaces to receive new floor; remove all debris from site m2 0.00
e Hack out the existing wall plaster in and prepare surfaces to receive new wall plaster m2 0.00
f Hack out the existing wall paint and prepare surfaces to receive new wall paint m2 0.00
g Remove existing doors and windows(various sizes) including frames and all iron mongery, cost of setting aside re-usable material as directed, removing debris from site and making good all affected surfaces Nr. 0.00
h Carefully remove all complete toilet fittings, prepare the affected surfaces to receive new fittings. Nr. 0.00
i Carefully remove all complete sinks fittings, prepare the affected surfaces to receive new fittings. Nr. 0.00
j Carefully remove all existing roof covering, repair the affected roof structures to receive new roof covering,; remove all debris from site as directed by site engineer m2 0.00
13 WATER AND SANITATION 0.00
Supply and fix the following sanitary appliances complete with all the connections to services, waste, jointing to supply overflows and plugging and screwing to the floors. Where trade names are mensioned below, the reference is intended to be as a guide to the type of fitting. 0.00
Water Closet 0.00
a 600x500mm deep Anti Vandal stainless steel squat type WC pan cast in concrete floor slab; complete with cistern and all necessary accessories Nr 0.00
b White European toilet complete with trap, cistern and all necessary accessories Nr 0.00
Wash hand basin (WHB) 0.00
c Ceramic Wash Hand basin complete with pedestal and all necessary accessories Nr 0.00
Urinal Bowl 0.00
d Wall hung ceramic urinal complete with all accessories and fixtures Nr 0.00
e Anti-vandal type stainless steel mirror Nr 0.00
Shower panel 0.00
f Shower panel to detail constructed in one piece grade 304stainless steel with all exposed surfaces polished to a satin finish; complete with an anti vandal spray head Nr. 0.00
Dhobi sinks 0.00
g Supply materials and construct concrete dhobi sink overall size 900x550mm wide Nr. 0.00
j Approved anti- vandal water tap Nr 0.00
k Supply and installation of a steel grease trap with a flow rate of 30GPM complete with accessories Nr 0.00
l Supply and install PVC water tanks with a capacity of 2 m3 complete with all fittings Nr 0.00
m Supply and install fibre glass tanks with a capacity of 5 m3 complete with all fittings Nr 0.00
n Install 10,000m3 Bulk Water Storage Fibre Glass tank complete with accessories Nr 0.00
Supply and install G.I. Class "B" Pipes complete with Fittings
p 32mm Diameter Pipe Lm 0.00
q 25mm ditto Lm 0.00
r 20mm ditto Lm 0.00
s 15mm ditto Lm 0.00
Supply and install PN 20 PPRC conforming to the current European standards for PPR installations and to the Engineer's approval, pipes jointing shall be by polyfusion or use of electric coupling.
Rates must allow for all Metal/plastic threaded adaptors where required for the connection of sanitary fixtures, valves. sockets, sliding and fixed joints, support raceways, isolating sheaths, elastic materials, expansion arm and bends, crossovers etc.
t 50mm dia pipe Lm 0.00
u 32mm dia pipe Lm 0.00
v 25mm ditto Lm 0.00
PPR to GI Adoption pieces
w 32mm diameter high pressure approved pattern brass rising stem full way gate valve with wheel head and jointing to tubing as 'PEGLAR' or approved equivalent. Nr. 0.00
x 12mm diameter 300mm long Copper tubing bent as required including jointing to GMS pipe and fitting. Nr. 0.00
Supply and install uPVC soil system to BS4660 and BS4515and muPVC waste systems to BS 5255withscrewed and socketed joints to BS 21. solvent welded joints shall be as per the system's manufacturer's written instruction. Tenderer must allow in their pipe work prices for all the couplings, connectors, joints etc as required in the running lengths of the pipe work and also where necessary for fixing clips, holder bats plugged and screwed.
y 100mm diameter grey heavy duty high pressure pipes Lm 0.00
z 50mm diameter waste pipes ditto Lm 0.00
a1 Supplying materials and construction of Inspection Chamber (IC) 600x600mm using solid concrete blocks for walls and casting concrete for the manhole base with thickness not less than 150mm; including cement plastering for inside walls. Nr 0.00
b1 Provide a rate for emptying of septic tank and disposal of waste m3 0.00
14 ELECTRICAL SUPPLY , CONDITIONING AND FIRE FIGHTING INSTALLATIONS
Supply, fix and install wires 1.5mm for lighting and 2.5mm for sockets, distribution panel boards with necessary circuit breakers, testing and earthing boards, cables, sockets, switches, fans, and lighting fixtures as specified in the drawings. All the price of the below items must include the materials and installations cost
a Main Distribution Panel Board of 150 AMP. Nr 0.00
b Twin sockets (13amp) Nr 0.00
c Single socket (13amp) Nr 0.00
d Switched Spur Outlet 13A c/w neon indicator lamp for Water Heaters Nr 0.00
e switches one gang (5amp) one way Nr 0.00
f switches one way (5amp) two gang Nr 0.00
g switches one way (5amp) three gang Nr 0.00
h Fluorescent lamps 40w 4 feet (Twin Unit) Nr 0.00
j Fluorescent lamps 40w 4 feet (Twin Unit) c/w Emergency Maintained Fluorescent fitting. Nr 0.00
k Fluorescent lamps 40w 4 feet (Single Unit) 'Splash Proof Fitting' Nr 0.00
l Fluorescent lamps 40w 4 feet (Single Unit) 'Splash Proof' c/w Emergency Maintained Fluorescent fitting. Nr 0.00
m Watertight IP65 Double 'D' Light Fitting Nr 0.00
n 3 speed box fan with 20 inch blades Nr 0.00
p Fire Escape Illuminated Fire Exit (Running Man) Sign to BS 5499 Nr 0.00
q Smoke Detector - Battery Operated 85dB Sounder with Test Button to BS 5839 Nr 0.00
r Battery Operated heat detector Nr 0.00
s Intercom code outlet points Nr 0.00
t Internet points Nr 0.00
Supply and install Air Conditioning A/C split unit, with complete installation and fittings
u 9000 BTU Nr 0.00
v 12000 BTU Nr 0.00
w 18000 BTU Nr 0.00
x 24000 BTU Nr 0.00
y Supply and installation of a 50KVA generator including all necessary wiring and builder's work Nr 0.00
z Ditto but Supply and installation of a 30KVA generator Nr 0.00
a1 Ditto but Supply and installation of a 20KVA generator Nr 0.00
b1 Ditto but Supply and installation of a 10KVA generator Nr 0.00
c1 Supply and installation of 150mm diameter extractor fan complete with humidity stat Nr 0.00
Fire Horse Reel
d1 Supply and installation of 1"x30m fire horse reel complete with disk ,waterway ,swing arm ,nozzle ,one meter inlet hose ,valve and all other necessary accessories Nr 0.00
Supply and erect pre-cast concrete Fencing Posts-Cranked
a 100x100mm Nr 0.00
b 100x125mm Nr 0.00
c 125x125mm Nr 0.00
d 125x150mm Nr 0.00
Chain Link Fencing
e Supply and install 2400mm high x 14 gauge chain link fencing on and including 100x125 cranked precast concrete fencing posts on concrete bases m 0.00
f Supply and install 12 1/2 Gauge x 4 strands galvanized barbed wire nailed to steel or concrete posts (Measured Separately) m 0.00
Supply and install 12 1/2 Gauge galvanized steel razor wire complete with 1000mm high 50x50x6mm thick angle iron posts at 1500mm centers; bottom part of posts built in concrete block walling
g 300mm diameter (stretched) m 0.00
h 450mm diameter (stretched) m 0.00
j 600mm diameter (stretched) m 0.00
k Supply materials and construct boom gate overall 10950mm long comprising of 350mm diameter mild steel pipe 1400 mm high filled with mass concrete , embedded on the ground with concrete and painted with reflective white and yellow paint; 50mm diameter mild steel pipe painted with reflective white paint; 950x950x950mm steel box filled with lightweight concrete and painted with white reflective paint: All to the details provided and the Site Engineer's instructions nr 0.00
16 WATER PROOFING
a Supply and lay approved single layer bituminous waterproofing membrane on sealer coat and hot laid with melted oxidized bitumen by specialist, tucking into grooves including forming grooves in block work or concrete, all in accordance with the manufacturer's specifications (10 years guarantee to be given, measured net) m2 0.00
b Supply materials and apply two part acrylic modified cementitious coating mixed with cement screed laid to fall to manufacturer's specifications m2 0.00
16 steel BOARDS & PARTITIONS
Supply and fix the following:-
25 mm thick block board
a Plain m2 0.00
b Veneered one side with mahogany m2 0.00
c Veneered BOTH sides with mahogany m2 0.00
d 3mm thick sheet m2 0.00
12 mm thick celotex soft board
e Sheets m2 0.00
f 3mm thick mahogany m2 0.00
Chip boards 8' X 4'
g 9 mm thick Plain Chip board m2 0.00
h 12 mm thick ditto m2 0.00
Gypsum boards 8' X 4'
j 9 mm thick m2 0.00
k 12 mm thick m2 0.00
l 12 mm thick m2 0.00
m 18 mm thick m2 0.00
Styrofoam boards 4' X 4'
n 25mm thick size 1200x1200 m2 0.00
p 12.5mm thick size 1200x1200mm m2 0.00
25 mm wrot T & G boarding
q Fabricated from 100 X 25 mm prime grade cypress m2 0.00
r Ditto in cedar Ditto. m2 0.00
Polystyrene Thermal Insulation Boards
s Supply and install 2500x600x100mm thick interlocking polystyrene thermal insulation boards with compressive strength of 250-300kpa and a density of 30kg/m2 : Thermal conductivity to be 0.029 W/mK. The insulation boards should be installed as per the manufacturer's instructions and the Project Engineer's approval m2 0.00
The works shall consist of furnishing materials, construction,installation, and completion as directed by site engineer.
a Cordinate to construct and test a round water fountain, comprised of an external fountain of 5.6m diameter,40cm high and an inside circular of 2.6m diameter 60cm high . Concrete tilling works,stone works and electromechanical works and equipment are included in their respective items. price to include all items including cleaning. Sum 0.00
b Supply and install, spread and make good a minimum of 30cm agricultural soil in designated areas m2 0.00
c Supply and plant trees. Price includes digging a minimum of 1.5m deep holes for each tree for the following:
i) Plam tree , medjoul type not less than 2m high in good condition Nr 0.00
ii) Ditto but pensian trees Nr 0.00
iii) Ditto but vecus trees Nr 0.00
iv) Supply and plant washintonian trees Nr 0.00
v) Ditto but Lavnedar 3 year old Nr 0.00
vi Ditto but Rose 1 year old Nr 0.00
vii Ditto but cuctus 6 month year old Nr 0.00
viii) Cypress tree , not less than 0.5m high in good condition Nr 0.00
ix) Reasonable general rate for any other trees not included here but commonly use in human habitation areas, not less than 0.5m high in good condition Nr 0.00
d Supply and install Arturo turf grass. Price to include leveling of the agricultural soil and fertilizers and all necessary works to complete the job according to the prevailing weather condition. m2 0.00
e Allow for shifting of existing cover plants / live fence/flowers . The rate has to take care about watering and maintenance of plants for about 3 months or until completion of the contract. m2 0.00
f Allow for shifting of existing small trees at the location of proposed units. – The rate has to take care about watering and maintenance of plants for about 3 months or until completion of the contract Nr 0.00
TOTAL FOR SCHEDULE OF RATES BILL (NOTE: THIS TOTAL WILL NOT BE CARRIED TO GRAND SUMMARY) 0.00
United Nations Office for Project Services
Horn of Africa Multi-Country Office
CROPS STORAGE MODEL DESIGN
ENHANCING FOOD SECURITY AND RESILIENCE OF RURAL COMMUNITIES (EFSR) IN SUDAN
UNPRICED BILL OF QUANTITIES (BOQ)
NOTE: It is a MANDATORY requirement for bidders to complete and return this section
Failure to complete all sections of the BOQ may result in automatic disqualification of your bid.
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
Bill No. 01 General Requirements and Provision 0.00
Bill No. 02 Crops Storage Main Building 0.00
Bill No. 03 MECHANICAL INSTALLATION 0.00
Bill No. 04 ELECTRICAL INSTALLATION 0.00
SUB-TOTAL 1 0.00
LESS DISCOUNT (IF ANY)
GRAND TOTAL 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QTY UNIT RATE (KES) AMOUNT (KES)
BILL NO. 1 PRELIMINARIES
All the Bidders are requested to refer "Pricing Preamble and notes below" and works items of this Bills of Quantities shall be priced to fulfill the requirements there-in. Also see that no page or items are missing prior to pricing of this bill of quantities.
A list of typical general items are given below. However, the Bidder is requested to price only those items that may affect this Contract. Note
The Bidder is advised to visit the site of the proposed work, as it is his responsibility to ascertain the conditions governing access to the site, and external working space, storage area etc. Note
If no price has been stated against any item hereunder, the Contractor shall not be entitled to claim any money for such items even though he is obliged to execute the work or provide services described therein. Preliminary items priced by the Tenderer are deemed to include the cost of unpriced items. Note
The Bidder is advised to refer to the General Notes, Pricing Preambles, Drawings, Specifications, Conditions of Contract, Particular Conditions of Contract and other relevant documents prior to pricing of the following items. Note
The bidder is required to visit the site of the proposed work, as it is his responsibility to ascertain the conditions governing access to the site, the external working space, storage area and any other information he may find necessary before he can tender for the work. Note
Cost and expenses in connection with any other preliminary item which is not listed below, but is necessary for the due completion of works, is deemed to be included in the tender rates. Note
Mechanical plant and equipment which emits excessive noise, smoke, fumes, obnoxious gases etc., will not be allowed to be used in the Site, without the prior approval of the Engineer. Note
The contractor shall be responsible for any loss or damage to the works, existing structures, adjoining structures and unfixed materials. Note
The contractor shall try to locate the new units in a way to avoid cutting trees. If it is really needed to cut down any number of trees, allow for planting same number of trees – Contractor has to take care about watering and maintenance of plants for about 3 months or until completion of the contract. (Fill schedule of late) Note
The contractor shall be responsible for providing necessary lighting, watchmen, and other suitable security measures during construction until handing over. Note
The contractor will be required throughout the contract to maintain and keep from obstructing the existing way. Note
The Contractor shall be responsible for the provision of all materials, scaffolding, tools, plant, transport and workmen required for the works except in so far as may be stated otherwise herein and he shall allow for the provision of the foregoing except for such items specifically and only required for the use of nominated Sub-Contractors as described herein. Note
All such plant, tools and scaffolding shall comply with all regulations whether general or local in force throughout the period of the contract and shall be altered or adapted during the contract, as may be necessary to comply with any amendments in or additions to such regulations. Note
Contractor shall provide helmets, gloves, safety masks, dusk masks, eye goggles, boots etc. for the workmen. Note
Contractor shall provide safety boards, signs and safety ribbons Note
Contractor shall take special care for safety of the patients, staff and public during transportation of materials and implementation of the contract. Note
Plant, Material & Work Practices
No work in any trade shall be carried out in such a manner as to cause any damage and nuisance to adjacent owners or the public. Note
Mechanical plant and equipment which emits excessive noise, water, smoke, fumes, or obnoxious liquids, gases etc., will not be allowed to be used on the site. If the use of such machinery becomes necessary, the Contractor is expected to obtain prior approval. Note
The Engineer has the discretion as to when he deems it necessary for the Contractor to take precautions, maintain or repair any such plant and equipment or order their removal from the site. Note
Contractor shall provide specimens, samples and sample panels of material and testing of materials as appropriate and as directed by Engineer. Note
HORN of AFRICA MULTI-COUNTRY OFFICE (HAMCO): Sudan Office
BILL OF QUANTITIES
ITEM DESCRIPTION UNIT QTY UNIT RATE AMOUNT
1 General Requirements and Provision
a Fabricate supply and erect Project Sign boards as per the drawings No 1 0.00
b Mobilization, Establishing contractor's camps, supply equipment ,personnel, Lab, accommodation and construction plant on the site, L.S 1 0.00
c Demobilization, removal of site establishments of the contractor's organization, camps and reinstating the site to the existed conditions L.S 1 0.00
d As Built Drawings L.S 1 0.00
Total Sub-section Sum Carried to Summary
2 Site Clearance and Organization
a Clearing and removal of bushes, trees and debris and site surfacing M2 245 0.00
b Fencing and protection of site , site security and entrance control L.S 45 0.00
Total Sub-section Sum Carried to Summary
GRAND TOTAL 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QUANTITY UNIT RATE AMOUNT
BILL NO.3 Crops Storage Main Building
A SUBSTRUCTURE AND EARTHWORK
a) Excavation on land of any nature in order to obtain project levels, including loading and transport of surplus material to the dump, eventual bracing, pumping of the tributary water to the excavation, regularization of the bottom of the box and replacement of land whenever necessary, all executed in order to obtain the levels indicated in the design. 155 m3 0.00
b) Excavations of Raft Footing for Water tank & pump room to the depths of not less than 2.0 m as per the drawings or as directed by the Engineer 92 m3 0.00
c) Excavations of square Isolated Footing foundations to the depths of not less than 2.5 m as per the drawings or as directed by the Engineer 355 m3 0.00
d) Excavate and removal of soft material for ramps, landscaping and outside fence 72 m3 0.00
c) Return, fill in and ram selected excavated material around foundations trenches 239 m3 0.00
3 Disposal of Surplus spoils
d) Load and cart away surplus material from site to an approved dumping site 116 m3 0.00
4 Selected filling
e) Backfilling Beneath the Foundations compacted in layers not exceeding 150mm deep and well watered 71 m3 0.00
f) Ditto; Under water tank & pump room 46 m3 0.00
g) Backfilling inside the walls till the tileing elevation with a selected materilas in a compacted in layers not exceeding 150mm deep and well watered 1350 m3 0.00 150
h) Backfilling of filter materials of notless than 150 mm beanecth internal tiling and the external landscaping and entrance ramps as per the drwaings or as directed by the Engineer 900 m3 0.00
i Backfilling for landscaping and entrance ramps with a selected materilas in a compacted in layers not exceeding 150mm deep and well watered as per the drwaings or as directed by the Engineer 150 m3 0.00
4 Concrete work
The contractor should provide for approval the concrete mix design and the aggregates, cement and sand wihich will be used in the construction works.The minimum cement conetent will be 350 Kg of cement per cubic meter
Rates shall include the price of steel reinforcement, formwork, mixing, placing, curing and removal of formwork for all concrete and for all threading fillets etc. The rates shall include the sampling and testing at an approved labortary . All exposed concrete surfaces in columns, beams, slabs etc. must be fair face and of first class standard.
First class shuttering must be used and it must be approved by the Engineer before the reinforcement is placed in position and before the concrete is casted.
Plastered surfaces are to be roughened to receive plaster cement and should be used for all types of concrete
Plain concrete class 15 (mix 1:3:6)
a) 100mm Thick surface blinding under strip footings 142 m2 0.00
b) Ditto; under external & internal tiles 1500 m2 0.00
c) Ditto; for latines seats and slabs 25 m2 0.00
d) Ditto; for water tank & pump room 46 m2 0.00
Insitu concrete class 30, vibrated and reinforced as described, in:-
d) Isolated Footings 86 m3 0.00
e) Raft footing for water tank & pump room 28 m3 0.00
f) Short Columns 19.5 m3 0.00
g) Grade Beam 35 m3 0.00
h) G.B. for Latrines slabs and walls 30 m3 0.00
i) Latrines Strip footing 12 m3 0.00
Foundation walling
Masonry stone walls bedded , jointed in cement and sand (1:3) mortar and reinforced with hoop irons at every alternate course
i) 200mm thick beaneath Grade Beam and ramps sides 200 mL 0.00
i) 12 mm thick cement : sand (1:3) plaster to plinth 160 m2 0.00
j) Three coats of bituminous paint to foundations, columns stubs, grade beam, plinths surfaces. 450 m2 0.00
TOTAL FOR SUBSTRUCTURES AND SITE EARTHWORK CARRIED TO SUMMARY 0.00
B STRUCTURAL FRAME & ROOF
1) Reinforced Concrete
Insitu concrete class 30 , vibrated and reinforced as described, High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
The contractor should provide for approval the concrete mix design and the aggregates, cement and sand wihich will be used in the construction works.The minimum cement conetent will be 350 Kg of cement per cubic meter. where there is an exposure to the sea water and chemical attack, the Contrator should provide the sulphte resistance cement and apply / isoltate the concrete properly form the chemical attack using membrane and painting reagents
Rates shall include the price of steel reinforcement, formwork, mixing, placing, curing and removal of formwork for all concrete and for all threading fillets etc. The rates shall include the sampling and testing at an approved labortary . All exposed concrete surfaces in columns, beams, slabs etc. must be fair face and of first class standard.
First class shuttering must be used and it must be approved by the Engineer before the reinforcement is placed in position and before the concrete is casted.
a) Intermediate tie beams ( top level +3.00m) 16 m3 0.00
b) Top beams ( top level +5.20m) 10.5 m3 0.00
c) R.C. Ground Floor Columns 27 m3 0.00
d) R.C. walls for water tank & pump room 12.5 m3 0.00
e) R.C. cover slab for water tank & pump room 6.25 m3 0.00
2 Steel Roofing Frame & Sheet
Contractor to allow for hoisting and all angle brackets or gusset plates bolts, cleats, fish tailing lugs, drilling holes and the likes for fixing members to position as per the details;
The following in trusses and/or independent members
Frame structure including rafters, cross bracing, fasteners,struts and purlins complete with bolts and nut, fillet weld together.The contractor shall obtain the roof structure manfacturer drawings and spsecifications before importing or delivering to site to be reveiwed and approved by the Engineer .
a) Fabricate, erect and fix in position steel columns of IPE 500 , including surface preparation, anti-corrosion primer, and two coats of enamel finish paint. 26.4 M.L 0.00
b) Fabricate, erect and fix in position roof framing shall consist of primary beams of IPE 400 ( Rafter ) as per the drawings. 323.4 M.L 0.00
c) Fabricate, erect and fix in position roof framing shall consist of Secondary beams of IPE 330 as per the drawings. 100 M.L 0.00
d) Fabricate, erect and fix in position roof framing shall consist of Purlins section (SHS100*4) as per the drawings. 1,644.80 M.L 0.00
e) Fabricate, erect and fix in position Double Rod Bracing ∅32mm as per the drawings. 342 M.L 0.00
f) Supply and install galvanized steel roofing sheets ( thick. 50mm) as specified placed in and to steel frame including fasteners and all fittings in accordance with the drawings, manufacturer's instructions and Engineer directions. 1,562.50 m2 0.00
TOTAL FOR STRUCTURAL FRAME & ROOF CARRIED TO SUMMARY 0.00
First Class Bricks: Type (Fire faced brick) Uniform size (e.g., ~242x115x70mm), sharp edges, free from cracks, good crushing strength , low water absorption (<12-20%), made from good brick earth.
Three- ply bituminous felt damp proof course bedded in cement and sand (1:3) mortar (measured net allow for 300mm laps):-
a) 200mm wide between grade beam and bottom of the brick wall 180 mL 0.00
1) External Walling
200mm Thick walling , Supply material and construct first calss masonry burnet brick walls bedded and jointed in cement and sand (1:3) mortar
a) for Main Building 800 m2 0.00
b) Ditto for landscaping and gates, fence 36 m2 0.00
c) Ditto for latrines 60 m2 0.00
2) Internal Partition offices Walling 60 m2 0.00
d) For gurd rooms and entrances 30 m2 0.00
TOTAL FOR WALLING CARRIED TO SUMMARY 0.00
D DOORS and WINDOWS
Note: All doors shall be supplied and installed in accordance with the provided details and schedule. The installation shall include all necessary design features to ensure proper sealing and protection against insects, rodents, dust, and moisture, including but not limited to rubber or brush seals, tight-fitting frames, and metal thresholds. All ironmongery not measured separately shall be deemed included in the rates for the corresponding doors..
Mild steel caged door made out of cold rolled steel sections thoroughly cleaned and phosphatized to resist corrosion before receiving Two coats of grey rust inhibiting primer
Door external frame grouted below finished floor and fixed to walls: All iron mongery and lugs fixed to manufacturer's specifications
a Entrance Sliding Door (5.0 x 4.0m ) : Supply and install high-quality metal door 2.5 - 3 mm for vehicle entry with enhanced security features, including heavy-duty steel construction, durable locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint, and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 2 Nr 0.00
b Supply and install high-quality Singl steel door ( 900x220mm high ) including locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint, and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 4 Nr 0.00
c Supply and install high-quality Singl steel door for Latrine ( 700x220mm high ) including locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint ,and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 4 Nr 0.00
d Fence Gate (4.0 x 1.8m ) : Supply and install high-quality metal door 2.5 - 3 mm for vehicle entry with enhanced security features, including heavy-duty steel construction, durable locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint, and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 1 Nr 0.00
TOTAL FOR DOORS CARRIED TO SUMMARY 0.00
a Supply and install a high-quality steel window (3000 × 1000 mm high) comprising three upward-opening glass panels, each fitted with external steel mesh. The window shall include locking mechanisms, hinges, handles, anti-rust treatment, and three layers of chemical-resistant paint, along with all necessary accessories to ensure strength, durability, and safety, in accordance with the specifications, drawings, and the Engineer’s instructions. 30 Nr 0.00
b Supply and install ( 1000x1200mm high ) Double glazed aluminum for Security Room, 2-panel hinged window including 6mm toughwood glass out skin and 7.5mm laminated glass inner skin, metal insect mesh. (Weight of section not less 1.6kg/m.l, and width of external section 100 mm) 2 Nr 0.00
c Supply and install ( 800x400mm high ) Double glazed aluminum for latrines, 2-panel hinged window including 6mm toughwood glass out skin and 7.5mm laminated glass inner skin, metal insect mesh. (Weight of section not less 1.6kg/m.l, and width of external section 100 mm) 4 Nr 0.00
TOTAL FOR WINDOWS CARRIED TO SUMMARY 0.00
Ceiling Finishes
1 Roof Isolation
a) Supply, roof tempreturs isolation sheets and install , with pproper fixing wires and glue under the corrugated roof sheets as per drwaings , spcifications or as directed by the Engineer 1500 m2 0.00
2 Anti-Rust and chemacal attack paints
Prepare and apply undercoat and two finishing coats of gloss oil paint; and anti-rust paints
b) beneath and on the top of the corrougated roof sheets 3000 m2 0.00
2) Floor finishes
a Supply and apply epoxy coating of floor with skirting (100 mm) and joints. Samples shall be approved by site Engineer prior to procurement. 1500 M2 0.00
b Supply and fix 600x600x8.5 thick ceramic floor tiles tiles layed over white cement slurry over cement sand screed to overll thickness of 100mm include skirting 8cm high. Samples shall be approved by site Engineer prior to procurement. 16 M2 0.00
c Supply and fix300x300x8.5 thick non-slip ceramic tiles for latrines over waterproofing adhesive layed over white cement slurry over cement sand screed . Samples shall be approved by site Engineer prior to procurement. 24 M2 0.00
d Supply and fix a floor pallet made from durable, untreated hardwood or pest-resistant softwood, measuring 1.2 x 0.8m with a minimum dynamic load capacity of 1,500 kg, featuring top deck boards spaced no more than 4 cm apart, and elevated 10 to 15 cm above the floor 1200 M2
a Supply and apply 5 cm thickness concrete tiles with textured surface and stamped on two layers of selected material 25 cm for each around premisses of main building pattern as per drawings 500 M2 0.00
3) Wall Finishes (Plastering)
Clean, well-graded sand; Portland cement; clean potable water; bonding agent or hardening walls, consistent mix. apply the mixture in a multi-step process involving surface preparation, applying coats of plaster, leveling, and proper curing. This process ensures a strong bond, a flat surface, and prevents cracking.
Internal Walls: 12mm thick cement sand plaster, with steel trowelled finish, as described to:-
a) Wall surfaces internally of main building 1000 m2 0.00
b) Wall surfaces internally of latrines 60 m2 0.00
External Walls: 15mm Cement and sand (1:3) render on block wall or concrete work to:-
Fill uneven surfaces with stucco filler to approval including sanding of all uneven surfaces; apply two undercoats emulsion paint and two finishing coats of first quality Silk Vinyl emulsion paint to match the existing ;-
c) Wall surfaces externally of main building 1000 m2 0.00
d) Wall surfaces externally of latrines 60 0.00
Wall Finishes (Painting)
Fill uneven surfaces with stucco filler to approval including sanding of all uneven surfaces; apply two undercoats emulsion paint and two finishing coats of first quality Silk Vinyl emulsion paints
a) Wall surfaces internally of main building 1000 m2 0.00
b) Wall surfaces internally of latrines 60 m2 0.00
c) Wall surfaces externally of main building 1000 m2 0.00
d) Wall surfaces externally of latrines 60 m2 0.00
Fence chain Link and posts
a Fabrication: GI Chain Link Mesh 50x50mm mesh size, 3mm or 4mm diameter). Height: Generally 2.0 meters above ground level. Posts: Main posts (60.3mm O.D.) and line posts, spaced 3m apart. Structure: 'Y' shaped arms (450mm) for 3-6 rows of barbed wire. Finish: Galvanized (ASTM-A392-81) or PVC coated. Foundation: Concrete base ( 1:4:8 mix) for posts. 320 mL 0.00
TOTAL FOR FINISHES CARRIED TO SUMMARY 0.00
ITEM DESCRIPTION
A SUBSTRUCTURES 0.00
B STRUCTURAL FRAME & ROOF 0.00
D DOORS & WINDOWS 0.00
TOTAL TO SUMMARY 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QUANTITY UNIT RATE AMOUNT
A MECHANICAL INSTALLATION
1 PORTABLE FIRE FIGHTING EQUIPMENT
CO2 Fire Extinguishers
a) 6 kg Carbon Dioxide Steel Stored pressure gas fire extinguishers conforming to BS EN 3 complete with:- - charge and fixing bracket - pictorial instructions - colour coding to BS 7863 - discharge horn and hose. - pressure indicator -Complete with all required identification signage as specified in Technical Specification 3 Nr. 0.00
b) 5 kg ABC type fire extinguishers conforming to BS EN 3 complete with:- - charge and fixing bracket - pictorial instructions - colour coding to BS 7863 -Complete with all required identification signage as specified in Technical Specification 14 Nr. 0.00
2 FIXED FIRE FIGHTING EQUIPMENT 0.00
a) Supply install, test and commission GRP reservoir cylindrical ground water storage tank of nominal capacity 25000 litres; as per provided drawing to be located within a shade to be made as a makeshift shade for fire pump and fire water reservoir as 'TOPTANK' on 300mm high plinth support to structural Engineer’s detail complete with cover. The tank is to be complete with the following ; a) 50mm diameter overflow b) 32mm diameter washouts with gate valve c) 80mm diameter outlet with gate valve (2No.) d) 40mm diameter inlet with high pressure float valve e) Tank connectors for all incoming & outgoing pipes 1 Nr. 0.00
b Supply, install and test and commission a modular skid mounted 22.7m³/hr. @ 80m head; main electric fire pump; (centrifugal with an electric motor capable of working 100% flow at rated pressure, 150% flow at ≥65% rated pressure); a diesel engine driven standby firepump of the same capacity including fuel tank of a minimum capacity of 8 hrs continous running ; and a 3m3/hr capacity electric jockey pump at the rated head of 80m; mounted on a modular skid including all the accessories, signage,manometers, relef valves; test valves; and interconnecting pipes and fittings ; to be installed on a 200mm RC foundation to be built within the fire pump shade ; to the structural and architectural details; to be compliant to NFPA standards. 1 Nr. 0.00
c Supply and install galvanized steel schedule 40 pipes to external fire water distribution system as where shown on the drawing. Complete with all the necessary fittings, support and accessories. DN[mm] = 65mm 20 m 0.00
d Supply, install, test, and commission a wall-mounted, lockable fire hose cabinet , designed for fire fighting purposes in compliance with relevant standards (e.g., EN 671-1 for hose systems .The cabinet shall include all necessary fittings and accessories for full functionality & complete with all required identification signage as specified in Technical Specification Section. Material: Mild steel with anti-corrosion red powder-coated finish, minimum 1.2 mm thickness, suitable for indoor/outdoor use with weather-resistant properties (IP54 or better). Dimensions: Approximately 700 mm (H) × 600 mm (W) × 250 mm (D), or as required to accommodate all components. Door: Hinged, lockable with a break-glass key access system, fitted with a clear tempered glass or acrylic panel for visibility. Mounting: Wall-mounted with corrosion-resistant brackets and fixings, securely anchored to the structure as per manufacturer’s recommendations and structural drawings. Fire hose Type: Synthetic rubber-lined fire hose, compliant with EN 671-1 or equivalent, suitable for Class A, B, and C fires. Length: 30 meters, coiled on a swinging hose reel for easy deployment. Diameter: 38 mm (1.5 inch) nominal, with brass or aluminum nozzle (jet/spray type, adjustable). Couplings: Instantaneous couplings, corrosion-resistant, compatible with local fire fighting standards. Accessories: Nozzle Holder: Integrated holder for the hose nozzle, ensuring secure storage.,Signage: Clear, durable fire equipment signage (minimum 200 mm × 200 mm) in compliance with fire safety regulations, indicating the location and contents of the cabinet.Inlet Valve: Bronze gate valve (PN16, minimum DN25), suitable for connection to the fire water supply system, compliant with BS EN 12201 or equivalent. 3 Nr. 0.00
e Construct rectangular manhole out of 250mm thick double brick walls,internal dimension 600mm x 600mm x 600mm (average depth),internally plastered with three coats of cement/sand mix ratio1:3 ,on a base of precast R.C slab of size ,1300mm x 1300mm x100mm , including benching and bottom channeling with mass concrete.Slab shall be reinforced with dia.8mm reinforcement bar c/c 130mm bothways. Provide 150mm thick granular materials beneath the slab,on a compacted earth . Manhole shall have precast R.C cover slab, each,size, 740mm x 740mm x 100mmreinforced with diameter 8mm steel barc/c140mm bothways,including diameter 14mm steel ring handle with supporter bar all in accordance with the given detail drawings .Unit price shall include excavation of the pitto a depth of 800mm (average) and cart away of the excavated soil. 7 Nr. 0.00
f Supply, lay, test, and commission a High-Density Polyethylene (HDPE) PN16 fire main pipeline , including all necessary fittings, as per the provided detail drawings . The work shall ensure a reliable, leak-free system compliant with site requirements. Pipe: Material: High-Density Polyethylene (HDPE), PE100 grade virgin material, Pressure Rating: PN16 (16 bar nominal pressure).Sizes: As specified in the detail drawings (DN80) Type: HDPE compression fittings, electrofusion fittings, or butt-fusion fittings.Standards: Compliant with BS EN 12201-3 or equivalent, Includes elbows, tees, reducers, couplers, end caps, and transition fittings where ever necessaey (to connect with valves or other materials). Valves: Type: PN16 gate valves, ball valves, or check valves where they are necessary.Material: Bronze, brass, or ductile iron with HDPE-compatible ends (flanged or spigot).Standards: Compliant with BS EN 1074-2 or equivalent. Other Accessories:Thrust blocks, anchor blocks, and supports to prevent pipe movement.Warning tape or marker tiles above buried pipes for identification during future excavations. All materials shall be new, free from defects, and certified for potable water use by relevant standards (WRAS, NSF/ANSI 61). Installation: Site Preparation: Excavate trenches to the depths and widths specified in the detail drawings, ensuring proper alignment and gradient (minimum 1:100 unless otherwise specified). Prepare trench beds with sand or fine granular material (minimum 100 mm thickness) to provide uniform support and prevent pipe damage. Remove rocks, debris, or sharp objects from the trench to protect the pipe. Pipe Laying: Lay HDPE pipes along the alignments shown in the detail drawings, ensuring continuous support and proper gradient for drainage where required. Join pipes using butt-fusion, electrofusion, or compression fittings, as specified, following manufacturer’s guidelines and BS EN 12201-5 procedures. Ensure joints are leak-proof and capable of withstanding PN16 pressure.Install fittings, valves, and accessories (e.g., air valves, washouts). Backfilling: Backfill trenches with compacted sand or fine granular material (minimum 300 mm above the pipe) to protect the pipe, followed by native soil or as specified. Compact backfill in layers (maximum 150 mm per layer) to prevent settlement, as per ASTM D698 or equivalent. Place warning tape or marker tiles 300 mm above the pipe for future identification. Thrust Restraint: Install concrete thrust blocks or anchor blocks at bends, tees, and valves to resist hydraulic thrust. Ensure thrust blocks are cast against undisturbed soil and cured adequately. Testing: Pressure Testing: Conduct a hydrostatic pressure test on the completed pipeline as per BS EN 805 or equivalent. Test pressure: 1.5 × PN16 = 24 bar, maintained for a minimum of 2 hours (or as specified). Monitor for leaks, pressure drops, or deformations, and repair any defects before proceeding. Leakage Testing: Perform a leakage test to ensure the system meets allowable leakage rates (as per BS EN 805 or local standards). Record test results, including pressure, duration, and any observed issues. Alignment and Gradient Check: Verify pipe alignment and gradient using surveying equipment. 0.00
Size Ø = DN80 101 m 0.00
Size Ø = DN 65 30 m 0.00
3 MECHANICAL VENTILATION & AIRCONDITIONING 0.00
a) Supply and install a 600mm throuat diameter wind powered turbine ventillator ; spaced in accordance with the drawings; flushing detail designs in accordance with manufacturer's recommendation and to the engineers approval ; to acheive a lasting ; weather proof joint. 14 Nr. 0.00
b) Supply, installation and test and commissioning of 5 kW cooling capacity split-type air conditioner (Inverter type) for Administration Office, complete with indoor unit (Hi-wall mounted), outdoor condensing unit, wireless remote control with timer and temperature settings, washable easy-access air filters, refrigerant charge (R-410A or equivalent), all interconnecting refrigerant piping (copper tubing with insulation), condensate drain piping and connections, wall mounting brackets,signage and hardware, vibration isolation pads for outdoor unit, electrical supply cable and connections, commissioning and testing. The unit price shall include refrigerant piping and respective insulation - closed-cell elastomeric foam, 13mm thickness, condensate piping and all supporting structure. Set 1
c) Ditto No b) but for Security Office + Bed Quarter Set 1
d) Supply, installation and test and commissioning of wall-mounted or window-mounted axial exhaust fan for Utilities Room, complete with airflow capacity ≥ 320 m³/h (approx. 190 CFM), direct drive motor thermally protected, 220-240V / 50 Hz single-phase power supply, corrosion-resistant construction, integral gravity backdraft damper, bird/insect screen on exterior discharge, weatherproof louver or hood for exterior discharge, manual on/off switch inside room, all mounting brackets, fasteners, signage and hardware, electrical supply cable and connections, door undercut (15-25mm) for makeup air, commissioning and testing Set 1
4 GENERAL ITEMS/ SUMMARY 0.00
a) Test & commission all systems as per approved working drawings, specifications and bills of quantities to the satisfaction of the Engineer. Testing and commissioning shall be to Chartered Institution of Building Services Engineer Commissioning Codes 1 Sum 0.00
b) Prepare and submit working and record (as-installed) drawings to easily readable scale, A1 or A0 paper size format as follows; i) general arrangement drawings of all equipment, plant etc. ii) routes - types and sizes and arrangement of all pipework iii) wiring(electrical & control) details iv) any other details as per specifications Drawings are to be submitted in soft copy (AutoCAD format) & hard copy to the client, the Architect and the Engineer. All drawings shall be submitted to the satisfaction of the Engineer. 1 Sum 0.00
c) Prepare & submit draft and three final copies of operation & instruction manuals to Engineer's approval 1 Sum 0.00
TOTAL FOR MECHANICAL INSTALLATION CARRIED TO GRAND SUMMARY 0.00
B SANITARY , DRAINAGE AND WATER
NOTE: TRADE NAMES
Where Trade Names are mentioned below, it is intended to indicate the level of quality required. The tenderer MAY supply alternatives which must be approved in writing by the Engineer/Architect.
This BOQ shall be read in conjunction with mechanical technical specifications general and particular method of measurements, the mechanical drawings except where otherwise indicated. The unit price for all items in all sections shall include for supplying, installation and commissioning unless otherwise specially mentioned.
Contractor must check site condition including all installed first fix, sleeves structural opening in concrete works, any modifications or alternations would be considered included in contractor price or priced in this item contractor shall not be entitled for any extra cost for opening in structural walls or slabs.
1 SITE WATER SUPPLY PIPING SYSTEM
a PPR Piping System (DN 25) – Supply, install, test, and commission PPR pipe DN 25 mm (1 inch), PN20 rating, including all fittings (elbows, tees, couplings), heat fusion joints, wall/floor penetrations, pipe supports at 1.2 m intervals, and hydraulic pressure test to 4 bar for 1 hour. Complete from GRP tank outlet to elevated tank inlet. the standard requirement at the expense of the contractor. lm 20.00 0.00
b Elevated Water Tank (500 Liters) – Supply, install, and commission one food-grade polyethylene elevated water tank, nominal capacity 500 liters, conforming to ISO 4422. Include galvanized steel support frame anchored to wall/column, float valve or level sensor (adjustable high/low setpoints), overflow pipe (DN 25) with screen, drain plug, lockable lid, outlet strainer (1 mm mesh), and DN 20 gate valve for isolation. Mounting height: 2 m above handwashing faucet. № 1.00 0.00
c Transfer Pump set(dual pump) (GRP to EWT) – Supply, install, test, and commission one centrifugal electric transfer pump, minimum flow 20 L/min, minimum total dynamic head 4 m, motor rating 0.135 hp (100 W), 230 V / 50 Hz / single-phase. Include built-in thermal overload protector, isolation valve, non-return valve on discharge, suction strainer, corrosion-resistant casing (bronze/stainless steel/engineered plastic), and dry-run protection. № 1.00 0.00
d Level Sensor and Control Panel – Supply, install, and commission one automatic pump control system comprising: ultrasonic or float switch level sensor (IP68, dry contact output, adjustable high/low setpoints) installed in elevated tank; and control panel (IP54) with magnetic contactor with overload protection, Hand-Off-Auto selector switch, indicator lights (Power ON, Pump Running, High Level, Low Level). Complete with all interconnecting wiring conforming to IEC 60364. Set 1.00 0.00
TOTAL FOR SITE WATER SUPPLY PIPING SYSTEM CARRIED TO GRAND SUMMARY 0.00
2 WASTE WATER DRAINAGE SYSTEMS
The rates for drainage ditches shall include full compensation for excavation, disposal of excavated material, preparation of subgrade, supply and placement of concrete (minimum 25 MPa compressive strength at 28 days) or masonry as specified, forming of trapezoidal or rectangular cross-section, installation of galvanized steel gratings where shown, construction of catch pits with debris screens, joint sealing, curing, and finishing to achieve Manning’s roughness coefficient n = 0.017 for concrete ditches and n = 0.025 for masonry ditches. The rate shall also include all formwork, reinforcement where required, and any necessary erosion protection measures at outlets. The unit rate is per linear meter of completed ditch of the cross-sectional dimensions indicated. No separate payment shall be made for excavation, backfill, or disposal.
a Pit Latrine Ventilation Pipe (DN 100) – Supply, install, and commission one uPVC ventilation pipe, DN 100 mm (4 inch), conforming to ISO 1452-1, including: pipe extending from 300 mm above pit floor to 1.0 m above highest roof peak, solvent welded joints, galvanized brackets at 2 m maximum intervals, weatherproof cowl (turbo vent or 180° bend with bird screen), stainless steel insect mesh (12 mm aperture) at top, and fly-proof mesh (2 mm aperture) at pit entry. № 2.00 0.00
b Handwashing Station (Standard) – Supply, install, and commission one handwashing station comprising: concrete basin (Type 304, 400×300×150 mm), eight (8)(four (4) on each side) lever-operated chrome-plated brass tap, two liquid soap dispenser (500 mL), supply piping PPR and uPVC drainage piping to soak away pit. set 1.00 0.00
c Soak Pit – Supply, excavate, construct, and commission one soak pit for handwashing station drainage, including excavation, stone/gravel filling, perforated pipe inlet, geotextile fabric lining, and covered top with inspection port. Dimensions as per standard design. set 1.00 0.00
d Waste Water Septictank Supply and apply a complete waterproofing system, Waste Water Septictank to pit latrine structure including brick protection wall as follows: (1) Surface preparation: clean, dry, and prime concrete pit walls; (2) Waterproofing coating: apply bituminous emulsion or acrylic waterproof coating (minimum 2 coats) to external concrete pit walls from base to 500 mm above ground level, conforming to ASTM D1227; (3) Cementitious top seal: apply cementitious crystalline waterproofing slurry (minimum 3 mm thickness) to top 500 mm of pit lining (interior and exterior surfaces); (4) Joint sealant: apply flexible polyurethane sealant at all construction joints and pipe penetrations; (5) Brick protection wall: construct half-brick thick (115 mm) masonry wall against external waterproofed surface from pit base to 500 mm above ground level using common burnt clay bricks (minimum class 7.5 MPa) laid in cement mortar (1:4 mix) to act as sacrificial protective layer preventing backfill damage to waterproof membrane; (6) Damp Proof Course (DPC): install 300 mm wide polyethylene DPC membrane between brick protection wall and backfill material at top 500 mm zone; (7) Backfill interface: backfill shall be placed carefully against brick wall, not directly against waterproofing. Unit rate includes all materials, labor, application, brick wall construction, testing, and commissioning for a complete watertight installation. Conforms to manufacturer's specifications and BS 8102.Please note that the waterproofing system shall be applied only after the concrete pit has cured for a minimum of 7 days. All surfaces shall be clean, dry, and free from dust, oil, or loose material before application. The contractor shall conduct a water spray test after completion to verify no water ingress occurs at the top sealed zone. Any leaks detected shall be repaired at no additional cost. m2 50.00 0.00
e Rainwater Downpipe DN 100 (Market Block) – Supply, install, test, and commission one uPVC rainwater downpipe, DN 100 mm nominal diameter, conforming to ISO 1452-1 or AS/NZS 1260, minimum wall thickness 2.5 mm. Include stainless steel leaf guard (5 mm mesh) at roof inlet, galvanized pipe brackets (vertical spacing 1.8 m maximum, horizontal spacing 1.0 m maximum), UV-reflective light-colored oil paint coating (white/light grey) conforming to ISO 4892-2 on all exposed sections, and discharge splash block at base. Complete from roof outlet to ditch/splash block. ml 110.00 0.00
f Rainwater Downpipe DN 80 (Toilet Block) – Supply, install, test, and commission one uPVC rainwater downpipe, DN 80 mm nominal diameter, conforming to ISO 1452-1 or AS/NZS 1260, minimum wall thickness 2.0 mm. Include stainless steel leaf guard (5 mm mesh) at roof inlet, galvanized pipe brackets (vertical spacing 1.8 m maximum, horizontal spacing 1.0 m maximum), UV-reflective light-colored oil paint coating (white/light grey) conforming to ISO 4892-2 on all exposed sections, and discharge splash block at base. Complete from roof outlet to ditch/splash block. ml 10.00 0.00
g Rainwater Downpipe DN 80 (Guard House) – Supply, install, test, and commission one uPVC rainwater downpipe, DN 80 mm nominal diameter, conforming to ISO 1452-1 or AS/NZS 1260, minimum wall thickness 2.0 mm. Include stainless steel leaf guard (5 mm mesh) at roof inlet, galvanized pipe brackets (vertical spacing 1.8 m maximum, horizontal spacing 1.0 m maximum), UV-reflective light-colored oil paint coating (white/light grey) conforming to ISO 4892-2 on all exposed sections, and discharge splash block at base. Complete from roof outlet to ditch/splash block. ml 10.00 0.00
h Drainage Ditch – Supply, excavate, construct, and commission reinforced concrete drainage ditch, rectangular cross-section, with different internal dimensions, concrete grade minimum 25 MPa, smooth finish achieving Manning’s n = 0.017, including excavation to required depth, disposal of surplus material, formwork, reinforcement, joints (with waterstop where ), and curing.. Provide a minimum slope of 1% or follow the natural ground slope which ever is greater ml 90.00 0.00
i SIZE[mmXmm] = 450 X 300 ml 220.00 0.00
j SIZE[mmXmm] = 350 X 250 ml 280.00 0.00
k Catch Pit with Debris Screen(manhole) – Supply, excavate, construct, and commission one catch pit at ditch junctions or before discharge points, including reinforced concrete construction, minimum 600×600×900 mm deep, heavy duty removable cast iron grating cover, stainless steel debris screen (12 mm mesh), inlet and outlet connections to adjoining ditches, and concrete base. № 5.00 0.00
l Heavy duty cast iron or galvanized steel or concrete Ditch Cover (Pedestrian Crossing) – Supply and install one heavy duty cast iron or concrete cover for the ditch at pedestrian and vehicle crossing, including frame and cover, designed for pedestrian loading (minimum 5 kN/m²), hot-dip galvanised finish(if galvanized used), sized to match the ditch opening. № 4.00 0.00
m Supply and install uPVC DN 160 mm PN10 pipe conforming to ISO 1452-1 / EN 1452-2 inside the open ditch from roof downpipes to the underground RC rainwater harvesting tank, including all necessary fittings (bends, couplings, tees), galvanized steel supports or concrete anchor blocks at maximum 3.0 m spacing, one non-return valve (check valve) at tank inlet, one sediment trap with 5 mm stainless steel debris screen upstream of tank, and UV-protective coating (ISO 4892-2) for all exposed sections. Installation shall maintain minimum 0.5% gravity gradient. Jointing shall be by solvent cement welding or rubber ring push-fit sockets per manufacturer's specifications. Testing shall be by 24-hour water flow test with no visible leakage or ponding. Unit rate includes all materials, labor, testing, and commissioning but excludes ditch constructio lm 55.00 0.00
n Piping system for underground RC tank: overflow (uPVC DN 100 PN10), rainwater inlet (uPVC DN 160 PN10), washout (uPVC DN 100 PN10 with isolating valve and extended operating rod), including all fittings, supports, watertight tank connections, testing, and commissioning. Conforms to ISO 1452-1 / EN 1452-2. set 1.00 0.00
o Water Harvest Tank Ditto item No 2.d but for the under ground rain water harvest tank (5 x 5 x 2 [m]) m2 95.00 0.00
p Allow for Testing and commissioning of the entire plumbing installation by a Chartered Mechanical Engineer and obtaining a Test Certificate (3rd party testing to approval of the Engineer) including all off-site and factory testing; inspections to demonstrate compliance with relevant standards, operating the completed installation and submitting all relevant test records and authority approval. LS 1 0.00
q All sanitary fittings supplied shall be provided with a minimum 5 year warranty, issued jointly and severally by the local supplier and the manufacturer. LS 1 0.00
r Allow for preparation of Operationa and Maintenance Manual including site users training for the O & M Maual of all plumbing and mechanical appliances. LS 1 0.00
s Supply and installation of Dry Latrine Squatting Pan – Ordinary Type Heavy-duty vitreous china or FRP pan, no water seal, shallow profile with anti-splash lip, drop hole min. 180mm. Includes fixing to concrete slab. No water supply connection. № 2
t Supply and installation of Dry Latrine Squatting Pan – PWD Type Accessible design for persons with disabilities. Heavy-duty FRP or china with raised footrests, pan rim height ≤200mm from floor. Includes stainless steel grab bars (wall-mounted, vertical & horizontal). Drop hole min. 200mm. No water supply connection. № 1
u Supply and installation of Shower Water Drain Intake to Pit Floor-mounted grating (stainless steel/HD plastic, min. 150mm diameter) with debris trap. Includes vertical drop pipe (PVC, 75mm min. diameter) from floor through pit cover slab into pit void. No trap, no water seal. No connection to pressurized water supply. № 1
TOTAL FOR WASTE WATER DRAINAGE SYSTEMS CARRIED TO GRAND SUMMARY 0.00
ITEM DESCRIPTION
A MECHANICAL INSTALLATION 0.00
B SITE WATER SUPPLY PIPING SYSTEM 0.00
C WASTE WATER DRAINAGE SYSTEMS 0.00
TOTAL TO SUMMARY 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
BILL NO.4 ELECTRICAL INSTALLATION
4 ELECTRICAL INSTALLATIONS
The Bill of Quantities, Specifications, Drawings and all other Contract documents are complementary to each other. It is the responsibility of the Contractor to check the locations and quantities of the materials and equipment to be executed in accordance with the drawings. The unit rate of the materials and equipment shall be based on the Specification, all components as required and specified under each item concerned in the Specifications, Drawings, and all other Contract documents.
5.1.1 Low Voltage Switchboard
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Normal / Standby Switchboards:
5.1.1 18 way TP/N - flush mounted distribution board DB 'S.CST.0 (E )' complete with 4X63A TP/N MCB main incomer and all MCB , as shown on schematic wiring Un 1
5.1.2 63A Load transfer switch (L.T.S), as shown on schematic wiring Un 1
5.1.3 18 way TP/N - flush mounted distribution board DB 'S.CST.1 (E )' complete with 4X40A TP/N MCB main incomer and all MCB , as shown on schematic wiring Un 1
5.1.4 12 way TP/N - flush mounted distribution board DB 'S.PR.0 (E )' IP65 complete with 4X20A TP/N MCB main incomer and all MCB , as shown on schematic wiring Un 1
5.1.5 4P-25 A (IP65) - flush mounted Fire PumpPump Isolator complete with all accessories , as shown on drawings Un 1
5.1.6 2P-10 A (IP65) - flush mounted Domestic Pump Isolator complete with allaccessories , as shown on drawings Un 1
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories including conduits and manholes as specified in schedules of equipment, detailed drawings and specs:
LV Distribution Cables including burid PVC ducting and all accessories as indicated in the drawings
5.2.1 - 4X16+16 Emm² Cu/ XLPE/ PVC (plain annealed stranded copper conductors, connecting Load transfer switch to switchboard to S.CST.0 ml 1
5.2.2 - 4X4+4 Emm² Cu/ XLPE/ SWA/PVC (plain annealed stranded copper conductors , connecting PR.0 to S.CST.0 ml 19
5.2.3 - 4X10+10Emm² Cu/ XLPE/ SWA/PVC connecting switchboardS.CST.1 to S.CST.0 ml 25
5.2.4 - Fire rated inside metallic conduit 4X4+4 Emm² Cu/ XLPE/ SWA/LSZH (plain annealed stranded copper conductors wrapped in mica glass fire-barrier tape, cross-linked polyethylene (XLPE) insulation, galvanized steel wire armor (SWA), and a low smoke zero halogen (LSZH/LSHF) outer sheath)connecting switchboardS.Fire pump to S.CST.0 ml 20
5.2.5 - 2X1.5+1.5 Emm² Cu/ XLPE/ SWA/PVC (plain annealed stranded copper conductors , connecting Domestic pump to PR.0 ml 8
Supply and installation of class SN8 conduit in accordance with the conditions defined in the in written pieces, specification, drawings and 100 mm diameter regid conduit buried in the ground
5.2.6.1 - PEAD Ø 110 mm for grid connection ml 5
5.2.6.2 - PEAD Ø 110 mm for lLV cables connecting panels S.ST.1 , Fire Pump, and S.PR.0 connection ml 55
5.2.7.1 - Low Voltage manhole chambers, with internal measures of 1000 x 1000 x 1000 (W*L*H), with RC cover thickness not less than 100 mm, as per drawing details Un 8
5.2.7.2 - Fire alarm cable manhole chambers, with internal measures of 1000 x 1000 x 1000 (W*L*H), with RC cover thickness not less than 100 mm, as per drawing details Un 4
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Indoor Lighting:
5.3.1 Luminaire fix to the ceiling (Downlight) LED 80W, IP65( L1) Un 98
5.3.2 Luminaire fix to the ceiling (Downlight) LED 30W, IP44(L2) Un 4
5.3.3 Luminaire fix to the ceiling LED15W, IP44 (L3) Un 12
5.3.4 Luminaire fix to the ceiling LED30W, IP44 (L4) Un 2
5.3.5 Luminaire fix to the ceiling LED30W, IP65 (L4) Un 3
5.3.6 POLE MOUNTED 2 Days SOLAR SYSTEM LIGHTING FIXTURE WITH 80W LED IP66/1K07. COMPLETE WITH SOLAR PANEL BATTERIES e,t,c AND 10 M HOT-DIP GALVANIZED STEEL WITH THICKNESS NOT LESS THAN 4MM FIXED ON CONCRET BASE Type L9 Un 16
5.3.7 Luminaire fix to the wall 2 Days Solar SystemLIGHTING FIXTURE WITH 80W LED IP66/1K07. COMPLETE WITH SOLAR PANEL BATTERIES e,t,c (L11) Un 5
Lighting Switches
5.3.8 - One way switch, recessed mounting Un 4
5.3.9 - Double pole switch, recessed mounting Un 6
5.3.10 Three pole switch, recessed mounting Un 8
5.3.11 Three pole switch, recessed mounting(IP65) Un 1
5.3.12 - Two Way Double pole switch, recessed mounting Un 2
LIGHTING Outlet
Supplying, installing, connecting and testing lighting outlets including conduit, conduitor fittings, boxes,wiring, cabling, earthing, accessories and all necessary works and materials required for complete installation back to panel boards as specified and as indicated on the drawings for the following items :
5.3.13 copper wire Cu/ XLPE/ PVC(2x1.5+1.5E sqmm) Cu/ XLPE/ PVC in 20mm minimum pvc conduit No. 71
5.3.14 copper wire Cu/ XLPE/ PVC(2x2.5+2.5E sqmm) in 20mm minimum pvc conduit No. 48
5.3.15 copper wire Cu/ XLPE/ PVC(2x1.5+1.5E sqmm) in 20mm minimum pvc conduit for emergency and safety lighting No. 23
Emergency / Safety Lighting
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Indoor Lighting:
5.3.16 - S1 - maintained (60min Autonomy) Un 19
5.3.17 - Maintained type Exit signe(3 Hours) Un 4
5.4 General Purpose Power Socket
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Double Flush and Surface Mounting Devices - Normal/Standby Supply:
5.4.1 - Flush Mounting Earthed Socket (BS546 ) - with cover 16A IP44 Un 16
5.4.2 - Flush Mounting Earthed Socket (BS546) - 16A Un 8
5.4.3 - Flush Mounting Earthed Socket (BS Type) - with cover 16A IP65 Un 2
Supplying, installing, connecting and testing electric outlets Including conduit or three compartment perimeter trunking which shall be designed to provide a solution to the segregation and access of power, data and communication cable trunk, r trunk accessories, conduit or trunk accessories, cabling, boxes terminations, earthing and all necessary ancillary works and materials required for complete installation as specified and as indicated on the drawings for the following items :
5.4.4 Sockets outlet ,240V by copper wire 3X2.5 mm2 Cu/ XLPE/ PVC in 20 mm pvc conduit. No. 26
5.4.5 Ditto but outlet by copper wires 3X1.5 mm2 Cu/ XLPE/ PVC in 20 mm pvc conduit Ceiling Fans No. 2
5.4.6 Ditto but outlet by copper wires 3X4 mm2 Cu/ XLPE/ PVC in 20 mm pvc conduit for Air conditioners No. 2
5.4.7 Ditto but outlet by copper wires 3X1.5 mm2 for Tools room exhaust fan Cu/ XLPE/ PVC in 20 mm pvc conduit No. 1
5.4.8 Power Outlets with fire rated cables(2X1.5mm² Cu/ XLPE/ LSZH , in galvanized steel coduit for fir alarm panel and repeater No. 2
5.5 Earthing System
5.5.1 Supplying, installing connecting and testing a complete protective earthing system including earthing pits, earthing electrodes, equalizer bars, earth continuity conductor, earthing conductor to switchboards, diesel generator set and transformers and all low voltage systems ...etc complete with all accessories, fixings, brackets test links, suspensions, drilling and cutting to form a complete installation as specified and as indicated on the earthing schematic drawings (Note: In the end It should be guaranteed, the achievement of a protective earth value less than a 1 Ohm (Regime TN-S)) LS 1
5.6 Lightening Protection Systeme
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
5.6.1 - Interseption rod installed on pole NO 6
5.6.2 - Detail C - Mechanical connector (connection to source earth) NO 12
5.6.3 - Main Earthing Terminal NO 12
5.6.4 - Source earth with 20mm Diameter made of copper NO 12
5.6.5 - Downward conductor 50 mm2 bar copper with connection terminal +Manhole / 400x400x500mm - ml 450
5.7 Fire Detection System
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories include 24 hours operation batteries as specified in schedules of equipment, detailed drawings and specs. All components of the fire alarm system shall be fire resistant (conduits, pullboxes…)
5.7.1 - Self contained , 4 loops Fire control panel, addressable pcs 1
5.7.2 - control panel, repeator pcs 1
Fire Detection Devices:
5.7.3 - Manual break glass points with protective cover pcs 5
5.7.4 - Optical smoke detector including detector base pcs 53
5.7.5 - Evacuation speaker pcs 7
5.7.6 Ditto but Water Proof pcs 2
5.7.7 Visual Alarm pcs 5
5.7.8 Ditto but Water Proof pcs 4
Electrical fire rated cables:
Enclosed in a recessed or surface mettalic conduiting include , all needed fire rated accessories :
5.7.9 - JE-H(st)H minimum 2x2x1mm² (The size to be determn according to system design), connecting repeator to control panel ml 448
5.7.10 - JE-H(st)H minimum 2x2x1mm² (The size to be determn according to system design), connecting Detectors to control panel and repeator ml 164
5.8 - Engineering, System Programming, including System Testing, Commissioning and Training. L.S 1
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
\ DESCRIPTION QUANTITY UNIT RATE AMOUNT
BILL NO.5 SCHEDULE OF RATES - GENERAL (NOTE: IT IS MANDATORY FOR BIDDERS TO COMPLETE THIS SECTION)
Note: The rates provided in this section will ONLY be used to value variation items whose rates are not provided in the measured work bills.
a Site Clearance m2 0.00
b Cutting, clearing and dumping away all shrubs, debris and unnecessary materials. m2 0.00
c Cutting of trees not exceeding 450mm girth including removing from site as directed nr 0.00
d Cutting of trees exceeding 450mm but not exceeding 600mm girth ditto nr 0.00
e Cutting of trees exceeding 600mm but not exceeding 900mm girth ditto nr 0.00
f Cutting of trees exceeding 900mm but not exceeding 1200mm girth ditto nr 0.00
g Cutting of trees exceeding 1200mm girth ditto nr 0.00
h Removing stumps of trees not exceeding 600mm girth and carting away debris nr 0.00
j Removing stumps of trees exceeding 600mm but not exceeding 1200mm girth ditto nr 0.00
k Removing stumps of trees exceeding 1200mm girth ditto nr 0.00
l Excavate the unconsolidated top soil to an average depth of 150mm m2 0.00
m Cutting of surface rock outcrops and removing debris from site m2 0.00
n Backfill to make up levels m3 0.00
p "Premise 200CC" insecticide treatment to surfaces of excavations applied as per manufacturer's instruction with a 10 year guarantee m2 0.00
q "Gladiator TC"(organophosphates chlorpyrifos)-covers 8SM per litre m2 0.00
r "Termidor" anti-termite with a coverage of 20m2 per litre m2 0.00
2 FOUNDATION EXCAVATION 0.00
a Excavate on normal soil to a depth of 1500mm from ground level m3 0.00
b Excavate on normal soil to a depth of 3000mm from ground level m3 0.00
c Excavate on normal soil to a depth of 4500mm from ground level m3 0.00
d Extra-over for excavating in rock class I m3 0.00
e Extra-over for excavating in rock class II m3 0.00
f Extra-over for excavating in rock class III m3 0.00
g Extra-over for excavating in clay soil m3 0.00
3 FOUNDATION WALLING 0.00
a 400mm thick rubble stone foundation walling bedded and jointed in cement and sand (1:3)mortar m2 0.00
b 200mm thick natural stone foundation walling bedded and jointed in cement and sand (1:3)mortar m2 0.00
4 CONCRETE WORK 0.00
a Provide all materials and cast insitu plain concrete class 15/20 (1:3:6) blinding under foundation m3 0.00
b Provide all materials and cast insitu plain concrete class 20/20 (1:2:4); vibrated m3 0.00
c Provide all materials and cast insitu plain concrete class 25/20 (1:11/2:3); vibrated m3 0.00
Sawn formwork to insitu concrete as described:- 0.00
d To sides of ring beams m2 0.00
e To soffits of suspended slabs m2 0.00
f To sides of columns m2 0.00
Extra over formwork for:- 0.00
g Fair face finish m2 0.00
a Provide materials and construct 100mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
b Provide materials and construct 150mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
c Provide materials and construct 200mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
d Provide materials and construct 400mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with two strips of hoop iron after every four courses m2 0.00
e Provide materials and construct 200mm thick hollow concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
f Provide materials and construct 100mm thick machine cut stone walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
g Provide materials and construct 150mm thick machine cut stone walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
h Provide materials and construct 200mm thick machine cut stone walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
6 ROOF CONSTRUCTION, COVERING AND RAIN WATER GOODS 0.00
a Supply and fix gauge 26 IT5 roofing sheets m2 0.00
b Approved concrete roofing tiles on 50x25mm soft wood battens at 200 centres m2 0.00
c Galvanized iron plain sheet 26 gauge m2 0.00
Approved pressure impregnated and treated hardwood steel 0.00
d 150x50mm section Steel members m 0.00
e 100x50mm section Steel members m 0.00
f 75x50mm section Steel members m 0.00
g 50x50mm section -Steel members m 0.00
h Provide and fix fascia board 250x25mm section fixed to the beams m 0.00
Approved pressure impregnated and treated softwood steel 0.00
j 150x50mm section Steel members m 0.00
k 100x50mm section Steel members m 0.00
l 75x50mm section Steel members m 0.00
n Provide and fix fascia board 250x25mm section fixed to the beams m 0.00
p Provide and fix 150x150mm box gutter fixed to fascia board with/and including brackets at rafter center and two coat of oil paint. The slopes to be considered according to the drawings m 0.00
q Supply and fix premanufactured 150x100mm PVC rain water gutter fixed to fascia board with mild steel brackets at 1200mm centres m 0.00
r Approve concrete roofing tiles on 50x25mm soft wood battens at 200 centres m2 0.00
7 WALL FINISHES 0.00
a Plaster with 18mm thick mortar on walls and beams, both inside and outside: Walls to be cured at least for one week after 24 hours of plastering. Contractor to allow for scaffolding and all necessary tools in his rate m2 0.00
b Plaster with 12mm thick mortar on walls and beams, both inside and outside: Walls to be cured at least for one week after 24 hours of plastering. Contractor to allow for scaffolding and all necessary tools in his rate m2 0.00
c Supply and apply two coats of white wash on all plastered surfaces with uniforms colours. Contractor to allow for scaffolding and all necessary tools in his rate m2 0.00
d Supply and fix ceramic wall tiles size 200x150x6mm thick m2 0.00
8 FLOOR FINISHES 0.00
Cement and sand screed 0.00
a 25mm thick insitu cement and sand (1:3) screeded beds, with steel trowelled finish , on concrete m2 0.00
Ceramic floor tiles 0.00
b Supply and fix ceramic floor tiles m2 0.00
c 100mm high ceramic tiles skirting m 0.00
Concrete Tiles 0.00
d Provide and install 50x50x5cm precast concrete tiles around the building 1m width as shown in the drawings m2 0.00
Epoxy paint 0.00
e Supply and apply epoxy industrial floor paint to all cement finished floors m2 0.00
Granolithic paving 0.00
f 38 mm thick (24mm cement and sand backing & 15mm thick granolithic layer) m2 0.00
g 20 x 100 mm Skirting m 0.00
Terrazzo Paving 0.00
h 38 mm thick (24mm cement and sand backing & 15mm thick terrazzo layer) m2 0.00
j 20 x 100 mm Skirting m 0.00
Plastic dividing strips. 0.00
k 32 x 3 mm thick plastic dividing strips. m 0.00
l Aluminum ditto m 0.00
m 25 mm wide non slip carborundum m 0.00
Precast Paving slabs
n) 600x600x50mm thick precast concrete paving slabs (standard) jointed in cement and sand mortar and laid on 50mm thick sand bed (Sample of paving slab to be provided by the Contractor for approval by the site Engineer). m2 0.00
Precast interlocking Paving slabs
o) Precast interlocking concrete paving slabs (standard) jointed in cement and sand mortar and laid on 50mm thick sand bed (m.s) (Sample of paving slab to be provided by the Contractor for approval by the site Engineer). m2 0.00
9 CEILING FINISHES 0.00
Acoustic Ceiling 0.00
a Tiles system suspended ceilings; 600 x 600 x 15 mm thick fissured mineral fibre tiles; jointed as per the manufacturer's instructions including suspending on 14 gauge pre-straightened galvanized annealed iron wire hungers at 2100 mm centers; rate to include steel brandering m2 0.00
Gypsum Board Ceiling 0.00
b Supply of materials and installation of gypsum board ceiling complete with steel brandering m2 0.00
Chipboard Ceiling 0.00
c 12mm thick chipboard ceiling fixed to and including 50x50mm cypress branderings at 600mm c/c both ways, with clout headed nails and set out in symmetrical panels with 'V' joints m2 0.00
Plywood Ceiling 0.00
d 8mm thick plywood ceiling (8'x4') boards on and including 50 x 50 mm softwood brandering m2 0.00
e Ex 75x50mm softwood molded steel cornice m 0.00
10 PAINTING 0.00
Prepare and apply three coats plastic emulsion paint to:- 0.00
a Plastered surfaces m2 0.00
Prepare and apply two coats gloss oil paint to:- 0.00
b Plastered surfaces m2 0.00
Aluminum primer or other equal and approved wood primer before fixing: - 0.00
c Backs of frame, board, etc over 100mm but not exceeding 200mm girth m 0.00
Prepare and apply three coats polyurethane clear matt varnish on woodwork internally 0.00
d General surfaces of flush doors and frames m2 0.00
Prepare and apply three coats permaplast weather proof paint to:- 0.00
e Walling and concrete ; external m2 0.00
a Mild steel grill door overall size 900x2100mm high made out of 40x80x4mm thick RHS framing, two equal door leafs each made out of 40x40x6mm mild steel plate frames, 12mm solid square bars welded to frame at equal 150mm centres at 450 angle both ways; including fixing frame to walling/concrete and complete with heavy duty hinges Nr. 0.00
b Supply and fix 30" mahogany veneered steel flush door size 900x2100mm high with hardwood lipping all round Nr. 0.00
c Door size 800x2100mm high Nr. 0.00
Wrot mahogany 0.00
Framed frames and framings 0.00
d 150 x 50 mm; 2 No. labours; plugged door frame m 0.00
e 50 x 15 mm architrave m 0.00
f 15x15mm quadrant beading m 0.00
Iron mongery 0.00
g Supply and fix three lever mortise lock complete with set lever handle furniture - fixed to steel doors Nr. 0.00
h 100mm steel butt hinges prs 0.00
j 900x100mm high standard Aluminum kicking plate Nr 0.00
k Four lever mortise lock complete with set lever handle furniture - fixed to steel doors Nr. 0.00
12 WINDOWS 0.00
Aluminum Windows 0.00
a Supply and fix 1500x1000mm high bronze anodized aluminium windows as per the specifications, with aluminium woven mesh fly screen in aluminium frame, and all necessary hardware and accessories. Nr 0.00
Steel Grill Windows 0.00
b Supply and fix steel grill window size 1500x1000mm high made out of 40x40x4mm SHS framing; 12mm solid square bars welded to frame at equal 150mm centers at 450 angles including fixing to approval Nr 0.00
Steel Casement Windows 0.00
c Supply and fix steel casement windows size 1200x1200mm in standard 'T' sections complete with closers, hinges, stays and all other necessary iron mongery Nr 0.00
d Supply and fix steel casement windows size 600x600mm in standard 'T' sections complete with closers, hinges, stays and all other necessary iron mongery Nr 0.00
e 5mm thick clear sheet glass and glazing to aluminium frames m2 0.00
f 5mm thick obscured sheet glass and glazing to aluminium frames m2 0.00
Adjustable Aluminum Louvre frames 0.00
g 8No. 100 mm blades (per set of blade ) Nr 0.00
h Ditto for 150 mm ( per set of blade ) Nr 0.00
Curtain fittings 0.00
j 35 mm diameter chrome plated curtain rod m 0.00
Pelmet boxes in wrot cypress 0.00
k End stops nr 0.00
l 150 X 25 mm pelmet top m 0.00
m 100 x 25 mm pelmet fascia m 0.00
Window Sills 0.00
n 500mm x 100mm precast concrete window sill pointed in cement and sand (1:3) mortar m 0.00
Window Blinds 0.00
p Supply and install vertical blinds to windows m2 0.00
Window Stay 0.00
q Supply and fixing of brass window stays approved from samples Nr 0.00
Window Handles 0.00
r Supply and fixing of brass window handles approved from samples Nr 0.00
13 DEMOLITION 0.00
a Demolition of single-storey masonry block/building including breaking the ground slab and the foundation , cleaning the site and making good the site for new construction, sort out arising materials as directed and removing all debris from site m2 0.00
b Demolition of multi-storey masonry block/building including breaking the ground slab and the foundation , cleaning the site and making good the site for new construction, sort out arising materials as directed and removing all debris from site m2 0.00
c Demolition of parts masonry wall, including any concrete beams and columns, make good the affected surfaces, sort out arising materials as directed and removing all debris from site m2 0.00
d Hack out the existing floor finish including the skirting and prepare floor surfaces to receive new floor; remove all debris from site m2 0.00
e Hack out the existing wall plaster in and prepare surfaces to receive new wall plaster m2 0.00
f Hack out the existing wall paint and prepare surfaces to receive new wall paint m2 0.00
g Remove existing doors and windows(various sizes) including frames and all iron mongery, cost of setting aside re-usable material as directed, removing debris from site and making good all affected surfaces Nr. 0.00
h Carefully remove all complete toilet fittings, prepare the affected surfaces to receive new fittings. Nr. 0.00
i Carefully remove all complete sinks fittings, prepare the affected surfaces to receive new fittings. Nr. 0.00
j Carefully remove all existing roof covering, repair the affected roof structures to receive new roof covering,; remove all debris from site as directed by site engineer m2 0.00
13 WATER AND SANITATION 0.00
Supply and fix the following sanitary appliances complete with all the connections to services, waste, jointing to supply overflows and plugging and screwing to the floors. Where trade names are mensioned below, the reference is intended to be as a guide to the type of fitting. 0.00
Water Closet 0.00
a 600x500mm deep Anti Vandal stainless steel squat type WC pan cast in concrete floor slab; complete with cistern and all necessary accessories Nr 0.00
b White European toilet complete with trap, cistern and all necessary accessories Nr 0.00
Wash hand basin (WHB) 0.00
c Ceramic Wash Hand basin complete with pedestal and all necessary accessories Nr 0.00
Urinal Bowl 0.00
d Wall hung ceramic urinal complete with all accessories and fixtures Nr 0.00
e Anti-vandal type stainless steel mirror Nr 0.00
Shower panel 0.00
f Shower panel to detail constructed in one piece grade 304stainless steel with all exposed surfaces polished to a satin finish; complete with an anti vandal spray head Nr. 0.00
Dhobi sinks 0.00
g Supply materials and construct concrete dhobi sink overall size 900x550mm wide Nr. 0.00
j Approved anti- vandal water tap Nr 0.00
k Supply and installation of a steel grease trap with a flow rate of 30GPM complete with accessories Nr 0.00
l Supply and install PVC water tanks with a capacity of 2 m3 complete with all fittings Nr 0.00
m Supply and install fibre glass tanks with a capacity of 5 m3 complete with all fittings Nr 0.00
n Install 10,000m3 Bulk Water Storage Fibre Glass tank complete with accessories Nr 0.00
Supply and install G.I. Class "B" Pipes complete with Fittings
p 32mm Diameter Pipe Lm 0.00
q 25mm ditto Lm 0.00
r 20mm ditto Lm 0.00
s 15mm ditto Lm 0.00
Supply and install PN 20 PPRC conforming to the current European standards for PPR installations and to the Engineer's approval, pipes jointing shall be by polyfusion or use of electric coupling.
Rates must allow for all Metal/plastic threaded adaptors where required for the connection of sanitary fixtures, valves. sockets, sliding and fixed joints, support raceways, isolating sheaths, elastic materials, expansion arm and bends, crossovers etc.
t 50mm dia pipe Lm 0.00
u 32mm dia pipe Lm 0.00
v 25mm ditto Lm 0.00
PPR to GI Adoption pieces
w 32mm diameter high pressure approved pattern brass rising stem full way gate valve with wheel head and jointing to tubing as 'PEGLAR' or approved equivalent. Nr. 0.00
x 12mm diameter 300mm long Copper tubing bent as required including jointing to GMS pipe and fitting. Nr. 0.00
Supply and install uPVC soil system to BS4660 and BS4515and muPVC waste systems to BS 5255withscrewed and socketed joints to BS 21. solvent welded joints shall be as per the system's manufacturer's written instruction. Tenderer must allow in their pipe work prices for all the couplings, connectors, joints etc as required in the running lengths of the pipe work and also where necessary for fixing clips, holder bats plugged and screwed.
y 100mm diameter grey heavy duty high pressure pipes Lm 0.00
z 50mm diameter waste pipes ditto Lm 0.00
a1 Supplying materials and construction of Inspection Chamber (IC) 600x600mm using solid concrete blocks for walls and casting concrete for the manhole base with thickness not less than 150mm; including cement plastering for inside walls. Nr 0.00
b1 Provide a rate for emptying of septic tank and disposal of waste m3 0.00
14 ELECTRICAL SUPPLY , CONDITIONING AND FIRE FIGHTING INSTALLATIONS
Supply, fix and install wires 1.5mm for lighting and 2.5mm for sockets, distribution panel boards with necessary circuit breakers, testing and earthing boards, cables, sockets, switches, fans, and lighting fixtures as specified in the drawings. All the price of the below items must include the materials and installations cost
a Main Distribution Panel Board of 150 AMP. Nr 0.00
b Twin sockets (13amp) Nr 0.00
c Single socket (13amp) Nr 0.00
d Switched Spur Outlet 13A c/w neon indicator lamp for Water Heaters Nr 0.00
e switches one gang (5amp) one way Nr 0.00
f switches one way (5amp) two gang Nr 0.00
g switches one way (5amp) three gang Nr 0.00
h Fluorescent lamps 40w 4 feet (Twin Unit) Nr 0.00
j Fluorescent lamps 40w 4 feet (Twin Unit) c/w Emergency Maintained Fluorescent fitting. Nr 0.00
k Fluorescent lamps 40w 4 feet (Single Unit) 'Splash Proof Fitting' Nr 0.00
l Fluorescent lamps 40w 4 feet (Single Unit) 'Splash Proof' c/w Emergency Maintained Fluorescent fitting. Nr 0.00
m Watertight IP65 Double 'D' Light Fitting Nr 0.00
n 3 speed box fan with 20 inch blades Nr 0.00
p Fire Escape Illuminated Fire Exit (Running Man) Sign to BS 5499 Nr 0.00
q Smoke Detector - Battery Operated 85dB Sounder with Test Button to BS 5839 Nr 0.00
r Battery Operated heat detector Nr 0.00
s Intercom code outlet points Nr 0.00
t Internet points Nr 0.00
Supply and install Air Conditioning A/C split unit, with complete installation and fittings
u 9000 BTU Nr 0.00
v 12000 BTU Nr 0.00
w 18000 BTU Nr 0.00
x 24000 BTU Nr 0.00
y Supply and installation of a 50KVA generator including all necessary wiring and builder's work Nr 0.00
z Ditto but Supply and installation of a 30KVA generator Nr 0.00
a1 Ditto but Supply and installation of a 20KVA generator Nr 0.00
b1 Ditto but Supply and installation of a 10KVA generator Nr 0.00
c1 Supply and installation of 150mm diameter extractor fan complete with humidity stat Nr 0.00
Fire Horse Reel
d1 Supply and installation of 1"x30m fire horse reel complete with disk ,waterway ,swing arm ,nozzle ,one meter inlet hose ,valve and all other necessary accessories Nr 0.00
Supply and erect pre-cast concrete Fencing Posts-Cranked
a 100x100mm Nr 0.00
b 100x125mm Nr 0.00
c 125x125mm Nr 0.00
d 125x150mm Nr 0.00
Chain Link Fencing
e Supply and install 2400mm high x 14 gauge chain link fencing on and including 100x125 cranked precast concrete fencing posts on concrete bases m 0.00
f Supply and install 12 1/2 Gauge x 4 strands galvanized barbed wire nailed to steel or concrete posts (Measured Separately) m 0.00
Supply and install 12 1/2 Gauge galvanized steel razor wire complete with 1000mm high 50x50x6mm thick angle iron posts at 1500mm centers; bottom part of posts built in concrete block walling
g 300mm diameter (stretched) m 0.00
h 450mm diameter (stretched) m 0.00
j 600mm diameter (stretched) m 0.00
k Supply materials and construct boom gate overall 10950mm long comprising of 350mm diameter mild steel pipe 1400 mm high filled with mass concrete , embedded on the ground with concrete and painted with reflective white and yellow paint; 50mm diameter mild steel pipe painted with reflective white paint; 950x950x950mm steel box filled with lightweight concrete and painted with white reflective paint: All to the details provided and the Site Engineer's instructions nr 0.00
16 WATER PROOFING
a Supply and lay approved single layer bituminous waterproofing membrane on sealer coat and hot laid with melted oxidized bitumen by specialist, tucking into grooves including forming grooves in block work or concrete, all in accordance with the manufacturer's specifications (10 years guarantee to be given, measured net) m2 0.00
b Supply materials and apply two part acrylic modified cementitious coating mixed with cement screed laid to fall to manufacturer's specifications m2 0.00
16 steel BOARDS & PARTITIONS
Supply and fix the following:-
25 mm thick block board
a Plain m2 0.00
b Veneered one side with mahogany m2 0.00
c Veneered BOTH sides with mahogany m2 0.00
d 3mm thick sheet m2 0.00
12 mm thick celotex soft board
e Sheets m2 0.00
f 3mm thick mahogany m2 0.00
Chip boards 8' X 4'
g 9 mm thick Plain Chip board m2 0.00
h 12 mm thick ditto m2 0.00
Gypsum boards 8' X 4'
j 9 mm thick m2 0.00
k 12 mm thick m2 0.00
l 12 mm thick m2 0.00
m 18 mm thick m2 0.00
Styrofoam boards 4' X 4'
n 25mm thick size 1200x1200 m2 0.00
p 12.5mm thick size 1200x1200mm m2 0.00
25 mm wrot T & G boarding
q Fabricated from 100 X 25 mm prime grade cypress m2 0.00
r Ditto in cedar Ditto. m2 0.00
Polystyrene Thermal Insulation Boards
s Supply and install 2500x600x100mm thick interlocking polystyrene thermal insulation boards with compressive strength of 250-300kpa and a density of 30kg/m2 : Thermal conductivity to be 0.029 W/mK. The insulation boards should be installed as per the manufacturer's instructions and the Project Engineer's approval m2 0.00
The works shall consist of furnishing materials, construction,installation, and completion as directed by site engineer.
a Cordinate to construct and test a round water fountain, comprised of an external fountain of 5.6m diameter,40cm high and an inside circular of 2.6m diameter 60cm high . Concrete tilling works,stone works and electromechanical works and equipment are included in their respective items. price to include all items including cleaning. Sum 0.00
b Supply and install, spread and make good a minimum of 30cm agricultural soil in designated areas m2 0.00
c Supply and plant trees. Price includes digging a minimum of 1.5m deep holes for each tree for the following:
i) Plam tree , medjoul type not less than 2m high in good condition Nr 0.00
ii) Ditto but pensian trees Nr 0.00
iii) Ditto but vecus trees Nr 0.00
iv) Supply and plant washintonian trees Nr 0.00
v) Ditto but Lavnedar 3 year old Nr 0.00
vi Ditto but Rose 1 year old Nr 0.00
vii Ditto but cuctus 6 month year old Nr 0.00
viii) Cypress tree , not less than 0.5m high in good condition Nr 0.00
ix) Reasonable general rate for any other trees not included here but commonly use in human habitation areas, not less than 0.5m high in good condition Nr 0.00
d Supply and install Arturo turf grass. Price to include leveling of the agricultural soil and fertilizers and all necessary works to complete the job according to the prevailing weather condition. m2 0.00
e Allow for shifting of existing cover plants / live fence/flowers . The rate has to take care about watering and maintenance of plants for about 3 months or until completion of the contract. m2 0.00
f Allow for shifting of existing small trees at the location of proposed units. – The rate has to take care about watering and maintenance of plants for about 3 months or until completion of the contract Nr 0.00
TOTAL FOR SCHEDULE OF RATES BILL (NOTE: THIS TOTAL WILL NOT BE CARRIED TO GRAND SUMMARY) 0.00
United Nations Office for Project Services
Horn of Africa Multi-Country Office
CROPS STORAGE MODEL DESIGN
ENHANCING FOOD SECURITY AND RESILIENCE OF RURAL COMMUNITIES (EFSR) IN SUDAN
UNPRICED BILL OF QUANTITIES (BOQ)
NOTE: It is a MANDATORY requirement for bidders to complete and return this section
Failure to complete all sections of the BOQ may result in automatic disqualification of your bid.
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
Bill No. 01 General Requirements and Provision 0.00
Bill No. 02 Crops Storage Main Building 0.00
Bill No. 03 MECHANICAL INSTALLATION 0.00
Bill No. 04 ELECTRICAL INSTALLATION 0.00
SUB-TOTAL 1 0.00
LESS DISCOUNT (IF ANY)
GRAND TOTAL 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QTY UNIT RATE (KES) AMOUNT (KES)
BILL NO. 1 PRELIMINARIES
All the Bidders are requested to refer "Pricing Preamble and notes below" and works items of this Bills of Quantities shall be priced to fulfill the requirements there-in. Also see that no page or items are missing prior to pricing of this bill of quantities.
A list of typical general items are given below. However, the Bidder is requested to price only those items that may affect this Contract. Note
The Bidder is advised to visit the site of the proposed work, as it is his responsibility to ascertain the conditions governing access to the site, and external working space, storage area etc. Note
If no price has been stated against any item hereunder, the Contractor shall not be entitled to claim any money for such items even though he is obliged to execute the work or provide services described therein. Preliminary items priced by the Tenderer are deemed to include the cost of unpriced items. Note
The Bidder is advised to refer to the General Notes, Pricing Preambles, Drawings, Specifications, Conditions of Contract, Particular Conditions of Contract and other relevant documents prior to pricing of the following items. Note
The bidder is required to visit the site of the proposed work, as it is his responsibility to ascertain the conditions governing access to the site, the external working space, storage area and any other information he may find necessary before he can tender for the work. Note
Cost and expenses in connection with any other preliminary item which is not listed below, but is necessary for the due completion of works, is deemed to be included in the tender rates. Note
Mechanical plant and equipment which emits excessive noise, smoke, fumes, obnoxious gases etc., will not be allowed to be used in the Site, without the prior approval of the Engineer. Note
The contractor shall be responsible for any loss or damage to the works, existing structures, adjoining structures and unfixed materials. Note
The contractor shall try to locate the new units in a way to avoid cutting trees. If it is really needed to cut down any number of trees, allow for planting same number of trees – Contractor has to take care about watering and maintenance of plants for about 3 months or until completion of the contract. (Fill schedule of late) Note
The contractor shall be responsible for providing necessary lighting, watchmen, and other suitable security measures during construction until handing over. Note
The contractor will be required throughout the contract to maintain and keep from obstructing the existing way. Note
The Contractor shall be responsible for the provision of all materials, scaffolding, tools, plant, transport and workmen required for the works except in so far as may be stated otherwise herein and he shall allow for the provision of the foregoing except for such items specifically and only required for the use of nominated Sub-Contractors as described herein. Note
All such plant, tools and scaffolding shall comply with all regulations whether general or local in force throughout the period of the contract and shall be altered or adapted during the contract, as may be necessary to comply with any amendments in or additions to such regulations. Note
Contractor shall provide helmets, gloves, safety masks, dusk masks, eye goggles, boots etc. for the workmen. Note
Contractor shall provide safety boards, signs and safety ribbons Note
Contractor shall take special care for safety of the patients, staff and public during transportation of materials and implementation of the contract. Note
Plant, Material & Work Practices
No work in any trade shall be carried out in such a manner as to cause any damage and nuisance to adjacent owners or the public. Note
Mechanical plant and equipment which emits excessive noise, water, smoke, fumes, or obnoxious liquids, gases etc., will not be allowed to be used on the site. If the use of such machinery becomes necessary, the Contractor is expected to obtain prior approval. Note
The Engineer has the discretion as to when he deems it necessary for the Contractor to take precautions, maintain or repair any such plant and equipment or order their removal from the site. Note
Contractor shall provide specimens, samples and sample panels of material and testing of materials as appropriate and as directed by Engineer. Note
HORN of AFRICA MULTI-COUNTRY OFFICE (HAMCO): Sudan Office
BILL OF QUANTITIES
ITEM DESCRIPTION UNIT QTY UNIT RATE AMOUNT
1 General Requirements and Provision
a Fabricate supply and erect Project Sign boards as per the drawings No 1 0.00
b Mobilization, Establishing contractor's camps, supply equipment ,personnel, Lab, accommodation and construction plant on the site, L.S 1 0.00
c Demobilization, removal of site establishments of the contractor's organization, camps and reinstating the site to the existed conditions L.S 1 0.00
d As Built Drawings L.S 1 0.00
Total Sub-section Sum Carried to Summary
2 Site Clearance and Organization
a Clearing and removal of bushes, trees and debris and site surfacing M2 245 0.00
b Fencing and protection of site , site security and entrance control L.S 45 0.00
Total Sub-section Sum Carried to Summary
GRAND TOTAL 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QUANTITY UNIT RATE AMOUNT
BILL NO.3 Crops Storage Main Building
A SUBSTRUCTURE AND EARTHWORK
a) Excavation on land of any nature in order to obtain project levels, including loading and transport of surplus material to the dump, eventual bracing, pumping of the tributary water to the excavation, regularization of the bottom of the box and replacement of land whenever necessary, all executed in order to obtain the levels indicated in the design. 155 m3 0.00
b) Excavations of Raft Footing for Water tank & pump room to the depths of not less than 2.0 m as per the drawings or as directed by the Engineer 92 m3 0.00
c) Excavations of square Isolated Footing foundations to the depths of not less than 2.5 m as per the drawings or as directed by the Engineer 355 m3 0.00
d) Excavate and removal of soft material for ramps, landscaping and outside fence 72 m3 0.00
c) Return, fill in and ram selected excavated material around foundations trenches 239 m3 0.00
3 Disposal of Surplus spoils
d) Load and cart away surplus material from site to an approved dumping site 116 m3 0.00
4 Selected filling
e) Backfilling Beneath the Foundations compacted in layers not exceeding 150mm deep and well watered 71 m3 0.00
f) Ditto; Under water tank & pump room 46 m3 0.00
g) Backfilling inside the walls till the tileing elevation with a selected materilas in a compacted in layers not exceeding 150mm deep and well watered 1350 m3 0.00 150
h) Backfilling of filter materials of notless than 150 mm beanecth internal tiling and the external landscaping and entrance ramps as per the drwaings or as directed by the Engineer 900 m3 0.00
i Backfilling for landscaping and entrance ramps with a selected materilas in a compacted in layers not exceeding 150mm deep and well watered as per the drwaings or as directed by the Engineer 150 m3 0.00
4 Concrete work
The contractor should provide for approval the concrete mix design and the aggregates, cement and sand wihich will be used in the construction works.The minimum cement conetent will be 350 Kg of cement per cubic meter
Rates shall include the price of steel reinforcement, formwork, mixing, placing, curing and removal of formwork for all concrete and for all threading fillets etc. The rates shall include the sampling and testing at an approved labortary . All exposed concrete surfaces in columns, beams, slabs etc. must be fair face and of first class standard.
First class shuttering must be used and it must be approved by the Engineer before the reinforcement is placed in position and before the concrete is casted.
Plastered surfaces are to be roughened to receive plaster cement and should be used for all types of concrete
Plain concrete class 15 (mix 1:3:6)
a) 100mm Thick surface blinding under strip footings 142 m2 0.00
b) Ditto; under external & internal tiles 1500 m2 0.00
c) Ditto; for latines seats and slabs 25 m2 0.00
d) Ditto; for water tank & pump room 46 m2 0.00
Insitu concrete class 30, vibrated and reinforced as described, in:-
d) Isolated Footings 86 m3 0.00
e) Raft footing for water tank & pump room 28 m3 0.00
f) Short Columns 19.5 m3 0.00
g) Grade Beam 35 m3 0.00
h) G.B. for Latrines slabs and walls 30 m3 0.00
i) Latrines Strip footing 12 m3 0.00
Foundation walling
Masonry stone walls bedded , jointed in cement and sand (1:3) mortar and reinforced with hoop irons at every alternate course
i) 200mm thick beaneath Grade Beam and ramps sides 200 mL 0.00
i) 12 mm thick cement : sand (1:3) plaster to plinth 160 m2 0.00
j) Three coats of bituminous paint to foundations, columns stubs, grade beam, plinths surfaces. 450 m2 0.00
TOTAL FOR SUBSTRUCTURES AND SITE EARTHWORK CARRIED TO SUMMARY 0.00
B STRUCTURAL FRAME & ROOF
1) Reinforced Concrete
Insitu concrete class 30 , vibrated and reinforced as described, High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
The contractor should provide for approval the concrete mix design and the aggregates, cement and sand wihich will be used in the construction works.The minimum cement conetent will be 350 Kg of cement per cubic meter. where there is an exposure to the sea water and chemical attack, the Contrator should provide the sulphte resistance cement and apply / isoltate the concrete properly form the chemical attack using membrane and painting reagents
Rates shall include the price of steel reinforcement, formwork, mixing, placing, curing and removal of formwork for all concrete and for all threading fillets etc. The rates shall include the sampling and testing at an approved labortary . All exposed concrete surfaces in columns, beams, slabs etc. must be fair face and of first class standard.
First class shuttering must be used and it must be approved by the Engineer before the reinforcement is placed in position and before the concrete is casted.
a) Intermediate tie beams ( top level +3.00m) 16 m3 0.00
b) Top beams ( top level +5.20m) 10.5 m3 0.00
c) R.C. Ground Floor Columns 27 m3 0.00
d) R.C. walls for water tank & pump room 12.5 m3 0.00
e) R.C. cover slab for water tank & pump room 6.25 m3 0.00
2 Steel Roofing Frame & Sheet
Contractor to allow for hoisting and all angle brackets or gusset plates bolts, cleats, fish tailing lugs, drilling holes and the likes for fixing members to position as per the details;
The following in trusses and/or independent members
Frame structure including rafters, cross bracing, fasteners,struts and purlins complete with bolts and nut, fillet weld together.The contractor shall obtain the roof structure manfacturer drawings and spsecifications before importing or delivering to site to be reveiwed and approved by the Engineer .
a) Fabricate, erect and fix in position steel columns of IPE 500 , including surface preparation, anti-corrosion primer, and two coats of enamel finish paint. 26.4 M.L 0.00
b) Fabricate, erect and fix in position roof framing shall consist of primary beams of IPE 400 ( Rafter ) as per the drawings. 323.4 M.L 0.00
c) Fabricate, erect and fix in position roof framing shall consist of Secondary beams of IPE 330 as per the drawings. 100 M.L 0.00
d) Fabricate, erect and fix in position roof framing shall consist of Purlins section (SHS100*4) as per the drawings. 1,644.80 M.L 0.00
e) Fabricate, erect and fix in position Double Rod Bracing ∅32mm as per the drawings. 342 M.L 0.00
f) Supply and install galvanized steel roofing sheets ( thick. 50mm) as specified placed in and to steel frame including fasteners and all fittings in accordance with the drawings, manufacturer's instructions and Engineer directions. 1,562.50 m2 0.00
TOTAL FOR STRUCTURAL FRAME & ROOF CARRIED TO SUMMARY 0.00
First Class Bricks: Type (Fire faced brick) Uniform size (e.g., ~242x115x70mm), sharp edges, free from cracks, good crushing strength , low water absorption (<12-20%), made from good brick earth.
Three- ply bituminous felt damp proof course bedded in cement and sand (1:3) mortar (measured net allow for 300mm laps):-
a) 200mm wide between grade beam and bottom of the brick wall 180 mL 0.00
1) External Walling
200mm Thick walling , Supply material and construct first calss masonry burnet brick walls bedded and jointed in cement and sand (1:3) mortar
a) for Main Building 800 m2 0.00
b) Ditto for landscaping and gates, fence 36 m2 0.00
c) Ditto for latrines 60 m2 0.00
2) Internal Partition offices Walling 60 m2 0.00
d) For gurd rooms and entrances 30 m2 0.00
TOTAL FOR WALLING CARRIED TO SUMMARY 0.00
D DOORS and WINDOWS
Note: All doors shall be supplied and installed in accordance with the provided details and schedule. The installation shall include all necessary design features to ensure proper sealing and protection against insects, rodents, dust, and moisture, including but not limited to rubber or brush seals, tight-fitting frames, and metal thresholds. All ironmongery not measured separately shall be deemed included in the rates for the corresponding doors..
Mild steel caged door made out of cold rolled steel sections thoroughly cleaned and phosphatized to resist corrosion before receiving Two coats of grey rust inhibiting primer
Door external frame grouted below finished floor and fixed to walls: All iron mongery and lugs fixed to manufacturer's specifications
a Entrance Sliding Door (5.0 x 4.0m ) : Supply and install high-quality metal door 2.5 - 3 mm for vehicle entry with enhanced security features, including heavy-duty steel construction, durable locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint, and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 2 Nr 0.00
b Supply and install high-quality Singl steel door ( 900x220mm high ) including locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint, and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 4 Nr 0.00
c Supply and install high-quality Singl steel door for Latrine ( 700x220mm high ) including locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint ,and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 4 Nr 0.00
d Fence Gate (4.0 x 1.8m ) : Supply and install high-quality metal door 2.5 - 3 mm for vehicle entry with enhanced security features, including heavy-duty steel construction, durable locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint, and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 1 Nr 0.00
TOTAL FOR DOORS CARRIED TO SUMMARY 0.00
a Supply and install a high-quality steel window (3000 × 1000 mm high) comprising three upward-opening glass panels, each fitted with external steel mesh. The window shall include locking mechanisms, hinges, handles, anti-rust treatment, and three layers of chemical-resistant paint, along with all necessary accessories to ensure strength, durability, and safety, in accordance with the specifications, drawings, and the Engineer’s instructions. 30 Nr 0.00
b Supply and install ( 1000x1200mm high ) Double glazed aluminum for Security Room, 2-panel hinged window including 6mm toughwood glass out skin and 7.5mm laminated glass inner skin, metal insect mesh. (Weight of section not less 1.6kg/m.l, and width of external section 100 mm) 2 Nr 0.00
c Supply and install ( 800x400mm high ) Double glazed aluminum for latrines, 2-panel hinged window including 6mm toughwood glass out skin and 7.5mm laminated glass inner skin, metal insect mesh. (Weight of section not less 1.6kg/m.l, and width of external section 100 mm) 4 Nr 0.00
TOTAL FOR WINDOWS CARRIED TO SUMMARY 0.00
Ceiling Finishes
1 Roof Isolation
a) Supply, roof tempreturs isolation sheets and install , with pproper fixing wires and glue under the corrugated roof sheets as per drwaings , spcifications or as directed by the Engineer 1500 m2 0.00
2 Anti-Rust and chemacal attack paints
Prepare and apply undercoat and two finishing coats of gloss oil paint; and anti-rust paints
b) beneath and on the top of the corrougated roof sheets 3000 m2 0.00
2) Floor finishes
a Supply and apply epoxy coating of floor with skirting (100 mm) and joints. Samples shall be approved by site Engineer prior to procurement. 1500 M2 0.00
b Supply and fix 600x600x8.5 thick ceramic floor tiles tiles layed over white cement slurry over cement sand screed to overll thickness of 100mm include skirting 8cm high. Samples shall be approved by site Engineer prior to procurement. 16 M2 0.00
c Supply and fix300x300x8.5 thick non-slip ceramic tiles for latrines over waterproofing adhesive layed over white cement slurry over cement sand screed . Samples shall be approved by site Engineer prior to procurement. 24 M2 0.00
d Supply and fix a floor pallet made from durable, untreated hardwood or pest-resistant softwood, measuring 1.2 x 0.8m with a minimum dynamic load capacity of 1,500 kg, featuring top deck boards spaced no more than 4 cm apart, and elevated 10 to 15 cm above the floor 1200 M2
a Supply and apply 5 cm thickness concrete tiles with textured surface and stamped on two layers of selected material 25 cm for each around premisses of main building pattern as per drawings 500 M2 0.00
3) Wall Finishes (Plastering)
Clean, well-graded sand; Portland cement; clean potable water; bonding agent or hardening walls, consistent mix. apply the mixture in a multi-step process involving surface preparation, applying coats of plaster, leveling, and proper curing. This process ensures a strong bond, a flat surface, and prevents cracking.
Internal Walls: 12mm thick cement sand plaster, with steel trowelled finish, as described to:-
a) Wall surfaces internally of main building 1000 m2 0.00
b) Wall surfaces internally of latrines 60 m2 0.00
External Walls: 15mm Cement and sand (1:3) render on block wall or concrete work to:-
Fill uneven surfaces with stucco filler to approval including sanding of all uneven surfaces; apply two undercoats emulsion paint and two finishing coats of first quality Silk Vinyl emulsion paint to match the existing ;-
c) Wall surfaces externally of main building 1000 m2 0.00
d) Wall surfaces externally of latrines 60 0.00
Wall Finishes (Painting)
Fill uneven surfaces with stucco filler to approval including sanding of all uneven surfaces; apply two undercoats emulsion paint and two finishing coats of first quality Silk Vinyl emulsion paints
a) Wall surfaces internally of main building 1000 m2 0.00
b) Wall surfaces internally of latrines 60 m2 0.00
c) Wall surfaces externally of main building 1000 m2 0.00
d) Wall surfaces externally of latrines 60 m2 0.00
Fence chain Link and posts
a Fabrication: GI Chain Link Mesh 50x50mm mesh size, 3mm or 4mm diameter). Height: Generally 2.0 meters above ground level. Posts: Main posts (60.3mm O.D.) and line posts, spaced 3m apart. Structure: 'Y' shaped arms (450mm) for 3-6 rows of barbed wire. Finish: Galvanized (ASTM-A392-81) or PVC coated. Foundation: Concrete base ( 1:4:8 mix) for posts. 320 mL 0.00
TOTAL FOR FINISHES CARRIED TO SUMMARY 0.00
ITEM DESCRIPTION
A SUBSTRUCTURES 0.00
B STRUCTURAL FRAME & ROOF 0.00
D DOORS & WINDOWS 0.00
TOTAL TO SUMMARY 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QUANTITY UNIT RATE AMOUNT
A MECHANICAL INSTALLATION
1 PORTABLE FIRE FIGHTING EQUIPMENT
CO2 Fire Extinguishers
a) 6 kg Carbon Dioxide Steel Stored pressure gas fire extinguishers conforming to BS EN 3 complete with:- - charge and fixing bracket - pictorial instructions - colour coding to BS 7863 - discharge horn and hose. - pressure indicator -Complete with all required identification signage as specified in Technical Specification 3 Nr. 0.00
b) 5 kg ABC type fire extinguishers conforming to BS EN 3 complete with:- - charge and fixing bracket - pictorial instructions - colour coding to BS 7863 -Complete with all required identification signage as specified in Technical Specification 14 Nr. 0.00
2 FIXED FIRE FIGHTING EQUIPMENT 0.00
a) Supply install, test and commission GRP reservoir cylindrical ground water storage tank of nominal capacity 25000 litres; as per provided drawing to be located within a shade to be made as a makeshift shade for fire pump and fire water reservoir as 'TOPTANK' on 300mm high plinth support to structural Engineer’s detail complete with cover. The tank is to be complete with the following ; a) 50mm diameter overflow b) 32mm diameter washouts with gate valve c) 80mm diameter outlet with gate valve (2No.) d) 40mm diameter inlet with high pressure float valve e) Tank connectors for all incoming & outgoing pipes 1 Nr. 0.00
b Supply, install and test and commission a modular skid mounted 22.7m³/hr. @ 80m head; main electric fire pump; (centrifugal with an electric motor capable of working 100% flow at rated pressure, 150% flow at ≥65% rated pressure); a diesel engine driven standby firepump of the same capacity including fuel tank of a minimum capacity of 8 hrs continous running ; and a 3m3/hr capacity electric jockey pump at the rated head of 80m; mounted on a modular skid including all the accessories, signage,manometers, relef valves; test valves; and interconnecting pipes and fittings ; to be installed on a 200mm RC foundation to be built within the fire pump shade ; to the structural and architectural details; to be compliant to NFPA standards. 1 Nr. 0.00
c Supply and install galvanized steel schedule 40 pipes to external fire water distribution system as where shown on the drawing. Complete with all the necessary fittings, support and accessories. DN[mm] = 65mm 20 m 0.00
d Supply, install, test, and commission a wall-mounted, lockable fire hose cabinet , designed for fire fighting purposes in compliance with relevant standards (e.g., EN 671-1 for hose systems .The cabinet shall include all necessary fittings and accessories for full functionality & complete with all required identification signage as specified in Technical Specification Section. Material: Mild steel with anti-corrosion red powder-coated finish, minimum 1.2 mm thickness, suitable for indoor/outdoor use with weather-resistant properties (IP54 or better). Dimensions: Approximately 700 mm (H) × 600 mm (W) × 250 mm (D), or as required to accommodate all components. Door: Hinged, lockable with a break-glass key access system, fitted with a clear tempered glass or acrylic panel for visibility. Mounting: Wall-mounted with corrosion-resistant brackets and fixings, securely anchored to the structure as per manufacturer’s recommendations and structural drawings. Fire hose Type: Synthetic rubber-lined fire hose, compliant with EN 671-1 or equivalent, suitable for Class A, B, and C fires. Length: 30 meters, coiled on a swinging hose reel for easy deployment. Diameter: 38 mm (1.5 inch) nominal, with brass or aluminum nozzle (jet/spray type, adjustable). Couplings: Instantaneous couplings, corrosion-resistant, compatible with local fire fighting standards. Accessories: Nozzle Holder: Integrated holder for the hose nozzle, ensuring secure storage.,Signage: Clear, durable fire equipment signage (minimum 200 mm × 200 mm) in compliance with fire safety regulations, indicating the location and contents of the cabinet.Inlet Valve: Bronze gate valve (PN16, minimum DN25), suitable for connection to the fire water supply system, compliant with BS EN 12201 or equivalent. 3 Nr. 0.00
e Construct rectangular manhole out of 250mm thick double brick walls,internal dimension 600mm x 600mm x 600mm (average depth),internally plastered with three coats of cement/sand mix ratio1:3 ,on a base of precast R.C slab of size ,1300mm x 1300mm x100mm , including benching and bottom channeling with mass concrete.Slab shall be reinforced with dia.8mm reinforcement bar c/c 130mm bothways. Provide 150mm thick granular materials beneath the slab,on a compacted earth . Manhole shall have precast R.C cover slab, each,size, 740mm x 740mm x 100mmreinforced with diameter 8mm steel barc/c140mm bothways,including diameter 14mm steel ring handle with supporter bar all in accordance with the given detail drawings .Unit price shall include excavation of the pitto a depth of 800mm (average) and cart away of the excavated soil. 7 Nr. 0.00
f Supply, lay, test, and commission a High-Density Polyethylene (HDPE) PN16 fire main pipeline , including all necessary fittings, as per the provided detail drawings . The work shall ensure a reliable, leak-free system compliant with site requirements. Pipe: Material: High-Density Polyethylene (HDPE), PE100 grade virgin material, Pressure Rating: PN16 (16 bar nominal pressure).Sizes: As specified in the detail drawings (DN80) Type: HDPE compression fittings, electrofusion fittings, or butt-fusion fittings.Standards: Compliant with BS EN 12201-3 or equivalent, Includes elbows, tees, reducers, couplers, end caps, and transition fittings where ever necessaey (to connect with valves or other materials). Valves: Type: PN16 gate valves, ball valves, or check valves where they are necessary.Material: Bronze, brass, or ductile iron with HDPE-compatible ends (flanged or spigot).Standards: Compliant with BS EN 1074-2 or equivalent. Other Accessories:Thrust blocks, anchor blocks, and supports to prevent pipe movement.Warning tape or marker tiles above buried pipes for identification during future excavations. All materials shall be new, free from defects, and certified for potable water use by relevant standards (WRAS, NSF/ANSI 61). Installation: Site Preparation: Excavate trenches to the depths and widths specified in the detail drawings, ensuring proper alignment and gradient (minimum 1:100 unless otherwise specified). Prepare trench beds with sand or fine granular material (minimum 100 mm thickness) to provide uniform support and prevent pipe damage. Remove rocks, debris, or sharp objects from the trench to protect the pipe. Pipe Laying: Lay HDPE pipes along the alignments shown in the detail drawings, ensuring continuous support and proper gradient for drainage where required. Join pipes using butt-fusion, electrofusion, or compression fittings, as specified, following manufacturer’s guidelines and BS EN 12201-5 procedures. Ensure joints are leak-proof and capable of withstanding PN16 pressure.Install fittings, valves, and accessories (e.g., air valves, washouts). Backfilling: Backfill trenches with compacted sand or fine granular material (minimum 300 mm above the pipe) to protect the pipe, followed by native soil or as specified. Compact backfill in layers (maximum 150 mm per layer) to prevent settlement, as per ASTM D698 or equivalent. Place warning tape or marker tiles 300 mm above the pipe for future identification. Thrust Restraint: Install concrete thrust blocks or anchor blocks at bends, tees, and valves to resist hydraulic thrust. Ensure thrust blocks are cast against undisturbed soil and cured adequately. Testing: Pressure Testing: Conduct a hydrostatic pressure test on the completed pipeline as per BS EN 805 or equivalent. Test pressure: 1.5 × PN16 = 24 bar, maintained for a minimum of 2 hours (or as specified). Monitor for leaks, pressure drops, or deformations, and repair any defects before proceeding. Leakage Testing: Perform a leakage test to ensure the system meets allowable leakage rates (as per BS EN 805 or local standards). Record test results, including pressure, duration, and any observed issues. Alignment and Gradient Check: Verify pipe alignment and gradient using surveying equipment. 0.00
Size Ø = DN80 101 m 0.00
Size Ø = DN 65 30 m 0.00
3 MECHANICAL VENTILATION & AIRCONDITIONING 0.00
a) Supply and install a 600mm throuat diameter wind powered turbine ventillator ; spaced in accordance with the drawings; flushing detail designs in accordance with manufacturer's recommendation and to the engineers approval ; to acheive a lasting ; weather proof joint. 14 Nr. 0.00
b) Supply, installation and test and commissioning of 5 kW cooling capacity split-type air conditioner (Inverter type) for Administration Office, complete with indoor unit (Hi-wall mounted), outdoor condensing unit, wireless remote control with timer and temperature settings, washable easy-access air filters, refrigerant charge (R-410A or equivalent), all interconnecting refrigerant piping (copper tubing with insulation), condensate drain piping and connections, wall mounting brackets,signage and hardware, vibration isolation pads for outdoor unit, electrical supply cable and connections, commissioning and testing. The unit price shall include refrigerant piping and respective insulation - closed-cell elastomeric foam, 13mm thickness, condensate piping and all supporting structure. Set 1
c) Ditto No b) but for Security Office + Bed Quarter Set 1
d) Supply, installation and test and commissioning of wall-mounted or window-mounted axial exhaust fan for Utilities Room, complete with airflow capacity ≥ 320 m³/h (approx. 190 CFM), direct drive motor thermally protected, 220-240V / 50 Hz single-phase power supply, corrosion-resistant construction, integral gravity backdraft damper, bird/insect screen on exterior discharge, weatherproof louver or hood for exterior discharge, manual on/off switch inside room, all mounting brackets, fasteners, signage and hardware, electrical supply cable and connections, door undercut (15-25mm) for makeup air, commissioning and testing Set 1
4 GENERAL ITEMS/ SUMMARY 0.00
a) Test & commission all systems as per approved working drawings, specifications and bills of quantities to the satisfaction of the Engineer. Testing and commissioning shall be to Chartered Institution of Building Services Engineer Commissioning Codes 1 Sum 0.00
b) Prepare and submit working and record (as-installed) drawings to easily readable scale, A1 or A0 paper size format as follows; i) general arrangement drawings of all equipment, plant etc. ii) routes - types and sizes and arrangement of all pipework iii) wiring(electrical & control) details iv) any other details as per specifications Drawings are to be submitted in soft copy (AutoCAD format) & hard copy to the client, the Architect and the Engineer. All drawings shall be submitted to the satisfaction of the Engineer. 1 Sum 0.00
c) Prepare & submit draft and three final copies of operation & instruction manuals to Engineer's approval 1 Sum 0.00
TOTAL FOR MECHANICAL INSTALLATION CARRIED TO GRAND SUMMARY 0.00
B SANITARY , DRAINAGE AND WATER
NOTE: TRADE NAMES
Where Trade Names are mentioned below, it is intended to indicate the level of quality required. The tenderer MAY supply alternatives which must be approved in writing by the Engineer/Architect.
This BOQ shall be read in conjunction with mechanical technical specifications general and particular method of measurements, the mechanical drawings except where otherwise indicated. The unit price for all items in all sections shall include for supplying, installation and commissioning unless otherwise specially mentioned.
Contractor must check site condition including all installed first fix, sleeves structural opening in concrete works, any modifications or alternations would be considered included in contractor price or priced in this item contractor shall not be entitled for any extra cost for opening in structural walls or slabs.
1 SITE WATER SUPPLY PIPING SYSTEM
a PPR Piping System (DN 25) – Supply, install, test, and commission PPR pipe DN 25 mm (1 inch), PN20 rating, including all fittings (elbows, tees, couplings), heat fusion joints, wall/floor penetrations, pipe supports at 1.2 m intervals, and hydraulic pressure test to 4 bar for 1 hour. Complete from GRP tank outlet to elevated tank inlet. the standard requirement at the expense of the contractor. lm 20.00 0.00
b Elevated Water Tank (500 Liters) – Supply, install, and commission one food-grade polyethylene elevated water tank, nominal capacity 500 liters, conforming to ISO 4422. Include galvanized steel support frame anchored to wall/column, float valve or level sensor (adjustable high/low setpoints), overflow pipe (DN 25) with screen, drain plug, lockable lid, outlet strainer (1 mm mesh), and DN 20 gate valve for isolation. Mounting height: 2 m above handwashing faucet. № 1.00 0.00
c Transfer Pump set(dual pump) (GRP to EWT) – Supply, install, test, and commission one centrifugal electric transfer pump, minimum flow 20 L/min, minimum total dynamic head 4 m, motor rating 0.135 hp (100 W), 230 V / 50 Hz / single-phase. Include built-in thermal overload protector, isolation valve, non-return valve on discharge, suction strainer, corrosion-resistant casing (bronze/stainless steel/engineered plastic), and dry-run protection. № 1.00 0.00
d Level Sensor and Control Panel – Supply, install, and commission one automatic pump control system comprising: ultrasonic or float switch level sensor (IP68, dry contact output, adjustable high/low setpoints) installed in elevated tank; and control panel (IP54) with magnetic contactor with overload protection, Hand-Off-Auto selector switch, indicator lights (Power ON, Pump Running, High Level, Low Level). Complete with all interconnecting wiring conforming to IEC 60364. Set 1.00 0.00
TOTAL FOR SITE WATER SUPPLY PIPING SYSTEM CARRIED TO GRAND SUMMARY 0.00
2 WASTE WATER DRAINAGE SYSTEMS
The rates for drainage ditches shall include full compensation for excavation, disposal of excavated material, preparation of subgrade, supply and placement of concrete (minimum 25 MPa compressive strength at 28 days) or masonry as specified, forming of trapezoidal or rectangular cross-section, installation of galvanized steel gratings where shown, construction of catch pits with debris screens, joint sealing, curing, and finishing to achieve Manning’s roughness coefficient n = 0.017 for concrete ditches and n = 0.025 for masonry ditches. The rate shall also include all formwork, reinforcement where required, and any necessary erosion protection measures at outlets. The unit rate is per linear meter of completed ditch of the cross-sectional dimensions indicated. No separate payment shall be made for excavation, backfill, or disposal.
a Pit Latrine Ventilation Pipe (DN 100) – Supply, install, and commission one uPVC ventilation pipe, DN 100 mm (4 inch), conforming to ISO 1452-1, including: pipe extending from 300 mm above pit floor to 1.0 m above highest roof peak, solvent welded joints, galvanized brackets at 2 m maximum intervals, weatherproof cowl (turbo vent or 180° bend with bird screen), stainless steel insect mesh (12 mm aperture) at top, and fly-proof mesh (2 mm aperture) at pit entry. № 2.00 0.00
b Handwashing Station (Standard) – Supply, install, and commission one handwashing station comprising: concrete basin (Type 304, 400×300×150 mm), eight (8)(four (4) on each side) lever-operated chrome-plated brass tap, two liquid soap dispenser (500 mL), supply piping PPR and uPVC drainage piping to soak away pit. set 1.00 0.00
c Soak Pit – Supply, excavate, construct, and commission one soak pit for handwashing station drainage, including excavation, stone/gravel filling, perforated pipe inlet, geotextile fabric lining, and covered top with inspection port. Dimensions as per standard design. set 1.00 0.00
d Waste Water Septictank Supply and apply a complete waterproofing system, Waste Water Septictank to pit latrine structure including brick protection wall as follows: (1) Surface preparation: clean, dry, and prime concrete pit walls; (2) Waterproofing coating: apply bituminous emulsion or acrylic waterproof coating (minimum 2 coats) to external concrete pit walls from base to 500 mm above ground level, conforming to ASTM D1227; (3) Cementitious top seal: apply cementitious crystalline waterproofing slurry (minimum 3 mm thickness) to top 500 mm of pit lining (interior and exterior surfaces); (4) Joint sealant: apply flexible polyurethane sealant at all construction joints and pipe penetrations; (5) Brick protection wall: construct half-brick thick (115 mm) masonry wall against external waterproofed surface from pit base to 500 mm above ground level using common burnt clay bricks (minimum class 7.5 MPa) laid in cement mortar (1:4 mix) to act as sacrificial protective layer preventing backfill damage to waterproof membrane; (6) Damp Proof Course (DPC): install 300 mm wide polyethylene DPC membrane between brick protection wall and backfill material at top 500 mm zone; (7) Backfill interface: backfill shall be placed carefully against brick wall, not directly against waterproofing. Unit rate includes all materials, labor, application, brick wall construction, testing, and commissioning for a complete watertight installation. Conforms to manufacturer's specifications and BS 8102.Please note that the waterproofing system shall be applied only after the concrete pit has cured for a minimum of 7 days. All surfaces shall be clean, dry, and free from dust, oil, or loose material before application. The contractor shall conduct a water spray test after completion to verify no water ingress occurs at the top sealed zone. Any leaks detected shall be repaired at no additional cost. m2 50.00 0.00
e Rainwater Downpipe DN 100 (Market Block) – Supply, install, test, and commission one uPVC rainwater downpipe, DN 100 mm nominal diameter, conforming to ISO 1452-1 or AS/NZS 1260, minimum wall thickness 2.5 mm. Include stainless steel leaf guard (5 mm mesh) at roof inlet, galvanized pipe brackets (vertical spacing 1.8 m maximum, horizontal spacing 1.0 m maximum), UV-reflective light-colored oil paint coating (white/light grey) conforming to ISO 4892-2 on all exposed sections, and discharge splash block at base. Complete from roof outlet to ditch/splash block. ml 110.00 0.00
f Rainwater Downpipe DN 80 (Toilet Block) – Supply, install, test, and commission one uPVC rainwater downpipe, DN 80 mm nominal diameter, conforming to ISO 1452-1 or AS/NZS 1260, minimum wall thickness 2.0 mm. Include stainless steel leaf guard (5 mm mesh) at roof inlet, galvanized pipe brackets (vertical spacing 1.8 m maximum, horizontal spacing 1.0 m maximum), UV-reflective light-colored oil paint coating (white/light grey) conforming to ISO 4892-2 on all exposed sections, and discharge splash block at base. Complete from roof outlet to ditch/splash block. ml 10.00 0.00
g Rainwater Downpipe DN 80 (Guard House) – Supply, install, test, and commission one uPVC rainwater downpipe, DN 80 mm nominal diameter, conforming to ISO 1452-1 or AS/NZS 1260, minimum wall thickness 2.0 mm. Include stainless steel leaf guard (5 mm mesh) at roof inlet, galvanized pipe brackets (vertical spacing 1.8 m maximum, horizontal spacing 1.0 m maximum), UV-reflective light-colored oil paint coating (white/light grey) conforming to ISO 4892-2 on all exposed sections, and discharge splash block at base. Complete from roof outlet to ditch/splash block. ml 10.00 0.00
h Drainage Ditch – Supply, excavate, construct, and commission reinforced concrete drainage ditch, rectangular cross-section, with different internal dimensions, concrete grade minimum 25 MPa, smooth finish achieving Manning’s n = 0.017, including excavation to required depth, disposal of surplus material, formwork, reinforcement, joints (with waterstop where ), and curing.. Provide a minimum slope of 1% or follow the natural ground slope which ever is greater ml 90.00 0.00
i SIZE[mmXmm] = 450 X 300 ml 220.00 0.00
j SIZE[mmXmm] = 350 X 250 ml 280.00 0.00
k Catch Pit with Debris Screen(manhole) – Supply, excavate, construct, and commission one catch pit at ditch junctions or before discharge points, including reinforced concrete construction, minimum 600×600×900 mm deep, heavy duty removable cast iron grating cover, stainless steel debris screen (12 mm mesh), inlet and outlet connections to adjoining ditches, and concrete base. № 5.00 0.00
l Heavy duty cast iron or galvanized steel or concrete Ditch Cover (Pedestrian Crossing) – Supply and install one heavy duty cast iron or concrete cover for the ditch at pedestrian and vehicle crossing, including frame and cover, designed for pedestrian loading (minimum 5 kN/m²), hot-dip galvanised finish(if galvanized used), sized to match the ditch opening. № 4.00 0.00
m Supply and install uPVC DN 160 mm PN10 pipe conforming to ISO 1452-1 / EN 1452-2 inside the open ditch from roof downpipes to the underground RC rainwater harvesting tank, including all necessary fittings (bends, couplings, tees), galvanized steel supports or concrete anchor blocks at maximum 3.0 m spacing, one non-return valve (check valve) at tank inlet, one sediment trap with 5 mm stainless steel debris screen upstream of tank, and UV-protective coating (ISO 4892-2) for all exposed sections. Installation shall maintain minimum 0.5% gravity gradient. Jointing shall be by solvent cement welding or rubber ring push-fit sockets per manufacturer's specifications. Testing shall be by 24-hour water flow test with no visible leakage or ponding. Unit rate includes all materials, labor, testing, and commissioning but excludes ditch constructio lm 55.00 0.00
n Piping system for underground RC tank: overflow (uPVC DN 100 PN10), rainwater inlet (uPVC DN 160 PN10), washout (uPVC DN 100 PN10 with isolating valve and extended operating rod), including all fittings, supports, watertight tank connections, testing, and commissioning. Conforms to ISO 1452-1 / EN 1452-2. set 1.00 0.00
o Water Harvest Tank Ditto item No 2.d but for the under ground rain water harvest tank (5 x 5 x 2 [m]) m2 95.00 0.00
p Allow for Testing and commissioning of the entire plumbing installation by a Chartered Mechanical Engineer and obtaining a Test Certificate (3rd party testing to approval of the Engineer) including all off-site and factory testing; inspections to demonstrate compliance with relevant standards, operating the completed installation and submitting all relevant test records and authority approval. LS 1 0.00
q All sanitary fittings supplied shall be provided with a minimum 5 year warranty, issued jointly and severally by the local supplier and the manufacturer. LS 1 0.00
r Allow for preparation of Operationa and Maintenance Manual including site users training for the O & M Maual of all plumbing and mechanical appliances. LS 1 0.00
s Supply and installation of Dry Latrine Squatting Pan – Ordinary Type Heavy-duty vitreous china or FRP pan, no water seal, shallow profile with anti-splash lip, drop hole min. 180mm. Includes fixing to concrete slab. No water supply connection. № 2
t Supply and installation of Dry Latrine Squatting Pan – PWD Type Accessible design for persons with disabilities. Heavy-duty FRP or china with raised footrests, pan rim height ≤200mm from floor. Includes stainless steel grab bars (wall-mounted, vertical & horizontal). Drop hole min. 200mm. No water supply connection. № 1
u Supply and installation of Shower Water Drain Intake to Pit Floor-mounted grating (stainless steel/HD plastic, min. 150mm diameter) with debris trap. Includes vertical drop pipe (PVC, 75mm min. diameter) from floor through pit cover slab into pit void. No trap, no water seal. No connection to pressurized water supply. № 1
TOTAL FOR WASTE WATER DRAINAGE SYSTEMS CARRIED TO GRAND SUMMARY 0.00
ITEM DESCRIPTION
A MECHANICAL INSTALLATION 0.00
B SITE WATER SUPPLY PIPING SYSTEM 0.00
C WASTE WATER DRAINAGE SYSTEMS 0.00
TOTAL TO SUMMARY 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
BILL NO.4 ELECTRICAL INSTALLATION
4 ELECTRICAL INSTALLATIONS
The Bill of Quantities, Specifications, Drawings and all other Contract documents are complementary to each other. It is the responsibility of the Contractor to check the locations and quantities of the materials and equipment to be executed in accordance with the drawings. The unit rate of the materials and equipment shall be based on the Specification, all components as required and specified under each item concerned in the Specifications, Drawings, and all other Contract documents.
5.1.1 Low Voltage Switchboard
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Normal / Standby Switchboards:
5.1.1 18 way TP/N - flush mounted distribution board DB 'S.CST.0 (E )' complete with 4X63A TP/N MCB main incomer and all MCB , as shown on schematic wiring Un 1
5.1.2 63A Load transfer switch (L.T.S), as shown on schematic wiring Un 1
5.1.3 18 way TP/N - flush mounted distribution board DB 'S.CST.1 (E )' complete with 4X40A TP/N MCB main incomer and all MCB , as shown on schematic wiring Un 1
5.1.4 12 way TP/N - flush mounted distribution board DB 'S.PR.0 (E )' IP65 complete with 4X20A TP/N MCB main incomer and all MCB , as shown on schematic wiring Un 1
5.1.5 4P-25 A (IP65) - flush mounted Fire PumpPump Isolator complete with all accessories , as shown on drawings Un 1
5.1.6 2P-10 A (IP65) - flush mounted Domestic Pump Isolator complete with allaccessories , as shown on drawings Un 1
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories including conduits and manholes as specified in schedules of equipment, detailed drawings and specs:
LV Distribution Cables including burid PVC ducting and all accessories as indicated in the drawings
5.2.1 - 4X16+16 Emm² Cu/ XLPE/ PVC (plain annealed stranded copper conductors, connecting Load transfer switch to switchboard to S.CST.0 ml 1
5.2.2 - 4X4+4 Emm² Cu/ XLPE/ SWA/PVC (plain annealed stranded copper conductors , connecting PR.0 to S.CST.0 ml 19
5.2.3 - 4X10+10Emm² Cu/ XLPE/ SWA/PVC connecting switchboardS.CST.1 to S.CST.0 ml 25
5.2.4 - Fire rated inside metallic conduit 4X4+4 Emm² Cu/ XLPE/ SWA/LSZH (plain annealed stranded copper conductors wrapped in mica glass fire-barrier tape, cross-linked polyethylene (XLPE) insulation, galvanized steel wire armor (SWA), and a low smoke zero halogen (LSZH/LSHF) outer sheath)connecting switchboardS.Fire pump to S.CST.0 ml 20
5.2.5 - 2X1.5+1.5 Emm² Cu/ XLPE/ SWA/PVC (plain annealed stranded copper conductors , connecting Domestic pump to PR.0 ml 8
Supply and installation of class SN8 conduit in accordance with the conditions defined in the in written pieces, specification, drawings and 100 mm diameter regid conduit buried in the ground
5.2.6.1 - PEAD Ø 110 mm for grid connection ml 5
5.2.6.2 - PEAD Ø 110 mm for lLV cables connecting panels S.ST.1 , Fire Pump, and S.PR.0 connection ml 55
5.2.7.1 - Low Voltage manhole chambers, with internal measures of 1000 x 1000 x 1000 (W*L*H), with RC cover thickness not less than 100 mm, as per drawing details Un 8
5.2.7.2 - Fire alarm cable manhole chambers, with internal measures of 1000 x 1000 x 1000 (W*L*H), with RC cover thickness not less than 100 mm, as per drawing details Un 4
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Indoor Lighting:
5.3.1 Luminaire fix to the ceiling (Downlight) LED 80W, IP65( L1) Un 98
5.3.2 Luminaire fix to the ceiling (Downlight) LED 30W, IP44(L2) Un 4
5.3.3 Luminaire fix to the ceiling LED15W, IP44 (L3) Un 12
5.3.4 Luminaire fix to the ceiling LED30W, IP44 (L4) Un 2
5.3.5 Luminaire fix to the ceiling LED30W, IP65 (L4) Un 3
5.3.6 POLE MOUNTED 2 Days SOLAR SYSTEM LIGHTING FIXTURE WITH 80W LED IP66/1K07. COMPLETE WITH SOLAR PANEL BATTERIES e,t,c AND 10 M HOT-DIP GALVANIZED STEEL WITH THICKNESS NOT LESS THAN 4MM FIXED ON CONCRET BASE Type L9 Un 16
5.3.7 Luminaire fix to the wall 2 Days Solar SystemLIGHTING FIXTURE WITH 80W LED IP66/1K07. COMPLETE WITH SOLAR PANEL BATTERIES e,t,c (L11) Un 5
Lighting Switches
5.3.8 - One way switch, recessed mounting Un 4
5.3.9 - Double pole switch, recessed mounting Un 6
5.3.10 Three pole switch, recessed mounting Un 8
5.3.11 Three pole switch, recessed mounting(IP65) Un 1
5.3.12 - Two Way Double pole switch, recessed mounting Un 2
LIGHTING Outlet
Supplying, installing, connecting and testing lighting outlets including conduit, conduitor fittings, boxes,wiring, cabling, earthing, accessories and all necessary works and materials required for complete installation back to panel boards as specified and as indicated on the drawings for the following items :
5.3.13 copper wire Cu/ XLPE/ PVC(2x1.5+1.5E sqmm) Cu/ XLPE/ PVC in 20mm minimum pvc conduit No. 71
5.3.14 copper wire Cu/ XLPE/ PVC(2x2.5+2.5E sqmm) in 20mm minimum pvc conduit No. 48
5.3.15 copper wire Cu/ XLPE/ PVC(2x1.5+1.5E sqmm) in 20mm minimum pvc conduit for emergency and safety lighting No. 23
Emergency / Safety Lighting
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Indoor Lighting:
5.3.16 - S1 - maintained (60min Autonomy) Un 19
5.3.17 - Maintained type Exit signe(3 Hours) Un 4
5.4 General Purpose Power Socket
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Double Flush and Surface Mounting Devices - Normal/Standby Supply:
5.4.1 - Flush Mounting Earthed Socket (BS546 ) - with cover 16A IP44 Un 16
5.4.2 - Flush Mounting Earthed Socket (BS546) - 16A Un 8
5.4.3 - Flush Mounting Earthed Socket (BS Type) - with cover 16A IP65 Un 2
Supplying, installing, connecting and testing electric outlets Including conduit or three compartment perimeter trunking which shall be designed to provide a solution to the segregation and access of power, data and communication cable trunk, r trunk accessories, conduit or trunk accessories, cabling, boxes terminations, earthing and all necessary ancillary works and materials required for complete installation as specified and as indicated on the drawings for the following items :
5.4.4 Sockets outlet ,240V by copper wire 3X2.5 mm2 Cu/ XLPE/ PVC in 20 mm pvc conduit. No. 26
5.4.5 Ditto but outlet by copper wires 3X1.5 mm2 Cu/ XLPE/ PVC in 20 mm pvc conduit Ceiling Fans No. 2
5.4.6 Ditto but outlet by copper wires 3X4 mm2 Cu/ XLPE/ PVC in 20 mm pvc conduit for Air conditioners No. 2
5.4.7 Ditto but outlet by copper wires 3X1.5 mm2 for Tools room exhaust fan Cu/ XLPE/ PVC in 20 mm pvc conduit No. 1
5.4.8 Power Outlets with fire rated cables(2X1.5mm² Cu/ XLPE/ LSZH , in galvanized steel coduit for fir alarm panel and repeater No. 2
5.5 Earthing System
5.5.1 Supplying, installing connecting and testing a complete protective earthing system including earthing pits, earthing electrodes, equalizer bars, earth continuity conductor, earthing conductor to switchboards, diesel generator set and transformers and all low voltage systems ...etc complete with all accessories, fixings, brackets test links, suspensions, drilling and cutting to form a complete installation as specified and as indicated on the earthing schematic drawings (Note: In the end It should be guaranteed, the achievement of a protective earth value less than a 1 Ohm (Regime TN-S)) LS 1
5.6 Lightening Protection Systeme
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
5.6.1 - Interseption rod installed on pole NO 6
5.6.2 - Detail C - Mechanical connector (connection to source earth) NO 12
5.6.3 - Main Earthing Terminal NO 12
5.6.4 - Source earth with 20mm Diameter made of copper NO 12
5.6.5 - Downward conductor 50 mm2 bar copper with connection terminal +Manhole / 400x400x500mm - ml 450
5.7 Fire Detection System
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories include 24 hours operation batteries as specified in schedules of equipment, detailed drawings and specs. All components of the fire alarm system shall be fire resistant (conduits, pullboxes…)
5.7.1 - Self contained , 4 loops Fire control panel, addressable pcs 1
5.7.2 - control panel, repeator pcs 1
Fire Detection Devices:
5.7.3 - Manual break glass points with protective cover pcs 5
5.7.4 - Optical smoke detector including detector base pcs 53
5.7.5 - Evacuation speaker pcs 7
5.7.6 Ditto but Water Proof pcs 2
5.7.7 Visual Alarm pcs 5
5.7.8 Ditto but Water Proof pcs 4
Electrical fire rated cables:
Enclosed in a recessed or surface mettalic conduiting include , all needed fire rated accessories :
5.7.9 - JE-H(st)H minimum 2x2x1mm² (The size to be determn according to system design), connecting repeator to control panel ml 448
5.7.10 - JE-H(st)H minimum 2x2x1mm² (The size to be determn according to system design), connecting Detectors to control panel and repeator ml 164
5.8 - Engineering, System Programming, including System Testing, Commissioning and Training. L.S 1
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
\ DESCRIPTION QUANTITY UNIT RATE AMOUNT
BILL NO.5 SCHEDULE OF RATES - GENERAL (NOTE: IT IS MANDATORY FOR BIDDERS TO COMPLETE THIS SECTION)
Note: The rates provided in this section will ONLY be used to value variation items whose rates are not provided in the measured work bills.
a Site Clearance m2 0.00
b Cutting, clearing and dumping away all shrubs, debris and unnecessary materials. m2 0.00
c Cutting of trees not exceeding 450mm girth including removing from site as directed nr 0.00
d Cutting of trees exceeding 450mm but not exceeding 600mm girth ditto nr 0.00
e Cutting of trees exceeding 600mm but not exceeding 900mm girth ditto nr 0.00
f Cutting of trees exceeding 900mm but not exceeding 1200mm girth ditto nr 0.00
g Cutting of trees exceeding 1200mm girth ditto nr 0.00
h Removing stumps of trees not exceeding 600mm girth and carting away debris nr 0.00
j Removing stumps of trees exceeding 600mm but not exceeding 1200mm girth ditto nr 0.00
k Removing stumps of trees exceeding 1200mm girth ditto nr 0.00
l Excavate the unconsolidated top soil to an average depth of 150mm m2 0.00
m Cutting of surface rock outcrops and removing debris from site m2 0.00
n Backfill to make up levels m3 0.00
p "Premise 200CC" insecticide treatment to surfaces of excavations applied as per manufacturer's instruction with a 10 year guarantee m2 0.00
q "Gladiator TC"(organophosphates chlorpyrifos)-covers 8SM per litre m2 0.00
r "Termidor" anti-termite with a coverage of 20m2 per litre m2 0.00
2 FOUNDATION EXCAVATION 0.00
a Excavate on normal soil to a depth of 1500mm from ground level m3 0.00
b Excavate on normal soil to a depth of 3000mm from ground level m3 0.00
c Excavate on normal soil to a depth of 4500mm from ground level m3 0.00
d Extra-over for excavating in rock class I m3 0.00
e Extra-over for excavating in rock class II m3 0.00
f Extra-over for excavating in rock class III m3 0.00
g Extra-over for excavating in clay soil m3 0.00
3 FOUNDATION WALLING 0.00
a 400mm thick rubble stone foundation walling bedded and jointed in cement and sand (1:3)mortar m2 0.00
b 200mm thick natural stone foundation walling bedded and jointed in cement and sand (1:3)mortar m2 0.00
4 CONCRETE WORK 0.00
a Provide all materials and cast insitu plain concrete class 15/20 (1:3:6) blinding under foundation m3 0.00
b Provide all materials and cast insitu plain concrete class 20/20 (1:2:4); vibrated m3 0.00
c Provide all materials and cast insitu plain concrete class 25/20 (1:11/2:3); vibrated m3 0.00
Sawn formwork to insitu concrete as described:- 0.00
d To sides of ring beams m2 0.00
e To soffits of suspended slabs m2 0.00
f To sides of columns m2 0.00
Extra over formwork for:- 0.00
g Fair face finish m2 0.00
a Provide materials and construct 100mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
b Provide materials and construct 150mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
c Provide materials and construct 200mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
d Provide materials and construct 400mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with two strips of hoop iron after every four courses m2 0.00
e Provide materials and construct 200mm thick hollow concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
f Provide materials and construct 100mm thick machine cut stone walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
g Provide materials and construct 150mm thick machine cut stone walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
h Provide materials and construct 200mm thick machine cut stone walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
6 ROOF CONSTRUCTION, COVERING AND RAIN WATER GOODS 0.00
a Supply and fix gauge 26 IT5 roofing sheets m2 0.00
b Approved concrete roofing tiles on 50x25mm soft wood battens at 200 centres m2 0.00
c Galvanized iron plain sheet 26 gauge m2 0.00
Approved pressure impregnated and treated hardwood steel 0.00
d 150x50mm section Steel members m 0.00
e 100x50mm section Steel members m 0.00
f 75x50mm section Steel members m 0.00
g 50x50mm section -Steel members m 0.00
h Provide and fix fascia board 250x25mm section fixed to the beams m 0.00
Approved pressure impregnated and treated softwood steel 0.00
j 150x50mm section Steel members m 0.00
k 100x50mm section Steel members m 0.00
l 75x50mm section Steel members m 0.00
n Provide and fix fascia board 250x25mm section fixed to the beams m 0.00
p Provide and fix 150x150mm box gutter fixed to fascia board with/and including brackets at rafter center and two coat of oil paint. The slopes to be considered according to the drawings m 0.00
q Supply and fix premanufactured 150x100mm PVC rain water gutter fixed to fascia board with mild steel brackets at 1200mm centres m 0.00
r Approve concrete roofing tiles on 50x25mm soft wood battens at 200 centres m2 0.00
7 WALL FINISHES 0.00
a Plaster with 18mm thick mortar on walls and beams, both inside and outside: Walls to be cured at least for one week after 24 hours of plastering. Contractor to allow for scaffolding and all necessary tools in his rate m2 0.00
b Plaster with 12mm thick mortar on walls and beams, both inside and outside: Walls to be cured at least for one week after 24 hours of plastering. Contractor to allow for scaffolding and all necessary tools in his rate m2 0.00
c Supply and apply two coats of white wash on all plastered surfaces with uniforms colours. Contractor to allow for scaffolding and all necessary tools in his rate m2 0.00
d Supply and fix ceramic wall tiles size 200x150x6mm thick m2 0.00
8 FLOOR FINISHES 0.00
Cement and sand screed 0.00
a 25mm thick insitu cement and sand (1:3) screeded beds, with steel trowelled finish , on concrete m2 0.00
Ceramic floor tiles 0.00
b Supply and fix ceramic floor tiles m2 0.00
c 100mm high ceramic tiles skirting m 0.00
Concrete Tiles 0.00
d Provide and install 50x50x5cm precast concrete tiles around the building 1m width as shown in the drawings m2 0.00
Epoxy paint 0.00
e Supply and apply epoxy industrial floor paint to all cement finished floors m2 0.00
Granolithic paving 0.00
f 38 mm thick (24mm cement and sand backing & 15mm thick granolithic layer) m2 0.00
g 20 x 100 mm Skirting m 0.00
Terrazzo Paving 0.00
h 38 mm thick (24mm cement and sand backing & 15mm thick terrazzo layer) m2 0.00
j 20 x 100 mm Skirting m 0.00
Plastic dividing strips. 0.00
k 32 x 3 mm thick plastic dividing strips. m 0.00
l Aluminum ditto m 0.00
m 25 mm wide non slip carborundum m 0.00
Precast Paving slabs
n) 600x600x50mm thick precast concrete paving slabs (standard) jointed in cement and sand mortar and laid on 50mm thick sand bed (Sample of paving slab to be provided by the Contractor for approval by the site Engineer). m2 0.00
Precast interlocking Paving slabs
o) Precast interlocking concrete paving slabs (standard) jointed in cement and sand mortar and laid on 50mm thick sand bed (m.s) (Sample of paving slab to be provided by the Contractor for approval by the site Engineer). m2 0.00
9 CEILING FINISHES 0.00
Acoustic Ceiling 0.00
a Tiles system suspended ceilings; 600 x 600 x 15 mm thick fissured mineral fibre tiles; jointed as per the manufacturer's instructions including suspending on 14 gauge pre-straightened galvanized annealed iron wire hungers at 2100 mm centers; rate to include steel brandering m2 0.00
Gypsum Board Ceiling 0.00
b Supply of materials and installation of gypsum board ceiling complete with steel brandering m2 0.00
Chipboard Ceiling 0.00
c 12mm thick chipboard ceiling fixed to and including 50x50mm cypress branderings at 600mm c/c both ways, with clout headed nails and set out in symmetrical panels with 'V' joints m2 0.00
Plywood Ceiling 0.00
d 8mm thick plywood ceiling (8'x4') boards on and including 50 x 50 mm softwood brandering m2 0.00
e Ex 75x50mm softwood molded steel cornice m 0.00
10 PAINTING 0.00
Prepare and apply three coats plastic emulsion paint to:- 0.00
a Plastered surfaces m2 0.00
Prepare and apply two coats gloss oil paint to:- 0.00
b Plastered surfaces m2 0.00
Aluminum primer or other equal and approved wood primer before fixing: - 0.00
c Backs of frame, board, etc over 100mm but not exceeding 200mm girth m 0.00
Prepare and apply three coats polyurethane clear matt varnish on woodwork internally 0.00
d General surfaces of flush doors and frames m2 0.00
Prepare and apply three coats permaplast weather proof paint to:- 0.00
e Walling and concrete ; external m2 0.00
a Mild steel grill door overall size 900x2100mm high made out of 40x80x4mm thick RHS framing, two equal door leafs each made out of 40x40x6mm mild steel plate frames, 12mm solid square bars welded to frame at equal 150mm centres at 450 angle both ways; including fixing frame to walling/concrete and complete with heavy duty hinges Nr. 0.00
b Supply and fix 30" mahogany veneered steel flush door size 900x2100mm high with hardwood lipping all round Nr. 0.00
c Door size 800x2100mm high Nr. 0.00
Wrot mahogany 0.00
Framed frames and framings 0.00
d 150 x 50 mm; 2 No. labours; plugged door frame m 0.00
e 50 x 15 mm architrave m 0.00
f 15x15mm quadrant beading m 0.00
Iron mongery 0.00
g Supply and fix three lever mortise lock complete with set lever handle furniture - fixed to steel doors Nr. 0.00
h 100mm steel butt hinges prs 0.00
j 900x100mm high standard Aluminum kicking plate Nr 0.00
k Four lever mortise lock complete with set lever handle furniture - fixed to steel doors Nr. 0.00
12 WINDOWS 0.00
Aluminum Windows 0.00
a Supply and fix 1500x1000mm high bronze anodized aluminium windows as per the specifications, with aluminium woven mesh fly screen in aluminium frame, and all necessary hardware and accessories. Nr 0.00
Steel Grill Windows 0.00
b Supply and fix steel grill window size 1500x1000mm high made out of 40x40x4mm SHS framing; 12mm solid square bars welded to frame at equal 150mm centers at 450 angles including fixing to approval Nr 0.00
Steel Casement Windows 0.00
c Supply and fix steel casement windows size 1200x1200mm in standard 'T' sections complete with closers, hinges, stays and all other necessary iron mongery Nr 0.00
d Supply and fix steel casement windows size 600x600mm in standard 'T' sections complete with closers, hinges, stays and all other necessary iron mongery Nr 0.00
e 5mm thick clear sheet glass and glazing to aluminium frames m2 0.00
f 5mm thick obscured sheet glass and glazing to aluminium frames m2 0.00
Adjustable Aluminum Louvre frames 0.00
g 8No. 100 mm blades (per set of blade ) Nr 0.00
h Ditto for 150 mm ( per set of blade ) Nr 0.00
Curtain fittings 0.00
j 35 mm diameter chrome plated curtain rod m 0.00
Pelmet boxes in wrot cypress 0.00
k End stops nr 0.00
l 150 X 25 mm pelmet top m 0.00
m 100 x 25 mm pelmet fascia m 0.00
Window Sills 0.00
n 500mm x 100mm precast concrete window sill pointed in cement and sand (1:3) mortar m 0.00
Window Blinds 0.00
p Supply and install vertical blinds to windows m2 0.00
Window Stay 0.00
q Supply and fixing of brass window stays approved from samples Nr 0.00
Window Handles 0.00
r Supply and fixing of brass window handles approved from samples Nr 0.00
13 DEMOLITION 0.00
a Demolition of single-storey masonry block/building including breaking the ground slab and the foundation , cleaning the site and making good the site for new construction, sort out arising materials as directed and removing all debris from site m2 0.00
b Demolition of multi-storey masonry block/building including breaking the ground slab and the foundation , cleaning the site and making good the site for new construction, sort out arising materials as directed and removing all debris from site m2 0.00
c Demolition of parts masonry wall, including any concrete beams and columns, make good the affected surfaces, sort out arising materials as directed and removing all debris from site m2 0.00
d Hack out the existing floor finish including the skirting and prepare floor surfaces to receive new floor; remove all debris from site m2 0.00
e Hack out the existing wall plaster in and prepare surfaces to receive new wall plaster m2 0.00
f Hack out the existing wall paint and prepare surfaces to receive new wall paint m2 0.00
g Remove existing doors and windows(various sizes) including frames and all iron mongery, cost of setting aside re-usable material as directed, removing debris from site and making good all affected surfaces Nr. 0.00
h Carefully remove all complete toilet fittings, prepare the affected surfaces to receive new fittings. Nr. 0.00
i Carefully remove all complete sinks fittings, prepare the affected surfaces to receive new fittings. Nr. 0.00
j Carefully remove all existing roof covering, repair the affected roof structures to receive new roof covering,; remove all debris from site as directed by site engineer m2 0.00
13 WATER AND SANITATION 0.00
Supply and fix the following sanitary appliances complete with all the connections to services, waste, jointing to supply overflows and plugging and screwing to the floors. Where trade names are mensioned below, the reference is intended to be as a guide to the type of fitting. 0.00
Water Closet 0.00
a 600x500mm deep Anti Vandal stainless steel squat type WC pan cast in concrete floor slab; complete with cistern and all necessary accessories Nr 0.00
b White European toilet complete with trap, cistern and all necessary accessories Nr 0.00
Wash hand basin (WHB) 0.00
c Ceramic Wash Hand basin complete with pedestal and all necessary accessories Nr 0.00
Urinal Bowl 0.00
d Wall hung ceramic urinal complete with all accessories and fixtures Nr 0.00
e Anti-vandal type stainless steel mirror Nr 0.00
Shower panel 0.00
f Shower panel to detail constructed in one piece grade 304stainless steel with all exposed surfaces polished to a satin finish; complete with an anti vandal spray head Nr. 0.00
Dhobi sinks 0.00
g Supply materials and construct concrete dhobi sink overall size 900x550mm wide Nr. 0.00
j Approved anti- vandal water tap Nr 0.00
k Supply and installation of a steel grease trap with a flow rate of 30GPM complete with accessories Nr 0.00
l Supply and install PVC water tanks with a capacity of 2 m3 complete with all fittings Nr 0.00
m Supply and install fibre glass tanks with a capacity of 5 m3 complete with all fittings Nr 0.00
n Install 10,000m3 Bulk Water Storage Fibre Glass tank complete with accessories Nr 0.00
Supply and install G.I. Class "B" Pipes complete with Fittings
p 32mm Diameter Pipe Lm 0.00
q 25mm ditto Lm 0.00
r 20mm ditto Lm 0.00
s 15mm ditto Lm 0.00
Supply and install PN 20 PPRC conforming to the current European standards for PPR installations and to the Engineer's approval, pipes jointing shall be by polyfusion or use of electric coupling.
Rates must allow for all Metal/plastic threaded adaptors where required for the connection of sanitary fixtures, valves. sockets, sliding and fixed joints, support raceways, isolating sheaths, elastic materials, expansion arm and bends, crossovers etc.
t 50mm dia pipe Lm 0.00
u 32mm dia pipe Lm 0.00
v 25mm ditto Lm 0.00
PPR to GI Adoption pieces
w 32mm diameter high pressure approved pattern brass rising stem full way gate valve with wheel head and jointing to tubing as 'PEGLAR' or approved equivalent. Nr. 0.00
x 12mm diameter 300mm long Copper tubing bent as required including jointing to GMS pipe and fitting. Nr. 0.00
Supply and install uPVC soil system to BS4660 and BS4515and muPVC waste systems to BS 5255withscrewed and socketed joints to BS 21. solvent welded joints shall be as per the system's manufacturer's written instruction. Tenderer must allow in their pipe work prices for all the couplings, connectors, joints etc as required in the running lengths of the pipe work and also where necessary for fixing clips, holder bats plugged and screwed.
y 100mm diameter grey heavy duty high pressure pipes Lm 0.00
z 50mm diameter waste pipes ditto Lm 0.00
a1 Supplying materials and construction of Inspection Chamber (IC) 600x600mm using solid concrete blocks for walls and casting concrete for the manhole base with thickness not less than 150mm; including cement plastering for inside walls. Nr 0.00
b1 Provide a rate for emptying of septic tank and disposal of waste m3 0.00
14 ELECTRICAL SUPPLY , CONDITIONING AND FIRE FIGHTING INSTALLATIONS
Supply, fix and install wires 1.5mm for lighting and 2.5mm for sockets, distribution panel boards with necessary circuit breakers, testing and earthing boards, cables, sockets, switches, fans, and lighting fixtures as specified in the drawings. All the price of the below items must include the materials and installations cost
a Main Distribution Panel Board of 150 AMP. Nr 0.00
b Twin sockets (13amp) Nr 0.00
c Single socket (13amp) Nr 0.00
d Switched Spur Outlet 13A c/w neon indicator lamp for Water Heaters Nr 0.00
e switches one gang (5amp) one way Nr 0.00
f switches one way (5amp) two gang Nr 0.00
g switches one way (5amp) three gang Nr 0.00
h Fluorescent lamps 40w 4 feet (Twin Unit) Nr 0.00
j Fluorescent lamps 40w 4 feet (Twin Unit) c/w Emergency Maintained Fluorescent fitting. Nr 0.00
k Fluorescent lamps 40w 4 feet (Single Unit) 'Splash Proof Fitting' Nr 0.00
l Fluorescent lamps 40w 4 feet (Single Unit) 'Splash Proof' c/w Emergency Maintained Fluorescent fitting. Nr 0.00
m Watertight IP65 Double 'D' Light Fitting Nr 0.00
n 3 speed box fan with 20 inch blades Nr 0.00
p Fire Escape Illuminated Fire Exit (Running Man) Sign to BS 5499 Nr 0.00
q Smoke Detector - Battery Operated 85dB Sounder with Test Button to BS 5839 Nr 0.00
r Battery Operated heat detector Nr 0.00
s Intercom code outlet points Nr 0.00
t Internet points Nr 0.00
Supply and install Air Conditioning A/C split unit, with complete installation and fittings
u 9000 BTU Nr 0.00
v 12000 BTU Nr 0.00
w 18000 BTU Nr 0.00
x 24000 BTU Nr 0.00
y Supply and installation of a 50KVA generator including all necessary wiring and builder's work Nr 0.00
z Ditto but Supply and installation of a 30KVA generator Nr 0.00
a1 Ditto but Supply and installation of a 20KVA generator Nr 0.00
b1 Ditto but Supply and installation of a 10KVA generator Nr 0.00
c1 Supply and installation of 150mm diameter extractor fan complete with humidity stat Nr 0.00
Fire Horse Reel
d1 Supply and installation of 1"x30m fire horse reel complete with disk ,waterway ,swing arm ,nozzle ,one meter inlet hose ,valve and all other necessary accessories Nr 0.00
Supply and erect pre-cast concrete Fencing Posts-Cranked
a 100x100mm Nr 0.00
b 100x125mm Nr 0.00
c 125x125mm Nr 0.00
d 125x150mm Nr 0.00
Chain Link Fencing
e Supply and install 2400mm high x 14 gauge chain link fencing on and including 100x125 cranked precast concrete fencing posts on concrete bases m 0.00
f Supply and install 12 1/2 Gauge x 4 strands galvanized barbed wire nailed to steel or concrete posts (Measured Separately) m 0.00
Supply and install 12 1/2 Gauge galvanized steel razor wire complete with 1000mm high 50x50x6mm thick angle iron posts at 1500mm centers; bottom part of posts built in concrete block walling
g 300mm diameter (stretched) m 0.00
h 450mm diameter (stretched) m 0.00
j 600mm diameter (stretched) m 0.00
k Supply materials and construct boom gate overall 10950mm long comprising of 350mm diameter mild steel pipe 1400 mm high filled with mass concrete , embedded on the ground with concrete and painted with reflective white and yellow paint; 50mm diameter mild steel pipe painted with reflective white paint; 950x950x950mm steel box filled with lightweight concrete and painted with white reflective paint: All to the details provided and the Site Engineer's instructions nr 0.00
16 WATER PROOFING
a Supply and lay approved single layer bituminous waterproofing membrane on sealer coat and hot laid with melted oxidized bitumen by specialist, tucking into grooves including forming grooves in block work or concrete, all in accordance with the manufacturer's specifications (10 years guarantee to be given, measured net) m2 0.00
b Supply materials and apply two part acrylic modified cementitious coating mixed with cement screed laid to fall to manufacturer's specifications m2 0.00
16 steel BOARDS & PARTITIONS
Supply and fix the following:-
25 mm thick block board
a Plain m2 0.00
b Veneered one side with mahogany m2 0.00
c Veneered BOTH sides with mahogany m2 0.00
d 3mm thick sheet m2 0.00
12 mm thick celotex soft board
e Sheets m2 0.00
f 3mm thick mahogany m2 0.00
Chip boards 8' X 4'
g 9 mm thick Plain Chip board m2 0.00
h 12 mm thick ditto m2 0.00
Gypsum boards 8' X 4'
j 9 mm thick m2 0.00
k 12 mm thick m2 0.00
l 12 mm thick m2 0.00
m 18 mm thick m2 0.00
Styrofoam boards 4' X 4'
n 25mm thick size 1200x1200 m2 0.00
p 12.5mm thick size 1200x1200mm m2 0.00
25 mm wrot T & G boarding
q Fabricated from 100 X 25 mm prime grade cypress m2 0.00
r Ditto in cedar Ditto. m2 0.00
Polystyrene Thermal Insulation Boards
s Supply and install 2500x600x100mm thick interlocking polystyrene thermal insulation boards with compressive strength of 250-300kpa and a density of 30kg/m2 : Thermal conductivity to be 0.029 W/mK. The insulation boards should be installed as per the manufacturer's instructions and the Project Engineer's approval m2 0.00
The works shall consist of furnishing materials, construction,installation, and completion as directed by site engineer.
a Cordinate to construct and test a round water fountain, comprised of an external fountain of 5.6m diameter,40cm high and an inside circular of 2.6m diameter 60cm high . Concrete tilling works,stone works and electromechanical works and equipment are included in their respective items. price to include all items including cleaning. Sum 0.00
b Supply and install, spread and make good a minimum of 30cm agricultural soil in designated areas m2 0.00
c Supply and plant trees. Price includes digging a minimum of 1.5m deep holes for each tree for the following:
i) Plam tree , medjoul type not less than 2m high in good condition Nr 0.00
ii) Ditto but pensian trees Nr 0.00
iii) Ditto but vecus trees Nr 0.00
iv) Supply and plant washintonian trees Nr 0.00
v) Ditto but Lavnedar 3 year old Nr 0.00
vi Ditto but Rose 1 year old Nr 0.00
vii Ditto but cuctus 6 month year old Nr 0.00
viii) Cypress tree , not less than 0.5m high in good condition Nr 0.00
ix) Reasonable general rate for any other trees not included here but commonly use in human habitation areas, not less than 0.5m high in good condition Nr 0.00
d Supply and install Arturo turf grass. Price to include leveling of the agricultural soil and fertilizers and all necessary works to complete the job according to the prevailing weather condition. m2 0.00
e Allow for shifting of existing cover plants / live fence/flowers . The rate has to take care about watering and maintenance of plants for about 3 months or until completion of the contract. m2 0.00
f Allow for shifting of existing small trees at the location of proposed units. – The rate has to take care about watering and maintenance of plants for about 3 months or until completion of the contract Nr 0.00
TOTAL FOR SCHEDULE OF RATES BILL (NOTE: THIS TOTAL WILL NOT BE CARRIED TO GRAND SUMMARY) 0.00
United Nations Office for Project Services
Horn of Africa Multi-Country Office
CROPS STORAGE MODEL DESIGN
ENHANCING FOOD SECURITY AND RESILIENCE OF RURAL COMMUNITIES (EFSR) IN SUDAN
UNPRICED BILL OF QUANTITIES (BOQ)
NOTE: It is a MANDATORY requirement for bidders to complete and return this section
Failure to complete all sections of the BOQ may result in automatic disqualification of your bid.
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
Bill No. 01 General Requirements and Provision 0.00
Bill No. 02 Crops Storage Main Building 0.00
Bill No. 03 MECHANICAL INSTALLATION 0.00
Bill No. 04 ELECTRICAL INSTALLATION 0.00
SUB-TOTAL 1 0.00
LESS DISCOUNT (IF ANY)
GRAND TOTAL 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QTY UNIT RATE (KES) AMOUNT (KES)
BILL NO. 1 PRELIMINARIES
All the Bidders are requested to refer "Pricing Preamble and notes below" and works items of this Bills of Quantities shall be priced to fulfill the requirements there-in. Also see that no page or items are missing prior to pricing of this bill of quantities.
A list of typical general items are given below. However, the Bidder is requested to price only those items that may affect this Contract. Note
The Bidder is advised to visit the site of the proposed work, as it is his responsibility to ascertain the conditions governing access to the site, and external working space, storage area etc. Note
If no price has been stated against any item hereunder, the Contractor shall not be entitled to claim any money for such items even though he is obliged to execute the work or provide services described therein. Preliminary items priced by the Tenderer are deemed to include the cost of unpriced items. Note
The Bidder is advised to refer to the General Notes, Pricing Preambles, Drawings, Specifications, Conditions of Contract, Particular Conditions of Contract and other relevant documents prior to pricing of the following items. Note
The bidder is required to visit the site of the proposed work, as it is his responsibility to ascertain the conditions governing access to the site, the external working space, storage area and any other information he may find necessary before he can tender for the work. Note
Cost and expenses in connection with any other preliminary item which is not listed below, but is necessary for the due completion of works, is deemed to be included in the tender rates. Note
Mechanical plant and equipment which emits excessive noise, smoke, fumes, obnoxious gases etc., will not be allowed to be used in the Site, without the prior approval of the Engineer. Note
The contractor shall be responsible for any loss or damage to the works, existing structures, adjoining structures and unfixed materials. Note
The contractor shall try to locate the new units in a way to avoid cutting trees. If it is really needed to cut down any number of trees, allow for planting same number of trees – Contractor has to take care about watering and maintenance of plants for about 3 months or until completion of the contract. (Fill schedule of late) Note
The contractor shall be responsible for providing necessary lighting, watchmen, and other suitable security measures during construction until handing over. Note
The contractor will be required throughout the contract to maintain and keep from obstructing the existing way. Note
The Contractor shall be responsible for the provision of all materials, scaffolding, tools, plant, transport and workmen required for the works except in so far as may be stated otherwise herein and he shall allow for the provision of the foregoing except for such items specifically and only required for the use of nominated Sub-Contractors as described herein. Note
All such plant, tools and scaffolding shall comply with all regulations whether general or local in force throughout the period of the contract and shall be altered or adapted during the contract, as may be necessary to comply with any amendments in or additions to such regulations. Note
Contractor shall provide helmets, gloves, safety masks, dusk masks, eye goggles, boots etc. for the workmen. Note
Contractor shall provide safety boards, signs and safety ribbons Note
Contractor shall take special care for safety of the patients, staff and public during transportation of materials and implementation of the contract. Note
Plant, Material & Work Practices
No work in any trade shall be carried out in such a manner as to cause any damage and nuisance to adjacent owners or the public. Note
Mechanical plant and equipment which emits excessive noise, water, smoke, fumes, or obnoxious liquids, gases etc., will not be allowed to be used on the site. If the use of such machinery becomes necessary, the Contractor is expected to obtain prior approval. Note
The Engineer has the discretion as to when he deems it necessary for the Contractor to take precautions, maintain or repair any such plant and equipment or order their removal from the site. Note
Contractor shall provide specimens, samples and sample panels of material and testing of materials as appropriate and as directed by Engineer. Note
HORN of AFRICA MULTI-COUNTRY OFFICE (HAMCO): Sudan Office
BILL OF QUANTITIES
ITEM DESCRIPTION UNIT QTY UNIT RATE AMOUNT
1 General Requirements and Provision
a Fabricate supply and erect Project Sign boards as per the drawings No 1 0.00
b Mobilization, Establishing contractor's camps, supply equipment ,personnel, Lab, accommodation and construction plant on the site, L.S 1 0.00
c Demobilization, removal of site establishments of the contractor's organization, camps and reinstating the site to the existed conditions L.S 1 0.00
d As Built Drawings L.S 1 0.00
Total Sub-section Sum Carried to Summary
2 Site Clearance and Organization
a Clearing and removal of bushes, trees and debris and site surfacing M2 245 0.00
b Fencing and protection of site , site security and entrance control L.S 45 0.00
Total Sub-section Sum Carried to Summary
GRAND TOTAL 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QUANTITY UNIT RATE AMOUNT
BILL NO.3 Crops Storage Main Building
A SUBSTRUCTURE AND EARTHWORK
a) Excavation on land of any nature in order to obtain project levels, including loading and transport of surplus material to the dump, eventual bracing, pumping of the tributary water to the excavation, regularization of the bottom of the box and replacement of land whenever necessary, all executed in order to obtain the levels indicated in the design. 155 m3 0.00
b) Excavations of Raft Footing for Water tank & pump room to the depths of not less than 2.0 m as per the drawings or as directed by the Engineer 92 m3 0.00
c) Excavations of square Isolated Footing foundations to the depths of not less than 2.5 m as per the drawings or as directed by the Engineer 355 m3 0.00
d) Excavate and removal of soft material for ramps, landscaping and outside fence 72 m3 0.00
c) Return, fill in and ram selected excavated material around foundations trenches 239 m3 0.00
3 Disposal of Surplus spoils
d) Load and cart away surplus material from site to an approved dumping site 116 m3 0.00
4 Selected filling
e) Backfilling Beneath the Foundations compacted in layers not exceeding 150mm deep and well watered 71 m3 0.00
f) Ditto; Under water tank & pump room 46 m3 0.00
g) Backfilling inside the walls till the tileing elevation with a selected materilas in a compacted in layers not exceeding 150mm deep and well watered 1350 m3 0.00 150
h) Backfilling of filter materials of notless than 150 mm beanecth internal tiling and the external landscaping and entrance ramps as per the drwaings or as directed by the Engineer 900 m3 0.00
i Backfilling for landscaping and entrance ramps with a selected materilas in a compacted in layers not exceeding 150mm deep and well watered as per the drwaings or as directed by the Engineer 150 m3 0.00
4 Concrete work
The contractor should provide for approval the concrete mix design and the aggregates, cement and sand wihich will be used in the construction works.The minimum cement conetent will be 350 Kg of cement per cubic meter
Rates shall include the price of steel reinforcement, formwork, mixing, placing, curing and removal of formwork for all concrete and for all threading fillets etc. The rates shall include the sampling and testing at an approved labortary . All exposed concrete surfaces in columns, beams, slabs etc. must be fair face and of first class standard.
First class shuttering must be used and it must be approved by the Engineer before the reinforcement is placed in position and before the concrete is casted.
Plastered surfaces are to be roughened to receive plaster cement and should be used for all types of concrete
Plain concrete class 15 (mix 1:3:6)
a) 100mm Thick surface blinding under strip footings 142 m2 0.00
b) Ditto; under external & internal tiles 1500 m2 0.00
c) Ditto; for latines seats and slabs 25 m2 0.00
d) Ditto; for water tank & pump room 46 m2 0.00
Insitu concrete class 30, vibrated and reinforced as described, in:-
d) Isolated Footings 86 m3 0.00
e) Raft footing for water tank & pump room 28 m3 0.00
f) Short Columns 19.5 m3 0.00
g) Grade Beam 35 m3 0.00
h) G.B. for Latrines slabs and walls 30 m3 0.00
i) Latrines Strip footing 12 m3 0.00
Foundation walling
Masonry stone walls bedded , jointed in cement and sand (1:3) mortar and reinforced with hoop irons at every alternate course
i) 200mm thick beaneath Grade Beam and ramps sides 200 mL 0.00
i) 12 mm thick cement : sand (1:3) plaster to plinth 160 m2 0.00
j) Three coats of bituminous paint to foundations, columns stubs, grade beam, plinths surfaces. 450 m2 0.00
TOTAL FOR SUBSTRUCTURES AND SITE EARTHWORK CARRIED TO SUMMARY 0.00
B STRUCTURAL FRAME & ROOF
1) Reinforced Concrete
Insitu concrete class 30 , vibrated and reinforced as described, High tensile steel reinforcement to B.S. 4461 in structural concrete work including cutting, bending, hoisting, fixing, tying wire and spacing blocks
The contractor should provide for approval the concrete mix design and the aggregates, cement and sand wihich will be used in the construction works.The minimum cement conetent will be 350 Kg of cement per cubic meter. where there is an exposure to the sea water and chemical attack, the Contrator should provide the sulphte resistance cement and apply / isoltate the concrete properly form the chemical attack using membrane and painting reagents
Rates shall include the price of steel reinforcement, formwork, mixing, placing, curing and removal of formwork for all concrete and for all threading fillets etc. The rates shall include the sampling and testing at an approved labortary . All exposed concrete surfaces in columns, beams, slabs etc. must be fair face and of first class standard.
First class shuttering must be used and it must be approved by the Engineer before the reinforcement is placed in position and before the concrete is casted.
a) Intermediate tie beams ( top level +3.00m) 16 m3 0.00
b) Top beams ( top level +5.20m) 10.5 m3 0.00
c) R.C. Ground Floor Columns 27 m3 0.00
d) R.C. walls for water tank & pump room 12.5 m3 0.00
e) R.C. cover slab for water tank & pump room 6.25 m3 0.00
2 Steel Roofing Frame & Sheet
Contractor to allow for hoisting and all angle brackets or gusset plates bolts, cleats, fish tailing lugs, drilling holes and the likes for fixing members to position as per the details;
The following in trusses and/or independent members
Frame structure including rafters, cross bracing, fasteners,struts and purlins complete with bolts and nut, fillet weld together.The contractor shall obtain the roof structure manfacturer drawings and spsecifications before importing or delivering to site to be reveiwed and approved by the Engineer .
a) Fabricate, erect and fix in position steel columns of IPE 500 , including surface preparation, anti-corrosion primer, and two coats of enamel finish paint. 26.4 M.L 0.00
b) Fabricate, erect and fix in position roof framing shall consist of primary beams of IPE 400 ( Rafter ) as per the drawings. 323.4 M.L 0.00
c) Fabricate, erect and fix in position roof framing shall consist of Secondary beams of IPE 330 as per the drawings. 100 M.L 0.00
d) Fabricate, erect and fix in position roof framing shall consist of Purlins section (SHS100*4) as per the drawings. 1,644.80 M.L 0.00
e) Fabricate, erect and fix in position Double Rod Bracing ∅32mm as per the drawings. 342 M.L 0.00
f) Supply and install galvanized steel roofing sheets ( thick. 50mm) as specified placed in and to steel frame including fasteners and all fittings in accordance with the drawings, manufacturer's instructions and Engineer directions. 1,562.50 m2 0.00
TOTAL FOR STRUCTURAL FRAME & ROOF CARRIED TO SUMMARY 0.00
First Class Bricks: Type (Fire faced brick) Uniform size (e.g., ~242x115x70mm), sharp edges, free from cracks, good crushing strength , low water absorption (<12-20%), made from good brick earth.
Three- ply bituminous felt damp proof course bedded in cement and sand (1:3) mortar (measured net allow for 300mm laps):-
a) 200mm wide between grade beam and bottom of the brick wall 180 mL 0.00
1) External Walling
200mm Thick walling , Supply material and construct first calss masonry burnet brick walls bedded and jointed in cement and sand (1:3) mortar
a) for Main Building 800 m2 0.00
b) Ditto for landscaping and gates, fence 36 m2 0.00
c) Ditto for latrines 60 m2 0.00
2) Internal Partition offices Walling 60 m2 0.00
d) For gurd rooms and entrances 30 m2 0.00
TOTAL FOR WALLING CARRIED TO SUMMARY 0.00
D DOORS and WINDOWS
Note: All doors shall be supplied and installed in accordance with the provided details and schedule. The installation shall include all necessary design features to ensure proper sealing and protection against insects, rodents, dust, and moisture, including but not limited to rubber or brush seals, tight-fitting frames, and metal thresholds. All ironmongery not measured separately shall be deemed included in the rates for the corresponding doors..
Mild steel caged door made out of cold rolled steel sections thoroughly cleaned and phosphatized to resist corrosion before receiving Two coats of grey rust inhibiting primer
Door external frame grouted below finished floor and fixed to walls: All iron mongery and lugs fixed to manufacturer's specifications
a Entrance Sliding Door (5.0 x 4.0m ) : Supply and install high-quality metal door 2.5 - 3 mm for vehicle entry with enhanced security features, including heavy-duty steel construction, durable locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint, and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 2 Nr 0.00
b Supply and install high-quality Singl steel door ( 900x220mm high ) including locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint, and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 4 Nr 0.00
c Supply and install high-quality Singl steel door for Latrine ( 700x220mm high ) including locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint ,and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 4 Nr 0.00
d Fence Gate (4.0 x 1.8m ) : Supply and install high-quality metal door 2.5 - 3 mm for vehicle entry with enhanced security features, including heavy-duty steel construction, durable locking mechanisms, hinges, handles, unti-rust painting & 3 layrs of chemical resistance paint, and all necessary accessories to ensure strength, durability, and safety as per specifications, drawings and Engineer's instructions 1 Nr 0.00
TOTAL FOR DOORS CARRIED TO SUMMARY 0.00
a Supply and install a high-quality steel window (3000 × 1000 mm high) comprising three upward-opening glass panels, each fitted with external steel mesh. The window shall include locking mechanisms, hinges, handles, anti-rust treatment, and three layers of chemical-resistant paint, along with all necessary accessories to ensure strength, durability, and safety, in accordance with the specifications, drawings, and the Engineer’s instructions. 30 Nr 0.00
b Supply and install ( 1000x1200mm high ) Double glazed aluminum for Security Room, 2-panel hinged window including 6mm toughwood glass out skin and 7.5mm laminated glass inner skin, metal insect mesh. (Weight of section not less 1.6kg/m.l, and width of external section 100 mm) 2 Nr 0.00
c Supply and install ( 800x400mm high ) Double glazed aluminum for latrines, 2-panel hinged window including 6mm toughwood glass out skin and 7.5mm laminated glass inner skin, metal insect mesh. (Weight of section not less 1.6kg/m.l, and width of external section 100 mm) 4 Nr 0.00
TOTAL FOR WINDOWS CARRIED TO SUMMARY 0.00
Ceiling Finishes
1 Roof Isolation
a) Supply, roof tempreturs isolation sheets and install , with pproper fixing wires and glue under the corrugated roof sheets as per drwaings , spcifications or as directed by the Engineer 1500 m2 0.00
2 Anti-Rust and chemacal attack paints
Prepare and apply undercoat and two finishing coats of gloss oil paint; and anti-rust paints
b) beneath and on the top of the corrougated roof sheets 3000 m2 0.00
2) Floor finishes
a Supply and apply epoxy coating of floor with skirting (100 mm) and joints. Samples shall be approved by site Engineer prior to procurement. 1500 M2 0.00
b Supply and fix 600x600x8.5 thick ceramic floor tiles tiles layed over white cement slurry over cement sand screed to overll thickness of 100mm include skirting 8cm high. Samples shall be approved by site Engineer prior to procurement. 16 M2 0.00
c Supply and fix300x300x8.5 thick non-slip ceramic tiles for latrines over waterproofing adhesive layed over white cement slurry over cement sand screed . Samples shall be approved by site Engineer prior to procurement. 24 M2 0.00
d Supply and fix a floor pallet made from durable, untreated hardwood or pest-resistant softwood, measuring 1.2 x 0.8m with a minimum dynamic load capacity of 1,500 kg, featuring top deck boards spaced no more than 4 cm apart, and elevated 10 to 15 cm above the floor 1200 M2
a Supply and apply 5 cm thickness concrete tiles with textured surface and stamped on two layers of selected material 25 cm for each around premisses of main building pattern as per drawings 500 M2 0.00
3) Wall Finishes (Plastering)
Clean, well-graded sand; Portland cement; clean potable water; bonding agent or hardening walls, consistent mix. apply the mixture in a multi-step process involving surface preparation, applying coats of plaster, leveling, and proper curing. This process ensures a strong bond, a flat surface, and prevents cracking.
Internal Walls: 12mm thick cement sand plaster, with steel trowelled finish, as described to:-
a) Wall surfaces internally of main building 1000 m2 0.00
b) Wall surfaces internally of latrines 60 m2 0.00
External Walls: 15mm Cement and sand (1:3) render on block wall or concrete work to:-
Fill uneven surfaces with stucco filler to approval including sanding of all uneven surfaces; apply two undercoats emulsion paint and two finishing coats of first quality Silk Vinyl emulsion paint to match the existing ;-
c) Wall surfaces externally of main building 1000 m2 0.00
d) Wall surfaces externally of latrines 60 0.00
Wall Finishes (Painting)
Fill uneven surfaces with stucco filler to approval including sanding of all uneven surfaces; apply two undercoats emulsion paint and two finishing coats of first quality Silk Vinyl emulsion paints
a) Wall surfaces internally of main building 1000 m2 0.00
b) Wall surfaces internally of latrines 60 m2 0.00
c) Wall surfaces externally of main building 1000 m2 0.00
d) Wall surfaces externally of latrines 60 m2 0.00
Fence chain Link and posts
a Fabrication: GI Chain Link Mesh 50x50mm mesh size, 3mm or 4mm diameter). Height: Generally 2.0 meters above ground level. Posts: Main posts (60.3mm O.D.) and line posts, spaced 3m apart. Structure: 'Y' shaped arms (450mm) for 3-6 rows of barbed wire. Finish: Galvanized (ASTM-A392-81) or PVC coated. Foundation: Concrete base ( 1:4:8 mix) for posts. 320 mL 0.00
TOTAL FOR FINISHES CARRIED TO SUMMARY 0.00
ITEM DESCRIPTION
A SUBSTRUCTURES 0.00
B STRUCTURAL FRAME & ROOF 0.00
D DOORS & WINDOWS 0.00
TOTAL TO SUMMARY 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QUANTITY UNIT RATE AMOUNT
A MECHANICAL INSTALLATION
1 PORTABLE FIRE FIGHTING EQUIPMENT
CO2 Fire Extinguishers
a) 6 kg Carbon Dioxide Steel Stored pressure gas fire extinguishers conforming to BS EN 3 complete with:- - charge and fixing bracket - pictorial instructions - colour coding to BS 7863 - discharge horn and hose. - pressure indicator -Complete with all required identification signage as specified in Technical Specification 3 Nr. 0.00
b) 5 kg ABC type fire extinguishers conforming to BS EN 3 complete with:- - charge and fixing bracket - pictorial instructions - colour coding to BS 7863 -Complete with all required identification signage as specified in Technical Specification 14 Nr. 0.00
2 FIXED FIRE FIGHTING EQUIPMENT 0.00
a) Supply install, test and commission GRP reservoir cylindrical ground water storage tank of nominal capacity 25000 litres; as per provided drawing to be located within a shade to be made as a makeshift shade for fire pump and fire water reservoir as 'TOPTANK' on 300mm high plinth support to structural Engineer’s detail complete with cover. The tank is to be complete with the following ; a) 50mm diameter overflow b) 32mm diameter washouts with gate valve c) 80mm diameter outlet with gate valve (2No.) d) 40mm diameter inlet with high pressure float valve e) Tank connectors for all incoming & outgoing pipes 1 Nr. 0.00
b Supply, install and test and commission a modular skid mounted 22.7m³/hr. @ 80m head; main electric fire pump; (centrifugal with an electric motor capable of working 100% flow at rated pressure, 150% flow at ≥65% rated pressure); a diesel engine driven standby firepump of the same capacity including fuel tank of a minimum capacity of 8 hrs continous running ; and a 3m3/hr capacity electric jockey pump at the rated head of 80m; mounted on a modular skid including all the accessories, signage,manometers, relef valves; test valves; and interconnecting pipes and fittings ; to be installed on a 200mm RC foundation to be built within the fire pump shade ; to the structural and architectural details; to be compliant to NFPA standards. 1 Nr. 0.00
c Supply and install galvanized steel schedule 40 pipes to external fire water distribution system as where shown on the drawing. Complete with all the necessary fittings, support and accessories. DN[mm] = 65mm 20 m 0.00
d Supply, install, test, and commission a wall-mounted, lockable fire hose cabinet , designed for fire fighting purposes in compliance with relevant standards (e.g., EN 671-1 for hose systems .The cabinet shall include all necessary fittings and accessories for full functionality & complete with all required identification signage as specified in Technical Specification Section. Material: Mild steel with anti-corrosion red powder-coated finish, minimum 1.2 mm thickness, suitable for indoor/outdoor use with weather-resistant properties (IP54 or better). Dimensions: Approximately 700 mm (H) × 600 mm (W) × 250 mm (D), or as required to accommodate all components. Door: Hinged, lockable with a break-glass key access system, fitted with a clear tempered glass or acrylic panel for visibility. Mounting: Wall-mounted with corrosion-resistant brackets and fixings, securely anchored to the structure as per manufacturer’s recommendations and structural drawings. Fire hose Type: Synthetic rubber-lined fire hose, compliant with EN 671-1 or equivalent, suitable for Class A, B, and C fires. Length: 30 meters, coiled on a swinging hose reel for easy deployment. Diameter: 38 mm (1.5 inch) nominal, with brass or aluminum nozzle (jet/spray type, adjustable). Couplings: Instantaneous couplings, corrosion-resistant, compatible with local fire fighting standards. Accessories: Nozzle Holder: Integrated holder for the hose nozzle, ensuring secure storage.,Signage: Clear, durable fire equipment signage (minimum 200 mm × 200 mm) in compliance with fire safety regulations, indicating the location and contents of the cabinet.Inlet Valve: Bronze gate valve (PN16, minimum DN25), suitable for connection to the fire water supply system, compliant with BS EN 12201 or equivalent. 3 Nr. 0.00
e Construct rectangular manhole out of 250mm thick double brick walls,internal dimension 600mm x 600mm x 600mm (average depth),internally plastered with three coats of cement/sand mix ratio1:3 ,on a base of precast R.C slab of size ,1300mm x 1300mm x100mm , including benching and bottom channeling with mass concrete.Slab shall be reinforced with dia.8mm reinforcement bar c/c 130mm bothways. Provide 150mm thick granular materials beneath the slab,on a compacted earth . Manhole shall have precast R.C cover slab, each,size, 740mm x 740mm x 100mmreinforced with diameter 8mm steel barc/c140mm bothways,including diameter 14mm steel ring handle with supporter bar all in accordance with the given detail drawings .Unit price shall include excavation of the pitto a depth of 800mm (average) and cart away of the excavated soil. 7 Nr. 0.00
f Supply, lay, test, and commission a High-Density Polyethylene (HDPE) PN16 fire main pipeline , including all necessary fittings, as per the provided detail drawings . The work shall ensure a reliable, leak-free system compliant with site requirements. Pipe: Material: High-Density Polyethylene (HDPE), PE100 grade virgin material, Pressure Rating: PN16 (16 bar nominal pressure).Sizes: As specified in the detail drawings (DN80) Type: HDPE compression fittings, electrofusion fittings, or butt-fusion fittings.Standards: Compliant with BS EN 12201-3 or equivalent, Includes elbows, tees, reducers, couplers, end caps, and transition fittings where ever necessaey (to connect with valves or other materials). Valves: Type: PN16 gate valves, ball valves, or check valves where they are necessary.Material: Bronze, brass, or ductile iron with HDPE-compatible ends (flanged or spigot).Standards: Compliant with BS EN 1074-2 or equivalent. Other Accessories:Thrust blocks, anchor blocks, and supports to prevent pipe movement.Warning tape or marker tiles above buried pipes for identification during future excavations. All materials shall be new, free from defects, and certified for potable water use by relevant standards (WRAS, NSF/ANSI 61). Installation: Site Preparation: Excavate trenches to the depths and widths specified in the detail drawings, ensuring proper alignment and gradient (minimum 1:100 unless otherwise specified). Prepare trench beds with sand or fine granular material (minimum 100 mm thickness) to provide uniform support and prevent pipe damage. Remove rocks, debris, or sharp objects from the trench to protect the pipe. Pipe Laying: Lay HDPE pipes along the alignments shown in the detail drawings, ensuring continuous support and proper gradient for drainage where required. Join pipes using butt-fusion, electrofusion, or compression fittings, as specified, following manufacturer’s guidelines and BS EN 12201-5 procedures. Ensure joints are leak-proof and capable of withstanding PN16 pressure.Install fittings, valves, and accessories (e.g., air valves, washouts). Backfilling: Backfill trenches with compacted sand or fine granular material (minimum 300 mm above the pipe) to protect the pipe, followed by native soil or as specified. Compact backfill in layers (maximum 150 mm per layer) to prevent settlement, as per ASTM D698 or equivalent. Place warning tape or marker tiles 300 mm above the pipe for future identification. Thrust Restraint: Install concrete thrust blocks or anchor blocks at bends, tees, and valves to resist hydraulic thrust. Ensure thrust blocks are cast against undisturbed soil and cured adequately. Testing: Pressure Testing: Conduct a hydrostatic pressure test on the completed pipeline as per BS EN 805 or equivalent. Test pressure: 1.5 × PN16 = 24 bar, maintained for a minimum of 2 hours (or as specified). Monitor for leaks, pressure drops, or deformations, and repair any defects before proceeding. Leakage Testing: Perform a leakage test to ensure the system meets allowable leakage rates (as per BS EN 805 or local standards). Record test results, including pressure, duration, and any observed issues. Alignment and Gradient Check: Verify pipe alignment and gradient using surveying equipment. 0.00
Size Ø = DN80 101 m 0.00
Size Ø = DN 65 30 m 0.00
3 MECHANICAL VENTILATION & AIRCONDITIONING 0.00
a) Supply and install a 600mm throuat diameter wind powered turbine ventillator ; spaced in accordance with the drawings; flushing detail designs in accordance with manufacturer's recommendation and to the engineers approval ; to acheive a lasting ; weather proof joint. 14 Nr. 0.00
b) Supply, installation and test and commissioning of 5 kW cooling capacity split-type air conditioner (Inverter type) for Administration Office, complete with indoor unit (Hi-wall mounted), outdoor condensing unit, wireless remote control with timer and temperature settings, washable easy-access air filters, refrigerant charge (R-410A or equivalent), all interconnecting refrigerant piping (copper tubing with insulation), condensate drain piping and connections, wall mounting brackets,signage and hardware, vibration isolation pads for outdoor unit, electrical supply cable and connections, commissioning and testing. The unit price shall include refrigerant piping and respective insulation - closed-cell elastomeric foam, 13mm thickness, condensate piping and all supporting structure. Set 1
c) Ditto No b) but for Security Office + Bed Quarter Set 1
d) Supply, installation and test and commissioning of wall-mounted or window-mounted axial exhaust fan for Utilities Room, complete with airflow capacity ≥ 320 m³/h (approx. 190 CFM), direct drive motor thermally protected, 220-240V / 50 Hz single-phase power supply, corrosion-resistant construction, integral gravity backdraft damper, bird/insect screen on exterior discharge, weatherproof louver or hood for exterior discharge, manual on/off switch inside room, all mounting brackets, fasteners, signage and hardware, electrical supply cable and connections, door undercut (15-25mm) for makeup air, commissioning and testing Set 1
4 GENERAL ITEMS/ SUMMARY 0.00
a) Test & commission all systems as per approved working drawings, specifications and bills of quantities to the satisfaction of the Engineer. Testing and commissioning shall be to Chartered Institution of Building Services Engineer Commissioning Codes 1 Sum 0.00
b) Prepare and submit working and record (as-installed) drawings to easily readable scale, A1 or A0 paper size format as follows; i) general arrangement drawings of all equipment, plant etc. ii) routes - types and sizes and arrangement of all pipework iii) wiring(electrical & control) details iv) any other details as per specifications Drawings are to be submitted in soft copy (AutoCAD format) & hard copy to the client, the Architect and the Engineer. All drawings shall be submitted to the satisfaction of the Engineer. 1 Sum 0.00
c) Prepare & submit draft and three final copies of operation & instruction manuals to Engineer's approval 1 Sum 0.00
TOTAL FOR MECHANICAL INSTALLATION CARRIED TO GRAND SUMMARY 0.00
B SANITARY , DRAINAGE AND WATER
NOTE: TRADE NAMES
Where Trade Names are mentioned below, it is intended to indicate the level of quality required. The tenderer MAY supply alternatives which must be approved in writing by the Engineer/Architect.
This BOQ shall be read in conjunction with mechanical technical specifications general and particular method of measurements, the mechanical drawings except where otherwise indicated. The unit price for all items in all sections shall include for supplying, installation and commissioning unless otherwise specially mentioned.
Contractor must check site condition including all installed first fix, sleeves structural opening in concrete works, any modifications or alternations would be considered included in contractor price or priced in this item contractor shall not be entitled for any extra cost for opening in structural walls or slabs.
1 SITE WATER SUPPLY PIPING SYSTEM
a PPR Piping System (DN 25) – Supply, install, test, and commission PPR pipe DN 25 mm (1 inch), PN20 rating, including all fittings (elbows, tees, couplings), heat fusion joints, wall/floor penetrations, pipe supports at 1.2 m intervals, and hydraulic pressure test to 4 bar for 1 hour. Complete from GRP tank outlet to elevated tank inlet. the standard requirement at the expense of the contractor. lm 20.00 0.00
b Elevated Water Tank (500 Liters) – Supply, install, and commission one food-grade polyethylene elevated water tank, nominal capacity 500 liters, conforming to ISO 4422. Include galvanized steel support frame anchored to wall/column, float valve or level sensor (adjustable high/low setpoints), overflow pipe (DN 25) with screen, drain plug, lockable lid, outlet strainer (1 mm mesh), and DN 20 gate valve for isolation. Mounting height: 2 m above handwashing faucet. № 1.00 0.00
c Transfer Pump set(dual pump) (GRP to EWT) – Supply, install, test, and commission one centrifugal electric transfer pump, minimum flow 20 L/min, minimum total dynamic head 4 m, motor rating 0.135 hp (100 W), 230 V / 50 Hz / single-phase. Include built-in thermal overload protector, isolation valve, non-return valve on discharge, suction strainer, corrosion-resistant casing (bronze/stainless steel/engineered plastic), and dry-run protection. № 1.00 0.00
d Level Sensor and Control Panel – Supply, install, and commission one automatic pump control system comprising: ultrasonic or float switch level sensor (IP68, dry contact output, adjustable high/low setpoints) installed in elevated tank; and control panel (IP54) with magnetic contactor with overload protection, Hand-Off-Auto selector switch, indicator lights (Power ON, Pump Running, High Level, Low Level). Complete with all interconnecting wiring conforming to IEC 60364. Set 1.00 0.00
TOTAL FOR SITE WATER SUPPLY PIPING SYSTEM CARRIED TO GRAND SUMMARY 0.00
2 WASTE WATER DRAINAGE SYSTEMS
The rates for drainage ditches shall include full compensation for excavation, disposal of excavated material, preparation of subgrade, supply and placement of concrete (minimum 25 MPa compressive strength at 28 days) or masonry as specified, forming of trapezoidal or rectangular cross-section, installation of galvanized steel gratings where shown, construction of catch pits with debris screens, joint sealing, curing, and finishing to achieve Manning’s roughness coefficient n = 0.017 for concrete ditches and n = 0.025 for masonry ditches. The rate shall also include all formwork, reinforcement where required, and any necessary erosion protection measures at outlets. The unit rate is per linear meter of completed ditch of the cross-sectional dimensions indicated. No separate payment shall be made for excavation, backfill, or disposal.
a Pit Latrine Ventilation Pipe (DN 100) – Supply, install, and commission one uPVC ventilation pipe, DN 100 mm (4 inch), conforming to ISO 1452-1, including: pipe extending from 300 mm above pit floor to 1.0 m above highest roof peak, solvent welded joints, galvanized brackets at 2 m maximum intervals, weatherproof cowl (turbo vent or 180° bend with bird screen), stainless steel insect mesh (12 mm aperture) at top, and fly-proof mesh (2 mm aperture) at pit entry. № 2.00 0.00
b Handwashing Station (Standard) – Supply, install, and commission one handwashing station comprising: concrete basin (Type 304, 400×300×150 mm), eight (8)(four (4) on each side) lever-operated chrome-plated brass tap, two liquid soap dispenser (500 mL), supply piping PPR and uPVC drainage piping to soak away pit. set 1.00 0.00
c Soak Pit – Supply, excavate, construct, and commission one soak pit for handwashing station drainage, including excavation, stone/gravel filling, perforated pipe inlet, geotextile fabric lining, and covered top with inspection port. Dimensions as per standard design. set 1.00 0.00
d Waste Water Septictank Supply and apply a complete waterproofing system, Waste Water Septictank to pit latrine structure including brick protection wall as follows: (1) Surface preparation: clean, dry, and prime concrete pit walls; (2) Waterproofing coating: apply bituminous emulsion or acrylic waterproof coating (minimum 2 coats) to external concrete pit walls from base to 500 mm above ground level, conforming to ASTM D1227; (3) Cementitious top seal: apply cementitious crystalline waterproofing slurry (minimum 3 mm thickness) to top 500 mm of pit lining (interior and exterior surfaces); (4) Joint sealant: apply flexible polyurethane sealant at all construction joints and pipe penetrations; (5) Brick protection wall: construct half-brick thick (115 mm) masonry wall against external waterproofed surface from pit base to 500 mm above ground level using common burnt clay bricks (minimum class 7.5 MPa) laid in cement mortar (1:4 mix) to act as sacrificial protective layer preventing backfill damage to waterproof membrane; (6) Damp Proof Course (DPC): install 300 mm wide polyethylene DPC membrane between brick protection wall and backfill material at top 500 mm zone; (7) Backfill interface: backfill shall be placed carefully against brick wall, not directly against waterproofing. Unit rate includes all materials, labor, application, brick wall construction, testing, and commissioning for a complete watertight installation. Conforms to manufacturer's specifications and BS 8102.Please note that the waterproofing system shall be applied only after the concrete pit has cured for a minimum of 7 days. All surfaces shall be clean, dry, and free from dust, oil, or loose material before application. The contractor shall conduct a water spray test after completion to verify no water ingress occurs at the top sealed zone. Any leaks detected shall be repaired at no additional cost. m2 50.00 0.00
e Rainwater Downpipe DN 100 (Market Block) – Supply, install, test, and commission one uPVC rainwater downpipe, DN 100 mm nominal diameter, conforming to ISO 1452-1 or AS/NZS 1260, minimum wall thickness 2.5 mm. Include stainless steel leaf guard (5 mm mesh) at roof inlet, galvanized pipe brackets (vertical spacing 1.8 m maximum, horizontal spacing 1.0 m maximum), UV-reflective light-colored oil paint coating (white/light grey) conforming to ISO 4892-2 on all exposed sections, and discharge splash block at base. Complete from roof outlet to ditch/splash block. ml 110.00 0.00
f Rainwater Downpipe DN 80 (Toilet Block) – Supply, install, test, and commission one uPVC rainwater downpipe, DN 80 mm nominal diameter, conforming to ISO 1452-1 or AS/NZS 1260, minimum wall thickness 2.0 mm. Include stainless steel leaf guard (5 mm mesh) at roof inlet, galvanized pipe brackets (vertical spacing 1.8 m maximum, horizontal spacing 1.0 m maximum), UV-reflective light-colored oil paint coating (white/light grey) conforming to ISO 4892-2 on all exposed sections, and discharge splash block at base. Complete from roof outlet to ditch/splash block. ml 10.00 0.00
g Rainwater Downpipe DN 80 (Guard House) – Supply, install, test, and commission one uPVC rainwater downpipe, DN 80 mm nominal diameter, conforming to ISO 1452-1 or AS/NZS 1260, minimum wall thickness 2.0 mm. Include stainless steel leaf guard (5 mm mesh) at roof inlet, galvanized pipe brackets (vertical spacing 1.8 m maximum, horizontal spacing 1.0 m maximum), UV-reflective light-colored oil paint coating (white/light grey) conforming to ISO 4892-2 on all exposed sections, and discharge splash block at base. Complete from roof outlet to ditch/splash block. ml 10.00 0.00
h Drainage Ditch – Supply, excavate, construct, and commission reinforced concrete drainage ditch, rectangular cross-section, with different internal dimensions, concrete grade minimum 25 MPa, smooth finish achieving Manning’s n = 0.017, including excavation to required depth, disposal of surplus material, formwork, reinforcement, joints (with waterstop where ), and curing.. Provide a minimum slope of 1% or follow the natural ground slope which ever is greater ml 90.00 0.00
i SIZE[mmXmm] = 450 X 300 ml 220.00 0.00
j SIZE[mmXmm] = 350 X 250 ml 280.00 0.00
k Catch Pit with Debris Screen(manhole) – Supply, excavate, construct, and commission one catch pit at ditch junctions or before discharge points, including reinforced concrete construction, minimum 600×600×900 mm deep, heavy duty removable cast iron grating cover, stainless steel debris screen (12 mm mesh), inlet and outlet connections to adjoining ditches, and concrete base. № 5.00 0.00
l Heavy duty cast iron or galvanized steel or concrete Ditch Cover (Pedestrian Crossing) – Supply and install one heavy duty cast iron or concrete cover for the ditch at pedestrian and vehicle crossing, including frame and cover, designed for pedestrian loading (minimum 5 kN/m²), hot-dip galvanised finish(if galvanized used), sized to match the ditch opening. № 4.00 0.00
m Supply and install uPVC DN 160 mm PN10 pipe conforming to ISO 1452-1 / EN 1452-2 inside the open ditch from roof downpipes to the underground RC rainwater harvesting tank, including all necessary fittings (bends, couplings, tees), galvanized steel supports or concrete anchor blocks at maximum 3.0 m spacing, one non-return valve (check valve) at tank inlet, one sediment trap with 5 mm stainless steel debris screen upstream of tank, and UV-protective coating (ISO 4892-2) for all exposed sections. Installation shall maintain minimum 0.5% gravity gradient. Jointing shall be by solvent cement welding or rubber ring push-fit sockets per manufacturer's specifications. Testing shall be by 24-hour water flow test with no visible leakage or ponding. Unit rate includes all materials, labor, testing, and commissioning but excludes ditch constructio lm 55.00 0.00
n Piping system for underground RC tank: overflow (uPVC DN 100 PN10), rainwater inlet (uPVC DN 160 PN10), washout (uPVC DN 100 PN10 with isolating valve and extended operating rod), including all fittings, supports, watertight tank connections, testing, and commissioning. Conforms to ISO 1452-1 / EN 1452-2. set 1.00 0.00
o Water Harvest Tank Ditto item No 2.d but for the under ground rain water harvest tank (5 x 5 x 2 [m]) m2 95.00 0.00
p Allow for Testing and commissioning of the entire plumbing installation by a Chartered Mechanical Engineer and obtaining a Test Certificate (3rd party testing to approval of the Engineer) including all off-site and factory testing; inspections to demonstrate compliance with relevant standards, operating the completed installation and submitting all relevant test records and authority approval. LS 1 0.00
q All sanitary fittings supplied shall be provided with a minimum 5 year warranty, issued jointly and severally by the local supplier and the manufacturer. LS 1 0.00
r Allow for preparation of Operationa and Maintenance Manual including site users training for the O & M Maual of all plumbing and mechanical appliances. LS 1 0.00
s Supply and installation of Dry Latrine Squatting Pan – Ordinary Type Heavy-duty vitreous china or FRP pan, no water seal, shallow profile with anti-splash lip, drop hole min. 180mm. Includes fixing to concrete slab. No water supply connection. № 2
t Supply and installation of Dry Latrine Squatting Pan – PWD Type Accessible design for persons with disabilities. Heavy-duty FRP or china with raised footrests, pan rim height ≤200mm from floor. Includes stainless steel grab bars (wall-mounted, vertical & horizontal). Drop hole min. 200mm. No water supply connection. № 1
u Supply and installation of Shower Water Drain Intake to Pit Floor-mounted grating (stainless steel/HD plastic, min. 150mm diameter) with debris trap. Includes vertical drop pipe (PVC, 75mm min. diameter) from floor through pit cover slab into pit void. No trap, no water seal. No connection to pressurized water supply. № 1
TOTAL FOR WASTE WATER DRAINAGE SYSTEMS CARRIED TO GRAND SUMMARY 0.00
ITEM DESCRIPTION
A MECHANICAL INSTALLATION 0.00
B SITE WATER SUPPLY PIPING SYSTEM 0.00
C WASTE WATER DRAINAGE SYSTEMS 0.00
TOTAL TO SUMMARY 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
BILL NO.4 ELECTRICAL INSTALLATION
4 ELECTRICAL INSTALLATIONS
The Bill of Quantities, Specifications, Drawings and all other Contract documents are complementary to each other. It is the responsibility of the Contractor to check the locations and quantities of the materials and equipment to be executed in accordance with the drawings. The unit rate of the materials and equipment shall be based on the Specification, all components as required and specified under each item concerned in the Specifications, Drawings, and all other Contract documents.
5.1.1 Low Voltage Switchboard
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Normal / Standby Switchboards:
5.1.1 18 way TP/N - flush mounted distribution board DB 'S.CST.0 (E )' complete with 4X63A TP/N MCB main incomer and all MCB , as shown on schematic wiring Un 1
5.1.2 63A Load transfer switch (L.T.S), as shown on schematic wiring Un 1
5.1.3 18 way TP/N - flush mounted distribution board DB 'S.CST.1 (E )' complete with 4X40A TP/N MCB main incomer and all MCB , as shown on schematic wiring Un 1
5.1.4 12 way TP/N - flush mounted distribution board DB 'S.PR.0 (E )' IP65 complete with 4X20A TP/N MCB main incomer and all MCB , as shown on schematic wiring Un 1
5.1.5 4P-25 A (IP65) - flush mounted Fire PumpPump Isolator complete with all accessories , as shown on drawings Un 1
5.1.6 2P-10 A (IP65) - flush mounted Domestic Pump Isolator complete with allaccessories , as shown on drawings Un 1
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories including conduits and manholes as specified in schedules of equipment, detailed drawings and specs:
LV Distribution Cables including burid PVC ducting and all accessories as indicated in the drawings
5.2.1 - 4X16+16 Emm² Cu/ XLPE/ PVC (plain annealed stranded copper conductors, connecting Load transfer switch to switchboard to S.CST.0 ml 1
5.2.2 - 4X4+4 Emm² Cu/ XLPE/ SWA/PVC (plain annealed stranded copper conductors , connecting PR.0 to S.CST.0 ml 19
5.2.3 - 4X10+10Emm² Cu/ XLPE/ SWA/PVC connecting switchboardS.CST.1 to S.CST.0 ml 25
5.2.4 - Fire rated inside metallic conduit 4X4+4 Emm² Cu/ XLPE/ SWA/LSZH (plain annealed stranded copper conductors wrapped in mica glass fire-barrier tape, cross-linked polyethylene (XLPE) insulation, galvanized steel wire armor (SWA), and a low smoke zero halogen (LSZH/LSHF) outer sheath)connecting switchboardS.Fire pump to S.CST.0 ml 20
5.2.5 - 2X1.5+1.5 Emm² Cu/ XLPE/ SWA/PVC (plain annealed stranded copper conductors , connecting Domestic pump to PR.0 ml 8
Supply and installation of class SN8 conduit in accordance with the conditions defined in the in written pieces, specification, drawings and 100 mm diameter regid conduit buried in the ground
5.2.6.1 - PEAD Ø 110 mm for grid connection ml 5
5.2.6.2 - PEAD Ø 110 mm for lLV cables connecting panels S.ST.1 , Fire Pump, and S.PR.0 connection ml 55
5.2.7.1 - Low Voltage manhole chambers, with internal measures of 1000 x 1000 x 1000 (W*L*H), with RC cover thickness not less than 100 mm, as per drawing details Un 8
5.2.7.2 - Fire alarm cable manhole chambers, with internal measures of 1000 x 1000 x 1000 (W*L*H), with RC cover thickness not less than 100 mm, as per drawing details Un 4
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Indoor Lighting:
5.3.1 Luminaire fix to the ceiling (Downlight) LED 80W, IP65( L1) Un 98
5.3.2 Luminaire fix to the ceiling (Downlight) LED 30W, IP44(L2) Un 4
5.3.3 Luminaire fix to the ceiling LED15W, IP44 (L3) Un 12
5.3.4 Luminaire fix to the ceiling LED30W, IP44 (L4) Un 2
5.3.5 Luminaire fix to the ceiling LED30W, IP65 (L4) Un 3
5.3.6 POLE MOUNTED 2 Days SOLAR SYSTEM LIGHTING FIXTURE WITH 80W LED IP66/1K07. COMPLETE WITH SOLAR PANEL BATTERIES e,t,c AND 10 M HOT-DIP GALVANIZED STEEL WITH THICKNESS NOT LESS THAN 4MM FIXED ON CONCRET BASE Type L9 Un 16
5.3.7 Luminaire fix to the wall 2 Days Solar SystemLIGHTING FIXTURE WITH 80W LED IP66/1K07. COMPLETE WITH SOLAR PANEL BATTERIES e,t,c (L11) Un 5
Lighting Switches
5.3.8 - One way switch, recessed mounting Un 4
5.3.9 - Double pole switch, recessed mounting Un 6
5.3.10 Three pole switch, recessed mounting Un 8
5.3.11 Three pole switch, recessed mounting(IP65) Un 1
5.3.12 - Two Way Double pole switch, recessed mounting Un 2
LIGHTING Outlet
Supplying, installing, connecting and testing lighting outlets including conduit, conduitor fittings, boxes,wiring, cabling, earthing, accessories and all necessary works and materials required for complete installation back to panel boards as specified and as indicated on the drawings for the following items :
5.3.13 copper wire Cu/ XLPE/ PVC(2x1.5+1.5E sqmm) Cu/ XLPE/ PVC in 20mm minimum pvc conduit No. 71
5.3.14 copper wire Cu/ XLPE/ PVC(2x2.5+2.5E sqmm) in 20mm minimum pvc conduit No. 48
5.3.15 copper wire Cu/ XLPE/ PVC(2x1.5+1.5E sqmm) in 20mm minimum pvc conduit for emergency and safety lighting No. 23
Emergency / Safety Lighting
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Indoor Lighting:
5.3.16 - S1 - maintained (60min Autonomy) Un 19
5.3.17 - Maintained type Exit signe(3 Hours) Un 4
5.4 General Purpose Power Socket
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
Double Flush and Surface Mounting Devices - Normal/Standby Supply:
5.4.1 - Flush Mounting Earthed Socket (BS546 ) - with cover 16A IP44 Un 16
5.4.2 - Flush Mounting Earthed Socket (BS546) - 16A Un 8
5.4.3 - Flush Mounting Earthed Socket (BS Type) - with cover 16A IP65 Un 2
Supplying, installing, connecting and testing electric outlets Including conduit or three compartment perimeter trunking which shall be designed to provide a solution to the segregation and access of power, data and communication cable trunk, r trunk accessories, conduit or trunk accessories, cabling, boxes terminations, earthing and all necessary ancillary works and materials required for complete installation as specified and as indicated on the drawings for the following items :
5.4.4 Sockets outlet ,240V by copper wire 3X2.5 mm2 Cu/ XLPE/ PVC in 20 mm pvc conduit. No. 26
5.4.5 Ditto but outlet by copper wires 3X1.5 mm2 Cu/ XLPE/ PVC in 20 mm pvc conduit Ceiling Fans No. 2
5.4.6 Ditto but outlet by copper wires 3X4 mm2 Cu/ XLPE/ PVC in 20 mm pvc conduit for Air conditioners No. 2
5.4.7 Ditto but outlet by copper wires 3X1.5 mm2 for Tools room exhaust fan Cu/ XLPE/ PVC in 20 mm pvc conduit No. 1
5.4.8 Power Outlets with fire rated cables(2X1.5mm² Cu/ XLPE/ LSZH , in galvanized steel coduit for fir alarm panel and repeater No. 2
5.5 Earthing System
5.5.1 Supplying, installing connecting and testing a complete protective earthing system including earthing pits, earthing electrodes, equalizer bars, earth continuity conductor, earthing conductor to switchboards, diesel generator set and transformers and all low voltage systems ...etc complete with all accessories, fixings, brackets test links, suspensions, drilling and cutting to form a complete installation as specified and as indicated on the earthing schematic drawings (Note: In the end It should be guaranteed, the achievement of a protective earth value less than a 1 Ohm (Regime TN-S)) LS 1
5.6 Lightening Protection Systeme
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories as specified in schedules of equipment, detailed drawings and specs:
5.6.1 - Interseption rod installed on pole NO 6
5.6.2 - Detail C - Mechanical connector (connection to source earth) NO 12
5.6.3 - Main Earthing Terminal NO 12
5.6.4 - Source earth with 20mm Diameter made of copper NO 12
5.6.5 - Downward conductor 50 mm2 bar copper with connection terminal +Manhole / 400x400x500mm - ml 450
5.7 Fire Detection System
Supply and installation in accordance with the conditions defined in the in written pieces, specification, drawings and other elements of the project, for the following equipment and materials, and all required accessories include 24 hours operation batteries as specified in schedules of equipment, detailed drawings and specs. All components of the fire alarm system shall be fire resistant (conduits, pullboxes…)
5.7.1 - Self contained , 4 loops Fire control panel, addressable pcs 1
5.7.2 - control panel, repeator pcs 1
Fire Detection Devices:
5.7.3 - Manual break glass points with protective cover pcs 5
5.7.4 - Optical smoke detector including detector base pcs 53
5.7.5 - Evacuation speaker pcs 7
5.7.6 Ditto but Water Proof pcs 2
5.7.7 Visual Alarm pcs 5
5.7.8 Ditto but Water Proof pcs 4
Electrical fire rated cables:
Enclosed in a recessed or surface mettalic conduiting include , all needed fire rated accessories :
5.7.9 - JE-H(st)H minimum 2x2x1mm² (The size to be determn according to system design), connecting repeator to control panel ml 448
5.7.10 - JE-H(st)H minimum 2x2x1mm² (The size to be determn according to system design), connecting Detectors to control panel and repeator ml 164
5.8 - Engineering, System Programming, including System Testing, Commissioning and Training. L.S 1
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
CROPS STORAGE MODEL DESIGN
\ DESCRIPTION QUANTITY UNIT RATE AMOUNT
BILL NO.5 SCHEDULE OF RATES - GENERAL (NOTE: IT IS MANDATORY FOR BIDDERS TO COMPLETE THIS SECTION)
Note: The rates provided in this section will ONLY be used to value variation items whose rates are not provided in the measured work bills.
a Site Clearance m2 0.00
b Cutting, clearing and dumping away all shrubs, debris and unnecessary materials. m2 0.00
c Cutting of trees not exceeding 450mm girth including removing from site as directed nr 0.00
d Cutting of trees exceeding 450mm but not exceeding 600mm girth ditto nr 0.00
e Cutting of trees exceeding 600mm but not exceeding 900mm girth ditto nr 0.00
f Cutting of trees exceeding 900mm but not exceeding 1200mm girth ditto nr 0.00
g Cutting of trees exceeding 1200mm girth ditto nr 0.00
h Removing stumps of trees not exceeding 600mm girth and carting away debris nr 0.00
j Removing stumps of trees exceeding 600mm but not exceeding 1200mm girth ditto nr 0.00
k Removing stumps of trees exceeding 1200mm girth ditto nr 0.00
l Excavate the unconsolidated top soil to an average depth of 150mm m2 0.00
m Cutting of surface rock outcrops and removing debris from site m2 0.00
n Backfill to make up levels m3 0.00
p "Premise 200CC" insecticide treatment to surfaces of excavations applied as per manufacturer's instruction with a 10 year guarantee m2 0.00
q "Gladiator TC"(organophosphates chlorpyrifos)-covers 8SM per litre m2 0.00
r "Termidor" anti-termite with a coverage of 20m2 per litre m2 0.00
2 FOUNDATION EXCAVATION 0.00
a Excavate on normal soil to a depth of 1500mm from ground level m3 0.00
b Excavate on normal soil to a depth of 3000mm from ground level m3 0.00
c Excavate on normal soil to a depth of 4500mm from ground level m3 0.00
d Extra-over for excavating in rock class I m3 0.00
e Extra-over for excavating in rock class II m3 0.00
f Extra-over for excavating in rock class III m3 0.00
g Extra-over for excavating in clay soil m3 0.00
3 FOUNDATION WALLING 0.00
a 400mm thick rubble stone foundation walling bedded and jointed in cement and sand (1:3)mortar m2 0.00
b 200mm thick natural stone foundation walling bedded and jointed in cement and sand (1:3)mortar m2 0.00
4 CONCRETE WORK 0.00
a Provide all materials and cast insitu plain concrete class 15/20 (1:3:6) blinding under foundation m3 0.00
b Provide all materials and cast insitu plain concrete class 20/20 (1:2:4); vibrated m3 0.00
c Provide all materials and cast insitu plain concrete class 25/20 (1:11/2:3); vibrated m3 0.00
Sawn formwork to insitu concrete as described:- 0.00
d To sides of ring beams m2 0.00
e To soffits of suspended slabs m2 0.00
f To sides of columns m2 0.00
Extra over formwork for:- 0.00
g Fair face finish m2 0.00
a Provide materials and construct 100mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
b Provide materials and construct 150mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
c Provide materials and construct 200mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
d Provide materials and construct 400mm thick solid concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with two strips of hoop iron after every four courses m2 0.00
e Provide materials and construct 200mm thick hollow concrete block walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
f Provide materials and construct 100mm thick machine cut stone walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
g Provide materials and construct 150mm thick machine cut stone walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
h Provide materials and construct 200mm thick machine cut stone walling bedded and jointed in cement and sand (1:3) mortar and reinforced with hoop iron at every alternate course m2 0.00
6 ROOF CONSTRUCTION, COVERING AND RAIN WATER GOODS 0.00
a Supply and fix gauge 26 IT5 roofing sheets m2 0.00
b Approved concrete roofing tiles on 50x25mm soft wood battens at 200 centres m2 0.00
c Galvanized iron plain sheet 26 gauge m2 0.00
Approved pressure impregnated and treated hardwood steel 0.00
d 150x50mm section Steel members m 0.00
e 100x50mm section Steel members m 0.00
f 75x50mm section Steel members m 0.00
g 50x50mm section -Steel members m 0.00
h Provide and fix fascia board 250x25mm section fixed to the beams m 0.00
Approved pressure impregnated and treated softwood steel 0.00
j 150x50mm section Steel members m 0.00
k 100x50mm section Steel members m 0.00
l 75x50mm section Steel members m 0.00
n Provide and fix fascia board 250x25mm section fixed to the beams m 0.00
p Provide and fix 150x150mm box gutter fixed to fascia board with/and including brackets at rafter center and two coat of oil paint. The slopes to be considered according to the drawings m 0.00
q Supply and fix premanufactured 150x100mm PVC rain water gutter fixed to fascia board with mild steel brackets at 1200mm centres m 0.00
r Approve concrete roofing tiles on 50x25mm soft wood battens at 200 centres m2 0.00
7 WALL FINISHES 0.00
a Plaster with 18mm thick mortar on walls and beams, both inside and outside: Walls to be cured at least for one week after 24 hours of plastering. Contractor to allow for scaffolding and all necessary tools in his rate m2 0.00
b Plaster with 12mm thick mortar on walls and beams, both inside and outside: Walls to be cured at least for one week after 24 hours of plastering. Contractor to allow for scaffolding and all necessary tools in his rate m2 0.00
c Supply and apply two coats of white wash on all plastered surfaces with uniforms colours. Contractor to allow for scaffolding and all necessary tools in his rate m2 0.00
d Supply and fix ceramic wall tiles size 200x150x6mm thick m2 0.00
8 FLOOR FINISHES 0.00
Cement and sand screed 0.00
a 25mm thick insitu cement and sand (1:3) screeded beds, with steel trowelled finish , on concrete m2 0.00
Ceramic floor tiles 0.00
b Supply and fix ceramic floor tiles m2 0.00
c 100mm high ceramic tiles skirting m 0.00
Concrete Tiles 0.00
d Provide and install 50x50x5cm precast concrete tiles around the building 1m width as shown in the drawings m2 0.00
Epoxy paint 0.00
e Supply and apply epoxy industrial floor paint to all cement finished floors m2 0.00
Granolithic paving 0.00
f 38 mm thick (24mm cement and sand backing & 15mm thick granolithic layer) m2 0.00
g 20 x 100 mm Skirting m 0.00
Terrazzo Paving 0.00
h 38 mm thick (24mm cement and sand backing & 15mm thick terrazzo layer) m2 0.00
j 20 x 100 mm Skirting m 0.00
Plastic dividing strips. 0.00
k 32 x 3 mm thick plastic dividing strips. m 0.00
l Aluminum ditto m 0.00
m 25 mm wide non slip carborundum m 0.00
Precast Paving slabs
n) 600x600x50mm thick precast concrete paving slabs (standard) jointed in cement and sand mortar and laid on 50mm thick sand bed (Sample of paving slab to be provided by the Contractor for approval by the site Engineer). m2 0.00
Precast interlocking Paving slabs
o) Precast interlocking concrete paving slabs (standard) jointed in cement and sand mortar and laid on 50mm thick sand bed (m.s) (Sample of paving slab to be provided by the Contractor for approval by the site Engineer). m2 0.00
9 CEILING FINISHES 0.00
Acoustic Ceiling 0.00
a Tiles system suspended ceilings; 600 x 600 x 15 mm thick fissured mineral fibre tiles; jointed as per the manufacturer's instructions including suspending on 14 gauge pre-straightened galvanized annealed iron wire hungers at 2100 mm centers; rate to include steel brandering m2 0.00
Gypsum Board Ceiling 0.00
b Supply of materials and installation of gypsum board ceiling complete with steel brandering m2 0.00
Chipboard Ceiling 0.00
c 12mm thick chipboard ceiling fixed to and including 50x50mm cypress branderings at 600mm c/c both ways, with clout headed nails and set out in symmetrical panels with 'V' joints m2 0.00
Plywood Ceiling 0.00
d 8mm thick plywood ceiling (8'x4') boards on and including 50 x 50 mm softwood brandering m2 0.00
e Ex 75x50mm softwood molded steel cornice m 0.00
10 PAINTING 0.00
Prepare and apply three coats plastic emulsion paint to:- 0.00
a Plastered surfaces m2 0.00
Prepare and apply two coats gloss oil paint to:- 0.00
b Plastered surfaces m2 0.00
Aluminum primer or other equal and approved wood primer before fixing: - 0.00
c Backs of frame, board, etc over 100mm but not exceeding 200mm girth m 0.00
Prepare and apply three coats polyurethane clear matt varnish on woodwork internally 0.00
d General surfaces of flush doors and frames m2 0.00
Prepare and apply three coats permaplast weather proof paint to:- 0.00
e Walling and concrete ; external m2 0.00
a Mild steel grill door overall size 900x2100mm high made out of 40x80x4mm thick RHS framing, two equal door leafs each made out of 40x40x6mm mild steel plate frames, 12mm solid square bars welded to frame at equal 150mm centres at 450 angle both ways; including fixing frame to walling/concrete and complete with heavy duty hinges Nr. 0.00
b Supply and fix 30" mahogany veneered steel flush door size 900x2100mm high with hardwood lipping all round Nr. 0.00
c Door size 800x2100mm high Nr. 0.00
Wrot mahogany 0.00
Framed frames and framings 0.00
d 150 x 50 mm; 2 No. labours; plugged door frame m 0.00
e 50 x 15 mm architrave m 0.00
f 15x15mm quadrant beading m 0.00
Iron mongery 0.00
g Supply and fix three lever mortise lock complete with set lever handle furniture - fixed to steel doors Nr. 0.00
h 100mm steel butt hinges prs 0.00
j 900x100mm high standard Aluminum kicking plate Nr 0.00
k Four lever mortise lock complete with set lever handle furniture - fixed to steel doors Nr. 0.00
12 WINDOWS 0.00
Aluminum Windows 0.00
a Supply and fix 1500x1000mm high bronze anodized aluminium windows as per the specifications, with aluminium woven mesh fly screen in aluminium frame, and all necessary hardware and accessories. Nr 0.00
Steel Grill Windows 0.00
b Supply and fix steel grill window size 1500x1000mm high made out of 40x40x4mm SHS framing; 12mm solid square bars welded to frame at equal 150mm centers at 450 angles including fixing to approval Nr 0.00
Steel Casement Windows 0.00
c Supply and fix steel casement windows size 1200x1200mm in standard 'T' sections complete with closers, hinges, stays and all other necessary iron mongery Nr 0.00
d Supply and fix steel casement windows size 600x600mm in standard 'T' sections complete with closers, hinges, stays and all other necessary iron mongery Nr 0.00
e 5mm thick clear sheet glass and glazing to aluminium frames m2 0.00
f 5mm thick obscured sheet glass and glazing to aluminium frames m2 0.00
Adjustable Aluminum Louvre frames 0.00
g 8No. 100 mm blades (per set of blade ) Nr 0.00
h Ditto for 150 mm ( per set of blade ) Nr 0.00
Curtain fittings 0.00
j 35 mm diameter chrome plated curtain rod m 0.00
Pelmet boxes in wrot cypress 0.00
k End stops nr 0.00
l 150 X 25 mm pelmet top m 0.00
m 100 x 25 mm pelmet fascia m 0.00
Window Sills 0.00
n 500mm x 100mm precast concrete window sill pointed in cement and sand (1:3) mortar m 0.00
Window Blinds 0.00
p Supply and install vertical blinds to windows m2 0.00
Window Stay 0.00
q Supply and fixing of brass window stays approved from samples Nr 0.00
Window Handles 0.00
r Supply and fixing of brass window handles approved from samples Nr 0.00
13 DEMOLITION 0.00
a Demolition of single-storey masonry block/building including breaking the ground slab and the foundation , cleaning the site and making good the site for new construction, sort out arising materials as directed and removing all debris from site m2 0.00
b Demolition of multi-storey masonry block/building including breaking the ground slab and the foundation , cleaning the site and making good the site for new construction, sort out arising materials as directed and removing all debris from site m2 0.00
c Demolition of parts masonry wall, including any concrete beams and columns, make good the affected surfaces, sort out arising materials as directed and removing all debris from site m2 0.00
d Hack out the existing floor finish including the skirting and prepare floor surfaces to receive new floor; remove all debris from site m2 0.00
e Hack out the existing wall plaster in and prepare surfaces to receive new wall plaster m2 0.00
f Hack out the existing wall paint and prepare surfaces to receive new wall paint m2 0.00
g Remove existing doors and windows(various sizes) including frames and all iron mongery, cost of setting aside re-usable material as directed, removing debris from site and making good all affected surfaces Nr. 0.00
h Carefully remove all complete toilet fittings, prepare the affected surfaces to receive new fittings. Nr. 0.00
i Carefully remove all complete sinks fittings, prepare the affected surfaces to receive new fittings. Nr. 0.00
j Carefully remove all existing roof covering, repair the affected roof structures to receive new roof covering,; remove all debris from site as directed by site engineer m2 0.00
13 WATER AND SANITATION 0.00
Supply and fix the following sanitary appliances complete with all the connections to services, waste, jointing to supply overflows and plugging and screwing to the floors. Where trade names are mensioned below, the reference is intended to be as a guide to the type of fitting. 0.00
Water Closet 0.00
a 600x500mm deep Anti Vandal stainless steel squat type WC pan cast in concrete floor slab; complete with cistern and all necessary accessories Nr 0.00
b White European toilet complete with trap, cistern and all necessary accessories Nr 0.00
Wash hand basin (WHB) 0.00
c Ceramic Wash Hand basin complete with pedestal and all necessary accessories Nr 0.00
Urinal Bowl 0.00
d Wall hung ceramic urinal complete with all accessories and fixtures Nr 0.00
e Anti-vandal type stainless steel mirror Nr 0.00
Shower panel 0.00
f Shower panel to detail constructed in one piece grade 304stainless steel with all exposed surfaces polished to a satin finish; complete with an anti vandal spray head Nr. 0.00
Dhobi sinks 0.00
g Supply materials and construct concrete dhobi sink overall size 900x550mm wide Nr. 0.00
j Approved anti- vandal water tap Nr 0.00
k Supply and installation of a steel grease trap with a flow rate of 30GPM complete with accessories Nr 0.00
l Supply and install PVC water tanks with a capacity of 2 m3 complete with all fittings Nr 0.00
m Supply and install fibre glass tanks with a capacity of 5 m3 complete with all fittings Nr 0.00
n Install 10,000m3 Bulk Water Storage Fibre Glass tank complete with accessories Nr 0.00
Supply and install G.I. Class "B" Pipes complete with Fittings
p 32mm Diameter Pipe Lm 0.00
q 25mm ditto Lm 0.00
r 20mm ditto Lm 0.00
s 15mm ditto Lm 0.00
Supply and install PN 20 PPRC conforming to the current European standards for PPR installations and to the Engineer's approval, pipes jointing shall be by polyfusion or use of electric coupling.
Rates must allow for all Metal/plastic threaded adaptors where required for the connection of sanitary fixtures, valves. sockets, sliding and fixed joints, support raceways, isolating sheaths, elastic materials, expansion arm and bends, crossovers etc.
t 50mm dia pipe Lm 0.00
u 32mm dia pipe Lm 0.00
v 25mm ditto Lm 0.00
PPR to GI Adoption pieces
w 32mm diameter high pressure approved pattern brass rising stem full way gate valve with wheel head and jointing to tubing as 'PEGLAR' or approved equivalent. Nr. 0.00
x 12mm diameter 300mm long Copper tubing bent as required including jointing to GMS pipe and fitting. Nr. 0.00
Supply and install uPVC soil system to BS4660 and BS4515and muPVC waste systems to BS 5255withscrewed and socketed joints to BS 21. solvent welded joints shall be as per the system's manufacturer's written instruction. Tenderer must allow in their pipe work prices for all the couplings, connectors, joints etc as required in the running lengths of the pipe work and also where necessary for fixing clips, holder bats plugged and screwed.
y 100mm diameter grey heavy duty high pressure pipes Lm 0.00
z 50mm diameter waste pipes ditto Lm 0.00
a1 Supplying materials and construction of Inspection Chamber (IC) 600x600mm using solid concrete blocks for walls and casting concrete for the manhole base with thickness not less than 150mm; including cement plastering for inside walls. Nr 0.00
b1 Provide a rate for emptying of septic tank and disposal of waste m3 0.00
14 ELECTRICAL SUPPLY , CONDITIONING AND FIRE FIGHTING INSTALLATIONS
Supply, fix and install wires 1.5mm for lighting and 2.5mm for sockets, distribution panel boards with necessary circuit breakers, testing and earthing boards, cables, sockets, switches, fans, and lighting fixtures as specified in the drawings. All the price of the below items must include the materials and installations cost
a Main Distribution Panel Board of 150 AMP. Nr 0.00
b Twin sockets (13amp) Nr 0.00
c Single socket (13amp) Nr 0.00
d Switched Spur Outlet 13A c/w neon indicator lamp for Water Heaters Nr 0.00
e switches one gang (5amp) one way Nr 0.00
f switches one way (5amp) two gang Nr 0.00
g switches one way (5amp) three gang Nr 0.00
h Fluorescent lamps 40w 4 feet (Twin Unit) Nr 0.00
j Fluorescent lamps 40w 4 feet (Twin Unit) c/w Emergency Maintained Fluorescent fitting. Nr 0.00
k Fluorescent lamps 40w 4 feet (Single Unit) 'Splash Proof Fitting' Nr 0.00
l Fluorescent lamps 40w 4 feet (Single Unit) 'Splash Proof' c/w Emergency Maintained Fluorescent fitting. Nr 0.00
m Watertight IP65 Double 'D' Light Fitting Nr 0.00
n 3 speed box fan with 20 inch blades Nr 0.00
p Fire Escape Illuminated Fire Exit (Running Man) Sign to BS 5499 Nr 0.00
q Smoke Detector - Battery Operated 85dB Sounder with Test Button to BS 5839 Nr 0.00
r Battery Operated heat detector Nr 0.00
s Intercom code outlet points Nr 0.00
t Internet points Nr 0.00
Supply and install Air Conditioning A/C split unit, with complete installation and fittings
u 9000 BTU Nr 0.00
v 12000 BTU Nr 0.00
w 18000 BTU Nr 0.00
x 24000 BTU Nr 0.00
y Supply and installation of a 50KVA generator including all necessary wiring and builder's work Nr 0.00
z Ditto but Supply and installation of a 30KVA generator Nr 0.00
a1 Ditto but Supply and installation of a 20KVA generator Nr 0.00
b1 Ditto but Supply and installation of a 10KVA generator Nr 0.00
c1 Supply and installation of 150mm diameter extractor fan complete with humidity stat Nr 0.00
Fire Horse Reel
d1 Supply and installation of 1"x30m fire horse reel complete with disk ,waterway ,swing arm ,nozzle ,one meter inlet hose ,valve and all other necessary accessories Nr 0.00
Supply and erect pre-cast concrete Fencing Posts-Cranked
a 100x100mm Nr 0.00
b 100x125mm Nr 0.00
c 125x125mm Nr 0.00
d 125x150mm Nr 0.00
Chain Link Fencing
e Supply and install 2400mm high x 14 gauge chain link fencing on and including 100x125 cranked precast concrete fencing posts on concrete bases m 0.00
f Supply and install 12 1/2 Gauge x 4 strands galvanized barbed wire nailed to steel or concrete posts (Measured Separately) m 0.00
Supply and install 12 1/2 Gauge galvanized steel razor wire complete with 1000mm high 50x50x6mm thick angle iron posts at 1500mm centers; bottom part of posts built in concrete block walling
g 300mm diameter (stretched) m 0.00
h 450mm diameter (stretched) m 0.00
j 600mm diameter (stretched) m 0.00
k Supply materials and construct boom gate overall 10950mm long comprising of 350mm diameter mild steel pipe 1400 mm high filled with mass concrete , embedded on the ground with concrete and painted with reflective white and yellow paint; 50mm diameter mild steel pipe painted with reflective white paint; 950x950x950mm steel box filled with lightweight concrete and painted with white reflective paint: All to the details provided and the Site Engineer's instructions nr 0.00
16 WATER PROOFING
a Supply and lay approved single layer bituminous waterproofing membrane on sealer coat and hot laid with melted oxidized bitumen by specialist, tucking into grooves including forming grooves in block work or concrete, all in accordance with the manufacturer's specifications (10 years guarantee to be given, measured net) m2 0.00
b Supply materials and apply two part acrylic modified cementitious coating mixed with cement screed laid to fall to manufacturer's specifications m2 0.00
16 steel BOARDS & PARTITIONS
Supply and fix the following:-
25 mm thick block board
a Plain m2 0.00
b Veneered one side with mahogany m2 0.00
c Veneered BOTH sides with mahogany m2 0.00
d 3mm thick sheet m2 0.00
12 mm thick celotex soft board
e Sheets m2 0.00
f 3mm thick mahogany m2 0.00
Chip boards 8' X 4'
g 9 mm thick Plain Chip board m2 0.00
h 12 mm thick ditto m2 0.00
Gypsum boards 8' X 4'
j 9 mm thick m2 0.00
k 12 mm thick m2 0.00
l 12 mm thick m2 0.00
m 18 mm thick m2 0.00
Styrofoam boards 4' X 4'
n 25mm thick size 1200x1200 m2 0.00
p 12.5mm thick size 1200x1200mm m2 0.00
25 mm wrot T & G boarding
q Fabricated from 100 X 25 mm prime grade cypress m2 0.00
r Ditto in cedar Ditto. m2 0.00
Polystyrene Thermal Insulation Boards
s Supply and install 2500x600x100mm thick interlocking polystyrene thermal insulation boards with compressive strength of 250-300kpa and a density of 30kg/m2 : Thermal conductivity to be 0.029 W/mK. The insulation boards should be installed as per the manufacturer's instructions and the Project Engineer's approval m2 0.00
The works shall consist of furnishing materials, construction,installation, and completion as directed by site engineer.
a Cordinate to construct and test a round water fountain, comprised of an external fountain of 5.6m diameter,40cm high and an inside circular of 2.6m diameter 60cm high . Concrete tilling works,stone works and electromechanical works and equipment are included in their respective items. price to include all items including cleaning. Sum 0.00
b Supply and install, spread and make good a minimum of 30cm agricultural soil in designated areas m2 0.00
c Supply and plant trees. Price includes digging a minimum of 1.5m deep holes for each tree for the following:
i) Plam tree , medjoul type not less than 2m high in good condition Nr 0.00
ii) Ditto but pensian trees Nr 0.00
iii) Ditto but vecus trees Nr 0.00
iv) Supply and plant washintonian trees Nr 0.00
v) Ditto but Lavnedar 3 year old Nr 0.00
vi Ditto but Rose 1 year old Nr 0.00
vii Ditto but cuctus 6 month year old Nr 0.00
viii) Cypress tree , not less than 0.5m high in good condition Nr 0.00
ix) Reasonable general rate for any other trees not included here but commonly use in human habitation areas, not less than 0.5m high in good condition Nr 0.00
d Supply and install Arturo turf grass. Price to include leveling of the agricultural soil and fertilizers and all necessary works to complete the job according to the prevailing weather condition. m2 0.00
e Allow for shifting of existing cover plants / live fence/flowers . The rate has to take care about watering and maintenance of plants for about 3 months or until completion of the contract. m2 0.00
f Allow for shifting of existing small trees at the location of proposed units. – The rate has to take care about watering and maintenance of plants for about 3 months or until completion of the contract Nr 0.00
TOTAL FOR SCHEDULE OF RATES BILL (NOTE: THIS TOTAL WILL NOT BE CARRIED TO GRAND SUMMARY) 0.00
Horn of Africa Multi Country Office (HAMCO)
BILLS OF QUANTITIES
LOT 1 New Halfa - Kassala State
LOT 2 Galanahal - Gedaref State
LOT 3 East Galabat (DOKA) - Gedaref State
LOT 4 West Galabat (KASSAB) - Gedaref State
LOT 5 Toker - Red Sea State
GRAND TOTAL ALL LOTS
LESS DISCOUNT (IF ANY)
GRAND TOTAL 0.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
01- Section I - Instructions to Bidders.pdf
Bidding document • 4.06 MB
02- Sections II, III, IV, V - Schedule of Requirements.pdf
Bidding document • 0.73 MB
03- Section VI - Returnable Schedules.docx
Bidding document • 2.92 MB
04.1 A - Lot 1 _ New Halfa Model Design Crops Storage BoQ..xlsx
Bidding document • 0.27 MB
04.1 B - Lot 2 _ Gala ElNahal Gedaref State_ Model Design Crops Storage BoQ..xlsx
Bidding document • 0.27 MB
04.1 C - Lot 3 _ East Galabat (DOKA) Model Design Crops Storage BoQ..xlsx
Bidding document • 0.27 MB
04.1 D - Lot 4 _ West Galabat (KASSAB) Model Design Crops Storage BoQ..xlsx
Bidding document • 0.27 MB
04.1 E - Lot 5 _ Toker Red Sea State Model Design Crops Storage BoQ..xlsx
Bidding document • 0.27 MB
04.1 F_ ALL LOTS GRAND SUMMARY_CROPS STORAGES.xlsx
Bidding document • 0.04 MB
05.A_ Section IV_ Construction-Contract-for-Small-Works_ Template.pdf
Bidding document • 1.27 MB
05.B_ General Conditions of Contract.pdf
Bidding document • 0.45 MB
06.A_ SPECIFICATION.pdf
Bidding document • 0.46 MB
06.B_ Civil Technical Specifications.pdf
Bidding document • 1.32 MB
06.C_ MECHANICAL SYSTEMS TECHNICAL SPECIFICATION R3.pdf
Bidding document • 0.34 MB
06.D_ TECHNICAL SPECIFICATION PLUMBING AND MECHANICAL.pdf
Bidding document • 0.25 MB
07.A_ Crop Storage Architectural drawings.pdf
Bidding document • 12.26 MB
07.B_ CROP STORAGE Structural Working Drawings..pdf
Bidding document • 10.66 MB
07.C_ Electrical work layout..pdf
Bidding document • 15.47 MB
07.D_ CROP & VEGETABLE STORAGE MECHANICAL LAYOUT.pdf
Bidding document • 3.46 MB
07.E_ GRAIN CROP STORAGE SANITARY & DRAINAGE LAYOUT.pdf
Bidding document • 4.52 MB
Pre-Bid Meeting Summary.pdf
Bidding document • 0.08 MB
Pre-bid Meeting Presentation -Crops Storages, Crops and Vegetables Markets.pptx
Bidding document • 3.76 MB
Notice on UNGM.html
Notice page • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .