Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
7,130 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
7,130 results • Latest
Madhyanchal Vidyut Vitran Nigam Ltd
The Work of Testing of Various 33/11 KV Substations As Well As Power Transformers in The Jurisdiction Of Electricity Test Division-Akbarpur (Ambedkarnagar)
Madhyanchal Vidyut Vitran Nigam Ltd
Madhyanchal Vidyut Vitran Nigam Ltd
KOLKATA MUNICIPAL CORPORATION
REPAIRING OF I.P.S. AND PAVER BLOCK FOOTPATH AT ANIL ROY ROAD, DOVER LN AND OTHER PLACES IN WD NO-86.
MUNICIPAL AFFAIRS DEPARTMENT
MUNICIPAL AFFAIRS DEPARTMENT
MUNICIPAL AFFAIRS DEPARTMENT
MUNICIPAL AFFAIRS DEPARTMENT
MUNICIPAL AFFAIRS DEPARTMENT
MUNICIPAL AFFAIRS DEPARTMENT
MUNICIPAL AFFAIRS DEPARTMENT
MUNICIPAL AFFAIRS DEPARTMENT
MUNICIPAL AFFAIRS DEPARTMENT
MUNICIPAL AFFAIRS DEPARTMENT
PUBLIC WORKS DEPARTMENT
Constn of Bldg for Adm cum Academic Building for the West Bengal University of Health Sciences at Salt Lake Kolkata --------Additional work for Partition and other ancillary work at Main building, Electrical Substation building and Boundary wall.
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left Ex Zamindari embankment of River Mundeswari from 3.066 KM. to 3.133 KM. for a length of 67.00 Mtr. at Gopimohanpur G.P.Chiladangi Block Pursurah Dist.Ho
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Right Ex Zamindari embankment of River Mundeswari from 7.185 KM. to 7.239 KM. for a length of 54.00 Mtr. at Paschim Durgapur Samantapara G.P. Tantishal Block
Zilla Parishad
Construction of road from Durgapur gholer ghat to Sahid Kati more via Nakultala Nirman Mina Bazar under Swarupnagar Block for the Scheme of RIDFXXVI
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left Ex Zamindari embankment River Mundeswari from 3.740 KM. to 3.824 KM. for a length of 84.00 Mtr. at Digruighat Manasa Mandir G.P. Shyampur Block Pursura
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left Ex Zamindari embankment of River Mundeswari from 7.536 KM. to 7.626 KM. for a length of 90.00 Mtr. at Balipur Kalitala G.P. Balipur Block Khanakul I D
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left Ex Zamindari embankment of River Mundeswari from 4.092 KM. to 4.168 KM. for a length of 76.00 Mtr. at Digruighat Manasa Mandir G.P Shyampur Block Pursu
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left Ex Zamindari embankment of Upper Harinakhali Khal from 13.470 KM. to 13.545 KM. for a length of 75.00 Mtr at Harua G.P. Chiladangi Block Pursurah Dist
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Right Ex Zamindari embankment of River Mundeswari from 5.785 KM. to 5.885 KM. for a length of 100.00 Mtr. at Kanakpur Adakpara G.P. Tantishal Block Khanak
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left Ex Zamindari embankment of River Mundeswari from 7.863 KM. to 7.947 KM. for a length of 84.00 Mtr. at Balipur Bhimtala G.P. Balipur Block Khanakul I D
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left Ex Zamindari embankment of River Mundeswari from 2.387 KM. to 2.475 KM. for a length of 88.00 Mtr. at Benegachhi Dhanpota G.P Chiladangi Block Pursurah
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and mitigation work and reducing vulnerability of people at Inspection Path of Dakatia Khal Left bank in between Ch. 891.00 and Ch. 944.00 for a length of 1585.00 Mtr. at G.P.Sahadeb Haripal Block Haripal Dist.Hooghly.
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and mitigation work and reducing vulnerability of people at Inspection Path of Dakatia Khal Right bank in between Ch. 615.00 Bahirkhanda and Ch. 672.00 Dulla for a length of 1737.00 Mtr. at G.P. Dwarhatta Block Haripal Dist. Hoogh
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and mitigation work and reducing vulnerability of people at Inspection Path of Dakatia Khal Right bank in between Ch.540.00 Madpur and Ch. 598.00 Bahirkhanda for a length of 1768.00 Mtr. at G.P. Narayanpur Bahirkhanda Block Haripa
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left Ex Zamindari embankment of River Mundeswari from 3.401 KM. to 3.473 KM. for a length of 72.00 Mtr. at Gopimohanpur G.P. Chiladangi Block Pursurah Dist.
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and mitigation work and reducing vulnerability of people at various streches of Dakatia Khal both bank in between Ch.952.00 and Ch.1228.00 for a length of 275.00 Mtr. at G.P. Radhanagar Furfura Kotalpur Block Jangipara Dist. Hoogh
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Right Ex Zamindari embankment of Upper Harinakhali Khal from 14.650 KM. to 14.734 KM. for a length of 84.00 Mtr. at Gholdigrui Ghoruipara G.P. Shyampur Bloc
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and mitigation work and reducing vulnerability of people at various streches of Raner Khal both bank in between 12.10 KM. and Ch.12.40 KM. for a length of 299.00 Mtr. at G.P. Bhanjipur and Astara Dattapur Block Tarakeswar Dist. H
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and mitigation work and reducing vulnerability of people by restortation at Ch. 838.00 Kamrajpur Ch. 890.00 Kalubati and Ch. 941.00 Khejuria of Dakatia both bank for a length of 112.00 Mtr. at G.P.Sahadeb Haripal Block Haripal Dist.
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left Ex Zamindari embankment of River Mundeswari from 2.884 KM. to 2.954 KM. for a length of 70.00 Mtr. at Gopimohanpur G.P Chiladangi Block Pursurah Dist. H
WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD
Renovation of Patpur IB surrounding area inside Patpur 33 11 KV premises Dist Bankura
WEST BENGAL STATE MARKETING BOARD
Construction of WBM approach road from NH-34 to North and South Gate of Nakashipara Krishak Bazar with cross drain at north road under Nadia Zilla Regulated Market Committee
PUBLIC WORKS DEPARTMENT
Construction two units of Resting Place/Guest House at Khustigiri Dargha Sharif Waqf Estate. (Project id- MD192009302S000)
J and K AGRO
PHE
Please refer BOQ
PWD
PWD
Const. of road Thathar Jammu by way of providing laying WBM Gr-II Gr-III Premix carpet. Part A
PHE
Please refer BOQ
PHE
Please refer BOQ
PHE
Please refer BOQ
SKUAST
MUNICIPAL AFFAIRS DEPARTMENT
Construction of three storied shelter for Urban Homeless Under National Urban Livelihood Mission within Ashokenagar Kalyangarh Municipality
Uttar Pradesh Jal Vidyut Nigam Limited
RDD-CEO-JALGAON
Supply Cement Bags OPC ISI mark 50 K G
Across all 7,130 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.