Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
6,724 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
6,724 results • Latest
Zilla Parishad
Building Renovation Of Chotojagulia BPHC at BarasatI Panchayat Samity North 24 Parganas Zilla
Zilla Parishad
Sinking of 100mmx40m Deep Tubewell in front of Godar More Bazar of BerachampaI GP under Deganga P/Samity.
Zilla Parishad
Sinking of 100mmx40m Deep Tubewell in front of Monmatha Para of Amdanga GP under Amdanga P/Samity
Zilla Parishad
Building Renovation Of Sindrani PHC at Sindrani G.P. under Bagdah Panchayat Samity North 24 Parganas Zilla
Zilla Parishad
Sinking of 100mmx40m Deep Tubewell in front of Abdut Mondals house of Sadhanpur GP under Amdanga P/Samity
Zilla Parishad
Construction of Shade for Patient outside of OPD of Pumlia PHC at Srikrishnapur G.P. under HabraII Panchayat Samity, North 24 Parganas
Zilla Parishad
Building Renovation Of Biswanathpur BPHC at Nurnagar G.P. under Deganga Panchayat Samity North 24 Parganas Zilla
Zilla Parishad
Building Renovation Of Adhata PHC at Adhata G.P. under Amdanga Panchayat Samity North 24 Parganas Zilla
Zilla Parishad
Construction of boundery wall and beautification of school campus at Bamangachi Bholanath High School
Zilla Parishad
Sinking of 100mmx40m Deep Tubewell at Bamangachhi Bholanath High School of Chhotojagulia GP under BarasatI P/Samity
Zilla Parishad
Sinking of 100mmx40m Deep Tubewell in front of Chatul Smriti Durga Mandir of DegangaI GP under Deganga P/Samity
DISTRICT MAGISTRATE PURULIA
RAISING NY SEEDLINGS TALL MISCELLANEOUS
DISTRICT MAGISTRATE PURULIA
RAISING NY SEEDLINGS TALL MISCELLANEOUS
KOLKATA MUNICIPAL CORPORATION
Operation and Maintenance of Electric Cremation Furnace nos.1and2 in Old Complex of Nimtala Burning Ghat
KOLKATA MUNICIPAL CORPORATION
Operation and Maintenance of Air Pollution Control Devices connected with Furnace no. 1and2 in Old Complex of Nimtala Burning Ghat
Zilla Parishad
CONST. OF CC ROAD FROM PROMILA SAHANI HOUSE TO CHHEDI PASWAN HOUSE AT KHOLAIBAKTARI. WORK CODE 3204009003RCGIS1659386
Panchayati Raj Department
Supply of construction material and providing equipments in NREGA and other Scheme at Gram Panchayat bola
Zilla Parishad
Construction of Box Culvert at Janjali Ckak (Madhyakul) on Siberhana road under Amta-I P.S in the district of Howrah
WRD - CE AND AS
Cleaning Sweeping work of office building at CE WR North ffice Campus Hanumangarh
WRD - CE AND AS
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of areas due to damaged of Sundarban embankment affected during full moon kotal from 17.04.2022 to 19.04.2022 from ch. 6.35 km to 6.825 km for a length of 400 m at Mouza Indrapur
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of area due to damages of Sundarban Embankment affected during Full Moon Kotal from 17.04.2022 to 19.04.2022 for a length of 600 Meters between Ch. 6.500 Km to Ch. 7.200 Km
IRRIGATION AND WATERWAYS DEPT.
Flood portection and mitigation work for reducing vulnaribility of the area due to damage of sundarban embankment affected during full moon kotal from 17.04.22 to 19.04.22 from Ch.23.90Km to Ch.24.14 Km for a length of 240 m at mouza- Budhakhali
IRRIGATION AND WATERWAYS DEPT.
Flood portection and mitigation work for reducing vulnaribility of the area due to damage of sundarban embankment affected during full moon kotal from 17.04.22 to 19.04.22 from Ch.28.25 Km to Ch.28.400 Km for a length of 150 m at mouza- Ganeshnagar
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of areas due to damaged of Sundarban embankment affected during full moon kotal from 17.04.2022 to 19.04.2022 from ch. 4.600 km to 4.060 km for a length of 460 m for making ring bandh
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and Mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon Kotal from 17.04.2022 to 19.04.2022 near Sitarampur AILA from ch. 5.670 km to 5.880 km for a length of 210 m
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of area due to damages of Sundarban Embankment affected during Full Moon Kotal from 17.04.2022 to 19.04.2022 between Ch. 16.890 Km and Ch. 17.070 Km facing river Muriganga at Mouza Banki
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducimg vulnerability of area due to damaged of Sundarban Embankment effected during full moon kotal from 17.04.2022 to 19.04.2022 inbetween ch.1.650 km and ch.1.911 km. for a length of 261.00m at Mahishmari
IRRIGATION AND WATERWAYS DEPT.
Flood portection and mitigation work for reducing vulnaribility of the area due to damage of sundarban embankment affected during full moon kotal from 17.04.22 to 19.04.22 from Ch.26.15Km to Ch.26.28 Km for a length of 130m at mouza- Rajnagar
IRRIGATION AND WATERWAYS DEPT.
Flood portection and mitigation work for reducing vulnaribility of the area due to damage of sundarban embankment affected during full moon kotal from 17.04.22 to 19.04.22 from Ch.24.40Km to Ch.24.49 Km for a length of 90 m at mouza- Budhakhali
IRRIGATION AND WATERWAYS DEPT.
Flood portection and mitigation work for reducing vulnaribility of the area due to damage of sundarban embankment affected during full moon kotal from 17.04.22 to 19.04.22 from Ch.17.01Km to Ch.17.451 Km for a length of 450 m at mouza- Purbaguriachac
IRRIGATION AND WATERWAYS DEPT.
Flood portection and mitigation work for reducing vulnaribility of the area due to damage of sundarban embankment affected during full moon kotal from 17.04.22 to 19.04.22 from Ch.24.75Km to Ch.25.025 Km for a length of 270 m at mouza- Budhakhali
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and Mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon Kotal from 17.04.2022 to 19.04.2022 from Ch. 1.495 km. to Ch. 1.867 km for a length of 372.00 m.
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of the area due to damage of sundarban embankment affected during full moon kotal from 17.04.2022 to 19.04.2022 from ch 0.420 km to ch 0.485km for a length of 65 m
IRRIGATION AND WATERWAYS DEPT.
Flood portection and mitigation work for reducing vulnaribility of the area due to damage of sundarban embankment affected during full moon kotal from 17.04.22 to 19.04.22 from Ch.12.50 Km to Ch12.75 Km for a length of 250 m at mouza- Kashinagar
IRRIGATION AND WATERWAYS DEPT.
Flood portection and mitigation work for reducing vulnaribility of the area due to damage of sundarban embankment affected during full moon kotal from 17.04.22 to 19.04.22 from Ch.23.60Km to Ch.23.850 Km for a length of 250 m at mouza- Budhakhali
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of areas due to damaged of Sundarban embankment affected during full moon kotal from 17.04.2022 to 19.04.2022 from ch. 3.00 km to 3.500 km for a length of 500 m at Mouza Gobindapur Abad
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and Mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon Kotal from 17.04.2022 to 19.04.2022 from Ch.11.800 km. to Ch. 12.150 km for a length of 350 m. at Mouza - Baliara
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and Mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon Kotal from 17.04.2022 to 19.04.2022 from Ch.10.010 km. to Ch. 10.170 km for a length of 160.00 m.
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and Mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon Kotal from 17.04.2022 to 19.04.2022 from Ch.12.727 km. to Ch. 13.327 km for a length of 600.00 m.
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of area due to damage of Sundarban embankment affected during full moon kotal from 17/04/22 to 19/4/22 from Ch. 4.100 km. to Ch. 4.410 km. for a length of 310.00 m. at mouza - Patibunia
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon kotal from 17.04.22 to 19.04.22 from Ch. 3.400 km. to Ch. 3.680 km for a length of 280.00 m. at Mouza - Uttar Nara
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and Mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon Kotal from 17.04.2022 to 19.04.2022 from Ch. 2.505 km. to Ch. 2.895 km for a length of 390 m. at Mouza - Bagdanga
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and Mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon Kotal from 17.04.2022 to 19.04.2022 from Ch.5.650 km. to Ch. 5.780 km for a length of 130 m. at Mouza -Patibunia
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of area due to damage of Sundarban embankment affected during full moon kotal from 17/04/22 to 19/4/22 from Ch. 3.74 km. to Ch. 4.14 km. for a length of 400.00 m. at mouza - Rajnagar
IRRIGATION AND WATERWAYS DEPT.
Flood portection and mitigation work for reducing vulnaribility of the area due to damage of sundarban embankment affected during full moon kotal from 17.04.22 to 19.04.22 from Ch6.40 Km to Ch6.90 Km for a length of 500 m at mouza- Iswaripur
IRRIGATION AND WATERWAYS DEPT.
Flood Protection and Mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon Kotal from 17.04.2022 to 19.04.2022 from Ch.6.00 km. to Ch. 6.15 km for a length of 150 m. at Mouza -Patibunia
Zilla Parishad
Zilla Parishad
Zilla Parishad
Across all 6,724 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.