Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
12,968 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
12,968 results • Latest
PHE
Different works related sinking of Tubewells LDSs RisingMains FHTCs Construction of different capacity RCC OHRs each with 20.0 mtr. PICHKURI KARATIA PWSS under Manteswar Block Dist PurbaBardhaman NEWSCHEME
PHE
Maintenance of Garden of Childrens Park at Eco-Tourism Park, AA-II from the period of 01.04.2023 to 31.03.2024 (i.e. 12 months) under New Town Kolkata Water Supply Division-I, P.H.E. Dte.
PHE
Maintenance of arboriculture work beneath of Metro Fly over towards Finance Centre towards position opposite side of Eco-Tourism Park (bandh more) 17 nos. Panel from Pillar no 615-632 under New Town Kolkata Water Supply Division-I, for the Period o
PHE
Annual maintenance of garden including supply of tools plants etc. on hire charges within WTP site in front of ADM , WTP maintenance building, Control building WTP phase-II and East and West side of WTP phase-I under New Town Kolkata W/S Division-
Directorate Urban Administration and Development
CONSTRUCTION OF BT ROAD UNDER KAYAKALP ABHIYAN AT MORENA TIRAHA BY NAGAR PALIKA UP TO PORSA CHOURAHA MUNICIPAL COUNCIL AMBAH DIST MORENA
DLB
PWD
PWD
PHE
Operation and Maintenance for Arsenic cum Iron Removal Plant of Kasiadanga zone 1 PWSS Capacity 143 m3/hr Under Murshidabad Division P.H.E. Dte.for 12 Twelve Months.
PHE
Operation and Maintenance for Arsenic cum Iron Removal Plant of Bhandara PWSS Capacity 110 m3 hr Under Murshidabad Division P.H.E. Dte.for 12 Twelve Months.
PHE
Operation and Maintenance for Arsenic cum Iron Removal Plant of Barabil-Raghunathpur Zone-II PWSS Capacity 96 m3 hr Under Murshidabad Division P.H.E. Dte.for 12 Twelve Months
PHE
Operation and Maintenance for Arsenic cum Iron Removal Plant of Habaspur PWSS Capacity 53 m3 hr Under Murshidabad Division P.H.E. Dte.for 12 Twelve Months
PHE
KOTALGHOSH PWSS with sinking of Tubewell LDS RisingMain FHTC Construction of 200 cum capacity RCC OHR with 20.0 mtr. TW site under Mongalkote Block Dist PurbaBardhaman NEW SCHEME
PHE
Different works related sinking of Tubewells LDSs RisingMains FHTCs Construction of different capacity RCC OHRs each with 20.0 mtr. different TW site to SHYAMPUR, GAHAK SHANKRA PWSS under Purbasthali I Block Dist PurbaBardhaman NEWSCHEME
PHE
Different works related sinking of Tubewells LDSs RisingMains FHTCs Construction of different capacity RCC OHRs each with 20.0 mtr. BELENDA JAMNA PIPLON PARGUNA PWSS under Manteswar Block Dist PurbaBardhaman NEWSCHEME
PHE
Different works related sinking of Tubewells LDSs RisingMains FHTCs Construction of different capacity RCC OHRs each with 20.0 mtr. NABASTA PASHALA POALKURA PWSS under Bhatar Block Dist PurbaBardhaman NEW SCHEME
PHE
PASCHIM NABAGRAM PWSS with sinking of Tubewell LDS RisingMain FHTC Construction of 250 cum capacity RCC OHR with 20.0 mtr. TW site under Mongalkote Block, Dist Purba-Bardhaman NEW SCHEME
PHE
KURMUN PWSS with sinking Tubewell LDS RisingMain FHTC Construction of 350 cum capacity RCC OHR with 20.0 mtr. boundary walls with gates and land development drain and internal pathway at different TW Burdwan-I Block Dist PurbaBardhaman New Scheme
PHE
Procurement of different dia Sluice Valves and C.I.M.J. Bolted Collar at Amtala Store under South 24-Pgs. W/S Division-I, PHE Dte. required for different maintenance work (Year- 2023) under Surface Water Based Water Supply Scheme in the arsenic Affec
PUBLIC WORKS DEPARTMENT
Fencing over Boundary wall along with ancillaries works at Banipur State welfare Homes, P.O. Banipur, District North 24-Parganas(2nd call)
PWD
PWD
PHE
Maintenance of Gardening / Arboriculture / Plantation, drainage system, water supply line and petty repair for the seven wonders within the Eco-Tourism Park Under New Town Kolkata W/S Division-I, P.H.E. Dte. (From 01.04.2023 - 31.03.2024) (Part-II)
WEST BENGAL STATE MARKETING BOARD
Infrastructure Development of Mainaguri By Pass Sub Market Yard Construction of Vegetable Shed Rigid Pavement Overhead Water Supply and Boundary Wall Dist Jalpaiguri
Rajasthan
PHE
Maintenance of Gardening / Arboriculture / Plantation, drainage system, water supply line and petty repair for the seven wonders within the Eco-Tourism Park From 01.04.2023- 31.03.2024 Under New Town Kolkata W/S Division-I, P.H.E. Dte.
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
PUBLIC WORKS DEPARTMENT
Supplying, fitting and fixing of Office Furniture for the use of different establishment under the Jurisdiction of Nadia Division, P.W.D. during the year 2022-2023
Zilla Parishad
Zilla Parishad
Construction of CC Road from the house of Emam Hussain to the house of Manjarul Momin at English under Mahesail-I GP
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Construction of CC drain from Anar Mirza to Eid Gha at Dechapra sansad XV under Talgram Gram Panchayat
PHE
Operation and Maintenance for Arsenic cum Iron Removal Plant of Bachhra Zone I PWSS Capacity 77.25 m3 hr Under Murshidabad Division P.H.E. Dte.for 12 Twelve Months..
PHE
Schedule for Operation and Maintenance for Arsenic cum Iron Removal Plant of Ramakantapur PWSS Capacity 55 m3 hr Under Murshidabad Division P.H.E. Dte.for 12 Twelve Months
PHE
Operation and Maintenance for Arsenic cum Iron Removal Plant of Ghorapakhiagangin zone-I PWSS Capacity 93.23 m3 hr Under Murshidabad Division P.H.E. Dte.for 12 Twelve Months
PHE
Operation and Maintenance for Arsenic cum Iron Removal Plant of Seikhpara Area PWSS Capacity 100 m3/hr Under Murshidabad Division P.H.E. Dte.for 12 Twelve Months
PHE
Operation and Maintenance for Arsenic cum Iron Removal Plant of Brindabanpur PWS Capacity 70 m3/hr Under Murshidabad Division P.H.E. Dte.for 12Twelve Months
PHE
Operation and Maintenance for Arsenic cum Iron Removal Plant of Basabari PWSS Capacity 37.32m3/hr Under Murshidabad Division P.H.E. Dte.for 12 Twelve Months.
PHE
Operation and Maintenance for Arsenic cum Iron Removal Plant of Garibpur Zone-II PWSS Capacity 39.13 m3 hr Under Murshidabad Division P.H.E. Dte.for 12 Twelve Months.
Across all 12,968 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.