Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
6,189 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
6,189 results • Latest
Directorate Urban Administration and Development
RDD-CEO-WARDHA
IndianOil
SUPPLY OF BLOWER SPARES AS PER TENDER SPECIFICATIONS
RDD-CEO-YAVATMAL
NTPC Limited
Nuclear Fuel Complex
Shifting, Installation of PDBs, laying and termination of power cables.
National Aluminium Company Limited,NALCO
DG,BSF,MHA
National Institute of Technology Raipur
As per tender
E-IN-C BRANCH - MILITARY ENGINEER SERVICES
as per BoQ
All India Institute of Medical Sciences
AR AND MO CDER SH - KOTA stone flooring and wall tiles work in AHU room OPD area 4th floor of CDER at AIIMS.
Maharashtra State Road Transport Corporation
Purchase of PU Paints
IHQ of MoD (Army)-(OSCC)
SPARE PART FOR STRELLA10M
IHQ of MoD (Army)-(OSCC)
SPARE PART FOR KRAZ
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - BORJA Block –BASTANAR, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt., including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - NEGANAR Block –LOHANDIGUDA, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt., including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - KHOTLAPAL Block –BASTAR, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt., including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - KARANJI Block –BAKAWAND, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt., including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - DABGUDA Block –BAKAWAND, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - PUSHPAL-A Block –LOHANDIGUDA, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 75/55 KL capacities & staging 12/12 mt., including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - KAUDAWAND Block –BAKAWAND, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 50/40 KL capacities & staging 12/12 mt., including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - CHITALUR Block –BAKAWAND, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt., including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - PAKHNAR-03 Block –DARBHA, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 85 KL capacities & staging 12 mt., including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - DIMRAPAL Block –BAKAWAND, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 45 KL capacities & staging 12 mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - MATNAR Block –LOHANDIGUDA, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt., including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - CHANDRAGIRI-02 Block –DARBHA, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 50 KL capacities & staging 12 mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - ERANDWAL Block –TOKAPAL, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 45 KL capacities & staging 12 mt., including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - PAKHNAR-02 Block –DARBHA, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 60 KL capacities & staging 12 mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - GHATDHANORA Block –TOKAPAL, District BASTAR
Rural Engineering Services (RES)
Guru Ghasidas Janmsthali Mein Aahata Nirman Dwitiya Charan, Village – Giraudpuri, Dist.-Balodabazar-Bhatapara (C.G.)
Rural Engineering Services (RES)
Guru Ghasidas Janmsthali Mein Pewar Path, Saundaryikaran Avam Pravesh Dwar Nirman Karya Village Giraudhpuri, Dist.-Balodabazar-Bhatapara (C.G.)
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 60 KL capacities & staging 13 mt., including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under RETRO FITTING of Piped Water Supply Scheme under Jal Jeevan Mission For Village - JAIBEL-01 Block –BAKAWAND, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 55 KL capacities & staging 12 mt., including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under RETRO FITTING of Piped Water Supply Scheme under Jal Jeevan Mission For Village - GHATPADMUR Block –JAGDALPUR, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt., 40 KL capacities & staging 15 mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - LAWAGAON Block –BAKAWAND, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 100 KL capacities & staging 12 mt., including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - MATNAR Block –BAKAWAND, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - GONDIYAPAL Block –BASTAR, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 50 KL capacities & staging 12 mt. 40 KL capacities & staging 12 mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - BADEKAKLUR-02 Block –BASTANAR, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt., 40 KL capacities & staging 12 mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - BHIRLINGA Block –BAKAWAND, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - TURANGUR Block –BASTANAR, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 50 KL capacities & staging 15 mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - NADISAGAR Block –BASTAR, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - PARALMETA Block –BASTANAR, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 60 KL capacities & staging 12 mt., 40 KL capacities & staging 12 mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - RETAWAND Block –BASTAR, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 50 KL capacities & staging 12 mt., 40 KL capacities & staging 12 mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - MASGAON Block –BAKAWAND, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - BAGMUNDIPANEDA Block –BASTANAR, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 50 KL capacities & staging 12 mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - MANDLAPAL Block –BASTAR, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 90 KL capacities & staging 12 mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - CHINDBAHAR Block –LOHANDIGUDA, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 75 KL capacities & staging 12 mt. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - KAWADGAON Block –BASTAR, District BASTAR
Public Health Engineering Department (PHED)
(4th Call) Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia & 75 mm dia HDPE PE-100 , PN-6 Pipe , 90 mm dia, 110 mm dia & 140 mm dia class 6/10 kg/sqcm with suitable joints 80 mm dia & 65 mm dia GI Pipe, valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity three phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/ Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.1 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection(F.H.T.C) in individual households and government instiution etc. complete with trial run operation & maintanance for 06 months under SVS of Piped Water Supply Scheme under Jal Jeevan Mission For Village - KODENAR Block –LOHANDIGUDA, District BASTAR
Urban Administration and Development Department (UADD)
Supply of Manpower (Skille, Un-Skilled, safai And Others worker)
NEW TOWN KOLKATA DEVELOPMENT AUTHORITY
Across all 6,189 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.