Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
8,118 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
8,118 results • Latest
Zilla Parishad
Construction of ACR at Channa FP School
Zilla Parishad
Installation of 42 nos. 9 Mtr. High Mast system in different places under Kandi Panchayat Samity.
PWD
Restoration of Kachari Road from Bandhan Marriage Hall to Gas Godown via State Bank of India in the district of Purba Bardhaman under Burdwan Division, P.W.D.
Zilla Parishad
Construction of CWSN Toilet at Gopalnagar High School within Singur Dev Block
Zilla Parishad
Construction of 2 nos Girls Toilet at Nasibpur High School within Singur Dev Block
Zilla Parishad
PHED-Chief Engineer(HQ),Jaipur
Providing Laying/Installation 400Sq. mm 1core AND 3.5core cable at Bhalautibba Pumphouse Under Sub Div Lalaniya
Jodhpur Development Authority
PHED-Chief Engineer(HQ),Jaipur
PHED-Chief Engineer(HQ),Jaipur
PHED-Chief Engineer(HQ),Jaipur
PHED-Chief Engineer(HQ),Jaipur
Rate Contract for Repairing of 1250 KVA 1600 KVA power transformer at Head works Bhallau Tibba Karamsana under Division Taranagar
DLB
PHED-Chief Engineer(HQ),Jaipur
PHED-Chief Engineer(HQ),Jaipur
Jaipur Development Authority
PHED-Chief Engineer(HQ),Jaipur
PHED-Chief Engineer(HQ),Jaipur
Er in Chief, Bihar
Er in Chief, Bihar
Er in Chief, Bihar
Er in Chief, Bihar
Er in Chief, Bihar
Er in Chief, Bihar
Er in Chief, Bihar
Er in Chief, Bihar
Er in Chief, Bihar
PMGSY Kashmir and CE PW (R and B) Kashmir
PMGSY Kashmir and CE PW (R and B) Kashmir
PMGSY Kashmir and CE PW (R and B) Kashmir
PMGSY Kashmir and CE PW (R and B) Kashmir
PMGSY Kashmir and CE PW (R and B) Kashmir
PMGSY Kashmir and CE PW (R and B) Kashmir
PMGSY Kashmir and CE PW (R and B) Kashmir
PMGSY Kashmir and CE PW (R and B) Kashmir
Er in Chief, Bihar
Er in Chief, Bihar
Er in Chief, Bihar
Er in Chief, Bihar
Er in Chief, Bihar
PHE
Opt. and Mtc. of Distribution System and Rising Main Pipeline(CI/DI/AC/UPVC) including repairing of FHTC Connection for FAKIRPUR WS Schemes of Burdwan-I Dev.Block .......... under Burdwan Divn., PHE Dte. Period for eleven months.
PHE
Opt. and Mtc. of Distribution System and Rising Main Pipeline(CI/DI/AC/UPVC) including repairing of FHTC Connection for Isufabad (Z-I and II) WS Schemes of Burdwan-I Dev.Block .......... under Burdwan Divn., PHE Dte. Period for eleven months.
PHE
Opt. and Mtc. of Distribution System and Rising Main Pipeline(CI/DI/AC/UPVC) including repairing of FHTC Connection for NABASTHA WS Schemes of Burdwan-II Dev.Block .......... under Burdwan Divn., PHE Dte. Period for eleven months.
PHE
Opt. and Mtc. of Distribution System and Rising Main Pipeline(CI/DI/AC/UPVC) including repairing of FHTC Connection for KAMARHATI-Zone-II WS Schemes of Raina- II Dev.Block .......... under Burdwan Divn., PHE Dte. Period for eleven months.
PHE
Balance Laying UPVC pipeline for supplying drinking water including FHTC works and reconnection of existing FHTCs of Brittihuda WS Scheme in Chapra Block under Nadia Arsenic Civil Division-II,P.H.E.Dte.as per door to door survey conducted by ISA TEAM
PHE
Deployment of Laboratory Personal at the laboratory under Haringhata WTP (Sub-district laboratory for Prandhara) at Kalyani,Nadia
PHE
Collection of Household Details at prescribed Format through Mobile App Hard Copy including Geo-Reference as directed by EIC and submission of same to PHE Dte in soft copy at different piped water supply scheme under Nadia Arsenic Division I PHED
Across all 8,118 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.