Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
12,474 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
12,474 results • Latest
PHE
Solarisation of WBSEDCL energised pump house with supply and installaiton of Grid-connected Rooftop solar PV systems with net metering at Jelerhat water supply scheme at Baruipur Block under SMD, PHE Dte, District South 24 Parganas
PHE
Repairing and Renovation of R.C.C. Elevated Reservoir of capacity 350 Cum (Intze Type) including other allied works, Repairing of DI rising main pipeline including cleaning of chokage and Providing Functional Household Tap Connection (FHTC) in connec
PHE
Solarisation of WBSEDCL energised pump house with supply and installaiton of Grid-connected Rooftop solar PV systems with net metering at Hogalkuria water supply scheme at Baruipur Block under SMD, PHE Dte, District South 24 Parganas
PHE
Annual Maintenance, caretaking gardening etc.for Conference Hall of Awareness Generation cum Water Sample Collection Centre at Mouza Ghat, Block Manbazar II, DistrictPurulia under Purulia Division, PHE Dte.
PHE
Construction of Boundary wall, RCC Pillar, gate, Barbed wire Sinking of 2(Two) nos tubewell at OHR Sites of Zone - XI XII of Hura Block under Surface Water Based Piped Water Supply Scheme for Purulia District (Northern Sector) of Raghunathpur Su
PHE
Construction of Boundary wall, RCC Pillar, gate, Barbed wire Sinking of 2(Two) nos tubewell at OHR Sites of Zone - IX X of Hura Block under Surface Water Based Piped Water Supply Scheme for Purulia District (Northern Sector) of Raghunathpur Sub-
Er in Chief, Bihar
Hindustan Shipyard Limited
Hindustan Shipyard Limited
Mazagon Dock Shipbuilders Limited
As per Tender Documents
PHE
Gravel Paking around Intake, Construction of Guard Wall , Chain link fencing , Digging of earth at Kolaboni Intake site under Kaloboni W/S Scheme of Raghunathpur Sub-Division under Purulia Division, PHE Dte.
Zilla Parishad
Zilla Parishad
Construction of 07(Seven) nos. of leach pit at different places of Bhekutia GP Fund SBM(G)
Zilla Parishad
Construction of 07(Seven) nos. of leach pit at different places of Daudpur GP Fund SBM(G)
Zilla Parishad
Construction of 07(Seven) nos. of leach pit at different places of Daudpur GP Fund SBM(G)
PHE
PHE
PHE
PHE
PHE
PHE
PHE
PHE
PHE
PHE
PHE
PHE
PHE
KOLKATA MUNICIPAL CORPORATION
IMPROVEMENT OF IP AND CONCRETE PASSAGE INCLUDING RENOVATION OF TOILET AND BATH AT 1/H/4, AGA MEHDI STREET, 24/3, SHARIF LANE, 96/3 COLLIN ST. ETC. IN WARD NO. 62
PHE
Laying Distribution Pipe line including other allied work for Zone-I of Neturia Block under Purulia Water Supply Scheme (Northern Sector) Under Purulia Division ,PHE Dte.(Part-D)
MUNICIPAL AFFAIRS DEPARTMENT
LED DISPLAY BOARD
PHE
Left Out Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SAPNA) at different habitation of Mouza-Rahardaga (Jl-64) Mouza-Mirdi (Jl-102) and extention of Parallal distribution pipe line under command
PHE
Laying of rising Main,Road and Calvert crossing and Balance distribution pipeline in Dalimpur Zone-I under Alipurduar Division PHE Dte
PHE
Construction and commissioning of RCC Over Head Reservoir (Torch type with solid raft) of capacity 150 CUM and staging height 20 mtr as per approved drawing (No PC-I/OHR/3/2012)with allied works for Zone- I of Neturia Block under Purulia Piped Water
PHE
Repairing of Boundary wall DI Rising Main at Barabazar River Site under Barabazar W/S Scheme under Purulia Sadar Sub Division under Purulia Division, PHE Dte.
PHE
Construction of Office Cum Godown at PHE Campus Under Keliathole Palashkola w/s Scheme within Raghunathpur Sub-Division under Purulia Division, PHE Dte.
Zilla Parishad
Construction of One No ACR at Pallishree Primary School
MUNICIPAL AFFAIRS DEPARTMENT
PHE
Providing House Hold Tap Connection (FHTC) at Narayangarh Majhipara and repairing and renovation of Pump House Campus under ARRAH W/S Scheme of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte.
PHE
Laying Distribution Pipe line including FHTC and other allied work for Zone-I of Neturia Block at Mouza-Pochhara under Purulia Water Supply Scheme (Northern Sector) Under Purulia Division ,PHE Dte.(Part-B)
PHE
Laying of Distribution Pipeline from Zone IV B OHR site to Ekunja More and other allied works for Aug. of Raghunathpur Water Supply Scheme (Zone - IV B) within Raghunathpur Sub-Division under Purulia Division, PHE Dte.
PHE
Daily maintenance of Garden (front side, back side and south side of Purulia Division Office) and lake at back side of guarden under Purulia Division, PHE Dte. (w.e.f. 01.01.2024 to 31.12.2024)
Zilla Parishad
Zilla Parishad
PHE
Renewal of license for FSSAI, BIS and Other allied works for Fulbari Bottling plant at Fulbari WTP Complex, Fulbari Hat in the district of Jalpaiguri , under Northern Mechanical Division, P.H.E .Dte.
PHE
Laying of UPVC Pipeline under JJM for Ukhilnara Zone-II at Payradanga G.P. at Ranaghat-I Block of Ground Water Based PWSS for Ukhilnara Zone-II W/S Scheme under Nadia Arsenic Division-I, P.H.E. Dte.
PHE
Hiring of 1 One no Luxury Taxi Maxi cab Motor cab on daily basis under monthly hiring category for the Assistant Engineer,Uluberia Sub- Division ,PHE Dte of the Government of West Bengal for Twelve months under Howrah Division,PHE dte.Period 365 days
PHE
Repair and renovation of Barsul Sub District Water Testing Laboratory under Burdwan Division, P.H.E. Dte.
PHE
Construction of Switch Room with additional Plinth Height, Boundary Wall, Land Development, Approach Road at Begampur (Zone-II) W/S Scheme under Serampore Sub-Division, P.H.E. Dte.
PHE
Laying additional pipeline in different mouzas of Paschim Gopinathpur Water Supply Scheme Under chandannagar Sub-Division under Hooghly Division, P.H.E Dte
Across all 12,474 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.