Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
14,509 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
14,509 results • Latest
Zilla Parishad
THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD.
PHE
Construction of Boundary Wall at Head Work site of Malior Water Supply Scheme under Harishchandrapur-II Block under Malda Division, PHE Dte. in the district of Malda.
PHE
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 70m3hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room backwash water disposal at head work site of Malior Water Suppl
PUBLIC WORKS DEPARTMENT
Augmentation of newly supplied 30KVA Green Generator Line at S.P.F, Ranaghat, Nadia
ASUTOSH COLLEGE
Procurement of Scanning Electron Microscope with Sputter Coater and EDS Detector
ASUTOSH COLLEGE
Procurement of 1. Polarizing Microscope with Camera and Image Analysis Software
PHE
Construction of Boundary Wall at Head Work site of Betahal Water Supply Scheme under Harishchandrapur-II Block under Malda Division, PHE Dte. in the district of Malda.
PHE
Construction of Boundary Wall at 2nd Tube Well site of Sultannagar Water Supply Scheme under Harishchandrapur-II Block under Malda Division, PHE Dte. in the district of Malda.
PHE
Construction of Boundary Wall at Head Work site of Sultannagar Water Supply Scheme under Harishchandrapur-II Block under Malda Division, PHE Dte. in the district of Malda.
PHE
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 40m3hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room backwash water disposal at head work site of Uttar Kumedpur Wat
PHE
Construction of Boundary Wall at Head Work site of Hatnagar Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda.
PHE
Construction of Boundary Wall at Head Work site of Saidpur Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda.
PHE
Construction of Boundary Wall at Head Work site of Dakshin Bhakuria Water Supply Scheme under Harishchandrapur-II Block under Malda Division, PHE Dte. in the district of Malda.
PHE
Construction of Boundary Wall at Head Work site of Babupur Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda.
PHE
Construction of Boundary Wall at Head Work site of Rahimpur Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda.
State Urban Development Agency
State Urban Development Agency
Cheif Engineer Kanpur Zone PWD Kanpur
RDD-CEO-AHMEDNAGAR
RDD-CEO-YAVATMAL
RDD-CEO-YAVATMAL
RDD-CEO-YAVATMAL
RDD-CEO-YAVATMAL
University Of Pune
M30 RCC Work TMT FE 500steel brick masonry Waterproofing Plastering Flooring and Painting work Door Aluminum sliding window work MS grill SS railing Water supply Sanitary fitting work
RDD-CEO-YAVATMAL
RDD-CEO-YAVATMAL
RDD-CEO-YAVATMAL
Directorate Of Municipal Administration
Directorate Of Municipal Administration
Directorate Of Municipal Administration
Directorate Of Municipal Administration
Public Works Region
PWD
Please refer to BOQ
PWD
Please refer to BOQ
PWD
Please refer to BOQ
Haryana Government
Haryana Board Corporation
Providing and laying of sewerage line with connection and construction of manholes in Sector 37C, Gurugram and all other works contingent thereto
Ajmer VVNL - MD
SUPPLY OF 3 PHASE, 4 WIRE A.C. STATIC HT- TRIVECTOR ENERGY METER FOR SOLAR ROOF TOP (BIDIRECTIONAL) OF CLASS OF ACCURACY 0.5S WITH DLMS PROTOCOL (C-TYPE)
PHE
Construction of Boundary Wall at head work site of Jotgopal Water Supply Scheme under Englishbazar Block under Malda Division, PHE Dte. in the district of Malda.
PHE
Construction of Boundary Wall at Head Work site of Choupaldanga Water Supply Scheme under Harischandrapur-I Block under Malda Division, PHE Dte. in the district of Malda.
PHE
Construction of Boundary Wall at 2nd Tubewell site of Choupaldanga Water Supply Scheme under Harischandrapur-I Block under Malda Division, PHE Dte. in the district of Malda.
PHE
Construction of Boundary Wall at Head Work site of Paro Water Supply Scheme under Harishchandrapur-I Block under Malda Division, PHE Dte. in the district of Malda.
PHE
Construction of Boundary Wall at Head Work site of Emamnagar Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda.
PHE
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 80m3hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room backwash water disposal at head work site of Arazi Jalsa Water
PHE
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 20m3hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room backwash water disposal at head work site of Sailpur Water Supp
PHE
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 70m3hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room backwash water disposal at head work site of Paschim Bhagabanpu
Kerala Rural Water Supply and Sanitation Agency
Sustainability support project 2023-24-Repair and maintenance work of Vakkilpadi WSS in Kavasseri Gramapanchayath in Palakkad District
Kerala Rural Water Supply and Sanitation Agency
Sustainability support project 2023-24-Repair and maintenance work of Thayamparambu WSS in Vettom Gramapanchayath in Malappuram District
Kerala Rural Water Supply and Sanitation Agency
Sustainability support project 2023-24-Repair and maintenance work of Anaswara WSS in Peruvallur Gramapanchayath in Malappuram District
Across all 14,509 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.