Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
9,355 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
9,355 results • Latest
Steel Industrials Kerala Ltd
Public Health Engineering- O/o Engineer In Chief
Installation of 400 Nos Single Phase Submersible Pump in Different Blocks of Division Satna
JSEB
NTPC Limited
Haryana Government
Installation of street lights in Vill.Marwa khurd Block Bilaspur Distt.Yamunanagar installation of street lights in village arnouli block bilaspur distt Yamunanagar installation of street light in vill.Mussimble h Block Bilaspur Distt.Yamunanagar
Pr. Chief Conservator of Forest and Head of Forest Force
Tamil Nadu Housing Board
Providing Electrical Panel Board arrangements in Construction of Commercial Complex Block 1 Ground 4floors Block 2 Stilt 4floors S No 89 4A 89 8A1 at Thoppur Village Thiruparankundram Taluk Madurai
Tamil Nadu Housing Board
Providing polycarbonate sheet fibre cement boards and Parking Column Guard in Construction of Commercial Complex (Block 1 G 4 Floors Block 2 Stilt 4 Floors in S No 89 4A 89 8A1 at Thoppur Village Thiruparankundram Taluk Madurai
THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD.
THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD.
KOLKATA MUNICIPAL CORPORATION
REJUVENATION OF WATER BODY NAMED AS UKIL BHERI,WARD NO-57,BR-VII
PHE
Construction of Sinking of 2 (two) nos DTH Tube well, Pump House and Toilet and Repairing and Renovation of 450 Cum OHR for Augmentation of Puncha and adjoining Mouzas Water Supply Scheme (Zone-A) under Onda Water Supply Scheme (BRGF Ph-I)
PHE
Repairing and Renovation of 500 Cum RCC OHR and Sinking of 2 (two) nos DTH Tube well for Augmentation of Puncha and adjoining Mouzas Water Supply Scheme (Zone-B) under Onda Water Supply Scheme (BRGF Ph-I)
PHE
Sinking of 2 (two) nos 300 X 200 mm dia Tube well 120 mtr. Deep by direct rotary rig method using UPVC pipe (CD) and UPVC deep well screen (RDS) and 150 mm dia MS delivery main connecting line from 2 (two) nos Vertical Tube Well to OHR Inlet pipe
PHE
Construction of Boundary Wall at Chingani CWR Site in connection with Jal Jeevan Mission (JJM) for for Augmentation of CHINGANI and adjoining mouzas W/S Scheme under ONDA Water supply scheme (BRGF ph - I project)
PHE
Sinking of 300 X 200 mm dia Tube well 120 mtr. Deep by direct rotary rig method using UPVC pipe (CD) and UPVC deep well screen (RDS) for creation of source in connection with Jal Jeevan Mission (JJM) for Augmentation of BIKRAMPUR and adjoining
PHE
Construction of Boundary wall, High lift Pump House, Laying Rising Main under Augmentation of SONADAHA (Zone - Q) under Bankura - I, II and Barjora Block W/S Scheme (BRGF Ph - I Project)
PHE
Repairing and Renovation of RCC Elevated Over Head Reservoir of 600 Cum, Sinking of 02 (Two) no. DTH Tube Wells and associated connecting line for Augmentation of Aguri Band Punisol and adjoining Mouzas Water Supply Scheme (Zone-C)
PHE
Crossing of Road by Jack pushing method ( 600 mm dia Hump pipe (NP3/NP4 and MS Pipe for casing) and 200mm dia carrier pipe for Augmentation of KHEYARKANALI OHR (Zone - J) under Bankura - I, II and Barjora Block W/S Scheme (BRGF Ph - I Project)
PHE
Construction of Pump House cum chlorine room (5.40mX3.6M) and Toilet with sanitary water supply arrangement, Construction of Guard Room and Toilet with sanitary and water supply arrangement, Construction of WBSEDCL Room and Crossing Rail
IRRIGATION AND WATERWAYS DEPT.
Annual Maintenance and upkeepment of Baruipur Irrigation Colony and Offices of Mograhat Drainage Division in the Dist-South 24 Parganas
Zilla Parishad
Zilla Parishad
Zilla Parishad
PHE
Renovation of Office Chamber of the Superintending Engineer-I,PMU, WBPWSP(P),PHE Dte under Bankura Sadar Sub- Division of Bankura Division, PHE Dte.
PHE
Special Repairing works at Intake site and Interconnection from CWR to Pump house under Sarberia W/S Scheme under Bankura Sadar Sub - Division of Bankura Division, PHE Dte.
Zilla Parishad
PHE
Construction of High lift Pump House, Boundary wall and laying rising main under Augmentation of BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) within Barjora Block under Bankura Sadar Sub-Division
PHE
Construction of Guard room at OHR site in connection with Jal Jeevan Mission (JJM) for Proposed Ground Water Based Pakhanna (Manachar) PIped Water Supply Scheme under Bankura Sadar Sub- Division of Bankura Division P.H.E. Dte
PHE
Laying UPVC pipeline installation of valves and construction sluice valve chamber in front of Ashram at Pabayan village under Kanchanpur (Zone- C) of Bankura- I, II and Barjora water supply scheme (BRGF ph- I) under Bankura Sadar Sub - Division
PHE
Construction of Staff Room cum chlorine room, Construction of High lift Pump House and Crossing of Road by Jack pushing method for Augmentation of TELEBEDIA (Zone - M) under Bankura - I, II and Barjora Block W/S Scheme (BRGF Ph - I Project)
PHE
Crossing of Road by Jack pushing method with( 300 mm dia MS casing pipe ( 8mm thick for casing) and 150 mm dia MS carrier pipe for Augmentation of ARJUNPUR (Zone - N) under Bankura - I, II and Barjora Block W/S Scheme (BRGF Ph - I Project)
PHE
Construction of Pump House and Toilet with sanitary and water supply arrangement including plinth protection, Ramp etc. according to departmental design and drawing for Aguri Band Punisol and adjoining Mouzas Water Supply Scheme (Zone-B)
PHE
Construction of Boundary Wall at Suklai River site Pump Houseand Sinking of 300 X 200 mm dia Tube well 120 mtr. Deep by direct rotary rig method using UPVC pipe (CD) and UPVC deep well screen (RDS) for creation of source
PHE
Crossing Rail Track ( South Eastern RLY. K.M Bg-. 213-29 /31) in between Rly. Station Ramsagar(RSG) and Onda Gram (ODM) Rly. station, P.S. Onda,by Jack Pushing method with 350 mm (OD) Spirally welded MS Casing Pipe with 200 mm dia. MS carrier pipe
IRRIGATION AND WATERWAYS DEPT.
Annual Maintenance of Kultali Rest shed including Clearing and Removing Jungle inside portion of Irrigation Campus in Block and PS Kultali Dist South 24 Parganas under Mograhat Drainage Division
THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD.
Zilla Parishad
CONSTRUCTION OF CC ROAD FROM THE HOUSE OF RANJIT BARMAN TO THE H/O DILIP ROY AT KISHAMAT DASGRAM UNDER KISHAMAT DASGRAM GRAM PANCHAYATAM GRAM PANCHAYAT
Zilla Parishad
CONSTRUCTION OF SOLAR SUBMERSIBLE PUMPING SYSTEM FOR DRINKING WATER NEAR AMLAGURI HARIMANDIR AT SAN 01 UNDER BAGDOKRA FULKADABRI GRAM PANCHAYAT WITHIN MEKHLIGANJ PANCHAYAT SAMITY.
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Construction of Toilet Block at Maynaguri High School within Moamari GP under Coochbehar-I Panchayat Samity.
DISTRICT MAGISTRATE COOCH BEHAR
Installation of drinking water tank with pump Solar system at Singimari High school under Rampur II GP within Tufanganj II Panchayat Samity Activity ID 89974947
DISTRICT MAGISTRATE COOCH BEHAR
Installation of drinking water tank with pump Solar system at Garbhanga Batan field booth no 50 under Rampur II GP within Tufanganj II Panchayat Samity Activity ID 89973372
Zilla Parishad
CONSTRUCTION OF CC ROAD FROM THE HOUSE OF BRAJEN ADHIKARY TO AWC AT HOKADAHA-I UNDER KISHAMAT DASGRAM GRAM PANCHAYATMAT DASGRAM GP
IRRIGATION AND WATERWAYS DEPT.
Construction Toilet Block and Entrance Gate adjacent to Newly Constructed Park in connection with the work Precast CC Block Pitching and Landscaping work for a length of 2000M including protection work for a length of 850M along the Left bank
IRRIGATION AND WATERWAYS DEPT.
Maintainace and Repairing of Dabu khalashi shade and toilet in GP Nikarighata Block Canning under Mograhat Drainage Division.
Across all 9,355 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.