Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
10,492 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
10,492 results • Latest
MUNICIPAL AFFAIRS DEPARTMENT
PUBLIC WORKS DEPARTMENT
Preparation of Drawing and DPR for the Fire Fighting arrangements such as Fire Hydrant Sprinkler System etc as per Fire Safety recommendation for the following buildings Newly constructed G4 Purulia Court Building Purulia.
PUBLIC WORKS DEPARTMENT
Preparation of Drawing and DPR for the Fire Fighting arrangements such as Fire Hydrant Sprinkler System etc as per Fire Safety recommendation for the following buildings Deben Mahato Govt Medical College and Hospital Purulia
PHE
Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Bhangankhali W/S Scheme, Block - Basanti. (Tube well no.-IV) (2nd Call)
Public Health Engineering- O/o Engineer In Chief
Remaining work for Retrofitting of Piped water supply scheme under Jal Jeewan Mission at Village Jhaknawada Block Petlawad District Jhabua (Vth Call)
PWD - CE AND AS
Delhi Development Authority
Repair and Maintenance of DDA Vacant shops at Vikaspuri and Hastsal and 2 DDA Flats at Hastsal under jurisdiction of DMD-5.
Delhi Development Authority
Repair and maintenance of DDA Vacant shops at Paschim Vihar and Janakpuri under jurisdiction of DMD-5
Directorate Urban Administration and Development
Directorate Urban Administration and Development
MP State Tourism Development Corporation Ltd.
Defence Research and Development Organisation
Public Works Roads Department-Externally Aided Project
CE/EAP/ARRBP/OCB/Bridge-1/West Karbi Anglong/06 Construction of Bridge in West Karbi Anglong district i. Br. on UAB road
Rural Development and Panchayat Raj Department
Construction of New Library Building At Pavithiram H/O Pavithiram Panchayat
Rural Development and Panchayat Raj Department
Construction of New Library Building At Chinnadharapuram H/O Chinnadharapuram Panchayat
Rural Development and Panchayat Raj Department
Construction of New Library Building (Annexure Building At Paramathi H/O Paramathi Panchayat
Rural Development and Panchayat Raj Department
Construction of New Library Building At Thennilai South H/O Thennilai South Panchayat
Rural Development and Panchayat Raj Department
Construction of New Library Building At Punnam H/O Punnam Panchayat
Northern Coalfields Limited
PUBLIC WORKS DEPARTMENT
DISTRICT MAGISTRATE PURULIA
DISTRICT MAGISTRATE PURULIA
DISTRICT MAGISTRATE PURULIA
Zilla Parishad
Construction of community Sanitary complex at Taltala Ashram under Beraberi GP within Singur PS Singur Hooghly 15th FC (Tied) SBM(G) Year 2023 2024
Zilla Parishad
Construction of community Sanitary complex at Madhusudanpur Sub Centre under Beraberi GP within Singur PS Singur Hooghly 15th FC (Tied) SBM(G) Year 2023 2024
Zilla Parishad
Installation of Mark II Tube well at Kamalapur Muslimpara under Borai Pahalampur GP (Tied)
PHE
Sinking of 250mm x 150mm dia. 360 mtr. deep (Replacement) Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter of Augmentation of Pathankhali (Zone-I) W/S Scheme, Block - Gosaba (Tubewell No.-4) (2nd Call)
PHE
Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Kanthalberia W/S Scheme, Block - Basanti. (Tube well no.-IV) (2nd Call)
PHE
Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Sonakhali W/S Scheme (Zone-IV), Block - Basanti. (Tube well no. - III) (2nd Call)
PHE
Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Basanti W/S Scheme (Zone-VI), Block - Basanti. (Tube well no. - II) (2nd Call)
PHE
Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Sonakhali W/S Scheme (Zone-I), Block - Basanti. (Tube well no.- III) (2nd Call)
PHE
Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Uttar Angadberia W/S Scheme, Block - Canning-I. (Tube well no. - VI) (2nd Call)
PHE
Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Budhkhali W/S Scheme, Block - Canning-II. (Tube well no. - VI) (2nd Call)
PHE
Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Daria W/S Scheme, Block - Canning-I. (Tube well no. - VI) (2nd Call)
PHE
Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Netra W/S Scheme, Block - Canning-II. (Tube well no. - V) (2nd Call)
PHE
Sinking of 250mm x 150mm dia. 350 mtr. deep Tubewell (replacement) by Direct Rotary Rig Method using P.V.C. pipe and pre-packed Resin Bonded Gravel Filter at Tube Well No.- 4 of Chunakhali W/S Scheme (Zone-II), Block - Basanti. (2nd Call)
PHE
Sinking of 250mm x 150mm dia. 360 mtr. deep Tubewell by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Basanti W/S Scheme (Zone-VI), Block - Basanti. (Tube well no.- III) (2nd Call)
Zilla Parishad
Construction of Pucca Ghat at Dighaldanga Manasatala under Mirzapur Bankipur GP (Un Tied)
Zilla Parishad
Construction of CC Road from the house of Swapan Ghosh towards Karkhana under Bighati GP (Un Tied)
Zilla Parishad
Earth work Single brick flat soling Shuttering Concreting Reinforcement Installation of Solar Solar Pump Plastering Tiles Water purifiers etc
Zilla Parishad
PUBLIC WORKS DEPARTMENT
Rehabilitation and restoration of Slab Culvert at 9.03 km and 11.870 km of Barbetia - Jamna Road under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
PUBLIC WORKS DEPARTMENT
Sabang - Mohar Road from 0.00 kmp to 12.00Kmp, patch repair works (In stretches) under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
PUBLIC WORKS DEPARTMENT
Repairing and painting of Midnapore Highway Division and South Western Highway Circle Office building outside and boundary wall under Midnapore Highway Division in the District of Paschim Medinipur.
Zilla Parishad
Earth work Single brick flat soling Shuttering Concreting Reinforcement Installation of Solar Solar Pump Plastering Tiles Water purifiers etc
Zilla Parishad
Zilla Parishad
Zilla Parishad
Construction of community Sanitary complex at Balarambati Balijala Village under Balarambati GP within Singur PS Singur Hooghly 15th FC (Tied) SBM(G) Year 2023 2024
Zilla Parishad
Zilla Parishad
Across all 10,492 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.