Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
11,399 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
11,399 results • Latest
Zilla Parishad
Solar System pump for Drinking water at Karaitala Bazar at Udaypur.work ID 49288833 2021-22
Zilla Parishad
Construction of CC road from Anichur Miahs house towards mosque pukur para at sitahar sansad.work ID-89153607/2024-25
PHE
Augmentation work of OHR, Pump House and Boundary Wall of Arjuna Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 80 mtr. at Mouza-Durgapur G.P. - Tantisal , Block - Khanakul-I, Dist.- Hooghly on Left embankment of Mundeswari River under LDID
Zilla Parishad
Zilla Parishad
THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD.
Zilla Parishad
SETTING ARRENGEMENT AT MATIR SRISTI AGRO ECO TOURISM
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 40 mtr. at Mouza- Tilakchak, G.P. - Arandi-II , Block - Arambagh, Dist.- Hooghly on Left embankment of Kana Mundeswari River under LDID
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 60 mtr. at Mouza-Veutia, G.P. - Sreirampur , Block - Pursurah, Dist.- Hooghly on Left dwarf embankment of river Mundeswari under LDID
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 25 mtr. at Mouza- Joshar, G.P. - Chiladangi , Block - Pursurah, Dist.- Hooghly on Right embankment of Mundeswari River under LDID
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 100 mtr. at Mouza-Gholdigrui, G.P. - Shyampur , Block - Pursurah, Dist.- Hooghly on Left bank of Upper Harinakhali River under LDID
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 40 mtr. at Mouza-Hati, G.P. - Chiladangi , Block - Pursurah, Dist.- Hooghly on Left bank of Upper Harinakhali River under LDID
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 110 mtr. at Mouza-Routara, G.P. - Pursurah-II , Block - Pursurah, Dist.- Hooghly on right bank of river upper Harinakhali under LDID
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 30 mtr. at Mouza- Veutia, G.P. - Srirampur , Block - Pursurah, Dist.- Hooghly on Right embankment of Mundeswari River under LDID
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 80 mtr. at five locations at Gholtajpur, Harinkhola-II , Arambagh, Dist.- Hooghly on Right embankment of river Mundeswari under LDID
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 50 mtr. at Mouza- Joshar, G.P. - Chiladangi , Block - Pursurah, Dist.- Hooghly on Right embankment of Mundeswari River under LDID
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 60 mtr. at Mouza-Saibona, G.P. - Pole-II , Block - Khanakul-I, Dist.- Hooghly on Left dwarf embankment of river Kana Mundeswari under LDID
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 20 mtr. at Mouza-Harua, G.P. - Chiladangi , Block - Pursurah, Dist.- Hooghly on Left bank of Upper Harinakhali River under LDID
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 30 mtr. at Mouza- Joshar, G.P. - Chiladangi , Block - Pursurah, Dist.- Hooghly on Right embankment of Mundeswari River under LDID
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 60 mtr. at Mouza-Gobindapur, G.P. - Rammohon-I , Block - Khanakul-I, Dist.- Hooghly on Right embankment of Kana Mundeswari River under LDID
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 20 mtr. at Mouza-Purba Radhanagar, G.P. - Balipur , Block - Khanakul-I, Dist.- Hooghly on Left embankment of river Lower Harinakhali under LDI
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 70 mtr. at Mouza-Chatrasal, G.P. - Arunda , Block - Khanakul-I, Dist.- Hooghly on Right embankment of river Lower Harinakhali under LDID
IRRIGATION AND WATERWAYS DEPT.
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 50 mtr. at Mouza- Veutia, G.P. - Srirampur , Block - Pursurah, Dist.- Hooghly on Right embankment of Mundeswari River under Ldid
Zilla Parishad
PUBLIC WORKS DEPARTMENT
Construction of proposed Type-A (G Plus 5) Quarter (With provision of (G Plus 6) foundation) for Judicial Officers at Haldia Sub-Divisional Court Compound under Tamluk Division, PWD in the District of Purba Medinipore.
DISTRICT MAGISTRATE SOUTH 24 PARGANAS
Setting Up of Control Room and CCTV Surveillance System
Zilla Parishad
THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD.
WEST BENGAL MEDICAL SERVICES CORPORATION LIMITED
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
CE-RD-AR
Road Construction (CTB)
CE-RD-AR
Road Construction (CTB)
CE-RD-AR
Construction of bridge on road T-01 Garu to Litemori(21.00 Km)
CE-RD-AR
Construction of RCC Bridge (Span 1 x 18.75m) at Chainage 11740 m over Cheme River on road, T-01 Garu to Litemori(21.00 Km)
CE-RD-AR
Construction of RCC Bridge (Span 1 x 16.50m) at Chainage 7085 m over Nina-Abu River on road, T-02Gensi to Litemori(13.02 Km)
CE-RD-AR
Earthwork, Abutment, Protection Work, Sub-Structure, Super-Structure, Approach, etc
CE-RD-AR
Formation cutting, GSB, WBM, MSS, RCC slab culvert , Protection wall and CC drain
CE-RD-AR
Earthwork, Abutment, Protection Work, Sub-Structure, Super-Structure, Approach, etc
CE-RD-AR
Formation cutting, GSB, WBM, MSS, RCC slab culvert , Protection wall and CC drain
CE-RD-AR
Earthwork, Abutment, Protection Work, Sub-Structure, Super-Structure, Approach, etc
CE-RD-AR
Formation cutting, GSB, WBM 3 , MSS, RCC slab culvert , Protection wall and CC drain
CE-RD-AR
Formation cutting, GSB, WBM 2, WBM 3 , MSS, RCC slab culvert , Protection wall and CC drain
CE-RD-AR
Formation cutting, GSB, WBM 2, WBM 3 , MSS, RCC slab culvert , Protection wall and CC drain
CE-RD-AR
Formation cutting, GSB, WBM 3 , MSS, RCC slab culvert , Protection wall and CC drain
CE-RD-AR
Formation cutting, GSB, WBM 3 , MSS, RCC slab culvert , Protection wall and CC drain
Across all 11,399 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.