Loading…
Loading…
16,577 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
16,577 results • Latest
CPWD
IMPLEMENTATION OF DISABILILTY FRIENDLY FEATURE IN RVTI, PRAYAGRAJ Subwork/Packages: MAIN WORK
Navodaya Vidyalaya Samiti
Directorate of Medical Education and Training
Bank of Maharashtra
Ministry of New and Renewable Energy
Urban Development Department Chhattisgarh
Minor Irrigation Department
CPWD
Public Works Department Uttar Pradesh
Directorate of Municipal Administration
PHE
Balance Laying of CI/DI Pipeline, Service Road, Protection Wall and Improvement of Existing AIRP (Modified Sujapur Sadipur Model, Capacity- 88.00 cum/hr) with allied works at Head Work Site of Dakshin Hanumantonagar Water Supply Scheme under Jal Jeev
WEST BENGAL STATE POLICE HOUSING CO. LTD.
WEST BENGAL STATE POLICE HOUSING CO. LTD.
WEST BENGAL STATE POLICE HOUSING CO. LTD.
PHE
Providing Balance FHTC work under Marokhnaa Zone - I PWSS, within Khanaakul- II Development block, under Arambag Sub Division, P.H.E. Dte.
PHE
Laying Rising main to connect Proposed Tube well with distribution system with ancillary works of Hirapur Zone - I PWSS under Khnakul - II Block, Arambagh Sub Division, Hoogghly Division, PHE Dte.
PHE
Sinking of 1 no replaced tube-well by D.R. Rig method at Mostafapur Piped Water Supply Scheme under Khanakul - II Block, ARAMBAG Sub-Division of Hooghly Division P.HEDte.
PHE
Laying Rising main to connect Proposed Tube well with distribution system with ancillary works of Hirapur Zone - II PWSS under Khnakul - II Block, Arambagh Sub Division, Hoogghly Division, PHE Dte.
PHE
Left out portion of Distribution Mechanism under GANESHBATI PWSS under GOGHAT-I Block under Arambagh Sub-Division of Hooghly Division P.H.E Dte.
PHE
Horizontal Boring and interconnection works for AUGMENTATION of MALAYPUR Piped Water Supply Scheme under Arambagh Sub-Division Of Hooghly Division P.H.E Dte. Block-Arambagh, under ARAMBAGH Sub-Division of Hooghly Division P.H.E Dte.
PHE
Sinking of 1 no Replacement T.W. by D.R. Rig method, Construction of 1no 3.65 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of 1 nos Boundary Wall and Connection of 1no Tubewell of Goghat Piped Water Supply Scheme
PHE
Sinking of Additional tube-well by D.R. Rig method, Construction of 3.65 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall and Connection of Tubewell of Jaykrishnapur Piped Water Supply Scheme
PHE
Providing Balance Laying Dedicated Pipe line and pending FHTC work under Hajipur PWSS, within Goghat II Development block, under Arambag Sub Division of Hooghly Division P.H.E. Dte.
PHE
Laying Rising main to connect Proposed Tube well with distribution system with ancillary works of Kaknan PWSS under Khnakul - II Block, Arambagh Sub Division, Hooghly Division, PHE Dte.
PHE
Left out portion of Distribution Mechanism under MANDRA PWSS under ARAMBAGH Block under Arambagh Sub-Division of Hooghly Division P.H.E Dte.
PHE
Providing Balance Functional Household Tap Connection (FHTC) works at Badangnj and Fului village within Badanganj Zone - II PWSS under Arambagh Sub Division of Hooghly Division PHE Dte. Hooghly
PHE
Sinking of 3 nos Tube-well by D.R. Rig method, Construction of 2nos 3.65 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of 2 nos Boundary Wall and Connection of 3nos Tubewell of Goghat Piped Water Supply Scheme
PHE
Laying Rising main to connect Proposed Tube well with distribution system with ancillary works of Hayatpur Piped Water Supply Scheme under ARAMBAG Sub-Division of Hooghly Division P.HEDte.
PHE
Laying Rising main to connect Proposed Tube well with distribution system with ancillary works of Routhkhana PWSS under Khnakul - II Block, Arambagh Sub Division, Hoogghly Division, PHE Dte.
PHE
Left out portion of Distribution Mechanism under JAYKRISHNAPUR PWSS under GOGHAT-II Block, under Arambagh Sub Division of Hooghly Division P.H.E Dte.
PHE
Left out portion of Distribution Mechanism for Brahman gram village under GARMANDARAN ZONE-I PWSS under GOGHAT-II Block, under Arambagh Sub-Division of Hooghly Division P.H.E Dte.
PHE
Laying Rising main to connect Proposed Tube well with distribution system with ancillary works of Udna Piped Water Supply Scheme under ARAMBAG Sub-Division of Hooghly Division P.HEDte.
KOLKATA MUNICIPAL CORPORATION
CONNECTION OF 2NOS. 750MM DIAMETER CITY GRID PIPELINE WITH NEWLY LAID 1200MM DIAMETER PIPELINE AT MANMATHA GANGULLY STREET NEAR TALLAH BRIDGE.
Yamuna Expressway Industrial Development Authority
PWD
Construction of Vehicle Shed at the Office premises of the Assistant Engineer, PWD, Hooghly Construction Sub-Division-III at Nalikul under Hooghly Construction Division, P.W.D. during the year 2025-2026.
PANCHAYAT AND RURAL DEVELOPMENT
Post 5 Years maintenance work for the road Ankurhati to Purba Noapara Mukherjee Para
PANCHAYAT AND RURAL DEVELOPMENT
Post 5 Years maintenance work for the road 57 A Bus Stand to Narna More
Department of MSME And Export Promotion
Rural Development and Panchayat Raj Department
Rural Development and Panchayat Raj Department
Directorate Urban Administration and Development
Allotment of 25 shops constructed d floor of community hall near vishwashrao subji mandi by Satna smart city development limited on premium and rent.Open tender is invited for allotment for 30 years as per immovable property transfer rules shop no 17
Andaman Lakshadweep Harbour Works
Delhi Development Authority
Deployment of mate, plumber, carpenter etc at pkt-1A,1B Sector A1 to A4, Narela.
Northern Coalfields Limited
Directorate of School Education
State Bank of India (SBI)
MUNICIPAL AFFAIRS DEPARTMENT
Across all 16,577 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.