Loading…
Loading…
13,125 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
13,125 results • Latest
PHE
Repairing of existing Switch Room, Boundary Wall and construction Toilet at 2nd T/W Site for DAKSHIN RASULPUR W/S Scheme under Arambagh Sub-Division of Hooghly Division, PHE Dte.
PHE
Repairing of existing Switch Room, Boundary Wall and construction Toilet at 2nd T/W Site for ARANDI W/S Scheme under Arambagh Sub-Division of Hooghly Division, PHE Dte.
PHE
Construction of Protection Wall at 3rd site of Bachanari Piped Water Supply Scheme under ARAMBAGH Sub-Division of Hooghly Division P.H.E Dte.
PHE
Sinking of 1 No. Additional tube-well, Rising Main for inter connection between T.W and Distribution, construction of switch-room and boundary wall of Paschim Narayanpur PWSS
PHE
Sinking of Additional tube-well by D.R. Rig method, Construction of 3.65 m X 3.00 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall and Connection of Tubewell of Krishnanagar PWSS
PHE
Sinking of 1 No. Additional tube-well, Rising Main for inter connection between T.W and Distribution, construction of switch-room and boundary wall of Enayetpur PWSS
PHE
Sinking of 1 No. Additional tube-well, Rising Main for inter connection between T.W and Distribution, construction of switch-room and boundary wall of Beraberi PWSS
PHE
Sinking of 1 No. 150x150mm dia tube-well 180 mtr depth, construction of switch-room for Baruipara Piped Water Supply Scheme under Chandannagar Sub-Division of Hooghly Division, P.H.E. Dte.
PHE
Sinking of1 No. Additional tube-well, Rising Main for inter connection between T.W and Distribution, construction of switch-room and boundary wall at Olipur Zone-I PWSS
PHE
Construction of Protection Wall at 3rd site of Atghara Piped Water Supply Scheme under ARAMBAGH Sub-Division of Hooghly Division P.H.E Dte.
PHE
Sinking of 1 No. Additional tube-well, Rising Main for inter connection between T.W and Distribution, construction of switch-room and boundary wall of Haripal Zone-II PWSS
PHE
Sinking of 2 nos Tube-well by D.R. Rig method, Construction of 2 nos 3.65 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of 2 nos Boundary Wall and Connection of 2 nos Tubewell of TANTISAL PWSS
PHE
Sinking of1 No. Additional tube-well, Rising Main for inter connection between T.W and Distribution, construction of switch-room and boundary wall of ASTARA PWSS
PHE
Sinking of 1 No. Additional tube-well, Rising Main for inter connection between T.W and Distribution, construction of switch-room and boundary wall of Kamarkundu Zone-VI Piped Water Supply Scheme under Chandannagar Sub-Division.
PHE
Replaced Existing Distribution Pipe line, New FHTC and Shifting of Household Tap Connection (100 Nos) under JAGATPUR PWSS, within Arambag Development block, under Arambag Sub Division of Hooghly Division, P.H.E. Dte.
PHE
Sinking of 1 No. Additional tube-well, Rising Main for inter connection between T.W and Distribution, construction of switch-room and boundary wall of Bighati Zone-I PWSS
PHE
Sinking of 1 No. Additional tube-well, Rising Main for inter connection between T.W and Distribution, construction of switch-room and boundary wall of Kamarkundu Zone-III PWSS
WBSIDCL
Supply of Utensils and Iron Items
WBSIDCL
Supply of Plastic Items, Folding Black Board, Display Board
PHE
Artificial recharging of existing river bed tubewells from existing pit along with all others related items of works to combat extreme drought like situation under Manguria-Lalpur W/S Scheme under Raghunathpur Sub-Division, PHE Dte. (TW No.1 2)
PHE
Artificial recharging of existing river bed tubewells from existing pit along with all others related items of works to combat extreme drought like situation under Manguria-Lalpur W/S Scheme under Raghunathpur Sub-Division, PHE Dte. (TW No.3 4)
PHE
Artificial recharging of existing river bed tubewells from existing pit along with all others related items of works to combat extreme drought like situation under Paharpur W/S Scheme under Raghunathpur Sub-Division, PHE Dte.
WEST BENGAL STATE SEED CORPORATION LTD.
Transportation of different types of seed and other agricultural inputs in bags and cartoons pack within the MURSHIDABAD District and outside the MURSHIDABAD district and the State as well.
PHE
Artificial recharging of existing river bed tubewells from existing pit along with all others related items of works to combat extreme drought like situation under Manguria-Lalpur W/S Scheme under Raghunathpur Sub-Division, PHE Dte. (TW No.5 6)
Chief Engineer PWD Central Zone,Lucknow
Chief Engineer PWD Central Zone,Lucknow
Chief Engineer PWD Central Zone,Lucknow
Special Repair Work at Pallia-Shahjahanpur-Hardoi-Lucknow Road in Km .261 (525), 262 and 263 (200)
PHE
Laying balance pipe line for providing FHTC at Gopalnagar Water Supply Scheme under Chandannagar Sub-Division of Hooghly Division P.H.E Dte.
PHE
Laying Balance pipe line for providing FHTC at Bainchipota zone -2 Water Supply Scheme under Chandannagar Sub-Division of Hooghly Division P.H.E Dte.
PHE
Laying Balance pipe line for providing FHTC at Nanda Water Supply Scheme under Chandannagar Sub-Division of Hooghly Division P.H.E Dte.
PHE
Construction of 5.4 m X 3.6 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall and Sinking of 3rd tube-well by D.R. Rig method, of BasudebBati Piped Water Supply Scheme under CHINSURAH Sub-Division
PHE
Providing FHTC at the left out portions of Bhastara PWSS under Bhastara Gram Panchayet of Dhaniakhali Block under Chinsurah Sub-Division of Hooghly Division, PHE Dte.
PHE
Laying Balance HDPE Pipe within left out mouzas/habitations of DubirBheri PWSS under Different Block of Chinsurah Sub Division of Hooghly Division, P.H.E Dte
PHE
Laying D.I pipe line and other ancillary work at BERABERI Water Supply Scheme under Chandannagar Sub-Division of Hooghly Division P.H.E Dte.
PHE
Laying of HDPE pipeline and Shifting House Connection from existing main to new main at Hanral Piped Water Supply Scheme of Chinsurah Sub-Division under Hooghly Division, PHE Dte.
PHE
Laying HDPE Pipe within left out mouzas/habitations of BASUDEBBATI PWSS under Different Block of Chinsurah Sub Division of Hooghly Division, P.H.E Dte
PHE
Laying balance pipe line for providing FHTC and other ancillary work at Borakamalpur zone-1 Water Supply Scheme under Chandannagar Sub-Division of Hooghly Division P.H.E Dte.
PHE
Horizontal Auger boring and other work at Borakamalpur zone -1 Water Supply Scheme under Chandannagar Sub-Division of Hooghly Division P.H.E Dte.
PHE
Sinking of Additional tube-well by D.R. Rig method, Construction of 3.65 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall and Connection of Tubewell with Balance LDS and FHTC of GHOLDIGRUI Z-II PWSS
PHE
Construction of 5.4 m X 3.6 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall and Sinking of 3rd tube-well by D.R. Rig method, of Rajhat Piped Water Supply Scheme under CHINSURAH Sub-Division
PHE
Laying balance pipe line for providing balance FHTC at Basubati Water Supply Scheme under Chandannagar Sub-Division of Hooghly Division P.H.E Dte.
PHE
Laying balance HDPE Pipe for providing FHTC at Balarambati Water Supply Scheme under Chandannagar Sub-Division of Hooghly Division P.H.E Dte.
PHE
Laying of Balance pipe line under BARAKAMALPUR ZONE-III Water Supply Scheme under Chandannagar Sub-Division of Hooghly Division P.H.E. Dte.
RDD-CEO-THANE
PHE
Laying of balance HDPE Pipe at BasudebBati Piped Water Supply Scheme under CHINSURAH Sub-Division of Hooghly Division P.HEDte.
PHE
Laying balance pipe line at Ganderpukur Water Supply Scheme under Chandannagar Sub-Division of Hooghly Division P.H.E Dte.
PHE
Setting up a Protection Wall at PURBA THAKURANICHAK ZONE-I Piped Water Supply Scheme under ARAMBAGH Sub-Division of Hooghly Division P.H.E Dte.
PHE
Balance Repairing of Pump House, Boundary wall of GOPALNAGAR W/S Scheme under Chandannagar Sub-Division of Hooghly Division, P.H.E. Dte., Dist. Hooghly.
PHE
Laying Balance HDPE Pipe for providing FHTC at Atisara Water Supply Scheme under Chandannagar Sub-Division of Hooghly Division P.H.EDte.
PHE
Laying balance pipe line at Diara Water Supply Scheme under Chandannagar Sub-Division of Hooghly Division P.H.E Dte.
Across all 13,125 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.