Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
10,603 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
10,603 results • Latest
Indian Air Force
Indian Space Research Organization
Storage Box for Electronic Component (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6416667 Dated : 07-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Bhabha Atomic Research Centre
Prasar Bharati Broadcasting Corporation Of India
National Zoological Park Delhi
Indian Army
PRESSURE COOKER 5 LTRS, PRESSURE COOKER 3 LTRS, DRINKING WATER GLASS, TAWA, CASE ROLL, IRON PRESS, FRY PAN, KADHAI, FULL PLATE, QUARTER PLATE, KATORI, SPOON, CUP SET, TEA STAINER, JAR FOR MIXER GRINDER LARGE, JAR FOR MIXER GRINDER SMALL, PATILA, JUG, CURTAIN WITH ACCESSORIES, DUSTABIN, FLOOR MAT, UMBRELLA, AQUARIUM FILTER, STABLIZER FOR 1.5 TON AC
Advanced Weapons And Equipment India Limited
Forest Development Corporation Of Maharashtra Ltd
India Optel Limited
Indian Navy
Black Lead Pencils (V2) as per IS 1375 (Q4), Sticky Notes (V2) (Q4), Eraser (Q4), scissors (Q4), Manual Pencil Sharpener (V3) (Q4), File/Folder (V3) (Q4), Stapler Pin Staples (V2) (Q4), Rollerball Pen (V3) (Q4), Metric Steel Scales (V2) as per IS 1481 (Q4), Permanent Marker Pen (Q4), Binder Clips (V2) (Q3), Self Adhesive Flags (V2) (Q4), Ball Point Pens (V2) as per IS 3705 (Q4), Glue Stick (V2) (Q4), Staplers (V2) (Q3), Highlighter Pen (Q4), Fluid Correction Pen (V2) (Q4) (3 (3 ))
Forest Department Rajasthan
Indian Army
Printer Head Cannon, Monitor 19.5, Gear Asy Cannon MFD 2224N, Drum Unit Cannon, Hard Disk 1TB
Madhya Pradesh State Agricultural Marketing Board
Bharat Earth Movers Limited (beml)
MECATEEC-EXPRESS, MAKE- L&T
National Institute Of Mental Health And Neuro Sciences
Consumables for Digital Duplicators (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6424689 Dated : 07-07-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 15000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Director Bangalore, Department of Health and Family Welfare, National Institute of Mental Health and Neuro Sciences (NIMHANS), Ministry of Health and Family Welfare (Dr. Pratima Murthy) 2/6 Splitting
Kendriya Vidyalaya Sangathan
Uttar Pradesh Power Corporation Limited (uppcl)
Bharatiya Nabhikiya Vidyut Nigam Limited
of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No11 Overhauling of Thruster brake up to drum size 200 to 400 mm; As per tender document, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 12 Rail alignment for EOT cranes for 12 meter rail; As per tender document, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 13 Applying rope compound for EOT cranes monorails and mobile cranes; As per tender document, Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Sl No 14 Periodic housekeeping greasing and oil top up for the cranes monorails; As per tender document, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 15 Oil seal replacement for the gear box of cranes from 60 to 100MT capacity; As per tender document, Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Sl No 16 Oil seal replacement for the gear box of cranes less than 60MT capacity; As per tender document, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 17 Surface cleaning of EDGs; As per tender document, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 18 Belt replacement of air compressor; As per tender document, Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Sl No 19 Fuel filter cleaning; As per tender document, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 20 Charge air filter cleaning; As per tender document, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 21 SRV calibration and replacement; As per tender document, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 22 Mechanical seal replacement for prelube oil pumps; As per tender document, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 23 Mechanical seal replacement for jacketwater oil pumps; As per tender document, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 24 Mechanical seal replacement for oil pumps; As per tender document, Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Sl No 25 NRV replacement; As per tender document, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 26 Compressor oil replacement; As per tender document, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 27 Engine oil service of ADGs; As per tender document
Home Department Madhya Pradesh
India Optel Limited
E-nagar Palika Government Of Madhya Pradesh
Indian Oil Corporation Limited
Gondia District Panchayats
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6424491 Dated : 07-07-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Hindustan Copper Limited
Rashtriya Chemicals And Fertilizers Limited (rcf)
310014492, 310014495, 310014554, 310014556, 310014513, 310014507, 310014518, 310014533, 300049355, 310014512, 300047333, 300047332, 310014496
Department Of Health And Family Welfare
Entry and Mid Level Laptop - Notebook (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6424733 Dated : 07-07-2025 Bid Document 1/8 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Bharat Heavy Electricals Limited (bhel)
Kolkata Municipal Corporation
Split or Cotter Pin (Q3), Brass rod as per IS: 319 (Q3), Plain Washer as per IS 2016 (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6424211 Dated : 07-07-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Primary product category Split or Cotter Pin Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 29259 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Ircon International Limited
Yantra India Limited
Zilla Parishad Sangli
Ntpc Limited
Bharat Heavy Electricals Limited (bhel)
Supply of BDTP, GS CDTP, GH DTP for CPP VRMP HPCL Vizaq
Central Mine Planning And Design Institute Limited
Television (TV) (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6425305 Dated : 07-07-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 129500 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 40 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CMPDI DHANBAD Cmpdil, ri-ii, COAL INDIA LIMITED, Central Mine Planning and Design Institute Limited, Ministry of Coal (Cmpdi, Regional Institute, Dhanbad) Splitting
Garden Reach Ship Builders And Engineers Limited (grse)
Uttar Pradesh Power Corporation Limited (uppcl)
Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6424673 Dated : 07-07-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Indian Army
A4PAPER, UNIBALLPEN BLUE, UNIBALLPEN RED, PILOTV7BLUE, BINDERCLIP25MM, BINDERCLIP32MM, REYNOLDSPEN, UCLIP, COLORFLAG, DOPAPER, STEPLERPINSMALL, ENVELOPA4SIZE, ENVELOPLEGALSIZE, COLORFLAGBIG, PAPERPIN, BONDPAPERWHITE, FEVISTICK, CALCULATOR, LETHERBRIFCASE, FLYCATCHERBAG, V7REFILL
Revenue And Forest Department Maharashtra
All in One PC (V2) (Q2), Computer Printer (V2) (Q2), Entry and Mid Level Laptop - Notebook (Q2), Scanner (V2) (Q2) (3 (3 ))
Andrew Yule
Bharat Coking Coal Limited
ITEM 1, ITEM 2, ITEM 3, ITEM 4, ITEM 5, ITEM 6, ITEM 7, ITEM 8, ITEM 9, ITEM 10, ITEM 11, ITEM 12, ITEM 13, ITEM 14, ITEM 15, ITEM 16
Central Board Of Direct Taxes (cbdt)
Nagarpalika
Health And Family Welfare Department Tamil Nadu
Indian Army
AVR Assy, Rubber Coupling, Fan Belt, Over Flow Pipe, Amper
Health And Family Welfare Department Tamil Nadu
Central Board Of Direct Taxes (cbdt)
Across all 10,603 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.