Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
11,333 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
11,333 results • Latest
Indian Army
Bty Charger DSMD, Bty Compartment of DSMD, Head Gearof RS Motorola, Digital Phone with Line Display, Bty Rechargeable 100MAH DSD, Bty of Aqua Jammer, Bty of LEO Jammer, Bty for Mobile Cell Jammer, Bty for GPS
Bharat Heavy Electricals Limited (bhel)
Indian Army
FUEL PIPE, COOLANT RESERVOIR TANK, WIPER BLADE CO DVR SIDE, WIPER BLADE DVR SIDE, DEAERATION TANK, BELT WATER PUMP, HIGH PRESSURE HOSE, SPEEDO CABLE, CLUTCH PLATE, FAN BELT
Indian Army
TAPPET COVER GAS KIT, SPARK PLUG, POLLY V BELT ALTERNATOR, CHAIN SPROCKET, BRAKE LIGHT ASSY, BRAKE PAD FRONT, AIR FILTER, OIL FILTER, AIR PRESSURE PIPE, FAN BELT, BEARING FOR CYL ROLLING
Indian Institute Of Astrophysics (iia)
High End Desktop Computer (Q2) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6489582 Dated : 24-07-2025 Bid Document 1/10 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 1450000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank Bank Of Baroda (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 38 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Stores & Purchase Officer Bengaluru, Department of Science and Technology (DST), Indian Institute of Astrophysics (IIA), Ministry of Science and Technology (Vishnu Vardhan Kp) Splitting
Western Coalfields Limited
Indian Army
MIRCHI POWDER, HALDI POWER, DHANIYA POWER, JEERA, LAUNG 150 GM PKT, CHHOTI ELAICHI, KALI MIRCHI, BADI ELAICHI, AJWAIN, DAL CHINI
Indian Army
FOOM SHEET, THINNER FOR SYNTHETIC PAINT, PUTTY, HT WIRE, CABLE ELECTRIC, PUMP ASSY, STARTING ROPE
Brahmaputra Valley Fertilizer Corporation Limited (bvfcl)
Indian Army
STAND REPAIR, HOOK REPAIR, ARMATURE REPAIR, FIELD COIL REPAIR, BRUSH CARRIER PLATE REPAIR
Indian Coast Guard
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - ICGS Vijit; Defect rectification on MDEC Engine Control Unit for PME through PAC firm; Service Provider
Integral Coach Factory
Insulation Tester (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6489678 Dated : 24-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Indian Oil Corporation Limited
Indian Army
PARTS KIT MECHANICAL EQUIPMENT, FRONT WIND SHIELD RH, FRONT WIND SHIELD LH, WIPER BOTTLE, WIPER BLADE CO-DRIVER, WATER PUMP, ASSY VACCUM HOSE FOR TC, GASKET CYLINDER HEAD MLS, RUBBER HOSE
Kendriya Vidyalaya Sangathan
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Semi-skilled; Middle School; Others
East Coast Railway
Designing Software (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Bid Number : GEM/2025/B/6477931 Dated : 24-07-2025 Bid Document 1/7 Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Centre For Development Of Advanced Computing (c-dac)
Central Bureau Of Investigation (cbi)
Indian Coast Guard
Ball Pen Blue Hauser Germany, Ball Pen Black Hauser Germany, Ball Pen Red Hauser Germany, Gel Pen Blue Pilot Hi-Tecpoint white 0.5 mm, Gel Pen Red Pilot, Gel Pen Green Pilot, Gel Pen Black Pilot, Paper Cutter Big Size, Plastic Arrow Flag, Double side tape, Notice Board ribbon Green Blue Red Yellow, Pencil 2B, Pencil 2HB, Pencil HB, Photo Copier Paper A4 Size, Cello tape 1 inch, Cello tape 2 inch, Packing Tape 2 inch, Lamination Sheet A4 Size, Masking tape 1 Inch, Register 4 QR, Register 5 QR, White Board Marker blue Red black Luxor, Permanent Marker blue black, CD Marker Black, Glue stick, Stapler Machine Small, Stapler Machine Big, Register Cover as per sample, Photo Paper A4 Size, Scale steel, Single punch, Double punch, Stick File, Pen Stand VIP, Highlighter Green Red yellow Orange, Paper Clip Medium Size, Notice Board Pin Red Green Yellow Blue, Dry Wet Erase spray for white Board, File Tags, Colour Paper Yellow Orange Parrot Green A4 Size, Calculater Casio Bid Number : GEM/2025/B/6490803 Dated : 24-07-2025 Bid Document 1/30
Rourkela Steel Plant
Submersible Sewerage Pump (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6490077 Dated : 24-07-2025 Bid Document 1/10 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Primary product category Submersible Sewerage Pump Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
National Informatics Centre (nic)
Indian Army
Clutch Master Cylinder, Brake Master Cyl assy, Hub seal Big and small, Water Pump, Selector and shifter shaft, Gear lever universal joint, Combination Switch, Isolator Switch, Head light assy RH, Door mechanism RH, Self Starter brush, Bearing Tapper Roller Outer, Fan Belt, Alternator Assy
Indian Port Rail And Ropeway Corporation Limited
Hiring of Consultants - Milestone/Deliverable Based - Conducting Geo-technical investigation, survey, preparation of GADs of minor bridges, major bridges/RUB/via-duct, Station/service building, SIP, Sectioning diagram & LOP, structural drawings of va..
Centre For Development Of Advanced Computing (c-dac)
Layer 2 Access Switch (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6490013 Dated : 24-07-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Central Board Of Direct Taxes (cbdt)
Indian Army
335 Y 4035, 332 Y 8485, 332 Y 2910, 335 Y 2910, 335 Y 7271, 335 Y 7148, 335 Y H2924, 400 N 5542, 40 302816, 40 301925, 320 68547, 332 Y 9876, 333 Y 2915, 333 Y 4086, 811 90813, 335 Y 7268, 335 47270
Panchayati Raj Department
Leg Press - Outdoor Gym Equipments (Q3), Chest Press - Outdoor Gym Equipments (Q3), Twister - Outdoor Gym Equipment (Q3), Air Walker/Stroller - Outdoor Gym Equipment (Q3), Shoulder Builder/Arm Wheel - Outdoor Gym Equipment (Q3), Parallel Bar - Outdoor Gym Equipment (Q3) (3 (3 ))
Hospital
Health & Family Welfare Department Gujarat
Ministry Of Ayush
Rites Limited
a Roller Bearing NU 330 Make NEI SKF FAG, b Roller Bearing NU 330 Make NEI SKF FAG, c Roller Bearing NU 330 Make NEI SKF FAG, a Roller Bearing NH 320 Make NEI SKF FAG, b Roller Bearing NH 320 Make NEI SKF FAG
Indian Army
FUEL PIPE, TRANSFER CASE OIL SEAL, BREAK BOOSTER ASSEMBLY, STUD BOLT PROPELLOR SHAFT, LOCKING RING RELEASE BEARING, CMC ASEMBLY, FUEL WATER SEPERATOR ASSY, SEALING RING, BENJO UNION 19X19, BENJO UNION 17X17, SPRING WASHER BREAK RETURNING SPRING, HEAD LIGHT BULB
Andaman & Nicobar
Geological Survey Of India (gsi)
Indian Air Force
Office Of Dg (ace)
Bhakra Beas Management Board
Polypropylene Ropes as per IS 5175 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Polypropylene Ropes as per IS 5175 Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6492031 Dated : 24-07-2025 Bid Document 1/9 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Central Railway
Indian Army
Spark Plug, Pad, Oil Seal, Ram Assy, Rear Brake Shoe Set, Joint Assy Universal, Body Assy Throttle, Reverse Light Switch, Wiper Arm Wiper Blade
Indian Army
Prismatic Spring RH, Prismatic Spring LH, Oil Seal HUb, Brake Cylinder, Cut off Switch, Inner Plate, Outer Plate, Gasket Cylinder Head
East Coast Railway
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Bid Number : GEM/2025/B/6478369 Dated : 24-07-2025 Bid Document 1/8 Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank IDBI Bank EMD Amount 52670 ePBG Detail Advisory Bank IDBI Bank (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 32 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr.DFM/WAT Office of the Senior Divisional Financial Manager, East Coast Railway, DRM OFFICE COMPLEX, VISAKHAPATNAM - 530004 (Sr.dfm/wat) Splitting
Directorate Of Purchase And Stores
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) ( PAC Only ) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6478326 Dated : 24-07-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Indian Army
Microsoft 11pro windo 1 year vaildity, Office softwere 1 year vaildity, Data recovery tools 1 year vaildity, Anti virus softwere 3 month vaildity, Filmora softwere softwere 1 year vaildity
Indian Army
FRT BUMPER, PANEL ASSY BACK DOOR, ASSY RR QTR WHLARH TRM RH, HEAD LAMP LH, SCARVET 6MM
Across all 11,333 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.