Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
11,620 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
11,620 results • Latest
Rdso
Nmdc Limited
Custom Bid for Services - Reconditioning of 2 number Shovel Bucket for HITACHI EX19006 and EX19005 Similar Category Repair and Overhauling Service Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Munitions India Limited
Bag Cotton Calico (bleached) for NCP 50 Kg capacity to DRG NO. OFBA/NR/251/2, Material of Cloth Cali
Indian Navy
Procurement and installation of radar based speed camera (independent camera, bi-directional)
Indian Army
Camera CP Plus, NVR 8 Ch CP Plus, NVR 16 Ch CP Plus, 6 TB HDD, 2 TB HDD, 8 Port PoE Switch, 4 Port PoE Switch, 24 Inch LED TV, 55 inch LED TV, UPS 1 KVA, Weatherproof Metal Box, Power Cable 1.5 mm, Media Convertor, HDMI Cable 30 Mtr, HDMI Cable 20 Mtr, HDMI Cable 1.5 Mtr, UTP Cable Cat 6, Optical Patch Cord, RJ 45 Connector, Power Board, 2 inch GI Pole 20 Ft Height, UAV Drone, 6F UA OFC, Laying of OFC and CAT6 and Electrical cable
Industrial Training Institute
Petronet Mhb Limited
All India Institute Of Speech And Hearing (aiish) Mysore
Indian Air Force
Fci Aravali Gypsum And Minerals India Limited (fagmil)
Fci Aravali Gypsum And Minerals India Limited (fagmil)
Hindustan Aeronautics Limited (hal)
OSTOOL-MANUFACTURE AND SUPPLY OF RUDDER DEFLECTION MEASUREMENT TOOL & DEFLECTION SCALE STAND, PACKAG
Indian Air Force
Science And Technology Department
Science & Technology Department Bihar
DC Source Variable, AC Source Variable, Voltmeter, Ammeter, Resistors Capacitors and Inductors, Demonstration kit for demonstrating statically and dynamically induced emf, Demonstration kit to demonstrate self and mutual inductance., Demonstration kit for Faradays laws, Demonstration kit for Flemings right hand and left hand rules, Demonstration kit for Lenzs law, Measuring tools, Wood working tools, Soldering and brazing equipment, Gas welding and hand tools, Arc welding and hand tools, Digital IC Trainer Kits, Logic Gates and other ICs, IC Tester, DC Ammeter, DC Voltmeter, AC Voltmeter, AC Ammeter, Single phase Electrodynamometer wattmeter, Digital portable LCR meter, Choke coil, Variable choke coil, Single phase Variac, Three phase Variac, Moving Iron Ammeter Moving Coil Ammeter, Moving Iron Voltmeter Moving Coil Voltmeter, Wattmeter, Energy Meter, Digitalorenergy meter, Shunt Multiplier, Current Transformer Potential Transformer, Model of MI MC Dynamometer and induction type meters, Kelvins double bridge, Wheatstone bridge, Maxwell bridge, Scherings Bridge, D C Regulated power supply, LCRorQ meter, Digital Voltmeter, Galvanometer, Digital VoltOhm Meter, Synchro scope, Lamp Load, DC Supply, Single phase transformer, Single phase auto transformer, Wattmeter LPF and UPF Single phase 3 phase, Current Transformer, Potential Transformer, Tachometer, Three phase transformers, SCR, MOSFET, IGBT, TRIAC, DIAC, Passive components, Resistor, Inductor, Variable inductor, Capacitor, Potentiometer, Incandescent lamp, DC Regulated Power Supply Dual, Experimental Thyristorised Kits, Resistive load, Resistive inductive load, Microprocessor Trainer kit 8085 8086, Microcontroller Trainer kit 89C52, PC, Trainer Kit for Stepper Motor, Trainer Kit, 7segment LED Display, Watt meter, Single phase autotransformer, 3 phase Autotransformers, Three phase variable Lamp load, Three phase variable inductive load, DOL Starter Star Delta Starter Autotransformer starter, Hysteresis motor, Linear Induction Motor, Stepper Motor working trainer, DC servo motor Speed Torque characteristics kit, AC servo motor Speed Torque characteristics kit, AC position control system Kit, DC Position trainer kit, Tyoe 1 trainer kit For control system lab, Type 2 trainer kit For control system lab, 3 Phase fault analyzer kit along with meters and motorgenerator set, Cut sections and charts, MCB MCCB HRC Fuse, Air Circuit breaker Simulator, Overcurrent relay test set up, Transformer protection Trainer kit, Transmission line protection Trainer kit, Planetary Gearbox Matching with 30or50or100or 250 kW, Concentrated Solar Power CSP system 5or10or20or30 kW, Wind 1kW Solar PV 1kW Hybrid System complete in all aspects 1 set, Motorized solar PV tracking systems, Ammeters, Three phase Power factor meters, Low power factor wattmeter, Single Phase Wattmeter, Clamp on meter, Experimental Thyristor trainer Kits, Microcontroller based trainer kit Microcontroller based DC moter Bid Details 2/87
Indian Army
Bolus Galactogogue strip of 4, Bolus Prajna Strip of 6, Bolus Sulphadimidine Strip of 4, Cotton Absorbent Pkt of 500 gm, Disposable sterile IV infusion set, Examination gloves Pack of 100, Eye drop Ciprofloxacin Bott of 10 ml, Fenbendazole 3 gm bolus strip of 2, Hepatobiliary syrup Bott of 120 ml, Inj Analgin Vial of 30 ml, Inj Avil Vial of 33 ml, Inj Belamyl Vial of 30 ml, Inj Meloxicam Vial of 30 ml, Inj Rabies Vial of 10 ml, Lotion Povidone Iodine Bott of 100 ml, Needle 18 gauge, Oint Healmax Tube of 30 gm, Pdr HB Strong Sachet of 10 gm, Pdr Liv 52 Pkt of 100 gm, Pdr Neblon Pkt of 100 gm, Pdr Neosporin 10 gm, Pdr Timpol Pkt of 100 gm, Pendistrin Intramammary tube, Spray Topicure Bott of 100 ml, Syp Calcium Bott of 1 Ltr, Tab Praziquantel 50 mg, Pyrantel 144 mg and Fenbendazole 500 mg, Inj DHPPi plus L, Tick collar Large, Lotion Kiskin 100ml, Syp Sucralfate 200 ml, Disposable Surgical Kit
South Western Railway
Buses (V2) (Q1) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6521879 Dated : 01-08-2025 Bid Document 1/8 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Health And Family Welfare Services Department Puducherry
India Optel Limited
Gail India Limited
Central Power Research Institute (cpri) Bangalore Karnataka
Indian Air Force
Indian Air Force
Border Road Organisation
Mechanically Woven, Double - Twisted, Hexagonal Wire Mesh Gabions, Revet Mattresses and Rock Fall Netting as per IS 16014 (Q3) (3 (3 ))
Oil India Limited
Panel Fence, Panel Gate
Indian Air Force
Indian Air Force
Bharat Heavy Electricals Limited (bhel)
Urban Development And Housing Department
Bharat Heavy Electricals Limited (bhel)
Kendriya Vidyalaya Sangathan
Glass Panes, Oil Painting, Plaster, Tin Shade, Color Painting, Expansion Joints
Bharat Heavy Electricals Limited (bhel)
Indian Army
Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4), Register (V2) (Q4), Gel Pen (V3) (Q4), Rollerball Pen (V3) (Q4), Fluid Correction Pen (V2) (Q4), Highlighter Pen (Q4), Stapler Pin/Staples (V2) (Q4), Desk Pads - Writing (V2) (Q4), knife blades (Q4), Black Lead Pencils (V2) as per IS 1375 (Q4), Glue Stick (V2) (Q4), Air Freshener Solid and Gel (Q4), stamp pads (Q4), Scrub Pad (Q4), Toilet Soap, Liquid (V2) as per IS 4199 (Q4), Naphthalene (V2) as per IS 539 (Q4), mosquito repellant cream spray and lotion (Q4), Glass Cleaner, Liquid (V2) as per IS 8540 (Q4), Bathing Soap Bar (V2) (Q4) (3 (3 ))
Science And Technology Department
Urban Development And Urban Housing Department Gujarat
Directorate Of Medical Education And Training
Facility Management Services - LumpSum Based - Healthcare; Security Services, O&M of existing CCTVs and installation of new CCTVs as and when required; Consumables to be provided by service provider (inclusive in contract cost)
Delhi Pollution Control Committee (dpcc)
Science And Technology Department
Central Railway
hand gloves woolen knitted (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Bidder Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6522383 Dated : 01-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Central Railway
Welder Gloves or Gauntlets as per IS 2573 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6523179 Dated : 01-08-2025 Bid Document 1/5 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Bharat Heavy Electricals Limited (bhel)
National Centre For Earth Science Studies(ncess)
Automatic Weather Station with 3 Year Warranty, Datalogger and accessories, Power Supply Enclosures and accessories, Mounting Tower and accessories, Software, Installation Demonstration and Training Charges if it has to be quoted separately, Transporatation and Unloading Charges if it has to be quoted separately
Power Grid Corporation Of India Limited
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6509852 Dated : 01-08-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 1053500 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 21000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 18 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : POWER GRID Corporation OF INDIA Limited POWER GRID Corporation OF INDIA Limited, Lapalang, Shillong, East Khais Hills District, Meghalaya-793006 2/8 (Powergrid Coorporation Of India Limited) Splitting
Across all 11,620 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.